Loading...
HomeMy WebLinkAboutContract 32301-IP1AD1 CSC No.32301-IP1AD1 MEMORANDUM OF UNDERSTANDING BETWEEN THE TRANSPORTATION AND PUBLIC WORKS DEPARTMENT AND THE PARK& RECREATION DEPARTMENT THIS Memorandum of Understanding ("MOU") is between the Stormwater Management Division of the Transportation and Public Works Department (TPW) and the Park Operations Division of the Park& Recreation Department(PARD). WITNESSETH: WHEREAS,the Stormwater Management Division of TPW applied for a United States Army Corps of Engineers (USACE) Individual Permit for drainage improvements to the Lebow Channel, Permit# SWF-2010-00470; and WHEREAS, the USACE approved the Individual Permit for drainage improvements to the Lebow Channel, # SWF-2010-00470, on June 26, 2018 (For Permit and Attachments, Ref. City Secretary Contract Number 32301-IP1); and WHEREAS, the USACE Individual Permit requires the City of Fort Worth to implement the Mitigation Plan (MP) titled "LEBOW DRAINAGE SEQUENCING AND MITIGATION PLAN" that was submitted to the USACE as an attachment to the Individual Permit; and WHEREAS, the MP specifies areas along the Lebow Channel (shown in attached Exhibit A)to be converted from parkland and dedicated as mitigation areas in perpetuity; and WHERAS, the MP establishes management rules for the dedicated mitigation areas; and WHEREAS, Stormwater Management Division of TPW and the Park Operations Division of the Park& Recreation Department desire to jointly manage the dedicated mitigation areas; NOW THEREFORE, in consideration of the above recitals and the premises and agreements, covenants and promises herein set forth, it is agreed as follows: Section 1. OBLIGATIONS OF THE PARK OPERATIONS DIVISION OF THE PARK & RECREATION DEPARTMENT: A. PARD agrees not to maintain the area shown in Exhibit A (i.e. cutting live trees, shrubs, vines, or grasses) and as stipulated in the MP; B. PARD agrees that there will be no grading, excavation, or discharging of materials into the mitigation area shown in Exhibit A and as stipulated in the MP; and, C. PARD may, at its discretion or through coordination with the Stormwater Management Division of TPW, remove any hazard trees (dead and/or a threat to adjacent property), remove trash/debris, and control any exotic and/or native ecologically invasive plant OFFICIAL RECORD Lebow Channel Mitigation Area CITY SECRETARY Memorandum of Understanding FT.WORTH,TX Page 1 of 3 species in accordance with the MP and if such species compromise the success of the planted vegetation. Section 2. OBLIGATIONS OF STORMWATER MANAGEMENT DIVISION OF TPW: A. Stormwater Management Division of TPW agrees to implement the required mitigation plan including the installation and maintenance of plant materials during the establishment period; B. Stormwater Management Division of TPW agrees to coordinate the mitigation area inspections during the establishment period as outlined in the MP; C. Stormwater Management Division of TPW agrees to install and maintain signage delineating the mitigation area as stipulated in the MP and at locations mutually agreed to between both parties herein; D. Stormwater Management Division of TPW agrees not to maintain the area shown in Exhibit A(i.e. cutting live trees, shrubs, vines, or grasses) and as stipulated in the MP; E. Stormwater Management Division of TPW agrees that there will be no grading, excavation, or discharging of materials into the mitigation area shown in Exhibit A and as stipulated in the MP; and, F. Stormwater Management Division of TPW may, at its discretion or through coordination with PARD, remove any hazard trees (dead and/or a threat to adjacent property), remove trash/debris, and control any exotic and/or native ecologically invasive plant species in accordance with the MP and if such species compromise the success of the planted vegetation. Section 3. TERM OF MEMORANDUM This MOU shall continue in force and effect in perpetuity. Lebow Channel Mitigation Area Memorandum of Understanding Page 2 of 3 ACCORDINGLY, the departments acting by and through their respective department heads have caused this MOU to be executed, to be effective upon the date subscribed by the last party to make this MOU fully executed. Stormwater Management Division Park Operations Division Transportation and Public Works Park & Recreation Department By By Richard�GLIa��Za02 11.41 a�CDT) William Johnson, Director Richard Zavala, Director Date: Oct 5, 2020 Date: Oct 5, 2020 By g5i ons(Oct2,202015:15 CDT) By. Sandra Youn o (Oct 2,202016:1T CDT) Greg Simmons, Assistant Director Sandra Youngblood, Assistant Director Date: Oct 2, 2020 Date: Oct 2, 2020 9eWdjit^M ba�,�ce C i X By.Jennifer Nf Dyke(Sep 29,7b201T:16 CDT) By. Craig Fox(Oct 2,202015:02 CDT) Jennifer Dyke, Stormwater Program Manager Craig Fox, Interim City Forester Date: Sep 29, 2020 Date: Oct 2, 2020 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 1-ada"W& Linda Young(Sep 29, 2012:23 CDT) Linda S. Young, TPW Stormwater OFFICIAL RECORD Lebow Channel Mitigation Area CITY SECRETARY Memorandum of Understanding FT.WORTH,TX Page 3 of 3 _ _ EXHIBIT A ' Trail Drivers Park V "' Note: The USACE Permit Mitigation Area is fully defined in the Individual s Permit SWF-2010-00470 as issued by the l S Department of the Army, 1. v. Fort Worth District, Corps of Engineers.A copy has been filed with the Fort -� Worth City Secretary's office and saved to the * Laserfiche system under CSCN 32301-IP1. I I s - y Sienaee (Typical) = USACE Permit rJ FEDERAL Mitigation Area MITIGATION AREA `►�`" _ (See Note) DO NOT MOW NO CORTAR ,, _ FORT WORTH.. LEBOW CHANNEL DRAINAGE IMPROVEMENTS Access within the Channel is Prohibited Prohibido el accesso al canal Fort Worth City Ordinance No.23722-08-2019 Trespassers may be prosecuted Texas Penal Code Section 30.05