Loading...
HomeMy WebLinkAboutContract 43086 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. /4 3 0' Cc WHEREAS, the undersigned Owner ("Owner") desires to make certain improvements ("Improvements") related to a project as described below, ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Owner and the City desire to enter into this "Agreement" in connection with the Improvements, Owner Information: Owner Company Name: Walsh Ranches Limited Partnership Authorized Signatory: G. Malcolm Louden Title: President Project Name: Walsh Ranch - Walsh Ranch Parkway Project Location: 1-30 to Walsh Ranch Old Weatherford Road Connector Additional Streets: FP-011-015 Plat Case No.: Plat Name: Walsh Ranch Parkway Mapsco: pg . 761 Council District: No. 3 CFA: DOE: 6683 To be completed b Received by- :( )V;ltiL:fliJt a 1 City Project No: 01745 Date: NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Owner do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA') as if copied herein verbatim. Owner agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Owner to comply with the Policy in connection with the work performed by said contractors. B. Owner shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Owner further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Owner agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. Owner, its successors or assigns, shall cause the installation of traffic signals on Walsh Ranch Parkway required to serve the development at such time as they are warranted. E. City acknowledges that construction of the northbound inside lane and the southbound inside lane of Walsh Ranch Parkway, under this Agreement, constitute oversizing in accordance with the Policy for the Installation of Community Facilities agreed to under the Economic Development 2 Agreement (CS 28585). As such the City will reimburse Owner for the associated improvement on mutually agreeable terms at a future date. F. The following checked exhibits are made a part hereof Water (A) X. Sewer (A-1) X , Paving (B) X , Storm Drain (B-1) X , Street Lights & Signs (C) X , Future Traffic Signals (C-1) X G. The Owner shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. H. For all infrastructure included in this Agreement for which the Owner awards construction contract(s), Owner agrees to the following• i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Owner for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for owner -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's 3 Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Owner's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. I. Owner agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement J. Owner shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. K. City shall not be responsible for any costs that may be incurred by Owner in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. L. Owner hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Owner for this Agreement. M. Owner agrees to provide, at its expense, all necessary rights of way and easements across property owned by Owner and required for the construction of the current and future improvements provided for by this Agreement. N. The Owner further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or 4 damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Owner, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said OWNER, his contractors, sub- contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused. itt whole or itt part. by the alleged negligence of the City of Fort Worth. its officers, servants, or employees. O. Owner will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such inhales, death or damages are caused, itt whole or in part, by the alleged negligence of the City of Fort Worth, its officers. servants, or employees. Further, Owner will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. P. Upon completion of all work associated with the construction of the infrastructure and improvements, Owner will assign to the City a non- exclusive right to enforce the contracts entered into by the Owner with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Owner agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 5 Q. Inspection and material testing fees are required as follows: i. Owner shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the owner's share of the total construction cost as stated in the construction contract. ii. Owner shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the owner's share of the total construction cost as stated in the construction contract. iii. Owner shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the owner's share of the streetlight construction cost as stated in the construction contract. iv. Owner shall pay in cash the total cost of street signs R. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the owner may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Owner's obligations under the Policy, this Agreement, its fmancial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Owner's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Owner's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of 6 two (2) years if the Owner breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Owner's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. S. Owner agrees that it will not assign all or any part of its rights, privileges or duties pursuant to Section D without the prior written consent of the City and any attempted assignment of same without such prior consent of the City shall be void. Cost Summary Sheet Project Name: Walsh Ranch — Walsh Ranch Parkway CFA No.: 2012-010 DOE No.: 6683 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Bridge Improvements 3. Storm Drain 4. Street Lights Installed by Developer TPW Construction Cost Sub -Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one 'Bond = 100% 'Completion Agreement - Paving/Storm Drain - 100% / Holds Plat 'Cash Escrow Water/Sanitary Sewer= 125% j'Cash Escrow Paving/Storm Drain = 125% 'Letter of Credit Water/Sewer = 125% w/2vr expiration period 'Letter of Credit Paving/Storm Drain = 125% w/2vr expiration period Developer's Cost 473,775.75 13, 724.25 487,500.00 5,311, 724.30 3,181,721.00 591,828.00 1,051,355.00 10,136, 628.30 10,624,128.30 9,750.00 9,750.00 19,500.00 363,410.93 181, 705.47 42,054.20 587,170.60 606,670.60 Choice Amount (ck one) 10,624,128.30 10,136,628.30 X 609,375.00 12,670,785.38 609,375.00 I X 12,670,785.38 I IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Owner has executed 6) 4 this instrument in quadruplicate, at Fort Worth, Texas this V)/ c1) , 20 / , . CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi Babulal, EMBA, P.E. Development Engineering Manager Douglas W. Black Assistant City Attorney M&C No. Date: ' ATTEST: OWNER: day of_ Transportation & Public Works Department Douglas ' . Wiersig, P.E. Director Approved by City Manager's Office .21700010sm4:4:4s.--• Fernando Costa Assistant City Manager Ate. 'FOR rfr 'et v ,cy edtr00°Q00000 c�� iiAQu P0 tili 0114 0 8 Zi ° 0 ° 0 0 OA 0'1:i 0 id 0 4-% X46 4a. 00000 _icY (14(.1,EXA'Sal '4'.. 468 p a0 r' 0 WALSH RANCHES LIMITED PARTNERSHIP gas limited partnership By: Walsh North Star Com'.ny, a Teas fcprpo at n, Ge 4 = Partner G. Malcolm Louden, President (Print) Name: 9 Print Name: FF1C9A6 IFT. WOW, CITY SEC ECU ETA Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map El 21 IE El gi FA II x a n I" Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Dram Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate Exhibit C1: Future Traffic Signals Future Traffic Signals Estimate (Remainder of Page Intentionally Left Blank) ,e. SITE 1: I' VICINITY MAP NOT TO SrALP AHPOINT EGINNININ G ' FUTURER:11H F-WAY -----I I-- --- �T'W----- _ 111.10 'feet SOIYIOrt Mel ItW =.I SOa lay Pons • KS 400 • Felt Waltz Ton UIi 7 1St 517313.1121 •1be r lr5.yCI !a, DICE&. WALSH RURYtLT ei PNfiN[R9kP YAC 77N tOt_U. YO K IAI . ILICAS SUIC 4fl AMEND (81IN. IVZ vial-.nJ FAX (Sn) S10-Sld FAX feel xm-+eta DUNA4AY ASSOI1476 LP. SSO Raker MIMIC SWIG 400 Mar WORM TEXAS 7101 NOWT Ant 333-1021 FAX (117) SM-Inn nom teat \—nms Amor 1 Jr 6 = 1 IV &MUM PAW Meal WEST FREEWAY (VARIABLE WIDTH RIGHT-OF-WAY) CD/ONO YOlt3 M to 1N bth Rana% roam*: 0..4I4pm.Y Armed 10', T+.nl.n O.es .at 1 32205) MI wM b nmpt list any *rvnawxw impact r.u.. 2. OuIdM %tn ..t 4 nr IM ati M net wail-, Iendp onnneep. M oe.s of f.00Fa m g. Y . InComMot. rp1.of Po2 East go COS Wing .oth TIM* once t.Nc ..q hn. YN.Mt 4. n.mNq le M. flood lruvn.. Rats Yap Ion PM.r Cony in and .. 1tp5.oanm.25 •Wort fdrv..aprt 01tM ajnp.rty eCbaand Y Zoe* A' MOM to ores Inundated by IM yew flood fl port N 1 ppnty 1. F Zan. C, 4•11wd a. anoo MnmMd 1. N od.M. OM i.or need pi.Y. IM..tat. n.nt an net Mimi my INo a flood study by Yrh Nm 5. M Movty saran —. SA 4M Poo rod soh ?win n rbrW Timor Asa. LP L. Janos *Plaits moot 0. RN.r 1 te.. t plan CP-a--NI 2. tarn 0m0440vy PM PP-010-0T netiOt mIOW - WLE rm .m Y.t KEY MAP elm* 1111•II PREUMINARY. THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY PURPOSE. ."ASS-aearns. \POINT OF COMMENCING FINAL PLAT OF WALSH RANCH PARKWAY RIGHT-OF-WAY AND LOTS 1X-8X .n econlben le Poh f County. Tam YWIW M the Houston in Y ¢e.wb RR Ounny. MMral MumMr OOe, the 1Mno*oM Y Civet WMHNn RR Co Zn.y Abetted Number 2004. and the SC Mutton iurvey. N.F.at Nuni r 93 PLO' MEMO .YNWRI. 20)2 T® MT Mtn 0 etaCCIf aly4 - Sheet 1 Of 6 SITE VICINITY MAP NOT TO SCALE se Ltd n.eea. 1. i tang wean re -tirtrytto (�3 I" A DUNAWAy Sla billy *SW/ • AM63, • hat Walh Tq 76107 MC Mal racOnsiJo r eer 0.1.11.*rt wan Set ------------------------- nose 1 W RAL9I RMdKS MI= PARDO'S-If a YALCOY t91000 S(O R. 21N SIREET, SOX IW) PORT WPM 1FAAS 26102-1771 POO< (61Rf 1D-J).1 rAn (BOP VW •av DOVAMAT ASSOCAMSLP. SSG WALLY AIME 981E 400 PTART storm MICAS 76IO2 PX PHONE. (617) 335-707 nr. c ,P.ct :•en,eMSaalnnrtC tolIrto oad lain wan sermiae wilam lel.. nor OP COaRAL NOTES 1. do b M• MULE Roth Ces wnk O..Iapm.N Aperm•nt (Ply Le tar newm..t a liar) Otto proyet b aren't porn tiny Tr«PMWbn hornet raw 2. dIpi t tc nR b - Ow Ply of not Vieth Zeit, PFmu 3. Lois .r b.**gP mew Cascara. Sy.l.n of IOW base m @y ab..vlbns wbq both Tenth. are Let Rd ,bras Wwvba A Odetenrinq to M. Mal Marva Rob Nq tor Parlor Conty. Trent, and V bia:fe me Am., Per* e]O N On. bop Nume. 46367C04.111[. Mop RirAmot Dole OWIwN. 2e. ODOq h*Ww M of IN MM.ny b brats: M Ions A' b6ny at O.w hunbl.0 by 100 ,n Rood eb part at thy Minty b bi bow ?-, bnn.S as na M.,nM.d b b Outside OW p *sod pens IN..IMmN. Oon not n6.tt PI IR. of ML Ob&I by WI Om pr000dy sews e. O/C loch Ian not .It y.R.. eve .tenp.d bunny Madre. V. eel en_ Uw.M pots. 6. Role to wnc.pt par P•-mo-OT I. Rear m M•Ombvy pat m.OIO-w> tate ar.mn...l ,... too' 1041 to-rotrocort wry ------------------------- v 2A Soenttfli .b pair MI/ LY4.111 12..S•nrara nNrRMW\ `Pitt t. rill int KRS l P.NAtb OPEN tram M .art n..'ncmtu[ rtn tra Ann IMMO Owillitroair tar lode 4 TON( MI6 MO OP PRELIMINARY. THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY PURPOSE o M. Ii I m ; z�1 ',game •oorromer ; _mil am r .�n•e �� 'I I rtnm 0. air pwartlirtla Par re WOW wt 4 LL 0 Q = 30 I 1 W EE lir IA tat rorlyreoureter- rt = I 11 LL acs 1 N MI I It 1...0 ch. — II1 tIt II W >3 j 111 < ' 11 11 II it E 1 1 11 6 1I 11 t it it tItl 1111 FINAL PLAT OF WALSH RANCH PARKWAY RIGHT-OF-WAY AND LOTS 1X-8X oietiIM b Porker County, To. ?betel M to NwMon Tap k OnMu RR .'tong,. Abstract N Oro ON. U IMtmnaml k Carat .Mbn RR Co Wray. Abstract Number OON. • a the ma. WUX.n Sons,. •bbwt Number t]. PLAT flp RO 144MRY. 2012 HIV Pun ma w owamn ao. nnl - - Shoat 2 of 6 VICINITY MAP NOT TO SCALE 40' i ve •rrJ .•MM1Ma .or cas oar mentor *mum mum oWee no✓T .atiu% 1 • emur• anon �� tn o er .• .re na rvn tots/ S DUNAWAy 510 Baby Anna •AIM dm • fatWatth.Tenn = M 81111S.1121 •F6 I17. lat Met WALSI cALSt NaMs2S LIMITED PAnPr.RSP • M W.ml.M Sawa tau M. lIN STREET, SUORE Tom FORT YpPM(10 SZ fl4Ir-Am FAX 017) 4X3040H AffiNfredeagtral. aOCIAIES % 150 BALLY MOOG SWF 400 FORT WORM EMS IVO) • qMc (OW .115-1171 PAIL (ell) SS!-70707 / / 1 '7` / / / W Wlf1CAL NOI6• / / I. Dv, to the owl 'tench t *ern* D.Mnpmen pwmet ,• limn anytm•arl.M.lMwool NosWl•tl b ..•nWt 2 BJdne Some .01 M M 1M Ott M Tot b1, Zane dlmaa.. 1 Book of bambino is the 'moo fm.dmlo Swam* n IOW based an CRS cb..wtan. ..M both "Able and 1.ka not ibn ..Nana. t AccQNnp to 1M Med immense Rate M9 for Perim. County. 1.w., .M IMMwPa.IM Mq Vaud 450 al Oft bw Mwbw b] 70:).9D E. Yee anise(' Voter September M. =BIB Swots. pat t tb VatIMMI b MwM Zeno 'A' donned .. ors Inundated by I00 Pow dbod end ben at On Preterit a M Zone'K. demon anew d tamind to M PXW. JW )v •o.d p1fn. Thb ot.tammt dew not Mill am type et Mad study by Mb Om. 1 A. Proper// sours 5/B *CA eon red eIN pop. cw .tmn.1 Twaoel Aseet tn- at unless tua.lr noted b Pee to eaewt port CR-MO-COI T. POW t. pwmby plat PP-OW-O07 / , // �sma v la. LLS 7.7 Pal arta. ma 1.01 Mt AtOrt1 net Moen. ar• ••••••• sw 1.a..a 14 need to oil teat rCr' rout noel -4 WALSH RANCH PARKWAY SOU -INBOUND tea PREIJMINARY• T1415 DOCUMENT SHALL NOT SE RECORDED FOR ANY PURPOSE. iwrwart meter o.nrt.• VT "pP.APAct oT14.111 Acne pampa mrtie enrentre FINAL PLAT OF WALSH RANCH PARKWAY RIGHT-OF-WAY AND LOTS 1X-8X an addition 1a Period caMh. Teem ouMd.d 1 IM Houston tee t Bvwrb RR Survey. Abinct Somber pft 0 Intonational ! Cent Northam RR Co Survey. Abstmcl Bomber Eq...M Ms M.C. Moulton Su..p. Ab.tnct Number ON MAY g1OARCD drawer. YOL• PUT TWO M MMWpmr AO utn - - Shoat 3 of 9 VICINITY MAP NOT TO SCALE r WC UCC MOLL Toter Case 113.175 Acres Riy,toaf Wor DellcetYn 36,622 Acres lfiet unease .•f RngnUS Lots 0 56 Ma Acts Renew Nor-Rww.nOS Lots g Non-k..N.nfM M.1g. 0 "heft Pukk Pat Acnkr 56.350 Am WOTAL ton= I. I�pp0�. a Rdw Pond(r Cosm]nWnn Dm.Agreement from my T ur Doeurnont Stec,05) ITN Ynh't 6 woof • gvteng M 1. P he CR ..l SFr toning O.w,wn• f bawq. 6 No taowat. Crate. .f 1950 bard CPS 'Sweetland. voYs both Mnbot one tons Reif Th,. Network. • Oto'" Y.: M, . w eY Sr S Wombs 4 [ryas Tows, w Pretend Coley September 2.0. 2005. in port el .awoc0.My C FOP efined at tesie • r n.le pooled m dx. *Rost oe Mod t net•o,.rm and w w m Oon w r Mood pleb. Y NNlmon on, tp. N Nord r fenne • a.Pwq damn IP' sot c. v. 0%'w hn OW FF.nnn Pas Menem(' 'b amboo? A.m 5 Prior lent pmµ 0-.M. 7. Rohe to MPn.,dry plot PP-010-00> CITY PLAN COMMISSION CITY or n.a:nOr tiniin ti AppaN bow go DUNAwAy SW RMNhn.w • 34.1. CO • at wal1S TTo76107 It B17]]l.1121•FCCBT7 m 0 salt IWO ktr a � RANOICS LMCw PMRdG7f.4r C MACCUA/ fain/ 5W N. 701 aSnttz 917E 1077 FORT 0ORM. TEXAS 71002-4773 !AC (at71 1J0-4644 O5151\*1v7matetrn DUMMY* AAOCAMC LP. 550 WAXY A1O0E 911E 400 FORT NORM 7EX4S 75707 $1G z (Bf7) X5-1121 RAS (017) 3]]-7477 err nxe Faroe nt OM la non trier elf Moll% ant owes lOn in re Oont s+enonaroi r or'� mvrvv.rw admirtrir Dunn, treetensw owniVite Oitin Onunint Mat oirreirlf rinAVrine Oeti • Oda Innen •IPPrOafrek end dress noose rest Lees S.sees p• Vise aei nN .*tbem i.tW end setsehe Yo.n tow. les tkat wool wrest aY pN OINKS 01116.1044 SO al be Fot we ✓wwInn � L el On On • Mani t•Fit4 *tint . CRY Caret r� a Cem.tf Nt D>=m w�Ow �Ye;? Meuse,co eel Ely mese Ism. Rs setup atter Om( knpfenwnst M toy way omelets yreIntessen. or Fin to goo of n ewe ref lass son of be:b. n+_tion. orb. wom.a q .^n Onion nos .... -.,.waft== tone balm' oeueemyre ewer esteem OW 410.11111 0, Lae Man/ tale natant Wet ownosemd. sass. se winstons ono ow Foes ye. sets, sere — mwsir " .onkno i. . dew ones mos Weser Toren . mg a , vodens rem ▪ SSass l^sn.oW1. CV lows soy toogIterir ion _ no nsec snot ib** na..w. s. Ohm N fort revn ytr nmsmu» SRO? be • SS..: - .t •ItPOOty IFIFFn es n::� -- ON koNaoYi b. Are senor& MOANS Mtn • aINA •/.. d:.n• Ondrant"eonto ,worn r so Nen porno lemma MOT woos speed N Mina. net dud es trOWFOOrtiOrt e pses IlaIRMO n.:.n ,p.. war sore ride okay Tr w vm sera saes ..,��� _I_ is oonot Find e.mnmw°nn 0- �.d-r*a.. *in Is permit SI. nen In . Tinini• OF ..NY.� !nano. m tow bow.`. • Morrie A... sew �T /00 yap WALSH RANCH PARKWAY vasmww.Aw.W+fn ?.W,nboa aIDTheirimiPt u � r oyes 0. f,an. erneneiveroit leg▪ s ewes*. a0c' .Ia:°n N. bwryNbynfana t inh non owl vase( b• silt Fe wry Smogs tank, or sossorss. ill thine ph "wives oast On . a Y. TAIL ?IMMIX Mr a Jun nee. Int. "Onion sent swan fart "1a yustoss ��.,.N:. of swoon st so, m WPM 034 Ma Yiyotnis cm as en tMe Sold ens, MA Windy. WI MO ill• Olin) fa trainer n• u nano M �n a..—na-/�.ai • .arras~ °nilleernat .oraic wm:.� eobelthiels ineinattieubsement eons et Owoases an owl faclitlem. tOt xof try AFOACerr Orn °on rut ran mit We Oa OMPLI Seal plower nun Nino WI Pe, roifire Int° tare sessoacene moo %.- toi• ON 4 .Q 1 CCRd'ICA110N: 1 the n rNr.d. d RcSl..d P,N..ena Land wn.nr b me own of Nam— y honey srt m„��: Ws m Pros ;laced �. m...Rw.6w. PRELIMINARY. THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY PURPOSE mf6 L ��k.*aloo We n4 Lass Reim FINAL PLAT OF WALSH RANCH PARKWAY RIGHT-OF-WAY AND LOTS iX-BX additlas $a Cusp f%Roan Nth• Reston Sunny. Mwse Nombw aN. the Gr ist Suns.b st Abet ba S% PUT PRCURCO YBWM. m13 11191 MAT pan 0oc307fr n um - Shoot 4 of 6 PLOTTED: Tuesday, December 27, 2011 AT 11:09 AM FILEPATH: G:\ProduWon\PlannedCommunity\2001\2001169\Private Se or♦WRP Phase 1\Exhibits\11 0531 CFAs\COVER.dwg dWi NOLLYDO1 ill ALS v • PARKER COUNTY 400 ISD TARRANTY COUNTY FORT WORTH ISD PARKER COUNTY TRANTY COUNTY LL d PLOTTED: Tuesday, March 27, 2012 AT 1: 0 100 200 I I SCALE: 1"= 100 ft. x PROPOSED 8" WATER LINE PROPOSED 16" WATER LINE DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (1X REG. F-1114) LEGEND PROPOSED WA TER LINE EXIS77NG WATER LINE — — — FUTURE WATER LINE x EXHIBIT "A" WATER EXHIBIT SHEET 1 OF 5 WALSH RANCH PARKWAY WALSH RANCH EXISTING 30" WATER LINE • PLOTTED: Tuesday, March 27, 2012 AT 1:30 PM F1LEPATH: G:\Production\PlannedCommunity\2001\2001169\Private Sector\WRP Phase 1\Exhibits\11_0531 CFAs\EXHIBIT A - WATER.dwg 3N17 d31 VM 8 03SOdodd 11001 =„ Z :11VDS WALSH RANCH PARK AY M„8 PLOTTED: Tuesday, March 27, 2012 AT 1:30 PM FILEPATH: G:\Production\PlannedCommunity\2001\2001169\Private Sector\WRP Phase 1\Exhibits\11_0531 CFAs\EXHIBIT A - WATER.dwg WALSH RANCH PARKWAY —o 3Nn 2l31 V44 32/(11 n3 3N/7 2/31 b'M ONLLSIX3 3N/7 2/31 bM 03S0d02/d PLOTTED: Tuesday, March 27, 2012 AT 1:30 PM FILEPATH: G:\Production\PlannedCommunity\2001\2001169\Private Sector\WRP Phase 1\Exhibits\11_0531 CFAs\EXHIBIT A - WATER.dwg 200 400 6inimiummiI 1 SCALE: 1"= 200 ft. PROPOSED 16" WATER LINE i PROPOSED 16" WATE LIVE I DUNAWAj/ 550 Bailey Avenue • Suite 400 • Fort worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) rWA7ER LINE LEGEND PROPOSED WATER LINE EXISTING WATER LINE - - FUTURE WATER LINE r EXIST/N( 30" it EXHIBIT "A" WATER EXHIBIT SHEET 4 OF 5 WALSH RANCH PARKWAY WALSH RANCH PROPOSED 16" WATER PROPOSED 8" WATER LINE PLOTTED: Tuesday, March 27, 2012 AT 1:30 PM FILEPATH: G:\Production\PlannedCommunity\2001\2001169\Private Sector\WRP Phase 1\Exhibits\11_0531 CFAs\EXHIBIT A - WATER.dwg WALSH RANCH PARKWAY 3N/7 2ELVA1 32/17l n3 3N17 ?J31 VM 9NLLS/X3 3N/7 d131 VM 03S0dOdld PLOTTED: Tuesday, March 27, 2012 AT 1:31 PM FILEPATH: GAProduction \MannedCommunity \2001 \2001169 \Private Sector \WRP Phase 1\Exhi °neanimmimimi 100 200 SCALE: 1"= 100 ft. D U N AWAY 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) -x -x WALSH RANC LEGEND x EXHIBIT "Al" SANITARY SEWER EXHIBIT SHEET 1 OF 1 WALSH RANCH PARKWAY WALSH RANCH • PROPOSED SANITARY SEWER LINE FUTURE SANITARY SEWER LINE PROPOSED SANITARY SEWER MANHOLE FUTURE SANITARY SEWER MANHOLE ,PROPOSED 10" SANITARY LINE VVALSI-1, RANCH PKWY. 9" CONCRETE PAVEMENT -8' - 12' TRAIL LEGEND PROPOSED 9" REINFORCED CONCRETE PAVEMENT 4177-I #4 BARS 0 18" O.C.B.W.; 3-6X AIR ENTRAINMENT DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) EXHIBIT "B" PAVING EXHIBIT SHEET 1 OF 5 WALSH RANCH PARKWAY WALSH RANCH 150' SPAN BRIDGE r- , rn SCALE: 1"= 200 ft. 400 ILEPATH: G:\Produ 2012 AT 1:09 PM LEGEND PROPOSED 9" REINFORCED CONCRETE PAVEMENT WITH /4 BARS 0 18" O.C.B. W.; 3-6X AIR ENTRAINMENT z PAVEMENT rn col N—I AA-LSFFRAATCH PKWV w DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TXREG. F-1114) —8' — 12' TRAIL 0I 200 400 I EXHIBIT "B" PAVING EXHIBIT SHEET 2 OF 5 WALSH RANCH PARKWAY WALSH RANCH SCALE: 1"= 200 ft. 169\Private Sector\WRP Ph MATCH LINE SHEET 2 �/ LEGEND / I PROPOSED 9" REINFORCED CONCRETE / PAVEMENT WITH /4 BARS 0 18" O.C.B.W.; 3-6X AIR ENTRAINMENT DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TXREG. F-1114) 9" CONCRETE PA VEMENT -8' - 12' TRAIL EXHIBIT "B" PAVING EXHIBIT SHEET 3 OF 5 WALSH RANCH PARKWAY WALSH RANCH 300' SPAN BRIDGE 0 200 400 I I SCALE: 1"= 200 ft. O J II II1i1111 „il li pli111'ell ILI11u III JI Jo J1 IJI owlowl ulYW'''!J, Iluiudlu Ili iddill i uYoJIW4J,11114111111e111 111u1u1J11uW1dI11Ju11J11J4W1BYYJi 11uuY1ulufimi.ini.11l'IYI.i1W11Y4JI11iI111iY1WJ cell1, 11i 111 11Iliili1J11111111111111JW1iY111111111I111i11'eYlluuluY4/11i UJ41u41I1WiJY4W1111i111iui l'. 11,1 III 1 II111111 111 III1111l11111111111111111111!11111 1 1111 II1161i!IJ11 uuu IiiIi 1111 ill I 0 W W J - 12' TRAIL MATCH LINE SHEET 5 LuO U00 0' U® O WLt 2 emes�.. 2 Ct O1 OW oVA aicc nhi i 1 1 SCALE: 1"= 200 ft. c1.11,11,1,ido11,I,14,11nWa.,I11,...,.,1...,,„1e11iid11111n1 £ 133HS 3NI1 HD1VW 0 O a^ 02 tr--: o Yn 32 a t� •ALL o u— Z� . w • . IDe) tri C 0 N co < 15- T I— N 6 m O Ln 11111111 km1111111J1J1J111111',Jill 11:1111111111e1I111eJ1,1J1II11WWW1JJ11111111111„1,11.11W11J,11e, J111IJ1,,11111J11J11111111 e11111J.. J1111YJY11J1111JJJ1JIWIYIJ,LWJJIIJ,YY1,1Ie,I1didm JIlee1 eJ11.I1,JUJ 11YJ4Jw1,.�11eW1e.1JJ1111WJ.111I1e1Y11.WYYIII11111,W1,11e1eII1J1111111eY1u114.,J1111WWJ1111111J11111W1111JWI11JJ11e11J111.JIJ1111 0MP'9NIAVd-8118IHX3\sV33I£SO TT\saigiyx3\T asegddIIM\aohasalenud\69TT00Z\TOOZ\X1!unwwcopauueid\ualDnpoJd\:9;HiVd3lId WdIT: TlVZTOZ'8Z4PJeW'6epsaupaM:03ll01d HIM 111 1 1 1111111111111111111 11111 I A IT B - PAVING.d u Min A 9" CONCRETE PAVEMENT J° FUTURE WALSH RANCH PKWY. DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) x LEGEND EXHIBIT "B" PAVING EXHIBIT SHEET 5 OF 5 WALSH RANCH PARKWAY WALSH RANCH PROPOSED 9" REINFORCED CONCRETE PAVEMENT WITH /4 BARS 0 18" O.C.B.W.; 3-6Z AIR ENTRAINMENT 0 200 400 1 SCALE: 1"= 200 ft. 0 L PLOTTED: Tuesday, March 27, 2012 AT 2:18 PM FILEPATH: G:\Production\PlannedCommunity \ 2001 \ 2001169 \Private Sector \WRP Phase 1 \ Exhibits \ 11_0531 CFAs \ EXHIBIT 81 - STORM DRAIN.dwg 0 100 200 SCALE: 1"= 100 ft. DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax 817.335.7437 (DC REG. F-1114) 21" RCP FUTURE 21" RCP 30" RCP 'X5' DROP ILET LEGEND 10' RECESSED CURB INLET 24" RCP . , \ i 1 \ i I \ 1 ! PROPOSED RCP STORM DRAIN \54" RCP 6 'X6 \SDMH 42 \ \ MATCH LINE SHEET 1 EXHIBIT "Bin STORM DRAIN EXHIBIT SHEET 3 OF 8 WALSH RANCH PARKWAY WALSH RANCH FORT WORTH TYPE SD-017 HEADWALL PLOTTED: Tuesday, March 27, 2012 AT 1:31 PM FILEPATH: G:\Production\PlannedCommunity\2001\2001169\Private Sector\WRP Phase 1\Exhibits\11_0531 CFAs\EXHIBIT B1 - STORM DRAIN.dwg O mNN 43 co (-3, kal V O V 3 44).0 r D73 '-D 70n ZD 2 n� -�G 9 3O t' 133HS 14 001 =„I :31VDS FUTURE WALSH RANCH PKWY. PLOTTED: Tuesday, March 27, 2012 AT 1:31 PM FILEPATH: G:\Production\PlannedCommunity\2001\2001169\Private Sector\WRP Phase 1\Exhibits\11_0531 CFAs\EXHIBIT 81 - STORM DRAIN.dwg 9 dO S 133HS 00I =„T : 1VDS FUTURE WALSH RANCH PKWY. N/v 'a PV?/OIS dOd a3s0daeld PLOTTED: Tuesday, March 27, 2012 AT 1:31 PM FILEPATH: G:\Production\PlannedCommunity\2001\2001169\Private Sector\WRP Phase 1\Exhibits \11_0531 CFAs\EXHIBIT B1 - STORM DRAIN.dwg 0 fl 2 v ;hz Tp O V 4 th O a Via< �X a O 9 30 1 133HS w MATCH LINE SHEET 2 1-1 00I =„I :31b'JS NIVYO 112/01S d0?J 03SOd02/d YI10u001011110110111Juu I111100Y1101J01111111111111111 u11011100101u11111111111111111111110001111101001111111111101100101101100011 u1110111I11u 111011111111111u01u01111111111u1111111111111111111011111111111111111111101100001111111111111111J1111111111111111111111101111111111111111111111111111111111111111 11111 1111111 1111I II I IIIUIIIIII Hill I111110IIIIOIIO1u1111000u101111YYu1uuuYY01u0u1001 Y0Yi10u1011110110Y1u1u1Y101Y•1110uY10111100YYY011101II100mili0011tlY1Y1YUYY011u1100Y1001Yw11YY1011Y00001u010000101YY1 IIIIII100111111 I III 111111111111111011111111111111111001 miEW 0 W w W J PROPOSED RCP STORM DRAIN 'AMNd HDNV8 HSIVM SCALE: 1"= 100 ft. MATCH LINE SHEET 1 f 5'X5' DROP INLET SHEET 2 OF 8 laweir II1111111110111u111YYI1tl111011111111110111 I 1 II II III II 11111111111h I 1111111 1 I I l lulu 11111111 hill I II III I I II 11111 hill II h11 1 hi 1111111111111 r 6Mp•NIV210 W2101S - T91I9IHX3\sVdD T£50 TT\sliq!gx3\T aseqd d21MUOPaS aleApd\69TTOOZ\ TOO? \A!unwwoJpauue!d\uopnpoid49 'H1Vd3lId Wd T£'T 1V ZTOZ 'LZ q»eW '6epsanl :031101d PATH: G: \Production \PlannedCommunity\2001\2001169 \Private Sector \WRP Phase 1 \Exhibits\11_0531 CFAs\ EXHIBIT B1 - STORM DRAIN PLOTTED: Tuesday, March 27, 2012 AT 1:31 PM FI 4'X4' DROP INLET 10' RECESSED CURB INLET 21" RCP 10' RECESSED CURB INLET 24" RCP 0 100 wommunal I SCALE: 1"= 100 ft. 200 DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (7x REG. F-1114) 21" RCP 36" RCP 5'X5' SDMH 10' RECESSED CURB INLET LEGEND PROPOSED RCP STORM DRAIN 24" RCP 42" _RCP QUAIL MEADO1A/ DRIVE - 21 4')'4"' DROP INLET EXHIBIT "Blu STORM DRAIN EXHIBIT SHEET 6 OF 8 WALSH RANCH PARKWAY WALSH RANCH L 133HS 3Nn 1-131VIAI 10' RECESSED CURB INLET 15' RECESSED CURB INLET 15' 'ECESSED— C INLET 21" RCP— DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel:817.335.1121 • Fax: 817.335.7437 (1X REG. F-1114) 24" RCP 0 6'X6' SDMH/ 48" RCP 54" RCP FORT WORTH TYPE SD-017 HEADWALL —21" RCP 21" RCP 4'X4' DROP INLET 21" RCP 21" RCP t 4'X4' SDMH LEGEND EXHIBIT "B1" STORM DRAIN EXHIBIT SHEET 7 OF 8 WALSH RANCH PARKWAY WALSH RANCH SCALE: 1n= 100 ft. PROPOSED RCP STORM DRAIN Tuesday, March 27, 2012 AT 1:31 PM FILEPATH: G:\Production\PlannedCommunity\2001\2001169\Private Sector\WRP Phase 1\Exhibits\11_0531 CFAs\EXHIBIT 81 - STORM DRAIN.dwg 15' RECESSED- L CURB INLET 15' RECESSEEr- CURB INLET / / e DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (1XREG. F-1114) 21" RCP WALSH RANCH PKWY. LEGEND 15' RECESSED CURB INLET y36"RCP ki 1 �-36" CONCRETE SDMH HEADWALL 7-361'RCP SDMH ' RECESSED B INLET EXHIBIT "B1" STORM DRAIN EXHIBIT SHEET 8 OF 8 WALSH RANCH PARKWAY WALSH RANCH PROPOSED RCP STORM DRAIN 0 100 200 I I SCALE: 1"= 100 ft. 531 CFAs\EXHIBIT C - STREET LIGHTS.D PLOTTED: Tuesday, March 27, 2012 AT 1:32 PM FILEPATH: G:\Production\PlannedCommunity\2001\2001169\Private Sector\WRP Phase 1\E Irl i I i PROPOSED STREET / LIGHTS (TYP.) N M - - - - .-. . - - - M N MATCH LINE DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) LEGEND •- PROPOSED LUMINAIRE T C X EXHIBIT "C" STREET LIGHT EXHIBIT SHEET 1 OF 3 WALSH RANCH PARKWAY WALSH RANCH PROPOSED TRANSFORMER PROPOSED CONTACTOR PROPOSED PULL BOX W/ APRON 0 500 1000 I I SCALE: 1"= 500 ft. MATCH LINE ®--.. MOM ----- PROPOSED STREET LIGHTS (TYP.) r- - - - - - - MATCH LINE DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG, F-1114) - - MINN e LEGEND 0-40 PROPOSED LUMINA/RE CI PROPOSED STREET LIGHTS (TYP.) EXHIBIT "C" STREET LIGHT EXHIBIT SHEET 2 OF 3 WALSH RANCH PARKWAY WALSH RANCH PROPOSED TRANSFORMER PROPOSED CONTACTOR PROPOSED PULL BOX W/ APRON 0 500 1000 SCALE: 1"= 500 ft. LLJ u U qqq W i p a • m' N 0 LU 0 a N N 0 N 1.2 1- 0 MATCH LINE DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) LEGEND MN MIEN IMO MIN •—• PROPOSED LUMINAIRE 3f T C x PROPOSED STREET LIGHTS (TYP.) �?E EXHIBIT "C" STREET LIGHT EXHIBIT SHEET 3 OF 3 WALSH RANCH PARKWAY WALSH RANCH PROPOSED TRANSFORMER PROPOSED CONTACTOR PROPOSED PULL BOX W/ APRON 0 500 1000 SCALE: 1"= 500 ft. IIIII ii 1111u1Y11111111111111111Y1111111111WY11111Y IIIIIIIII11u11111Y1Y111u111011111111mIu1Y111u111111111J1111111111u 01111111u1111101111111Y1u1u111III II IIIIIIIIIIII1111111111Y1111111111111WIIhii 1 1111 YJIWW1WYWuludllllmluuYuuYIuYYWulm11u1 YIIIW11111111uY1YY1111111111111Y1111111111111111111111111111111111111111111111111111111111111111111111Im111 J1111uulu1JJ11111111111uJ0u11u11111111 u01u101u1uu1111u 1111 11111 II IIu111101111Ju1u11u11111111111u111111111111111 IIIIIIIII11111111111111111uIIIlu1111111111u11111111u111111111111111111uI1u11111111111Y1111u11111uu1111111111111111111i1u1111110111u11111u1111umYuluYlulJJleIUJYJuJul Yl uYlu nY W-WW1Ylul11111 1 II IIIJ 11Y 7.=-�w�zu,-«��m-w.�m.mv-.ro s+-z�.ti;z��e•. sc-..,.. .-.�.rs...w-arc....,.-_ a= - .. .: Its \11_0531 CFAs \Exhib t D - PM FILEPATH: G:\Production\PlannedCommunty\2001\2001169\Private Sector\WRP Phas PLOTTED: Tuesday, March 27, 2012 AT 1: UTILITY CROSSING SLEEVES EXHIBIT "D" \ I EX OLD WEATHERFORD ROAD _ 1- si SHEET. 1 WATER LINE NO. 8 & 9. SHEET 2 WATER LINE NO. 10 & 11 SHEET 3 WATER LINE NO. 1, 2 & 3 SHEET 4 WATER LINE 5, 6 & 7 FUTURE UTILITY CROSSING' SLEEVES SHEET 5 WATER LINE REL OCA TION WA j o O U e Q FUTURE UTILITY CROSSING' SLEEVES LV' Ci`f ' jfADOW WALSH RANCH WALSH RANCH PARKWAY 1-30 TO WALSH RANCH OLD WEATHERFORD ROAD CONNECTOR D U AWAY/ 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (1X REG. F-1114) III 1111101u 111111111111111 1 1 II II I 1111 I II 11111 PARKER COUNTY TARRANTY COUNTY / INTERSTATE 30 II SCALE: 1" = 1500' 11111 1 I I 11111111111111111111III I 1 uu m uuum uuueo111uu 1 — PART B — PROPOSAL OWNER AWARDED CONTRACTS This proposal must not be removed from this book of Contract Documents TO: Walsh Ranches Limited Partnership PROPOSAL FOR: PROJECT NAME: Walsh Ranch Parkway — Bridge Improvements WATER PROJECT NO. P275-603140174583 SANITARY SEWER PROJECT NO. P275-703130174583 FILE NO. W-2175 `X ' NO. 21562 CITY PROJECT NO. 01745 Includes the furnishing of all materials, except materials specified to be furnished by the City, equipment and labor for the installation of BRIDGE IMPROVEMENTS 'and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: Walsh Ranch Parkway (I-30 to Walsh Ranch Old Weatherford Road Connector) Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder having thoroughly examined the Contract Documents, including plans, special contract documents, the General Contract Documents and General Specifications for Water Department Projects, the General Contract Documents and General specifications for Transportation and Pubhc works Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Transportation & Public Works of the City of Fort Worth Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Perfoi mance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums. UNIT II B PAVING (BRIDGES ONLY) PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, including all appurtenant work, the following items• 1. BID-00400 231 CY CEMENT STABILIZED BACKFILL Thirty-four thousand six hundred fifty Dollars Zero Cents 2. BID-00416 1,034 LF DRILL SHAFT (36 IN) One hundred sixty-five thousand, four hundred forty Dollars Zero Cents BID-00416 814 LF DRILL SHAFT (42 IN) One hundred fifty thousand, five hundred ninety Dollars Zero Cents 4. BID-00420 582 CY CL C CONCRETE (ABUT) Two hundred ninety -fix thousand, eight hundred twenty Dollars Zero Cents 5. BID-00420 277 CY CL C CONCRETE (BENT) Two hundred twenty-four thousand three hundred seventy Dollars Zero Cents UNIT PRICE AMOUNT BID $ 150.00 $ 34,650.00 $ 160.00 $ 165,440.00 $ 185.00 $ 150,590.00 $ 510.00 $ 296,820.00 $ 810.00 $ 224,370.00 ;r} PAY BID APPROX. DESCRIPTION OF ITEMS WITH BID ITEM ITEM NO. QUANTITY PRICES WRITTEN IN WORDS Furnish and Install complete in place, including all appurtenant work, the following items: 6. BID-00420 536 CY CL S CONCRETE (FOOTING) Two hundred forty-six thousand, five hundied sixty Dollars Zero Cents 7. BID 00420 571 CY CL S CONCRETE (SLAB) Two thousand ninety-one thousand, two hundred ten Dollars Zero Cents 8. BID 00420 230 CY CL S CONCRETE (SHEAR KEY) Fifty-nine thousand, eight hundred Dollars Zero Cents 9. BID-00420 241 CY CL S CONCRETE (APPR SLAB) One hundred twenty-two thousand, nine hundred ten Dollars Zero Cents 10. BID-00420 69 CY CL S CONCRETE (BRIDGE SDWK) Twenty-seven thousand, six hundred Dollars Zero Cents 11. BID-00423 5,128 SF RETAINING WALL (SPREAD FOOTING) Two hundred fifty-six thousand, four hundied Dollars Zero Cents B-3 UNIT AMOUNT PRICE BID $ 460.00 $ 246,560.00 $ 510.00 $ 291,210.00C $ 260.00 $ 59,800.00 $ 510.00 $ 122,910.00 $ 400.00 $ 27,600.00 $ 50.00 $ 256,400.00 ti i•. PAY BID APPROX. ITEM ITEM NO. QUANTITY Furnish and Install complete in place, i 12. 1,939 SF 13. 110 LF 14. BID-00425 4,027 LF 15. BID 00425 16. BID 00425 17, BID 00428 DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS ncluding all appurtenant work, the following items: RETAINING WALL STONE FASCIA Seventeen thousand, four hundred fifty-one Dollars Zero Cents RETAINING UNDERDRAINS Three thousand three hundred Dollars Zero Cents PRESTRESSED CONCRETE BOX BEAM (5B40) Eight hundred five thousand, four hundred Dollars Zero Cents 597 LF PRESTRESSED CONCRETE BOX BEAM (5B40 MOD) One hundred twenty-two thousand, three hundred and eighty-five Dollars Zero Cents 300 LF PRECAST CONCRETE PANELS (FASCIA) Thirty-seven thousand, five hundred Dollars Zeio Cents 2,363 SY CONCRETE SURFACE TREATMENT (CLASS I) Eleven thousand, eight hundred and fifteen Dollars Zero Cents B-4 UNIT PRICE $ 9.00 $ 30.00 $ 200.00 $ 205.00 $ 125.00 $ 5.00 AMOUNT BID $ 17,451.00 $ 3,300.00. $ 805,400.00 $ 122,385.00 $ 37,500.00 $ 11,815.00 PAY ITEM Furnish BID APPROX. DESCRIPTION OF ITEMS WITH BID ITEM NO. QUANTITY PRICES WRITTEN IN WORDS and Install complete in place, including all appurtenant work, the following items 18. BID-00442 418 LBS STRUCTURAL STEEL (NON -BRIDGE) (MISC) Six thousand, two hundred and seventy_ Dollars Zei o Cents 19. BID-00450 656 LF RAIL (TY T411) (MOD) Eighty-eight thousand, five hundred and sixty Dollars Zero Cents 20. BID-00450 412 LF RAILING (PEDESTRIAN) (SPL) Seventy-two thousand, one hundred Dollars Zero Cents 21. BID 00450 904 LF RAILING T401 (MOD) One hundred thirteen thousand Dollars Zero Cents 22. BID 00454 234 LF SEALED EXPANSION JOINT (4 IN) (SEJ - A) Nineteen thousand, eight hundred and ninety Dollars Zero Cents 23. BID 00432 22 CY CONCRETE RIPRAP (FLUME) Seven thousand, seven hundred Dollars Zero Cents 'Does not include any pedestrian bridge structure. B-5 • UNIT PRICE $ 15.00 $ 135.00 $ 175.00 $ 125.00 $ 85.00 $ 350.00 AMOUNT BID $ 6,270.00 $ 88,560.00 $ 72,100.00 $ 113,000.00 $ 19,890.00 $ 7,700.00 i6, BID SUMMARY UNIT II B - TOTAL AMOUNT BID PAVING (BRIDGES ONLY): $ 3,181,721.00 — Three million one hundred eighty-one thousand seven hundred twenty-one dollars and zero cents. GRAND TOTAL AMOUNT BID $ 3,181,721.00 — Three million one hundred eighty-one thousand seven hundred twenty-one dollars and zero cents. PART B - PROPOSAL (Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as requned by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Owner. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within calendar days after issue of the work order, and to complete the contract within working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of . Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. B-7 I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, By: Title Address Telephone: (Seal) Date: PART B — PROPOSAL OWNER AWARDED CONTRACTS This proposal must not be removed from this book of Contract Documents. TO: Walsh Ranches Limited Partnership PROPOSAL FOR: PROJECT NAME: Walsh Ranch Parkway (I-30 to Walsh Ranch Old Weatherford Road Connector) WATER PROJECT NO. P275-603140174583 SANITARY SEWER PROJECT NO P275-703130174583 FILE NO W-2175 `X' NO. 21562 CITY PROJECT NO. 01745 Includes the furnishing of all materials, except materials specified to be furnished by the City, equipment and labor for the installation of PAVING, DRAINAGE, WATER, SEWER, AND STREET LIGHTS and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: Walsh Ranch Parkway (I-30 to Walsh Ranch Old Weatherford Road Connector) i Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, the General Contract Documents and General Specifications for Water Department Projects, the General Contract Documents and General specifications for Transportation and Public works Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as piovided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Transportation & Public Works of the City of Fort Worth Texas* and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents foi the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: B-1 UNIT I A DOMESTIC WATER PAY ITEM BID APPROX. ITEM NO. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, including all appurtenant work, the following items: 1. BID-00600 310 LF Pipe - Pressure - 30 Inch Ductile Iron Pipe Install Sixty-six thousand, six hundred fifty Dollars Zei o Cents BID-00592 1,379 LF Pipe - Pressure - 16 Inch PVC ' Install Seventy-one thousand seven hundred eight Dollars Zei o Cents BID-00591 877 LF Pipe - Pressure - 12 Inch PVC - Install Thirty-five thousand and eighty Dollars Zero Cents BID-00618 593 LF Pipe - Pressure - 8 Inch PVC Install Seventeen thousand seven hundred ninety Dollars Zero Cents BID-00730 3 EA Valve - 30 Inch Gate w/ Vault - Install Eighty-five thousand five hundred Dollars Zero Cents B-2 UNIT PRICE AMOUNT BID $ 215.00 $ 66,650.00 $ 52.00 $ 71,708.00 $ 40.00 $ 35,080.00 $ 30.00 $ 17,790.00 $ 28.500.00 $ 85,500.00 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish mid Install con plete in place, including all appurtenant work, the following items: 6. BID-00719 4 EA Valve - 16 Inch Gate w/ Vault — Install BID-00717 Fifty thousand Dollars Zero Cents 5 EA Valve - 12 Inch Gate Valve w/ Box Install Nine thousand two hundred fifty Dollars Zero Cents BID-00749 9 EA Valve - 8 Inch Gate Valve w/ Box Install Nine thousand Dollars Zero Cents BID-00568 3.4 TN Pipe Fittings <Than 16 Inch DI Pipe Install Eleven Thousand Nine Hundred Dollars Zero Cents 10. BID-00569 1 1.9 TN Pipe Fittings 16 Inch or > DI Pipe — Install Forty-one thousand six hundred fifty Dollars Zei o Cents 11. BID-00546 5 EA Fire Hydrant Assembly w/ 6 Inch Gate Valve - Install Sixteen thousand Dollars Zero Cents B-3 UNIT PRICE AMOUNT BID $ 12,500.00 $ 50,000.00 $ 1.850.00 $ 9.250.00 $ 1,000.00 $ 9,000.00 $ 3,500.00 $ 11,900.00 $ 3,500.00 $ 41,650.00 $ 3,200.00 $ 16,000.00 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install con plete in place, including all appurtenant work, the following items. 12. BID-00372 3,199 LF Trench Safety System 5 Foot Depth Install Six thousand, three hundred and ninety- eight Dollars Zero Cents 13. 3,199 LF Water System Testing — Service 14. BID-00619 Seven hundred and ninety-nine Dollars Seventy-five Cents 1 LS Pipe - Pressure - Cathodic Protection System (DIP) - Install 15. BID-00646 l EA Four thousand Dollars Zero Cents Pipe -Tapping Sleeve & 16 Inch G.V. w/ Vault - 30 Inch X 16 Inch ' Install (Shown as 30 x 16 TEE, Sheet 16) Eiehteen thousand, five hundred Dollars Zero Cents 16. BID-00637 I EA Pipe -Tapping Sleeve & 12 Inch G.V. w/ Box - 30 Inch X 12 Inch — Install Seventy-five thousand Dollars Zero Cents 17. BID-00702 1 EA Pipe -Tapping Sleeve & 8 Inch G.V. w/ Box 30 Inch X 8 Inch — Install Five thousand Dollars Zero Cents B-4 UNIT PRICE AM OUNT BID $ 2.00 $ 6,398.00 $ .25 $ 799.75 $ 4,000.00 $ 4,000.00 $ 18,500.00 $ 18,500.00 $ 7,500.00 $ 7,500.00 $ 5,000.00 $ 5,000.00 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, including all appurtenant work, the following items: 18. 2 EA Pipe - Connect to Existing 30 Inch Water Line — Install Ten thousand, four hundred Dollars Zero Cents 19. 365 LF Removal - 30 Inch Water Line Three thousand, six hundred and fifty Dollars Zeto Cents 3 EA Removal - 30 Inch Gate Valve & Vault Three thousand Dollars Zero Cents UNIT PRICE AMOUNT BID $ 5,200.00 $ I0,400.00 $ 10.00 $ 3,650.00 $ 1,000.00 $ 3,000.00 TOTAL AMOUNT BID DOMESTIC WATER: $ 473,775.75 — Four hundred seventv-three thousand seven hundred seventv-five dollars and seventv-five cents. Al SANITARY SEWER IMPROVEMENTS PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install con plete in place, including all appurtenant work, the following items: I . BID-00227 253 LF Pipe - 10 Inch Sewer (All Depths) - Install Eight thousand. eight hundred and fifty-five Dollars Zei o Cents BID 00213 I EA Manhole - Std 4 Ft Diameter (to 6 Ft Depth) ee Install Two thousand, five hundred Dollars Zero Cents BID 00214 10 VF Manhole - Std 4 Ft Dia - Added Depth (over 6 Ft Depth) — Install Fifteen hundred Dollars Zero Cents 20 LF Concrete Encasement '— Install Two hundred Dollars Zero Cents BID-00372 253 LF Trench Safety System 5 Foot Depth Install BID-00201 Two hundred and fifty-three Dollars Zero Cents 253 LF Inspection - Post Construction Cleaning & TV — Study Three hundred and sixteen Dollars Twenty-five Cents B-6 UNIT PRICE AMOUNT BID $ 35.00 $ 8,855.00 $ 2,500.00 $ 2,500.00 $ 150.00 $ 1,500.00 $ 10.00 $ 200.00 $ 1.00 $ 253.00 $ 1.25 $ 316.25 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, i icluding all appurtenant work, the following items: 7. BID-00217 1 EA Manhole -Vacuum Test — Services One hundred Dollars Zero Cents UNIT PRICE AMOUNT BID $ 100.00 $ 100.00 TOTAL AMOUNT BID SANITARY SEWER: $ 13,724.25 - Thirteen Thousand Seven Hundred Twenty-four Dollars And Twenty-five Cents. UNIT II B PAVING PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, i icluding all appurtenant work, the following items: I . BID-0 1 266 73,761.8 SY Concrete Pavement - 9 Inch — Install UNIT PRICE AMOUNT BID Two million four hundred eighty-five thousand seven hundred seventv-two Dollars $ 33.70 $ 2.485.772.66 Sixtv-six Cents BID-00486 83,147.7 SY Subgrade - 8 Inch Lime Stabilized (42 lbs/SY) _ Install Two hundred twenty thousand, three hundred and fortv-one Dollars Forty-one Cents BID-00496 1,746.2 TN Subgrade - Lime for Stabilization - Install Two hundred sixty-one thousand, nine hundred thirty Dollars Zero Cents BID-00843 13,178.3 LF Curb - 7 Inch — Install Sixteen thousand, four hundred and seventv-two Dollars Eighty-eight Cents BID-00842 12,027.7 LF Curb - 6 Inch -- Install Twelve thousand and twentv-seven Dollars Seventy Cents B-8 $ 2.65 $ 220,341.41 $ 150.00 $ 261,930.00 $ 1.25 $ 16.472.88 $ 1.00 $ 12,027.70 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, including all appurtenant work, the following items: 6. BID-00465 5,611.6 SY Stamped Concrete (Reinforced Vehicular Concrete Paving with Integral Color and Stamped Pattern Finish) Install I0. Three hundred ninety-two thousand, eight hundred twelve Dollars Zero Cents BID-01227 45 EA Sidewalk - ADA Wheelchair Ramp — Install BID-00439 Forty-five thousand Dollars Zero Cents I LS Pavement Markings — Install Forty-nine thousand Dollars Zero Cents BID-00504 2 EA Signage - Project Designation — Install One thousand Dollars Zero Cents 1 LS Signage - Traffic — Install Ten thousand Dollars Zero Cents 20 EA Signage — Street Names Install Ten thousand Dollars Zero Cents B-9 UNIT PRICE AMOUNT BID $ 70.00 $ 392,812.00 $ 1,000.00 $ 45,000.00 $ 49,000.00 $ 49.000.00 $ 500.00 $ 1,000.00 $ 10,000.00 $ 10.000.00 $ 500.00 $ 10,000.00 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, i icluding all appurtenant work, the following items: 12. BID-00137 18,318 SY Grass - Sod _ Install Forty-five thousand. seven hundred ninety- five Dollars Zero Cents 13. BID-00134 208,375 SY Grass - Hydromulch Seeding -- Install Sixtv-two thousand five hundred twelve Dollars Fifty Cents 14. BID-00147 46,233 CY Topsoil — Install One hundred ninety-six thousand, four hundred ninety Dollars Twenty-five Cents 15. 50,704 SY Flexible Growth Medium Fifty thousand seven hundred four Dollars Zero Cents 16. 152,682 SF Sidewalk (5 Inch Thick Reinforced Concrete Trail with medium Broom Finish) Install Four hundred fifty-eight thousand and fortv-six Dollars Zero Cents 17. 19,202.8 SF Decorative Pavement (Pavestone Concrete Pavers 80 mm Min. Thickness) — Install One hundred fifty-three thousand six hundred twenty-two Dollars Forty Cents B-10 UNIT PRICE AMOUNT BID $ 2.50 $ 45,795.00 $ .30 $ 62,512.50 $ 4.25 $ 196,490.25 $ 1.00 $ 50,704.00 $ 3.00 $ 458,046.00 $ 8.00 $ 153,622.40 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, it cluding all appurtenant work, the following items: 18. 1,065 SF Enhanced Trail Shoulder - 3 Foot Wide Reinforced Concrete Trail Paving with Integral Color and Stamped Pattern Finish Eight thousand. five hundred and twenty Dollars Zei o Cents 19. 92 LF Handrail - 42 Inch Height Ornamental Metal Railing — Install Nine thousand, two hundred Dollars Zero Cents 2,315 LF Utility Conduit (4 Banks with 16 conduits or varying size) — Install Six hundred seventy-seven thousand. one hundred thirtv-seven Dollars Fitly Cents 21. 1,240 LF Irrigation Conduit Type 1 Thirtv-five thousand. three hundred fortv Dollars Zeio Cents 22. 1,318 LF Irigation Conduit Type 2 Thirtv-two thousand, nine hundred fifty Dollars Zero Cents 23. 421 LF End of Road Barricade Ten thousand. five hundred twenty-five Dollars Zero Cents B-11 UNIT PRICE AMOUNT BID $ 8.00 $ 8.520.00 $ 100.00 $ 9,200.00 $ 292.50 $ 677,137.50 $ 28.50 $ 35.340.00 $ 25.00 $ 32.950.00 $ 25.00 $ 10,525.00 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, including all appurtenant work, the following items: 24. 1,512 LF Standard Traffic Barrier Fixed Type Vertical Panel as shown on TxDOT BC (9) -07 and the Type III Barricade (Skid) on BC(10)-07. Forty-eight thousand. three hundred eighty- four Dollars Zero Cents 25. 899 LF STEEL CASING PIPE (16-INCH) Eight thousand and ninetv-one Dollars Zero Cents 26. 67 LF STEEL CASING PIPE (26-INCH) Ten thousand and fifty Dollars Zero Cents 'Does not include any pedestrian bridge structure. UNIT PRICE AMOUNT BID $ 32.00 $ 48,384.00 $ 90.00 $ 8,091.00 $ 150.00 $ 10.050.00 TOTAL AMOUNT BID PAVING: $ 5311,724.30 — Five million, three hundred eleven thousand, seven hundred twenty-four dollars and thirty cents. B-12 Bi STORM DRAIN PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install con plete in place, t wcluding all appurtenant work, the following items. 1. BID-00101 10,218 CY Unclassified Trench Excavation & Backfill Install Thirty thousand six hundred and fiftv-four Dollars Zero Cents BID-00081 2,036 LF Pipe - 21 Inch Class III — Install Eighty-one thousand four hundred and forty Dollars Zero Cents BID-00082 1,789 LF Pipe - 24 Inch Class III — Install Eighty thousand five hundred and five Dollars Zero Cents BID-00083 366 LF Pipe - 30 Inch Class III — Install Twenty thousand, one hundred and thirty Dollars Zero Cents BID-00085 588 LF Pipe - 36 Inch Class III — Install Forty-four thousand, one hundred Dollars Zero Cents 6. BID-00086 1,434 LF Pipe - 42 Inch Class III — Install One hundred hventy-nine thousand sixty Dollars Zet o Cents B-13 UNIT PRICE AMOUNT BID $ 3.00 $ 30,654.00 $ 40.00 $ 81,440.00 $ 45.00 S 80,505.00 $ 55.00 $ 20,130.00 $ 75.00 $ 44,100.00 $ 90.00 $ 129,060.00 PAY BID APPROX. DESCRIPTION OF ITEMS WITH BID ITEM ITEM NO. QUANTITY PRICES WRITTEN IN WORDS Furnish and Install complete in place, including all appurtenant work, the following items: 7. BID-00919 312 LF Pipe - 54 Inch Class III — Install BID-00075 Forty thousand, five hundred and sixty Dollars Zeio Cents 1 EA Headwall - 36 Inch SD-017 _ Install Two thousand Dollars Zero Cents 9. BID-01283 2 EA Headwall - 54 Inch SD-017 Install Nine thousand Dollars Zero Cents 10. 2 EA Headwall - 36 Inch TxDOT Type PW Install Four thousand. four hundred Dollars Zero Cents I I . 1 EA Headwall - 54 Inch TxDOT Type PW Install Five thousand Dollars Zero Cents 12. 1 EA Headwall - 21 Inch TxDOT Type SETP- CD — Install One thousand, eight hundred Dollars Zero Cents B-14 UNIT PRICE AMOUNT BID $ 130.00 $ 40,560.00 $ 2,000.00 $ 2,000.00 $ 4.500.00 $ 9,000.00 $ 2,200.00 $ 4,400.00 $ 5,000.00 $ 5,000.00 $ 1,800.00 $ 1,800.00 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, ii eluding all appurtenant work, the following items: 13. BID-0011 1 IO EA Recessed Inlet - 10 Foot — Install Twenty-one thousand Dollars Zero Cents 14. BID-001 12 5 EA Recessed Inlet - 15 Foot - Install Eighteen thousand Dollars 15. BID-00118 16. BID-00117 17. BID-01287 18. BID-01287 Zero Cents 9 EA Drop Inlet - 4 Ft x 4 Ft w/ Concrete Apron -- Install Twenty-seven thousand Dollars Zero Cents 2 EA Drop Inlet - 5 Ft x 5 Ft w/ Concrete Apron — Install Nine thousand Dollars Zero Cents 6 EA Junction Box - 4 Ft x 4 Ft — Install Fifteen thousand Dollars Zero Cents I EA Junction Box - 5 Ft x 5 Ft — Install Three thousand Dollars Zero Cents B-15 UNIT PRICE AMOUNT BID $ 2,100.00 $ 21,000.00 $ 3,600.00 $ 18,000.00 $ 3.000.00 $ 27,000.00 $ 4,500.00 $ 9,000.00 $ 2,500.00 $ 15,000.00 $ 3,000.00 $ 3,000.00 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, including all appurtenant work, the following items: 19. BID-01287 3 EA Junction Box - 6 Ft x 6 Ft Install Twelve thousand Dollars Zero Cents 20. BID-00372 6,742 LF Trench Safety System - 5 Ft Depth Install Thirteen thousand, four hundred eighty- four Dollars Zero Cents 21. BID-00092 303 SY Rock Rip -Rap - Install Nineteen thousand, six hundred ninety-five Dollars Zeio Cents 22. BID-00100 1 LS Implementation of SWPPP Install Five thousand Dollars Zero Cents UNIT PRICE AMOUNT BID $ 4.000.00 $ 12,000.00 $ 2.00 $ 13,484.00 $ 65.00 $ 19,695.00 $ 5,000.00 $ 5,000.00 TOTAL AMOUNT BID STORM DRAIN: $ 591,828.00 — Five hundred ninetv-one thousand, eieht hundred twenty-eiiht dollars and zero cents. B-16 C LIGHTING PAY ITEM BID ITEM NO. APPROX. DESCRIPTION OF ITEMS WITH BID QUANTITY PRICES WRITTEN IN WORDS Furnish and Install complete in place, i icluding all appurtenant work, the following items. 1. BID-00388 16,320 LF Conduit - 2 Inch SCH 80 PVC w/ 2-2-2-4 Aluminum Quad Wiring -- Install One hundred forty-six thousand, eight hundred and eighty Dollars Zero Cents BID-00398 91 EA Light - Illumination Assembly (Single Fixture) — Install Twenty-seven thousand three hundred Dollars Zei o Cents 3. BID-00398 15 EA Light - Illumination Assembly (Twin Fixture) — Install I Six thousand Dollars Zero Cents 106 EA Light - 30 Ft Pole Type D30-6 - Install Six hundred and four thousand, two hundred Dollars Zero Cents BID-00967 101 EA Light - Concrete Foundation Type 2 Install One hundred twenty-one thousand, two hundred Dollars Zero Cents B-17 UNIT PRICE AMOUNT BID $ 9.00 $ 146,880.00 $ 300.00 $ 27,300.00 $ 400.00 $ 6,000.00 $ 5,700.00 $ 604,200.00 $ 1,200.00 $ 121,200.00 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install con plete in place, including all appurtenant work, the following items: 6. BID-00395 101 EA Electrical Pull Box — Install 8. Thirty-five thousand, three hundred and fifty Dollars Zero Cents 2 EA Electrical Combination Control Cabinet Panel Board — Install Three thousand Dollars Zero Cents 2 EA Concrete Foundation - Transformer Install Six hundred Dollars Zero Cents 9. 32 EA Ground Box - Install Twenty-five thousand six hundred Dollars Zero Cents 10. 2,650 LF Conduit - 2 Inch SCH 80 PVC (w/ Flowable Back Fill) - Install Twenty-six thousand, five hundred Dollars Zero Cents 1 1. 5,300 LF Conduit - 3 Inch SCH 80 PVC (w/ Flowable Back Fill) — Install Forty-four thousand, three hundred and twenty-five Dollars Zero Cents B-18 UNIT PRICE AMOUNT BID $ 350.00 $ 35,350.00 $ 1,500.00 $ 3,000.00 $ 300.00 $ 600.00 $ 800.00 $ 25,600.00 $ 10.00 $ 26,500.00 $ 10.25 $ 54,325.00 PAY ITEM BID ITEM NO. APPROX. QUANTITY DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Furnish and Install complete in place, including all appurtenant work, the following items: 12. 4 EA PEDISTIAN LIGHTS Four hundred Dollars Zero Cents Quantity includes an additional 30% for City Inventory & Maintenance UNIT PRICE AMOUNT BID $ 100.00 $ 400.00 TOTAL AMOUNT BID LIGHTING: $ 1,051,355.00 — One million fifty-one thousand three hundred fifty-five dollars and zero cents. BID SUMMARY UNIT I A - TOTAL AMOUNT BID DOMESTIC WATER: $ 473,775.75 — Four hundred seventy-three thousand seven hundred seventy-five dollars and seventy-five cents. Al - TOTAL AMOUNT BID SANITARY SEWER: $ 13,724.25 - Thirteen Thousand Seven Hundred Twenty-four Dollars And Twenty-five Cents. UNIT II B - TOTAL AMOUNT BID PAVING: $ 5,311,724.30 — Five million. three hundred eleven thousand, seven hundred twenty-four dollars and thirty cents. B 1 - TOTAL AMOUNT BID STORM DRAIN: $ 591,828.00 — Five hundred ninety-one thousand, eight hundi ed twenty-eight dollars and zero cents C - TOTAL AMOUNT BID LIGHTING: $ 1,051,355.00 — One million fifty-one thousand three hundred fifty-five dollars and zero cents. GRAND TOTAL AMOUNT BID: $ 7,442,407.30 Seven million four hundred forty-two thousand four hundred seven dollars and thirty cents BRIDGE CONSULTING/MANAGEMENT FEE*: $ 25,000.00 Twenty-five thousand dollars and zero cents. * This fee is in not subject to City Inspection or Testing Fees. GRAND TOTAL CONTRACT AMOUNT: $ 7,467 407.30 Seven million four hundred sixty-seven thousand four hunch ed seven dollars and thirty cents B-20 PART B - PROPOSAL (Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security if required is to become the property of the Owner. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within calendar days after issue of the work order, and to complete the contract within working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place of business are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. B-21 { Formatted: Font color: Auto 1 (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) (Seal) Date: Respectfully submitted, By: Title Address Telephone: B-22