Loading...
HomeMy WebLinkAboutContract 47191 (2)r RECEIVEL) NOV - 3 2015 Developer and Project Information Cover Sheet: Developer Company Name: Lodgestar Investments Address, State, Zip Code: 6350 Overton Ridge Blvd Phone & Email: 817-989-7800, april@lodgestar.net Authorized Signatory, Title: Rakesh Patel, CEo Project Name and Brief LCG Centreport Phase III Description: Project Location: Plat Case Number: Mapsco: 56P None FP-15 -03 8 Plat Name: LCG Centre Port Phase III Addition Council District: 5 CFA Number: 2015-092 To be comple 'd ay staff: Received by: City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 1 of 11 City Project Number: 02666 DOE Number: 7524 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § § City Secretary Contract No. WHEREAS, Lodgestar Investments, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as LCG Centre Port Phase III ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) , Sewer (A-1) ■ , Paving (B) , Storm Drain (B-1) ►1, Street Lights & Signs (C) F1 ■ E1 E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in confou nance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then -current City -established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state - approved form) supplied by the contractor's insurance provider and bound in the construction contract book.. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Depai huent G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants. or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and stonnn drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 7 of 11 Project Name: Cost Summary Sheet LCG Centre Port Phase III CFA No.: 2015-092 DOE No.: 7524 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 45,190.00 $ 45,190.00 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals $ 56,680.35 $ 5,525.00 $ 4,500.00 TPW Construction Cost Total $ 66,705.35 Total Construction Cost (excluding the fees): $ Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Signals Inspection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2vr expiration period City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 8 of 11 $ 111,895.35 903.80 903.80 1,807.60 2,488.21 1,244.11 180.00 $ 3,912.32 $ 5,719.92 Amount 111, 895.35 111,895.35 56,487.50 83,381.69 139,869.19 Choice (Mark one) ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH Jesus J. Chapa Assistant City Manager Date: 49 3c"iS Recommended by: • b......-t, r" 'Le c-- Wendy Chi- abulal, EMBA, P.E. Development Engineering Manager Water Department lAkThZ Douglas . Wiersig, P.E. Director Transportation & Public Works Department Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. aditie Date: City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 9 of 11 DEVELOPER Lodgestar Investments Name: Rakesh Patel Title: CEO Date: / 0 raR- / ATTEST: (Only if required by Developer) Signature Name: ATTEST: `ilar/J. K5/6'r City Secretary OFFICIAL RECORD CITY SECRETARY F7: WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included ■ 0 ■ Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvments Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 10 of 11 ATTACHMENT "1" Changes to Standard Agreement Community Facilities Agreement City Project No. 02666 None City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 11 of 11 360 SITE LLAGE WAY IIIII II I 1 1 Ilili11111111r1 III I I i 1. I i I 1 SOVEREIGN z O CEf"TER STA_/ z 0 a. 1 co 0 w 1- z w U BUCKINGHAM w 0 m w d w 0 • O 1- W J w TRINITY BLVD. R VICINITY MAP N.T.S. WATER, PAVING, STORM DRAIN & STREET LIGHT IMPROVEMENTS TO SERVE LCG CENTREPORT PHASE III (LCG CENTREPORT PHASE III ADDITION, LOT 1-7, BLOCK A) 1 II M a a N N O WO-aa ix 9O 05 Z <. 0 00 2 w0 N N U 0 I < I:o cc z I 0 11 W cc 8, W 31' EMERGENCY AND ACCESS ESMT F- 2<.•W 24"W •.../ / 100' GRAPHIC SCALE 15' WATER PUBLIC ESMT LOT 3 200' } tcf- N W W J N LOT 1, BLOCK 107 CENTREPORT ADDITION INST. NO. D211180645 REGGIS COURT LOT 1 6' PUBLIC PEDESTRIAN -I ACCESS ESMT 6' PUBLIC PEDESTRIAN - ACCESS EASEMENT LOT 4 Q 0) 1 O F-O ZW W �w 1 > 0) 1 LOT 5 \\8 W BACCE S UC ESMT PEDESTRIAN �i I 4„y 2 24' _- 10' WATER LINE ESMT —000 STATE HIGHWAY 360 12"W 8"W D14 T 1 4- 7 1 LEGEND EXISTING WATER LINE PROPOSED WATER LINE EXISTING FIRE HYDRANT ASSEMBLY EXISTING WATER VALVE PROPOSED FIRE HYDRANT ASSEMBLY N PROPOSED WATER VALVE EXHIBIT A WATER IMPROVEMENTS LCG CENTREPORT PHASE III (LCG CENTREPORT PHASE III ADDITION, LOT 1-7, BLOCK A) SHEET 1 OF 2 • 5 Z V) Z cn q w r u) U W ZUT w al U wCD m a_ in a 3TRIAN �I I 24 W -�_ lE 2 I � 1 0' 100' GRAPHIC SCALE 1 15' WATER ESMT LOT 6 w LOT 1, BLOCK 107 CENTREPORT ADDITION INST. NO. D211180645 -711"--- - REGGIS COURT MIN LOT 2 6' PUBLIC PLDESTRIAN ACCESS ES >-1 cc qv) w z I uw )) i I 24"In Li ELECTRIC ESM O 1' EMERGENCY AND PUBLIC ACCESS ESMT O LOT 7 10' WATER LINE ESMT / t) -J I� STATE HIGHWAY 360 200' LEGEND 12"W EXISTING WATER LINE 8"W PROPOSED WATER LINE EXISTING FIRE HYDRANT ASSEMBLY N EXISTING WATER VALVE PROPOSED FIRE HYDRANT ASSEMBLY PROPOSED WATER VALVE EXHIBIT A WATER IMPROVEMENTS LCG CENTREPORT PHASE III (LCG CENTREPORT PHASE III ADDITION, LOT 1-7, BLOCK Al SHEET 2OF2 Lodgestar Construction Preliminary Construction Cost LCG CentrePort Phase III CFA NO: 2015-92 j DOE: 7524 j City Project No: 02666 j X No: X-23246 I File No: K-2421 Water Project No: P265 605150266683 Bidlist Item I No. 3312.0117 3312.3003 3312.3002 3311.0261 3311.0161 3312.0001 3311.0001 3303.0204 3305.0116 Description Connection to existing 12" water main 8Gate Valve and box 6' Gate Valve and box 8' Water Pipe 6' Water Pipe Fire Hydrant (3' - 6' Depth) Ductile Iron Water Fittings w/Restraint Crushed limestone Trench Safety Specification Unit of Bid Section No. I Measure Quantity UNIT I: WATER 33 12 25 33 12 20 33 12 20 33 11 12 33 11 12 33 12 40 33 11 11 33 05 10 33 05 10 EA EA EA LF LF EA TON CY LF Unit Price I Bid Value 1 $2,600.001 2 $1,100.00 2 $1,000.00 930 $25.00 10 $19.00 2 $2,500.00 20 $225.00 100 $32.00 940 $2.39 TOTAL UNIT I: WATER $2,600.00 $2,200.00 $2,000.00 $23,250.00 $190.00 $5,000.00 $4,500.00 $3,200.00 $2,250.001 $45,190.00I LOT 1 MOO LOT 5 EX. 54" RCP -f EX 42" RCP LOT 6 PROPOSED 10' CURB INLET TOP OF EXISTING CURB INLET BOX TO BE CONVERTED TO JUNCTION BOX. REGGIS=GOURT �\ ... LOT 2 PROPOSED 35 LF OF 18' RCP FROM EXISTING INLET TO PROPOSED 10' CURB INLET EX. 54" RCP LOT 7 STATE HIGHWAY 360 0' EX 48" RCP II_ 100' GRAPHIC SCALE EXHIBIT B-1 STORM DRAIN IMPROVEMENTS LCG CENTREPORT PHASE III (LCG CENTREPORT PHASE III ADDITION, LOT 1-7, BLOCK Al EX 54_RCP / t• � CDz a_ a a a o°to w to o o'_ O OaW CV 0 W MJrZ OON Q Z z 0 O 200' Lodgestar Construction Preliminary Construction Cost LCG CentrePort Phase III CFA NO: 2015-92 DOE: 7524 1 City Project No: 02666 1 X No: X-23246 1 File No: K-2421 Water Project No: P265 605150266683 I Bidlist Item No. 3305.0105 2241.0103 3305.0105 Description Specification Unit of Bid Section No. I Measure Quantity Unit 11: STORM DRAIN Connect 18" RCP to exist concrete curb inlet 33 05 14 18" CL III RCP 33 41 10 Convert top of exist curb inlet to juct box 33 08 14 EA LF EA Unit Price Bid Value 1 $750.00 35 $65.00 1 $2,500.00 TOTAL UNIT 11: STORM DRAIN $750.00 $2,275.00 $2,500.00 $5,525.00 LOT 5 100' GRAPHIC SCALE LOT 1, BLOCK 107 CENTREPORT ADDITION INST. NO. D211180645 REGGIS COURT LOT 6 PROPOSED CONCRETE DRIVE APPROACH AND BARRIER FREE RAMPS 11.5' TRAVEL LANE 11.5' TRAVEL LANE 200' 0 LOT 2 LOT 7 PROPOSED CONCRETE DECELERATION LANE (14' TOTAL WIDTH) _L a I0I STATE HIGHWAY 360 1 LEGEND 1 1 I , 1 , 1 1 1 as IPROPOSED PAVING IMPROVEMENTS EXHIBIT B PAVING IMPROVEMENTS LCG CENTREPORT PHASE III (LCG CENTREPORT PHASE III ADDITION, LOT 1-7, BLOCK A) a N J N O FW(D O U S M �ro tt-OCi z �r -Jo(n az CC r z a 0 to Yr O l- ES m W N N ¢ O M z _ OO JQ pNp FZ EZ) z 0 0 O li.I II II II Hill I I Lodgestar Construction Preliminary Construction Cost LCG CentrePort Phase III CFA NO: 2015-92 j DOE: 7524 I City Project No: 02666 I X No: X-23246 1 File No: K-2421 Water Project No: P265 605150266683 Bidlist Item I No. 0241.1300 3213.0103 3212.0501 3211.0502 3211.0400 3216.0101 3213.0506 3217.0201 3217.0001 3217.1004 3217.1002 3217.0501 3441.4002 3441.4002 3217.2102 3471.0001 9999.0001 3305.0111 Description UNIT III: Specification I Unit of I Bid I Q Section No. Measure uantity Unit Price I Bid Value PAVING (STREETS AND SIDEWALKS) Remove exist concrete curb and gutter 8" (4,000psi) Reinforced Concrete Pavement 4" Asphalt Stabilized Base (Type D) 8" Lime Stabilized Subgrade Hydrated Lime for Stabilized subgrade 6" Monolithic integral curb Barrier free sidewalk ramps - TXDOT type 7 8' Thermoplastic 4' Thermoplastic Thermoplastic only Thermoplastic arrow Thermoplastic stop bar Install stop sign per TXDOT standards Install one way sign per TXDOT standards Buttons Traffic Control Erosion Control Relocate and adjust irrigation control 02 41 15 LF 32 13 13 SY 32 1129 32 1129 32 11 29 32 1613 32 13 20 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 34 4130 34 41 30 32 17 23 34 71 13 3125 00 33 05 14 SY SY TON LF EA LF LF EA EA EA EA EA EA MO LS EA I 288 $1.80 256 $127.66 256 $42.37 256 $10.37 7 $126.17 425 $3.04 2 $1,136.16 285 $2.75 400 $1.11 1 $310.00 3 $256.00 1 $243.13 1 $460.00 1 I $460.00 20 $4.01 1 I $1,585.40 1 I $0.00 1 $0.00 TOTAL UNIT III: PAVING (STREETS AND SIDEWALKS) $518.40 $32,680.96 $10,846.72 $2,654.72 $883.19 $1,292.00 $2,272.32 $783.75 $444.00 $310.00 $768.00 $243.13 $460.00 $460.00 $80.20 $1,585.40 $0.00 $0.00 $56,282.79 EX 42" RCP LOT 5 0' 100' GRAPHIC SCALE 200' FIEGGI&GOUI3I CI LOT 2 EXISTING STREET LIGHT POLE AND BASE TO BE REMOVED. UNDERGROUND ELECTRICAL CONDUIT TO BE EXTENDED TO NEW LIGHT POLE LOCATION. 11 II II EX 48' RCP L EX 54" RCP 1 _ i Z o0� Y < 0 In O E D n LOT 6 LOT 7 ! N ¢ o CCLa to PROPOSED STREET LUMINAIRE ' o o vi FONDATION AND POLE PER CITY 1 z z STANDARDS. (LOCATED AT PC OF 1 i I o PROPOSED CURB RETURN) 2 1 1 `-' = __ __ 7 J __ , ,, STATE HIGHWAY 360 LEGEND c PROPOSED STREET LIGHT EXHIBIT C STREET LIGHT IMPROVEMENTS LCG CENTREPORT PHASE III (LCG CENTREPORT PHASE III ADDITION, LOT 1-7, BLOCK A) Lodgestar Construction Preliminary Construction Cost LCG CentrePort Phase ID CFA NO: 2015-92 1 DOE: 7524 1 City Project No: 02666 1 X No. X-23246 l File No: K-2421 Water Project No: P265 605150266683 Bidlist Item I No. 9999-0002 3441.3502 3441.3301 2605,3012 Description Specification IUnit of BidSection No. Measure Quantity UNIT IV: STREET LIGHTING Remove existing light pole and pole base Relocate street light per city standards Concrete base per city standards & specs 2" Schedule 40 PVC conduit & wire extensions 02 41 14 EA 02 41 14 EA 03 30 00 EA 26 05 43 LF 1 1 1 25 TOTAL UNIT IV: UNIT IV: STREET LIGHTING Unit Price I Bid Value $1,050.00 $500.00 $1,450.00 $60.00 $1,050.00 $500.00 $1,450.00 $1,500.00 $4,500.00