Change Order Request
ProjectName:1 Fort Worth EMWTP 1 HSP-H-20 and Hydro Tank City Sec No.; 52898
Project No.(s): 56017-0600430-001780 DOE No. N/A CityProj.No.:l 100277
Project Descriplion:r Installation of a second Hydropnematic tank at the Eagle Mountain Water Treatment Plant
Contractor:I Archer Western Construction,LLC Change Order# ® Date: 1 10/1/2020
City Project Mgr.1 Dena Johnson City Inspector: I Carmen Drake
Phone Number: 817-392-7866 Phone Number: 817-392-8347
Dept. Water Totals Contract Time(Calenderdays)
Original Contract Amount $1,023,700.00 $1,023,700.00 395
Extras to Date $23,113.14 $23,113.14
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,046,813.14 $1,046,813.14 395
Amount of Proposed Change Order $24,914.91 $24,914.91 040
Revised Contract Amount $1,071,728,05 $1,071,728.05 435
Original Funds Available for Change Orders $51,185.00 $51,185.00
Remaining Funds Available for this CO $28,071.86 $28,071.86
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 4.69%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $1,279,625.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change Order No.4 will allow for field machining on the sole plate of the existing pump to remove corrosion
pitting and level condition out the plate.Inspection of the barrel flange for HSP-H-20 revealed that it pitted and
out of level.
Staff recommends the approval of 40 additional calendar days on the change order.
i
I
i
i
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's company Name Contractor Name Contractor Signature Date
Archer Western Construction,LLC Jeff Kendall Jeff Kendall 10/2/2020
In pector Date Project Manager Date
►.K- n 61 A111? lel —/^ (/94,:Z, fL 10-1-20
Director Water Dept Dale Co struclion Su isor(Water Dept) Date
cm c Ner10R4u y32con
'r Oct 6,2020
Assistant City Attorney Dale Assistant City Manager Date
009- Oct 7,2020 S r Oct 8,zozo
�B
Council Action If Required)
M&C Number N/A M&C Date Approved A OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
Fc3n-r V-V�r,-F>F-1t City of Fort Worth
—�'_ _t=' Change Order Additions
Project Name Fort Worth EMWTP 1 HSP-H-20 and Hydro Tank City Sec No.: 52898
Project No.(s): 56017-0600430-001780 1 DOE No. N/A City Proj.No.: 100277
Project Installation of a second Hydropnemalic tank at the Eagle Mountain Water Treatment Plant
Description
Contractor Archer Western Construclion,LLC Change Order:® Date; 1011/2020
City Project Mgr. F Dena Johnson City Inspector Fcarmen Drake
ADDITIONS
DEPT Qty Unit Unit Cost Total
6 Field machining of barrel for HSP-H-20 to restore surface finish and bring Water 1.00 LS $17,689.40 $17,689.40
level back into tolerance
7 Non-Fused disconnect adjacent to Panel HHP Water 1.00 LS $7,225.51 $7,225.51
I
i
�I
I'
i
1
t II
i
'i
Water 1$24,914.91
Page 2 of 4 Additions Sub Total 1$24,914.91
Bo,a-F ViT0rz- I-it City of Fort Worth
- {'=J Change Order Deletions
Project Name Fort Worth EMWTP 1 HSP-H-20 and Hydro Tank City Sec No.: 1 52898
Project No.(s): 56017-0600430-001780 DOE No. N/A City Proj.No.: 100277
Project Description Installation of a second Hydropnemalic lank at the Eagle Mountain Water Treatment Plant
Contractor Archer Western Construction,LLC Change Order: ® Dale 1 10/1/2020
City Project Mgr. Dena Johnson City Inspector: ECarmen Drake
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
I�
1
I
I I
i
f
i
f
i
i
Water
i
Page 3 of 4 Deletions Sub Total
i
I.
IVIMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# AMOUNT
DATE
I
i
i
Total $0.00
i
(
i
i I
� l
I �
I ,
I
i
i �
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Denajohnson
Name of Employee
Project Manager
Title
ao�vvUp��
v *r=s-o—
fo, ..... 9d0 t
O0, oo=dATTEST: �p,� *Ronald P.Go—lea(UR8,2@OM:MCDT)%,ald P.Go—lea lGR 8,2@O M:M CUT) 00000000
Mary J. Kayser
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
SMITH
PUMP
301 M&B Industrial Waco,Texas 76712
(COMPANY, INC. (800)299-8909 (254)776-0377 FAX(254)776-0023
To: Josh Stombaugh— Archer Western
From: Smith Pump Company
RE: Barrel Flange Level Report
We had a field service man come out to the jobsite to take level
measurements of the existing barrel flange. Upon inspection of the flange, he
noticed severe pitting on the surface. This caused difficulty in recording a level
reading. The flange slopes down from the discharge side and to the right. The
barrel also had water in it which did not allow us to take a plumb measurement.
Report page is below along with pictures.
Our recommendation is to have the flange field machined to correct the level
and renew the surface finish.
i
i
3500 Comsouth Drive,Suite 500 Austin,Texas 78744 (512)310-1480 FAX(512)310-1417
4624 Martin Luther King Frwy Fort Worth,Texas 76119 (817)589-2060 FAX(817)595-4900
6824 Bourgeois Road Houston,Texas 77065 (713)997-8647 FAX(281)912-6042
0 SMITH PUMP COMPANY, INC.
BARREL FLANGE LEVEL REPORT
As Found
0 UNIT#: HSP-H-20 By: Rodney Greenwood
Dale: 911112020 SO#: 177902-02
WARNING JOB: 177902-02Level Barrel Flange
BARREL LEVEL FLANGE PROJECT: City of Fort Worth
STATION: City of Fort Worth EMWTP
EXCEEDS TOLERANCE -----------------------------------------
CALCULATED LEVEL:
0°TO DISCHARGE: 0.0073 INIFT
90°TO DISCHARGE: 0.0030 IN/FT
Discharge 0.022 IN Discharge
O 0'� -O- �-(3. � O
p�
I O
I
p 0.009 IN
I I
I
O
I O
O �` e� O
SPAN: 36 IN
NOTES:
1.ALL LEVEL READINGS ARE IN INCHES.
COMMENTS:
Due to heavy pilling on the surface of the Range,accurate level measunn ants were difficult to obtain.A plumb reading was unable to be taken due to the water level
In the can.With the existing conditions,we recommend Field machining to restore level.
hll s�1/smllhournjxsharepoinl.com>QMS>O eralions>Forms O erattons>Fietd Forms>Fleld Service Forms>Level Reports Rev.03 010210
I
File:K\Quality\Quality Management System\Documents and Forms\Field Service Forms Rev.12/08/2015
i
i
r r ,j ff I
r:
�..:a Lam• 'LL�.L�•- ...1�-�
t4 !
i
i
i
i
I�
I
i,
I I
n t,
II I •' II I
I �
i�
,i
ii
I
I�
I
y
i
i
I
i
XFMR
( Main / LH I
Breaker Ira
i �`T.{•-�_• + it sl f
W
lips
�
Spare
OL -�- lighting
<03
con
1
Imo.
tT c �� O
Room Air - _
,3 I'` O wio_a
f
j •1II 1�1+ t I 1� �--' I- `- O h'�•JP.0
Compressor .: ._� __ _ _ ► o I�o
ow•1PI�+� la I � der ioGl i I;_�I�.�:,,Ff 12•� �i
Aft,
_ �; O ` L�1• _ -• � l! isi
fn
9
lei
Hydo I
- N) Com lessor
I
pfi�� I I( II
I '
IF
.r li
I I
I
I i r
Ii
I
I l��li I.♦_ ii I li i' i .�
I
i
i
I
i