Loading...
HomeMy WebLinkAboutContract 50006-A4 CSC No. 50006-A4 AMENDMENT No. 4 TO CITY SECRETARY CONTRACT VMIERJUS, the City of Fort Worth (CITY) and Plummer Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No . 50006, (the CONTRACT) which was authorized by M&C C- 28464 on the 7th day of November, 2017 in the amount of $688, 037 . 00; and VM ERFAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount $16, 005 . 00 administratively authorized on July 31 , 2018 , Amendment No . 2 in the amount of $54 , 039 . 00 administratively authorized on November 19, 2018 and Amendment No . 3 in the amount of $393, 152 . 00 authorized by M&C C-29090 on April 9, 2019; and VVUEREAS, the CONTRACT involves engineering services for the following project: North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement; and VVHEltrAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. I OVY THEREFORE CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in the proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $6,443 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1 ,157 , 676 . 00 . 3 . All other provisions of the Contract, which are not expressly OFFICIAL RECORD Page -1- CITY SECRETARY FT.WORTH,TX amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Plummer Associates, Inc. Iwq a WLde Dana Burghdoff(0 13,20201 :51 CDT) Dana Burghdoff David A. Gudal, P.E. Assistant City Manager Senior Associate Oct 13,2020 DATE: DATE: 10/8/2020 APPROVAL RECOMMENDED: Christopher Hard (Oct 13,202007:21 CDT) Chris Harder, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. ,OfDena Johnson, P.E. Project Manager DBWk(Oct 13,202017:50 CDT) Douglas W. Black Senior Assistant City Attorney QgU�UQ a QFORT��d ATTEST: p,°oOlo for Ronald P.Gonzales o cig of c for Ronald P.Gonzales(Oct 14,202009:32 CDT) P °o*� Mary J. Kayser ��°�nEaASapp� City Secretary Form 1295 No. :N/A M&C No. : N/A OFFICIAL RECORD M&C Date:NEA CITY SECRETARY FT.WORTH, TX Page -2- �w PLUMMER 0318-058-01 September 18, 2020 Ms. Dena Johnson, P.E. Project Manager City of Fort Worth 200 Texas Street Fort Worth,Texas 76102-4397 Re: North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement (City Project No. 02328) Contract Amendment No. 4 Dear Ms.Johnson: The purpose of this letter is to request authorization for$6,443 in Special Services to update the CT study for the North Holly Water Treatment Plant.Amendment No.4 adds the following new scope items: • The Engineer will prepare a disinfection contact-time (CT)study worksheet for the North Holly Water Treatment Plant to reflect the changes made to disinfection zone 8 (D8) as part of the Sedimentation Basin Sludge Removal System Replacement project; • The Engineer will utilize the existing CT study(as approved by the Texas Commission on Environmental Quality in a letter dated July 9, 2014)for selecting the inputs for other disinfection zones and baffling factor for zone D8 (as established by previous tracer study*); • The Engineer will submit the CT study worksheet to the City for review; • The Engineer will address City comments and submit a cover letter and updated CT study worksheet to the TCEQ for review and approval. *An update to the previous sedimentation basin tracer study is not anticipated to be needed and is not included in the scope of services. The following table summarizes the engineering services fees: Item Amount Original Contract and Amendment No.1 $704,042 Amendment No.2 $54,039 Amendment No.3 $393,152 Amendment No.4 $6,443 Total Cost $1,157,676 1320 South University Drive,Suite 300 Fort Worth,Texas 76107 Phone 817.806.1700 Fax 817.870.2536 plummer.com Page 1 of 2 TBPE Firm No.13 The updated CT study shall be submitted to the TCEQ within 21 days of receipt of written authorization to proceed with the proposed scope of services. Best Regards, PLUMMER Christopher C. Boyd, Ph.D., P.E. Principal CCB Enclosure: Fee Summary cc: Mr.Alan Davis, P.E., PMP, Plummer Associates, Inc. Page 2 of 2 City of Fort Worth,TX NHWTP CT Study Update CT Study Update 0318-058-02102328 hoject Reject Leve12(Wuse)No.and Descdp0on M.IPA Sr.Praj Mgr Maruger Figtneer EtT CAO TecluYcian Sr.AdMn QC Tatal Labor PuceN of Level 3(ts4 No aM Qes p5 (las) (Ms) (Ivs) (Wi) (Ms) (trs) (Ms) (hrs) Noes Fee(SSf) Talal Fee CT Study Update 1.0 0.0 8.0 25.0 0.0 0.0 4.0 1.0 39 fi,315 100.0:4 1 CTSt,4 update 1.0 OA SA 25.0 ee 0.0 4.0 1.0 39 S 6,115 100.0Y 1.1 Prepare a Cs6t/ec C-rme(Cn Sky 05 4.0 20.a 4.0 1 1.0 30 S 4,638 73.4% 1.2 So tM CTSNdy to tM TCEO 1.0 1.0 2 3 315 5.5% 1.3 TCEQ C0W &, 05 20 4A T S 1,133 175% 1.4 Pmfecl ManagemeN 1.0 1 5 200 32% 0 5 0.0% 0 E MIA T LL 80 TNat Labor Sbvs 4.0 0.0 6.0 25.0 0.0 0.0 4.4 1.0 19 Total U.,A- f 6,315 100.0% Total Ar-Ne by Ubor Category $ 305 S - f 1,fi00 f 1,625 S - 3 f 411 S ]Ob $ 6,316 UbOr Category Percentgf Total Labor 4A% 6.0•L 2fi.3% 67A% 0.0% 4.8% 100.0% TOTAL E%PENSES leee tueakdoxn he10w1 Total SaixonsgtaNs S Tdal Rebr,haraatles f 126 T. Expenses f 128 GRAND TOTAL-CT Study Update S 6,443 SUBCONSULTANT EXPENSES REIMBURSABLE EXPENSES Code Oescd fan Cml Markup Fee %M Total Fee Cade Desedgton Cost Markup Fee CA 1- 3 0% 5102.0 Lahar Ma S 1.10 3 CC i 1.10 $ 0% 524t.a eMOea $ LID $ CE $ Me $ 0% Hot1.0 Tdecvm 32Aabor Hr i 7a 1A0 f 78 LG S 1.10 5 0% 5202.0 T-L Meals,Lade $ - 1.10 3 - CM S 1.10 5 O% 5203A Reproduc0on $ Lie $ CO 3 52 o Lorg Oistarwe T-Up- 3 1.10 s CS S 1.10 5 0% 5205.0 Slipping,Q K"..Postage 5 1.10 3 Cy $ 1.10 5 O% 5207.0 m $ I.fO i CI 5 1.10 3 0% 5206.0 keXouse Re odudbn 3 50 f.00 $ b0 C2 5 1.10 f 0% S 1.f0 f Q3 s 1.10 s 6% S 1.f6 f C1 5 1.10 S 0% C5 5 Me $ 016 S t.t0 f C6 5 1.ta $ Q% S t.to $ TQTALSl10CCNSU.TANTEXPI 1I f $ 0% TOTALREV38MIL413LEEXPF7 M 6 128 f 126 F.)W*Re`Q316y158-0-Medrvstm5mlll COtt1RACTjIGREFI,IFJiN-1-1 CCHTRACTSWnandrrent4q-"SO NHWIPCTSNdy Update MdgeLs yv .Jed1 010620