HomeMy WebLinkAboutContract 50006-A4 CSC No. 50006-A4
AMENDMENT No. 4
TO CITY SECRETARY CONTRACT
VMIERJUS, the City of Fort Worth (CITY) and Plummer
Associates, Inc. , (ENGINEER) made and entered into City Secretary
Contract No . 50006, (the CONTRACT) which was authorized by M&C C-
28464 on the 7th day of November, 2017 in the amount of
$688, 037 . 00; and
VM ERFAS, the CONTRACT was subsequently revised by: Amendment
No. 1 in the amount $16, 005 . 00 administratively authorized on July
31 , 2018 , Amendment No . 2 in the amount of $54 , 039 . 00
administratively authorized on November 19, 2018 and Amendment No . 3
in the amount of $393, 152 . 00 authorized by M&C C-29090 on April 9,
2019; and
VVUEREAS, the CONTRACT involves engineering services for the
following project:
North Holly Water Treatment Plant Sedimentation Basin Sludge
Removal System Replacement; and
VVHEltrAS, it has become necessary to execute Amendment No. 4
to the CONTRACT to include an increased scope of work and revised
fee.
I OVY THEREFORE CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in the proposal attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $6,443 . 00 .
2 .
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid
by the City for all work and services shall be an amount of
$1 ,157 , 676 . 00 .
3 .
All other provisions of the Contract, which are not expressly
OFFICIAL RECORD
Page -1- CITY SECRETARY
FT.WORTH,TX
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED: ENGINEER
City of Fort Worth Plummer Associates, Inc.
Iwq a WLde
Dana Burghdoff(0 13,20201 :51 CDT)
Dana Burghdoff David A. Gudal, P.E.
Assistant City Manager Senior Associate
Oct 13,2020
DATE: DATE: 10/8/2020
APPROVAL RECOMMENDED:
Christopher Hard (Oct 13,202007:21 CDT)
Chris Harder, P.E.
Director, Water Department
APPROVED AS TO FORM AND LEGALITY:
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
,OfDena Johnson, P.E.
Project Manager
DBWk(Oct 13,202017:50 CDT)
Douglas W. Black
Senior Assistant City Attorney
QgU�UQ
a QFORT��d
ATTEST: p,°oOlo
for Ronald P.Gonzales o cig of c
for Ronald P.Gonzales(Oct 14,202009:32 CDT) P °o*�
Mary J. Kayser ��°�nEaASapp�
City Secretary Form 1295 No. :N/A
M&C No. : N/A OFFICIAL RECORD
M&C Date:NEA
CITY SECRETARY
FT.WORTH, TX
Page -2-
�w
PLUMMER
0318-058-01
September 18, 2020
Ms. Dena Johnson, P.E.
Project Manager
City of Fort Worth
200 Texas Street
Fort Worth,Texas 76102-4397
Re: North Holly Water Treatment Plant
Sedimentation Basin Sludge Removal System Replacement (City Project No. 02328)
Contract Amendment No. 4
Dear Ms.Johnson:
The purpose of this letter is to request authorization for$6,443 in Special Services to update
the CT study for the North Holly Water Treatment Plant.Amendment No.4 adds the
following new scope items:
• The Engineer will prepare a disinfection contact-time (CT)study worksheet for the
North Holly Water Treatment Plant to reflect the changes made to disinfection zone
8 (D8) as part of the Sedimentation Basin Sludge Removal System Replacement
project;
• The Engineer will utilize the existing CT study(as approved by the Texas Commission
on Environmental Quality in a letter dated July 9, 2014)for selecting the inputs for
other disinfection zones and baffling factor for zone D8 (as established by previous
tracer study*);
• The Engineer will submit the CT study worksheet to the City for review;
• The Engineer will address City comments and submit a cover letter and updated CT
study worksheet to the TCEQ for review and approval.
*An update to the previous sedimentation basin tracer study is not anticipated to be needed
and is not included in the scope of services.
The following table summarizes the engineering services fees:
Item Amount
Original Contract and Amendment No.1 $704,042
Amendment No.2 $54,039
Amendment No.3 $393,152
Amendment No.4 $6,443
Total Cost $1,157,676
1320 South University Drive,Suite 300
Fort Worth,Texas 76107
Phone 817.806.1700
Fax 817.870.2536
plummer.com Page 1 of 2
TBPE Firm No.13
The updated CT study shall be submitted to the TCEQ within 21 days of receipt of written
authorization to proceed with the proposed scope of services.
Best Regards,
PLUMMER
Christopher C. Boyd, Ph.D., P.E.
Principal
CCB
Enclosure: Fee Summary
cc: Mr.Alan Davis, P.E., PMP, Plummer Associates, Inc.
Page 2 of 2
City of Fort Worth,TX
NHWTP CT Study Update
CT Study Update
0318-058-02102328
hoject Reject
Leve12(Wuse)No.and Descdp0on M.IPA Sr.Praj Mgr Maruger Figtneer EtT CAO TecluYcian Sr.AdMn QC Tatal Labor PuceN of
Level 3(ts4 No aM Qes p5 (las) (Ms) (Ivs) (Wi) (Ms) (trs) (Ms) (hrs) Noes Fee(SSf) Talal Fee
CT Study Update 1.0 0.0 8.0 25.0 0.0 0.0 4.0 1.0 39 fi,315 100.0:4
1 CTSt,4 update 1.0 OA SA 25.0 ee 0.0 4.0 1.0 39 S 6,115 100.0Y
1.1 Prepare a Cs6t/ec C-rme(Cn Sky 05 4.0 20.a 4.0 1 1.0 30 S 4,638 73.4%
1.2 So tM CTSNdy to tM TCEO 1.0 1.0 2 3 315 5.5%
1.3 TCEQ C0W &, 05 20 4A T S 1,133 175%
1.4 Pmfecl ManagemeN 1.0 1 5 200 32%
0 5 0.0%
0 E MIA
T LL 80
TNat Labor Sbvs 4.0 0.0 6.0 25.0 0.0 0.0 4.4 1.0 19
Total U.,A- f 6,315 100.0%
Total Ar-Ne by Ubor Category $ 305 S - f 1,fi00 f 1,625 S - 3 f 411 S ]Ob $
6,316
UbOr Category Percentgf Total Labor 4A% 6.0•L 2fi.3% 67A% 0.0% 4.8% 100.0%
TOTAL E%PENSES leee tueakdoxn he10w1
Total SaixonsgtaNs S
Tdal Rebr,haraatles f 126
T. Expenses f 128
GRAND TOTAL-CT Study Update S 6,443
SUBCONSULTANT EXPENSES REIMBURSABLE EXPENSES
Code Oescd fan Cml Markup Fee %M Total Fee Cade Desedgton Cost Markup Fee
CA 1- 3 0% 5102.0 Lahar Ma S 1.10 3
CC i 1.10 $ 0% 524t.a eMOea $ LID $
CE $ Me $ 0% Hot1.0 Tdecvm 32Aabor Hr i 7a 1A0 f 78
LG S 1.10 5 0% 5202.0 T-L Meals,Lade $ - 1.10 3 -
CM S 1.10 5 O% 5203A Reproduc0on $ Lie $
CO 3 52 o Lorg Oistarwe T-Up- 3 1.10 s
CS S 1.10 5 0% 5205.0 Slipping,Q K"..Postage 5 1.10 3
Cy $ 1.10 5 O% 5207.0 m $ I.fO i
CI 5 1.10 3 0% 5206.0 keXouse Re odudbn 3 50 f.00 $ b0
C2 5 1.10 f 0% S 1.f0 f
Q3 s 1.10 s 6% S 1.f6 f
C1 5 1.10 S 0%
C5 5 Me $ 016 S t.t0 f
C6 5 1.ta $
Q% S t.to $
TQTALSl10CCNSU.TANTEXPI 1I f $ 0% TOTALREV38MIL413LEEXPF7 M 6 128 f 126
F.)W*Re`Q316y158-0-Medrvstm5mlll COtt1RACTjIGREFI,IFJiN-1-1 CCHTRACTSWnandrrent4q-"SO NHWIPCTSNdy Update MdgeLs yv .Jed1 010620