Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 43084 (3)
AMENDMENT No .1 CITY SEc ARY CONTRACT NO. �3Ll-�1_. TO CITY SECRETARY CONTRACT No. 43084 WHEREAS, the City of Fort Worth (CITY) and URS Corporation, (ENGINEER) made and entered into City Secretary Contract No. 43084, (the CONTRACT) which was authorized by M&C. C-25441 on the 21 day of February, 2012 in the amount of $ 143, 680. 00; and • WHEREAS, the CONTRACT involves engineering services for the following project: Carten Street Drainage Improvements; and WHEREAS, it has become necessary to execute Amencment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 12, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $59,995. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $203,675.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 3 RECEIVED 3Ut4 -411i3 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: 6/4/43 APPROVAL RECOMMENDED: er3i &L) Do u gl a /' .. Wei rs i g Director, Department of T and Public Works ansportation APPROVED AS TO FORM AND LEGALITY: MA' tit r W ill ' ATAK 17 Do -a€----W-: s i a.ck 2 C� iieAssistant City Attorney ATTEST: Mary J. Ka City Secre City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 skre ENGINEER URS Corporation km) ak- a Dev Ra s t ogi , PE V.i c e President DATE: °,3 ) ; M&C: Date: Vra %ID in a � a°o � F XAS ote" O00Q �vv- C2&zL/2 5 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FUNDING BREAKDOWN SHEET City Secretary No. 43084 Amendment No. 1 Department TPW City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 Fund -Account -Center P227 531200 2042800673 30 Total: Amount $59,995.00 $59, 995. 00 February 12, 2013 Mr. Michael R. Perkins, P.E. Storm Water Management Division Transportation & Public Works Department City of Fort Worth 900 Monroe Street, Suite 404 Fort Worth, Texas 76102 Re: Request for Amendment No. 1 — Additional Design Services for Storm Drain Improvements CARTEN ST. DRAINAGE IMPROVEMENTS City Project No. 00673 URS Project No. 25335260 Dear Mr. Perkins: This letter is for requested additional engineering services for the above referenced project. The services for Amendment No. 1 are in addition to or modify our current scope of services. A description of the additional services and associated fees are provided below. A detailed breakdown of the proposed fee for these additional services is also attached. ADDITIONAL ENGINEERING DESIGN SERVICES 1. Project Management - Provide project management services for the preparation of additional storm drain design, water line lowering design, headwall improvements, and oversight of subconsultants. URS Corporation Services = $3,540.00 Subconsultant Mark-up (1O%) _ $ 355.00 Total Additional Management Services = $3,895.00 2. Additional Storm Drain Design Services 7 Per City's direction during the 30% design review meeting held on 12/11/12, the following additional design services will be performed by the URS design team. a. "Phase 2" Storm Drain Design: The proposed storm drain on Janice Lane will be extended to a point approximately 225-ft, south of the intersection with Norma St as shown on the 30% design submittal. This extension involves preliminary and final design of an additional 825 ft. of storm drain and approximately four additional storm inlets. The additional storm drain design includes performing hydraulic calculations, hydraulic gradient line, and inlet computation tables to be included on the construction plans. The traffic control plan and URS Corporation 1300 Summit Avenue, Suite 600 Fort Worth, TX 76102 Tel: 817.390.1000 Fax: 817.882.9462 www.urscorp.com URS Mr. Michael R. Perkins, P.E. February 12, 2013 Page 2 of erosion control plan will require expansion to include the additional area of construction for the "Phase 2" portion of the project. URS Corporation Services = $44,550.00 EBG Engineering Services = $ 2,300.00 Phase II Storm Drain Design $46,850.00 b. "Phase 2" Water Line Lowering Design: The additional storm drain laterals will conflict with the existing 8" water line in Janice Lane. Four additional water line lowering locations are included in the additional design efforts. EBG Engineering Services = $ 1,25 0.00 "Phase 2" Water Line Lowering Design $ 1,250.00 c. Headwall Improvements: A new vertical headwall will be designed to replace the existing flared wing wall, north of Meadowbrook Drive. Minor grading design will be performed on the channel immediately north of the headwall. The existing 6'X5' box drain will be extended approximately six feet north to accommodate the proposed tangential sidewalk alignment revision along the north side of Meadowbrook Drive. URS Corporation Services = $ 8,000.00 Headwall Improvements $ 8,000.00 Total Additional Design Services = $56,100.00 The proposed fee for the services as described above does not include the following services: 1. Additional topographic survey, as it is assumed that existing Topographic survey is sufficient to. provide the above mentioned design services. 2 Permit preparation services. 3. Any Additional Geo-Technical exploratory borings other than the eight borings included in the original contract. 4. Easement preparation. 5. Paving improvements beyond the normal limits (as defined by the City Standard pavement trench repair details) of the proposed storm drain improvements and water line lowering. 6. Any services not specifically stated above. We therefore request a contract amendment to increase the lump sum fee amount by $59,995. Mr. Michael R. Perkins, P.E. February 12, 2013 Page 3 of 4 Summary - Amendment No. 1 The additional fees to provide the above mentioned additional services are as follows: Description Project Management Surveying Engineering Services Reproduction Total Fee URS Fee $3,895.00 $0.00 $52,550.00 $0.00 $56,445.00 EBG Engineering (M/WBE) $0.00 $0.00 $3,550.00 $0.00 $3,550.00 Gorrondona & Assoc. (M/WBE) $0.00 $0.00 $0.00 $0.00 $0.00 Original Contract Amount $ 143,680 Amendment No. 1 $ 59,995 - Requested herein Total Revised Lump Sum Amount $ 203,675 Arlington Blueline (M/WBE) MWBE % $0.00 0.00 % $0.00 0.00% $0.00 6.76 % $0.00 0.00 % $0.00 6.29 % The MWBE participation goal assigned to the original contract is 19.0%. In order to maintain that goal, URS proposes to transfer the Phase 1 design services for preparation of traffic control plans, erosion control plans, and water line lowering to EBG Engineering for an agreed lump sum fee of $7,850.00. This will provide EBG Engineering with a more significant role in the project. The total M/WBE fee participation for this project including Amendment No. 1 and the afore -mentioned transfer of design services to EBG Engineering will be $38,934.00 ($27,534.00 + 3,550.00 + $7,850.00 = $38,934.00) or a total M/WBE percentage of 19.00%. Please contact me if you have any questions regarding this contract amendment. Thank you for the opportunity to continue providing professional engineering services to the City of Fort Worth. URS Mr. Michael R. Perkins, P.E. February 12, 2013 Page 4 of 4 Sincerely, URS CORPORATION C-Q-4ek_ Douglas C. Mikeworth, P.E. Senior Project Manager DCM: mgp 4�, Task No, Task Description 1.0 protect Management 1.1 h+tanaping the team 1.1 Infernal Team Meetuncs 1 1 ONQc 3.0 n (60 Percent) 32 Geofgs'uda6il )rtv avement Design 3.3 Consffrr ti(y ©v►ew 3,1 faring 3.5 lJtilitr Clearance 3.6 raffia Control Plan 3.8 ;onstruction Estimate Kati 4.0 last Desi Thal Draft SOU%) Construction Plans and 4.1 ns 4 2 d ii %) Plans and §Qtxf bons 4.4 ;ons ction Estimates ( and 100%) 6.0 ConSctioePhartg Services 6.1 -Construction bYppp 6.1 Protect Site Visits 6.1 Submittal Review 6.i Final Walk Through and Punch List 6.2 Kecora Orswings Totals City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Re!ease Date: 519 2010 Project Director 5215 2 1 2 0 0 Project ManaS5 6 2 4 28 24 1 1 13 8 4 1 2 1 1 4 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Amendment #1, Additional Design Services for Carten Street Drainage Improvements City Project No. 00673 Labor hours) Project Engineer 51151 590 EIT 81 10 CADD 575 0 Administrative 560 2 2 6 2 63) 90 1341 54 80 120 1 4 1 6 8 2 2 4 6 1 311 641 102 4 20 a 3 40 16 6 66 36 2 2 7 0 0 6 1 dI 1091 1641 2361 7 Total Labor Cost $3,540 $1 135 5,405 531,345 $27,090 Subconsultant MWBE 50 Ense xI Travel Non-MWBE S0 S0 Reproduction Total Expense Cost S01 S0 S12S0 " _g $1.100 $1295 $19,750 51.2501 $12 410 $6 4� $1./ $1.195 $3 $55,14 I 53.5501 S0 SQ sot 565 S165 $750 5500 $75 590 S0 S0 530 S0 $20 510 0I 5301 5230 30 30 520 St0 50 S3,810 Task Sub Total Pro(ict Summary Tout Hours Total Labor Total ExPepftse MWBE Subcormufant Non-MWBE Subconsultant 10% Sub Markuq M'WbECosParticipation o Prorofeci Cosh 53.540 5 51 $2,52,405 51 $t 5 51.r525 $1,295 $21,165 $905 $0 $320 50 $59,640 569 555.830 S3,810 S3, 550 S0 S355 5,9% 559,995 2/12/2013 1 of 1 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 5/14/2013 DATE Tuesday, May 14, 2013 REFERENCE NO.: **C-26248 LOG NAME: 20SW CARTEN STREET DESIGN AMENDMENT #1 SUBJECT: Authorize Execution of Amendment No. 1 to City Secretary Contract No. 43084, an Engineering Services Agreement with URS Corporation, in the Amount of $59,995.00 for the Design of Stormwater Utility Project—Carten Street Erosion Protection and Drainage Improvements, Thereby Increasing the Total Contract Amount to $203,675 00 (COUNCIL DISTRICTS 4 and 5) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 1 to City Secretary Contract No. 43084, an engineering services Agreement with URS Corporation in the amount of $59,995.00 for the design of stormwater utility project—Carten Street erosion protection and drainage improvements, thereby increasing the total contract amount to $203,675.00. DISCUSSION: The Amendment recommended by this Mayor and Council Communication will provide for the design of additional storm drain, replacement of an existing headwall and relocation of a City waterline outside of the original project limits. The need to expand project limits was identified during preliminary analysis. On January 21, 2012, the City Council authorized an Agreement with URS Corporation, to provide preliminary analysis and engineering (M&C C-25441). URS Corporation, proposes to perform the Amendment design services for a lump sum fee in the amount of $59,995.00. Staff considers the fee to be fair and reasonable for the scope of services provided Funding for this project is being provided from revenue bonds in the Stormwater Capital Projects Bond Fund. M/WBE Office: URS Corporation, agrees to maintain its initial M/WBE commitment of 19 percent that it made on the original Agreement and extend and maintain that same M/WBE commitment of 19 percent to this first Amendment. Therefore, URS Corporation, remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICTS 4 and 5, Mapsco 80G. FISCAL INFORMATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Stormwater Capital Projects Bond Fund FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers P227 531200 204280067330 $59.995.00 CERTIFICATIONS: Submitted for City Manager's Office bv: Originating Department Head: Additional Information Contact: ATTACHMENTS Fernando Costa (6122) Douglas W. Wiersig (7801) Russell Poer (7891) 1. 00673—Carten Street Outfall Dg n Am 1 MWBE 04-24-13.ndf 2.00673 Man.udf 3. 123. 20SW Carten Street Design — Amendment(FAR verification of funds JCT 4-29-131.docx 4. FAR-00673 00008—Amendment #1.ndf