HomeMy WebLinkAboutContract 54645 Received Date: 10/08/2020
Received Time: 2:35 PM
Developer and Project Information Cover Sheet:
Developer Company Name: Copper Creek Partners,LP
Address, State,Zip Code: 5055 Keller Springs Rd., Suite 500 Addison,TX,75001
Phone&Email: 214-914-9809,FredP@trezcapital.com
Authorized Signatory,Eitle.JFred Phillips, Senior Vice President
Project Name: Copper Creek Phase 4.1
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: FM 156 and Heritage Trace Parkway
Plat Case Number: Plat Name:
Mapsco: Council District: 7
CFA Number: CFA20-0089 City Project Number: 102731
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
City of Fort Worth,Texas Page 1 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
CSC No.54645
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by
and between The City of Fort Worth ("City"), a home-rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and Copper Creek Partners, LP
("Developer"),acting by and through its duly authorized representative. City and Developer are referred to
herein individually as a"party"and collectively as the"parties."
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Copper
Creek Phase 4.1
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement("Community Facilities"or"Improvements"); and
WHEREAS,as a condition of approval of the Project,Developer is required to meet the additional
obligations contained in this Agreement, and Developer may be required to make dedications of land,pay
fees or construction costs,or meet other obligations that are not a part of this Agreement.; and
WHEREAS,the City is not participating in the cost of the Improvements or Project; and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated
into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exist between the terms and conditions
of this Agreement and the CFA Ordinance,the CFA Ordinance shall control.
2.
Incorporation of Engineering Plans
The engineering plans for the Improvements that have been accepted by the City ("Engineering
Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
City of Fort Worth,Texas Page 2 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the general location, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
® Exhibit A: Water
® Exhibit A-1: Sewer
® Exhibit B: Paving
® Exhibit B-1: Storm Drain
® Exhibit C-1: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates
conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 —
Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and
Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all
purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer's contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee").
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
6.
Completion Deadline; Extension Periods
This Agreement shall be effective on the date this Agreement is executed by the City's Assistant
City Manager ("Effective Date"). Developer shall complete construction of the Improvements and
obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term").
City of Fort Worth,Texas Page 3 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time("Extension Period"). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement,becomes insolvent, or fails to pay costs of construction.
(c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any property which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d) Nothing contained herein is intended to limit the Developer's obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's
contractors,or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer's contractors begin
constructing the Improvements, Developer agrees to the following:
(a) that Developer and City must execute a termination of this Agreement in writing;
(b) that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c) to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City's inspectors at preconstruction meetings.
9.
Award of Construction Contracts
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including,but not limited,to being prequalified,insured,licensed and bonded to
construct the Improvements in the City.
City of Fort Worth,Texas Page 4 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
(c) Developer will require Developer's contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer's contractors to
provide the City with a maintenance bond naming the City as an oblige, in the amount of one
hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2) years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City's
Standard Conditions,Chapter 2253 of the Texas Government Code,and the Texas Insurance Code.
(d) Developer will require Developer's contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's
insurance provider,which shall be made a part of the Project Manual.
(e) Developer will require the Developer's contractors to give forty-eight (48)hours' advance notice
of their intent to commence construction of the Improvements to the City's Construction Services
Division so that City inspection personnel will be available. Developer will require Developer's
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City's inspectors. Developer will require Developer's contractors to not install or
relocate any sanitary sewer, storm drain,or water pipe unless a City inspector is present and gives
consent to proceed,and to allow such laboratory tests as may be required by the City.
(f) Developer will not allow Developer's contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2) to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
11.
Easements and Rights-of-Way
Developer agrees to provide,at its expense,all necessary rights-of-way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
City of Fort Worth,Texas Page 5 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
12.
Liability and Indemnification
(a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b) THE DEVELOPER COVENANTS AND AGREES TO,AND BY THESE PRESENTS DOES
HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS
OFFICERS,AGENTS AND EMPLOYEES FROM ALL SUITS,ACTIONS OR CLAIMS OF
ANY CHARACTER, WHETHER REAL OR ASSERTED,BROUGHT FOR OR ONACCOUNT
OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS,INCLUDINGDEATH,
OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE
CONSTRUCTION, DESIGN,PERFORMANCE OR COMPLETION OF ANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO
PROPERL Y SAFEGUARD THE WORK, OR ON ACCOUNT OF ANY ACT,INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES,
WHETHER OR NOT SUCHINJURIES,DEATH OR DAMAGESARE CAUSED,IN WHOLE
OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS,SERVANTS, OR EMPLOYEES.
(c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH,RESULTING FROM, OR INANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER
OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE
ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY
FOR ANY LOSSES, DAMAGES, COSTS OR ERPENSES SUFFERED BY THE CITY OR
CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE
WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE
MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE,
AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS.
13.
Right to Enforce Contracts
Upon completion of all work associated with the construction of the Improvements,Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors,along with an assignment of all warranties given by the contractors,whether express or implied.
Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
City of Fort Worth,Texas Page 6 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees,and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars ($50.00),the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre-approved material testing laboratories. The Developer must
contract with material testing laboratories on the City's list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtainproof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand-
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY: DEVELOPER:
Development Coordination Office Copper Creek Partners, LP
City of Fort Worth 5055 Keller Springs Rd. Suite 500
200 Texas Street Addison, TX 75001
Fort Worth, Texas 76102
With copies to:
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
City of Fort Worth,Texas Page 7 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer's contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of
three(3)years after final payment under the contract,have access to and the right to examine any directly
pertinent books, documents,papers and records of such contractor, involving transactions to the contract,
and further,that City shall have access during normal working hours to all of the contractor's facilities,and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer's contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants,officers,contractors,subcontractors,and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co-employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
City of Fort Worth,Texas Page 8 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants, officers, contractors, subcontractors,and volunteers.
The City, through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas,Fort Worth Division.
20.
Non-Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City's right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose,their attorneys,have had the opportunity to review
and comment on this document;therefore any rule of contract construction or interpretation that would
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
language.
City of Fort Worth,Texas Page 9 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and(2)will not boycott Israel during the term of the contract. The term"boycott Israel"has
the meaning ascribed to it by Section 808.001 of the Texas Government Code. The term"company"has
the meaning ascribed to it by Section 2270.001 of the Texas Government Code. To the extent that Chapter
2270 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer
certifies that Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and(2)will not boycott Israel during the term of this Agreement.
26.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,
DEVELOPER'S EMPLOYEES,SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
27.
Amendment
No amendment,modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
28.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City's prior written approval shall be void and constitute a breach of this Agreement.
29.
No Third-Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise,to any other person or entity.
City of Fort Worth,Texas Page 10 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
30.
Compliance with Laws,Ordinances,Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed
and understood that, if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
31.
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order,resolution,ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
32.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original,but which together will constitute one instrument.
33.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder,and
any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth,Texas Page 11 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
34.
Cost Summary Sheet
Project Name: Copper Creek Phase 4.1
CFA No.: CFA20-0089 City Project No.: 102731
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 557,014.00
2.Sewer Construction $ 533,476.00
Water and Sewer Construction Total $ 1,090,490.00
B. TPW Construction
1.Street $ 833,205.00
2.Storm Drain $ 284,858.00
3.Street Lights Installed by Developer $ 89,166.51
4. Signals $ -
TPW Construction Cost Total $ 1,207,229.51
Total Construction Cost(excluding the fees): $ 2,297,719.51
Estimated Construction Fees:
C. Construction Inspection Service Fee $70,650.00
D. Administrative Material Testing Service Fee $19,502.00
E. Water Testing Lab Fee $1,590.00
Total Estimated Construction Fees: $ 91,742.00
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond= 100% $ 2,297,719.51 x
Completion A reement=100%/Holds Plat $ 2,297,719.51
Cash Escrow Water/Sanity Sewer= 125% $ 1,363,112.50
Cash Escrow Paving/Storm Drain=125% $ 1,509,036.89
Letter of Credit= 125% $ 2,872,149.39
City of Fort Worth,Texas Page 12 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC)
IN WITNESS WHEREOF,the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH DEVELOPER
Copper Creek Partners,LP
a Texas limited partnership
Dana Burghdoff(Oct 8,202 :54 CDT) By TA GP,LLC
Dana Burghdoff a Delaware limited liability company
Assistant City Manager its General Partner
Date: Oct 8,2020 #edk1- (fLh����f
'fredericksphillips(Oc 7,202016: 0CDT)
Recommended by: Name: Fred Phillips
Title: Senior Vice President
EveG—m grfGet
Evelyn froberts(Oct 7,202016:50CDT) Date: Oct 7,2020
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development
Approved as to Form &Legality:
Richa A.McCracken(Oct8,202008:09CDT)
Richard A.McCracken
Sr.Assistant City Attorney
M&C No. N/A
Date: Contract Compliance Manager:
Form 1295: N/A By signing, I acknowledge that I am the person
oovoan
bpF Fosr4�aa responsible for the monitoring and
0 ooa000000�a
o� o
a administration of this contract,including
ATTEST: �r. a�d
pgo a=� ensuring all performance and reporting
poi 0o* requirements.
fvr gowga A. C� °an rsl0000
'for Ronald P.Gonzales(Oct ,202014:15 CDT) �bppoQo4
Mary J.Kayser/Ronald Gonzales Laurie Lewis
City Secretary/Assistant City Secretary Laurie Lewis(Oct 7,202017:30 CDT)
Name: Laurie Lewis
Title: Interim Development Manager
OFFICIAL RECORD
CITY SECRETARY
City of Fort Worth,Texas FT. WORTH, TX Page 13 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
❑ Attachment 2—Phased CFA Provisions
❑ Attachment 3 —Concurrent CFA Provisions
® Location Map
® Exhibit A: Water Improvements
® Exhibit A-1: Sewer Improvements
® Exhibit B: Paving Improvements
® Exhibit B-1: Storm Drain Improvements
® Exhibit C-1: Street Lights and Signs Improvements
® Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas Page 14 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
ATTACIEMENT"I"
Changes to Standard Community Facilities Agreement
City Project No. 102731
None
City of Fort Worth,Texas Page 15 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC]
00 42 43
BID PROPOSAL
Page 1"r2
Copper Creek - Phase 4.1
City Project#102731
UNIT PRICE BID
Project Item Information Bidder's Proposal
Bidlist Description Specification Section No. Unit of Bid Quantity Unit Price Bid Value
Item No. Measure
Water Facilities
1 3311.0261 8"PVC Water Pie 3311 10,3311 12 LF 5 557 $34.00 $1188938.00
2 3311.0251 8"DIP Water Pipe 3311 10 LF 212 $64.00 $13,568.00
3 3311.0161 6"PVC Water Pie 3311 12 LF 66 $32.00 $2 112.00
4 3312.3003 8"Gate Valve&Valve Box 331220 EA 15 $1 300.00 $19,500.00
5 3312.0001 Std.Fire Hydrant Assembly w/6"Gate Valve&Valve Box 331240 EA 11 $4,500.00 $49.500.00
6 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 2.0 $5,000.00 $10 000.00
7 3305.0109 Trench Safely 330610 LF 1 5 577 $1.001 $5 577.00
8 3312.2003 1"Domestic Water Services 331210 EA 133 $950.00 $126 350.00
9 33122003 1.5"Irrigation Water Services 331210 EA 1 $2,000.00 $2 000.00
10 3312.0117 Conned to Existing 8"W.L.Stub-out 33 12 25 EA 5 $1 000.00 $5 000.00
11 3305.1103 20"Casing By Other Than Open Cut 8"W.L.BORE 33 05 22 LF 192 $600.00 $115.200.00
12 9909.0001 Automatic Flusher 00 00 00 EA 3 $4 500.00 $13 500.00
13 3304.0101 Water Test 33 04 30 LF 5,769 $1.00 $5 769.00
Water Subtotal S557 014.00
Sanitary Sewer Facilities
14 13331.4115 8"SDR-26 PVC Sewer Pie 3311 10,33 31 12,33 31 20 LF 4 847 $44.00 $213 268.00
15 19999.0002 Conned to Exisfin 8"S.S.Stub-out 00 00 00 EA 2 $1 000.00 $2,000.00
16 3331.3101 SDR-26 4"Sewer Services 33 31 50 EA 140 $650.00 $91 000.00
17 3339.1001 4'Std.Dia.S.S.Manhole 33 3910,33 39 20 EA 34 4,200.00 $142.800.00
18 3339.1002 4'Std.Dia.Drop S.S.Manhole-Conversion 33 3910,33 39 20 EA 1 $5,200.00 $5200.00
19 3339.1003 Extra Depth for 4'Std.Dia.Manhole 33 39 10,33 39 20 VF 132 $185.00 $24 420.00
20 3331.4116 8"PVC Sewer Pi w/CSS Backfill 13311 10,33 31 12,33 3120 LF 350 $54.001 $18 900.00
21 9999.0003 Interior Corrosion Protection 00 00 00 EA 3 $4 500.00 $13 600.00
22 3305.0113 Trench Water Stop330515 EA 12 250.00 $3 000.00
23 3305.0109 Trench Safety 33 05 10 LF 4,847 $1.00 $4 847.00
24 3301.0002 Post-CCTV Inspection 330131 LF 1 4,847 $3.00 $14,541.00
Sanitary Sewer Subtotal $533,476.00
Stone Drain Facilities
25 3349.5002 15'Curb Inlet 33 49 20 EA 8 S4.400.00 $35 200.00
26 3349.5003 20'Curb Inlet 33 49 20 EA 1 $5.400.00 $5 400.00
27 3349.6001 10'Recessed Inlet 33 49 20 EA 1 $4.200.00 $4,200.00
28 3341.0201 21"Class III R.C.P. 3341 10 LF 218 $55.00 $11 990.00
29 3341.0205 24"Class III R.C.P. 3341 10 LF 418 $60.00 S25 080.00
30 3341.0302 30"Class III R.C.P. 3341 10 LF 420 $70.00 $29.400.00
31 3341.0409 48"Class III R.C.P. 334110 LF 604 $150.00 $90,600.00
32 13341.0502 54"Class III R.C.P. 3341 10 LF 160 $195.001 $31 200-00
33 9999.0004 Remove Ex.54"Headwall&35 LF 00 00 00 LS 1 1 50o.00l $1.500.00
34 9999.0005 Remove&Replace 10"Concrete Pavement 00 00 00 SY 18 $95.00 $1 710.00
35 3349 4109 24"Class III R.C.P. Sloped End Headwall 33 49 40 EA 1 $3 000.00 $3 000.00
36 3349.0001 4'x4'S.D-M.H. 33 49 10 EA 1 $5 000.00 S5,000.00
37 3349.0002 5'xT SO M.H. 33 49 10 EA 2 $6,000.00 $12 000.00
38 3349.0003 6'x6'S.D.M.H. 00 00 00 EA 1 $7 500.00 $7 500.00
39 9999.0006 Conned to Exislin 6'X 4'Junction Box 33 49 10 EA 1 $2.500.00 $2 500.00
40 3305.0109 Trench Safety 330510 LF 1.820 $1.00 $1,820.00
41 3137.010212"DIA(Large Slone Rip-rap,Dry 313700 SY 129 S102.00 $13158.00
42 1313e.0104 Gabion Mattress 9"Thirk 31 36 00 SY 1 24 $150.00 $3,600,00
Storm Drain Subtotal $284.858.30
Water/Sanitary Sewer/Storm Drain Facilities Subtotal $t 375 348.00
CITY OF FORT W ORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUhEN S
Form Revised 20120120 Copp.Creek Ph 4.1 Bid P.posel C"""L".
00 42 43
BIDPROPOSAL
Pge2 or2
Copper Creek - Phase 4.1
City Project#102731
UNIT PRICE BID
Project Item Information Bidder's Proposal
Bidlist Description Specification Section No. Unit of Bid Quantity Unit Price Bid Value
Item No. Measure
Paving Facilities
43 3213.0101 6"Concrete Pavement(Residential) 32 13 13 SY 16,286 $34.50 $561,867.00
44 3211.0501 6"Lime Treated Sub grade(Residential) 32 11 29 SY 17,315 $3.00 $51,945.00
45 3211.0400 Hydrated Lime CcD 30lbs./S.Y.(Residential) 3211 29 TON 260 $185.00 $48 100.00
46 3213.0103 10"Concrete Pavement(Heritage Trace Parkway) 3311 13 SY 1,591 $57.50 $91,482.50
47 3211.0502 B"Lime Treated Sub grade(Heritage Trace Parkway) 321129 SY 1,738 $4.00 $6,952.00
48 3211.0400 Hydrated Lime 36 lbs./S.Y.(Heritage Trace Parkway) 321129 TON 32 $185.00 $5,920.00
49 3213.0506 P-1 Ramp 321320 EA 6 $1,300.001 $7,800.00
50 3213.0501 R-1 Ramp 321320 EA 8 $1,400.00 $11,200.00
51 3213.0302 5'Concrete Sidewalk 321320 LF 280 $16 25 $4,550.00
52 3213.0302 10'Concrete Sidewalk 321320 LF 549 $32.50 $17,842.50
53 9999.0007 Conned to Existing Concrete 00 00 00 LF 115 $20.00 $2,300.00
54 9999.0008 Stop Signs 00 00 00 EA 10 $650.00 $6,500.00
55 3441.4006 Street Name S' ns 344130 EA 44 $250.00 $11,000.00
56 3217.0001 4"SLD Pvmt Markin HAS(W 321723 LF 630 $2.00 $1,260.00
57 3217.0201 8"SLD Pvmt Marking HAS(W) 32 17 23 LF 260 $4.00 $1,040.00
58 3217.0501 24"SLD Pvmt Marking HAE i W) 32 17 23 LF 14 $20,00 $280,00
59 3217.2102 REFL Raised Marker TY I-C 321723 EA 54 $4.00 $216.00
60 End of Road Barricade 00 00 00 LF 29 $50.00 $1,450.00
61 19999.0009 Remove Existing Pavement Striping&Flexible Delineators 00 00 00 LS 1 $1,500.00 $1,500.00
Paving Subtotal 1 $833 205,00
Bid Summary
Water/Sanitary Sewer/Storm Drain Facilities Subtotal $1 375 348.00
PavingFacilities Subtotal $833 205.00
Total Bid $2,208,553.00
This bid is submitted by the entity listed below:
Company: Conatser Construction TX,L.P. By: Brock Hu gins
Street Address:5327 Wichita Street
City,State,Zip Cede:Ft Worth,TX 76119
Phone: 817534-1743 Signa
Title:President
Date:
Contractor agrees to complete WORK for FINAL ACCEPTANCE within Z410 working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Fonn Revised 20120120 Copper Cr k Ph 4.1 Bid Proposal Coeelsa
00414,
Bm PROPOSAL
Pace 1 of I
Copper Creek - Phase 4.1
City Project# 102731
UNIT PRICE BID
Project Item Information Bidder's Proposal
Bidlist Description Specification Section No. Unit of Bid Quantity Unit Price Bid Value
Item No. Measure
61 13441.3341 Light Pole Assembly-Type 11 Pole,Single 33B Arm,ATBO LED Luminaire 3411 10 EA 18 $3915.0 $70,470
62 2605.3011 2"Conduit PVC SCH 40 T OS33 .00
LF 1,239 $10.71 $13 269.69
63 13441.1408 No.10 Copper(Single Fixture Residential 3441 10 LF 3,717 1 $1.46 $5 426.82
Street Lighting Subtotal $89,166:51
Bid Summary
Street Lighting Facilities Subtotal $89,166.51
Total Bid 1 $89,166.51
This bid is submitted by the entity listed below:
Company: Independent Utility Construction By: Ehar Wolfe
Street Address: 5109 Sun Valley Drive
City,State,Zip Code: Ft.Worth,TX 76119
Phone: 817-478-4444 nature
Title:President
Date: 8/07/2020
Contractor agrees to complete WORK for FLI ACCEPTANCE within 30 working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUWNTS
F—R-is d 20120120 Copper Creek Ph 4.1 Bid Proposal Independent
I h l I t l l I
s �/
,r x
r
,V i \ 1
:w >
E
z4 /
1 ~ �
II
o
N
O
N
o
a 01C \
y
LL
ca
-_
N � -
i i.
N
O
t
SCALE 11' = 700'
OPPER CREEK
CL
U
a
U
PHASE 4.1
o�
C= PR0J. NO. 102731
N MAPSC O NO. 20X9 34B
L
O
m
CO Y OF FORT V V ORTH9 TEXAS
m
u
®��D/dDEVELOP]EllD BY:CL
PREPARED BY:
u GOODWINI
I Copper Creek Partners, LP MARSHALL 9
m 5055 KELLER SPRINGS ROAD, SUITE 500 GML ENGINEERS-PLANNERS-SURVEYORS
o ADDISON, TEXAS 75001 24MMusr Difte,GrepWne,Texw7 1
W (214 ) 914-9809 (8»' MAVGUST, 2020
TBPE RED.#F2944 TBPLS FIRM#70021700
COPPER PER CREEK
PHASE 4.1
WAMR
13=1T nAn
EB
N
W E
NOTE S
ALL WATER LINES SHOWN
ARE 8' IN DIAMETER UNLESS GRAPHIC SCALE 1"=200'
OTHERWISE INDICATED.
0 200 400 600 (�
®VAiEIID/JD EVI(0PE]EIID BY:
Copper Creek Partners, LP
5055 KELLER SPRINGS ROAD, SUITE 500
ADDISON, TEXAS 75001
(214 ) 914-9809
MA TCM.ME SEEPAGE 2''14 13 12 12 10 9
21 22 23 24 25 26 16 15 0P°N 0 ME
RON ME DOW RIV 22 �< )
20 v
BLOCK AA Cl21 V�.
49 16 BLOCK Y
10 g 14 15
18 12 13 17
11 B OCK �G9�20
17 al 18 19
0 12 7 /
16 a 13 6 w
B OCK V > CO ER AD C URT 7
15 z 14 5 o
I� 14 aI I 15 a H 0 O���P�� /
19 W a 5 ���o a��P`�` /
16 3 a 6F
12 17 2 U BLOCKYrA
z 7X 3 P % EX. 48" NSII W.L.
11 16
OPIVE
10 19 POOW / f
BLOCK 9A �pN(PNp 1 / / /
ppQ10P41 ti
B 2 z /
Ex, 4 3 OCK A / QO
B" W.L.
7X 6 5
P �PA� PREPARED BY:
i
i1pP�% (300 DVnNl
Al EX. �VTI ,IL,
K B W.L. CML ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang Drive,Grepealne,Texas 7SD.S1
I— — Metro(817)329.Q73
TBK REG.#F-M4 THPLS FlRM#10021700
B" W.L. BORE W/STEEL CASING PAGE 1 OF
E 1\10591 — Copper Creek\Plans\Phase 4 & 4A\Copper Creek Phase 4.1 & 4.2 CFAs.pro 10 Sep 2020
COPPER CREEK
WAMIW PHASE 4.1
~ � r r WA
�Q �77I('I�E+I�
I NOTE
ALL WATER LINES SHOWN
COPPER CREEK ARE IN DIAMETER UNLESS
J PHASE 1 OTHERWISE INDICATED:
PROJECT NO. 02572
EX. 8" W.L. EX. 8" W.L. EX. 8" W.L.
�1 _COPPER CROSSING DRIVE
1 31 1 31
5
2 30 2 OC Y
GRAPHIC SCALE 1"=200' 30
3 29 3 H
0 200 400 Boo ¢ 29
FUTURE 4 2B 4 0 28 ( Q'
COPPER CREEK 27 I a COPPER CREEK
N
PHASE 4.2 5 5 27 aI I PHASE 3
PROJECT NO. 102886 = 26 or
6
Q 6 cr r P6 F-I PROJECT NO. 101457
m I w
.j 25 a
L 7 W 7 25
11 24 B 24 I =I
ZV,1P 9 631 23 / 23
5' OCK CC 22
10 21 �?'\ -EX. 48" NSII W.L.
FUTURE opt 20
COPPER CREEK 19 0
PHASE 4.2 28 o
PROJECT NO. 102686 27
26 17
25 wP
BLo4 z 27 , ®VIN II DEVELOPEDBY:
28 Copper Creek Partners LP
22 29 � Ppe f
P � 5055 KELLER SPRINGS ROAD, SUITE 500
7x so��o� ADDISON, TEXAS 75001
31
�j (214 ) 914-9809
32
33 Y' PREPARED EX:
G00DVnNl
�d 1, CIVIL ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang DAve,GMPW ins,Texas 75051
Mello(817)3294373
TBPE REG.#F2944 TBPLS FIRM#10021700
PAGE 2 OF 2
E 1\10591 — Copper Creek\Plans\Phase 4 8 4A\Copper Creek Phase 4.1 8 4.2 CFAs.pro 10 Sep 2020
�r CHOPPER CREEK SHMAHYMAP
W E
® SEWER GRAPHIC SCALE 1"=200'
7p=BE A�+n —ll¶ro
lC
0 200 400 600
1
I
I
NOTE
ALL SANITARY SEWER LINES
SHOWN ARE 8' IN DIAMETER
UNLESS OTHERWISE INDICATED.
MATCHLINE SEEPAGE 2 _ 10
12 P
21 22 23 24 25 26 16 15 14 13
20
RON ME DOW RIV OFON Cj 22
y� �[
BLOCK AA _ 21
19 16 ` _ BLOCK Y
1B 10 9 12 13 14 15 17
w 11 B OCK 20
17 0 12 7
18 19
16 a 13 6 w> 11 10 9 8
OCK V C ERH AD C URT 7
15 z 14 5 0
Or
® 14 !i I I 15 4
y} Pay
13 16 3 a 4 5 6 �O� P����
12 17 2 BLOCKY
7X 3
11 18 1 2
IVE f
10 19 PCfJ /
BLOCK AA �PC1jPr1P 1 / / PREPARED BY:
O GODS I
2 CML ENGINEERS-PLANNERS�-SURVEYORS
3 OCK A
4 � / � 2405 Mus o .arapevine,7m®a 7so51
7X 6 5 \ ( `�� Dnus
MWo(817)329-M
TBPE REG.#F-29" TBPLS FIRM#10021700
i Q'OvP EX. B„ S.S.
OWNED/DEVEILOPED BY:
GOQQ�P ��o1A5� Copper Creek Partners, LP
QNP 2 5055 KELLER SPRINGS ROAD, SUITE 500
991D N ADD(14 1 914 TEXAS 01
9809
PAGE 1 OF 2
E \10591 — Copper Creek\Plans\Phase 4 8 4A\Copper Creek Phase 4.1 8 4.2 CFAs.pro 10 Sep 2020
COPPER CREEK
ti r
PHASE 4.R
SEEVIER
F.® ]E=17°°A-Ilrr
I
NOTE
ALL SANITARY SEWER LINES
SHOWN ARE ER IN DIAMETER
UNLESS OTHERWISE INDICATED..
� COPPER CREEK
PHASE-1
PROJECT NO. 02572
CO
� EX. 8" S.S. �EX. 8" S.S.
I (COPPER CROSSING DRIVE
GRAPHIC SCALE 1"=200'
I
0 200 400 600 1 31 1 31
2 30 2 0 30
3 29 3 ti 29
¢ I
a
r
4 28 4 0 28
27
URE 5 5 27 w I
COPPERY CREEK 26 0+ 26 I Cc
I IFCOPPHASEPER CREEK
PHASE 4.2 6 6 0
PROJECT NO. 102886 25 I I PROJECT N0. 101457
7 7 25 ¢I
24 I I *I
23 23
oQ QP 0. 22
9
� OCK CC
10 21
20
O9��F
28 p 1
27 18
26 17
25 �P OV D.DEV.®PED BY:
BLO Z ���
23 24 28 27 Capper Creek Partners, LP
F�
22 29 5055 KELLER SPRINGS ROAD, SUITE 500
P (,$ ADDISON, TEXAS 75001
7x 3a ,�31 (214 ) 914-9809
0�. Y
32
�A 33 PREPARED BY:
G ' GOODWHNI
®� CIVIL ENGINEERS—PLANNERS-SURVEYORS
2405 Mustang Drive,OrepeOrte,Texas 7W51
Metro(817)329-4373
TBPE REG.#F-2944 TBPLS FIRM#10021700
PAGE 2 OF 2
E \10591 — Copper Creek\Plans\Phase 4 8 4A\Copper Creek Phase 4.18 4.2 CFAs.pro 10 Sep 2020
N
SWWDRARVNEY" COPPER CREEK W*E
IF STORM DRAIN GRAPHIC SCALE 1"=200'
- i.
'=BET 15-Rif
0 200 400 600
fir' I LEGEND
PROPOSED STORM DRAIN LINE
PROPOSED STORM DRAIN INLET
PROPOSED STORM DRAIN HEADWALL
NOTE
ALL STORM DRAIN LATERALS
SHOWN ARE 21' IN DIAMETER
UNLESS OTHERWISE.INDICATED.
.NIA M&AE SEE PAGE 2 - '^
9
11 IVE
15' URB INLE 14 13 12 o0W
21 22 23 24 25 26 16 15 eP�E ME
20
RON ME DOW RIV 22
BLOCK AA 48' / 0 21 v �r
19 10 9 12 13 14 15 16 m n LOCK Y
18 g 17 �G 20
w 11 OCK 9�
15'CURB INLET 18 19
17 0 12 7
16 a 11 10 9 8
13 g OCK V6 > CO ER AD C URT 7
15 z 14 5 0 _l Oe?Er
® 14 a I I 15 4 H 48'
13 I i cr ,1
,oP1�QPG�
16 3 9 aw 4 5 6
[� 12 17 2 BLOCK Y aP�'49OQ
Q�
z 7X 15' CURB INLET 3
11 18 1 2 j
O¢14E
10 19 pOOW 54' �EX.gE -EX. STORM DRAIN
BLOCK AAA �pNZPNpf�C 1 / /
0
-EX. CURB INLET
2
e / X / 1PREPA M EY-
Zd 4 3 OCK A
7X 5
6 10' URB I ET \ / P�� 1 bi RLHALL 9
0.� CML ENGINEER-PLANNERS-SURVEYORS
/ PEPPS G�QQQ�P��. 2405 MLWMV Drtve,G TWWTM1
Metm ISM 329-4373
21'
i Pax-- Q¢0 TBPE REG,#F-2944 TBPLS FIRM#10021700
-'�-EX. STORM DRAIN
I ' ® DEVE ®FED BY:
SEX. CURB INLET
Copper Creek Partners, LP
-EX. S.D. HEADWALL 5055 KELLER SPRINGS ROAD, SUITE 500
ADDISON, TEXAS 75001
(214 ) 914-9809 PAGE l OF
E \10591 — Copper Creek\Plans\Phase 4 & 4A\Copper Creek Phase 4.1 8 4.2 CFAs.pro 9 Sep'2020
COPIER CREEK 101
7 �
PHASE 4.R
7pS�llT7®[Tnr7[RD�7fll�1DRAIN
GRAPHIC SCALE i"=200'
1l.t1Ji f'LJLBr "B— 1V
® JL 0 200 400 600
NOTE,
ALL STORM DRAIN LATERALS
SHOWN ARE 21' IN DIAMETER
UNLESS OTHERWISE INDICATED.
I
3
i
lam'"
COPPER CREEK
PHASE-1
PROJECT NO. 02572
LEGEND �X. CURB INLET EX. STORM DRAIN
/ +
PROPOSED STORM DRAIN LINE - f\r— COPPER CROSSING DRIVE/i
1 31 1 31
PROPOSED STORM DRAIN INLET 2 EX.3&URB INLET2 C
30
�— PROPOSED STORM DRAIN HEADWALL 3 2s 3 H
¢ 29
a
r
FUTURE 4 28 4 Q 28
COPPER CREEK 27 g a
PHASE 4.2 5 5 w 27 �I
PROJECT NO. 102886 ' 26 N` I ( � COPPER CREEK
B Q 6 ¢ 26 I PHASE 3
25 25 al PROJECT NO. 101457
24
�pP—21' B a~ 8 24
$3 23
5Z good a' OCK CC' 22 ( �l
9 10 21
zo
FUTURE 28 yo 19 0 1
COPPER CREEK 27 18 <"
PHASE 4.2 26 17
PROJECT NO. 102886 25 �P
BLO z c`` �1� ®WNED/D EVIE)<OMD BY: i
27
23 24 �� 29 2 . Copper Creek Partners, LP
22 5055 KELLER SPRINGS ROAD, SUITE 500
7X 30� �P ADDISON, TEXAS 75001
31 0�° S (214 1 914-9809
32
33 �t f PREPARED BY:
OML ENGINEERS—.PLANNERS-"SURVEYORS
2405 Mustanp.Drtve,Grepevine,Texas 7W51
Metro(8M 329-4373
TBPE REG.#F-2944 TBPLS FIRM a#10021700
PAGE 2 OF 2
E 1\10591 — Copper Creek\Plans\Phase 4 8 4A\Copper Creek Phase 4.1 a 4.2 CFAs.pro 9 Sep 2020
COPPER CREEK
® PHASE 4.1
STS
JG=IT rr�rr
LEGEND
PROPOSED 29' B—B ROADWAY
w/ 50' R.O.W.
6' CONCRETE PAVING
PROPOSED VARIABLE WIDTH
B—B ROADWAY w/ 130' R.O.W.
10' CONCRETE PAVING
5' SIDEWALK BY HOMEBUILDER
N SIDEWALK PER THIS CONTRACT
W E NOTE: ALL P—18 R-1 RAMPS BY DEVELOPER
S
GRAPHIC SCALE 1"=200'
0 200. 400 600
MATC &ME SEE PAGE_2 1313 10 9 u,
1VE
14 13 12
21 22 23 24 25 26 16 15
RON ME DOW IV R /R' MP � 22
20 7 BLOCK AA A 21 C+
19 10—/ A MP R l R MP P5/ RAMP BLOCK Y
16 12 13 14 1 17 12 N
w 11 8 OCK �20 /
17 0 1B 19
12 7 / -
1/1 P
16 0 13 6 w io 9
11 8 7h
� OCK V > CO ER 9 H AD C URT`
15 z 14 5 G�F�OR�O /
® 14 a 15 4 H
13
16 3 a 6 O
i2 17
5' SI WALK 2 BLOCk Y Q�o�FO'oe �j EXISTING
7X 3
11 16
10 19 P PpOY�OP1�E P-/ MP
BLOCK AAA LPN�PN 1 / PREPARED BY:
G OOMM I
8 5' IDEWA 3 2 /�/ LARM 9
4 OCK A / CML ENGINEERS-PLANNERS--SURVEYORS
2405 Musta OrWe,Grapevine,Texas 70051
7X
6 5 �/ ng Metro(817)30"M
SPA TBPE REGaf F2944 TBPLS FIRM#10021700
10'SIDEWALK
OVROWDlEV ELOPED BY:
OPEEK Copper Creek Partners, LP
f G�ppP p50300� 5055 KELLER SPRINGS ROAD, SUITE 500
ADD SON TEXAS
75 01
1 9
PAGE 1 OF 1
E \10591 — Copper Creek\Plans\Phase 4 6 4A\Copper Creek Phase 4.1 8 4.2 CFAs.pro 9 Sep 2020
COPPER CREEK
�Jr
PHASE 4.�
I LEGEND
PROPOSED 29' B—B ROADWAY
w/ 50' R.O.W.
j 6' CONCRETE PAVING
1
PROPOSED VARIABLE WIDTH
B—B ROADWAY w/ 130' R.O.W.
I 10' CONCRETE PAVING
E01 e
— 5' SIDEWALK BY HOMEBUILDER
SIDEWALK PER THIS CONTRACT
NOTE: ALL P—I 8 R-1 RAMPS BY DEVELOPER
COPPER CREEK
PHASE-1
CO PROJECT NO. 02572
EXISTING
GRAPHIC SCALE f"m200` - q
COPPER CROSSING DRIVE
0 200 400 600 -
1 31 1 31
2 30 2 30
3 29 3 H
29
a
4 28 4 0 28
27 I I as
FUTURE 6 5 27 w
tU nWi I I a I COPPER CREEK
COPPER CREEK Q 26 0 26 Or I PHASE 3
PHASE 4.2 6 � 6 m I ' � I PROJECT NO. 101457
PROJECT NO. 102886 2a 25 �I
7 to 7 24 w 24 I I
23
23 I I I I EXISTING
OCK CC 22
10 21
R—I RAMP 11
20 0 s
R-1 RAMP B 1s o �' �G�
I
27 18 0
26 17 0 VV l�1CiD1J1 E V JP+ll.®PED BY:
25 Copper Creek Partners, LP
BLO Z
24 27 5055 KELLER SPRINGS ROAD, SUITE 500
23 4`y 28 ADDISON, TEXAS 75001
22 29 Y (214 ) 914-9809
S. 7X 30
s 31 PREPAREflD BY-
7 32 (300DV N1
CML ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang Drive,Grapevine,Texas 78ml®
Metro(817)92&9373
TBPE REQA F-2844 TBPLS FIRM#10021700
PAGE 2 OF 2
E1\10591 — Copper Creek\Plans\Phase 4 8 4A\Copper Creek Phase 4.1 8 4.2 CFAs.pro 9 Sep 2020
COPPER PIPER CREEK
�G PHASE 4.1
LEGEND
STET NAME SIGNS PVC Conduit
-} &STET LIGHTS Trans former on PAD
JCiAlJL1l1LJ�I °1c-111
® Pole Assembly 100w HPS
I
Existing
—M Dual Light Standard
�- Existing Pole Assembly
I
N Street Name Sign
W E
S
GRAPHIC SCALE Y"=200'
0 200. 400 600
MAM&DVE SEEPAGE 2�•� 6�I Ba 10
21 22 23 24 25 26 I 16 15 14 13 1PON
6, f
RON ME DDW RIV � �y 22 0v
BLOCKA 21 �+
19 16 \ BLOCK Y ��
10 9 14 15 N
12 13 C2
18 w d1 8 OCK R-47j�20
i7 18 19
¢0 12 7
16 0 1d 10 9 8 r %
13 OCK V6 > CO ERH AD CURT Z f
15 z ( 14 5 or
13 R w ( 4 6 4 5n�o O��QPGF /
16 3 a 6---------------
12 17 S BLOCKY
z7X 3
11 18 1 2 / j MWARED BY-
10 19
BLOCK 9A 0PN�Pr1P CMLENGINEE(�SPLAANN SURVEYORS
2405 MLWOV Min,GMpWAne,TOM 78051
R-4 1 / // Metro(817)3294M
8 2 �r TBPE RE®.*F2944 TBPLS FIRM#10021700
4 9 OCK A
7X 6 5 \
OWNED/dDEVELOPIEIID BY:
P�Qp�
Copper Creek Partners LP
P CA 5055 KELLER SPRINGS ROAD, SUITE 500
f -' T GOPpQ pgE'',�pgAS� ADDISON, TEXAS 75001
(214 ) 914-9809
PAGE 1 OF 2
E \10591 — Copper Creek\Plans\Phase 4 a 4A\Copper Creek Phase 4.1 8 4.2 CFAs.pro 9 Sep 2020
COPPER PIPER CREEK
PHASE 4.1 LEGEND
—ill i PVC Conduit
� IE7C NAME LIONS
&STREET LIGHTS Transformer on PAD
® Pole Assembly IOOw 14PS
j Existing
Dual Light Standard
r
Existing Pole Assembly
� Street Name Sign
COPPER CREEK
PHASE-1
PROJECT NO. 02572
COPPER CROSSING DRIVE
5
GRAPHIC SCALE. 1"=200'
1 iI 31 1 � 31
0 200 400 600 2 I -30 2 0 Y
30
3 29 3 ¢ 29
4 28 4 C9 28
a
5 27 5 w 27 I
26 Nr I ( COPPER CREEK
Q 6 ¢ 26
s ra W PHASE 3
FUTURE 25 25 I I~) PROJECT NO. 101457
COPPER CREEK 7 / 24 7 =I '
PHASE 4.2 8 8 24
PROJECT NO. 102886 /�� 23
23
10
OCK CC � 2122
28 f 19 20 0 1:0
27 18 0�
25 26 �P 17 �1 ® /DE�®P 'D BY:
BL Z
24 27 Copper Creek Partners, LP
�� /
23 y 28 Y� 5055 KELLER SPRINGS ROAD, SUITE 500
22 29 ADDISON, TEXAS 75001
7x
/ 30 (214 ) 914-9809
31
i1i�l PREPAY BY:
3R— 32 (( /�V
(Cv0GD RN1
® CIVIL ENGINEERS—PLANNERS—SURVEYORS
+� 2405 Mustang Drive,Grapevine,Twrm 78051
v' Metro(317)329-4373
TBPE REG.#F-2944 TBPLS FIRM#10021700
PAGE 2 OF 2
E \10591 — Copper Creek\Plans\Phase 4 8 4A\Copper Creek Phase 4.1 8 4.2 CFAs.pro 9 Sep 2020