Change Order Request
Project Name I Hemphill Street Connection from Lancaster to Vickery City Sec# 1 45717
Client Project 4(s)l C00141
Project GMP 2-Bridge and Road
Description
Contractor McCarthy Building Companies,Inc. Change Order# 3 Date 9/3012020
City Project Mgr. Michael Weiss,P.E. City Inspector Randy Horton
Contract Time
Dept. TPW Totals (CD)
Original Contract Amount $35,408,258.00 $35,408,258.00 912
Extras to Date $0.00 195
Credits to Date $80,032.60 $80.032.60
Pending Change Orders(in M&C Process)
Contract Cost to Date $35,328,225.40 $35,328,225.40 1,107
Amount of Proposed Change Order -$198,312.40 •$198,312.40
Revised Contract Amount $35,129,913.00 $35,129,913.00 1,107
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $80,032.60 $80,032.60
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -0.79%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $44,260.322.50
" JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change Order 43 will reduce McCarthy's Construction contract in the amount of$198,312.40 from the Owners Allowance for utility relocations for the construction of the
Hemphill Street Connector Project from Lancaster Avenue to West Vickery Boulevard.These credits will be used to execute a Discretionary Service Agreement with Oncor
Electric Delivery Company,LLC for the installation of permanent electric utilities.The scope of Change Order#3 was originally approved and executed as part of Allowance
Request NO.I I on 7/29/19 by CSC No.45717-A3AR11(pages 56-61).The proper instrument to effect the change in the contract is a change order and the purpose of this
change order is to reconcile the transaction.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Contractor's Company Name : Contractor(Name) Contract Signature Qate
jo
McCarthy Building Companies,Inc. David Wallace Oct 13,2020
Inspectorllnspection Supervisor Date Project and Contract Compliance Manager Date
Oct 13,2020 Oct 13,2020
Program Manager Date Senior Capital Project Officer Date
¢.rs*y Oct 14,2020 Oct 15,2020
Assistant Director(Dept) Date Director,Contracting Department Dept Date
.La_za n/9� Oct 15,2020 d—^ Oct 16,2020
Assistant City Attorney Date anager Date
Oct 16,2020 Oct 16,2020
ouncil Action(if required)_
M&C Number C- 29170 M&C Date Approved
ag44Un4
ATTEST: 0(t FORttta 6/25/2019
a.�o oO dp
ate° 9d
Mary J.Kayser,City Secretary dvg o P.
Ronald P.Gonzales p0. o�*
Assistant City Secretary a�at nEXASobQ OFFICIAL RECORD
VL
CITY SECRETARY
FT.WORTH,TX
City of Fort Worth
Change Order Additions
Project Name I Hemphill Street Connection from Lancaster to Vickery City Sec# 4571y
Client Project# I C00141
Contractor McCarthy Building Companies,Inc. PM Michael Weiss,P.E. Inspector Randy Ho ton
Change Order Submittal# 0 Date 913012020
ADDITIONS
HEM DESCRIPTIOW Unit Unit Cost ota
TPW $0.00
u ota ikons
Change Order Additions Page 2 of 4
FORTWORTH City of Fort Worth
Change Order Deletions
Project Name Hemphill Street Connection from Lancaster to Vickery Ciry Sec 4 45717
Client Project# C00141
Contractor McCarthy Building Companies,Inc. PM Jichael Weiss,P.E. Inspector Randy Ho ton
Change Order Submittal# F 3— Date 913012020
DELI:IIUNJ
y — unit UnitCost -----Total
ncorePermanent ec c Facilities
I=—
TPWA $198,312.4U
Sub TotalDeletions
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub, Type ofi Service Amount for this CO
Total $OOQ
Previous Change Orders
DATE>; �� �.r `AMOUNT
Total 0,
O , o
Y
G In W
ri 0) 0 0 0 0 O 0 L 'O
of Hrq rl c (U
_ ++
u L
1^ O v OD >
c O O
U C o Y
V J O O O O O O O O CD O O O O 'm W
O O O O O O O O O O O O O O N > m
w m m -1 N r•I 00 V N w w w O M Q [L O
1� 00 n N N m t't M M 00 N m O 11 2 0n E E
1� O 1� � O l0 N it Q1 tr 1, 00 , a U c 01 N
C f'I� M 00 H rl wm O m 0 H N Ir w (n
H of H H to ri M O W M to M M N 'O is �.
N m O ":� v Ct O I^ Lr N N ri - C LL m O
r-lrl O N m M y N M N c} M M N — C N c
{�' cc u^1 N F- nc O O
1 + ct O
GI = 1° fO m o u
�F _-
G Y
Q
C m N In v
m V?V? 4A V? to V1•V? � V1 V? V? V). V). AA COf
O N V
V C _
ai
O i Y C
j U O W c O In
O +-' N
C to Z on O
Y to
N .X Q. Q C � +, U
iR N U c 30 LL om -o o
n E
(6 m J m c +' u L- O
Q — p v _ Y u
L h w O U c O 01
tv rn o -
O C Y ` — Nra
— L
bA M u Y
C Q' N >- m p v
N N N c (UE r1 0
O C v Z O V U E N N
Y L C O r-I
'~ V► Z GJ 0)
L O U m
U
C O d O m U O a0
o C) 0 0 0 o 0 O O O O O O O U M u C N Y 0)
O O O O O O O O O O O O O OG C Oal - N
_ \ 1O omo - - N ri 00 4 to Lo k6 L6 o M O ri v O o
O > r, O h m � m m oo r m o V-1 Li- o
V u E n � ow N to m In Vl 00 -c:r G1 _ ci N F-- u 01 p
..0 C O j a 00 rH-I 1^Il l!1 O m O a--I N t� lD Ol , N aL-. C
N O N N ri 00 o l0 In In co m v N Z O yrrj N a-
t: v O
GD ,Y rt 3 m W cf 00 N In N N A H VO] Y
O LO a);f, W u m w N m v M V N (Y't N d' M M Q 7 O r- OU tEa
m W
Qj
O r in3 m E `4 O Y
O Ud p Z m 0 0 t000 M
a) E c
LL O +' Q O L m 06 4- In
`� C m > ♦- Y v p tf
O '�'' C u V1• N V> V? V) V} V} V? V? VT V? VT VT V)- U C aL-+ p C VT 'yam
L J bo 4i LL U C Y O p a+
u +1 c a m H a E
N E j:.r OJ N 000 U C m C
C ai p O c m CL, O +L.+ O Cn
O m U U Y N C m
E In
N E C N N W
n C O L u m
C p O C O U C N u +' c
U ril i .0 N C L O V m C N U
o c on v :. u -a u 3 v tw 0
o ° evn y 3 o c o c c C v
In co c u o Q c cu m Lo
c cl) m � U o Q o ° c V o C c a u
f° ° y m +, o a o v m 3 Q E ou 3 p m
E u c c IL c o c - -2 n w O In O v 3 3
_ p In E u Q o v `-° v `-° c c u V) c c o
,n LO E u In m v v Ems° > m > o o N o o O Q
E Q c vo � � Q .� Q '�oQ tw o 0
m xx aU o o m > n > v c m u ri rt O `^ t+i � V m
Z G m ra N o0 N a0+ a Q m Q o Q O 0 > > V E u E 7 W C W
nI �"� L O O In C � C '� L
b a o c c o o a` a y ii ti m y '°'- a� fO cu
J O a u O U Q O O 00 LL C LL C m C N O C y_, C N .O O v
Y Y C O '- - +-' C
O C f0 YO n m N C C m C_ is C_ O U C_ — In C m
01 _C In Y L O 7 Vl .0 m C m .Y O — O B' O O
IL0 a -O 'O ++ O O CD 0n m L E Q L E C
aci aci o E E a>i w 'c aEi v o o c o p o c
O w u a a u Q Q n: O cc 0 1 cc Q I Q u I Q LL
APPROVED:
CITY OF FORT WORTH
L'�A
Dana Burghdoff
Interim Assistant City Manager
Date: 1-2_q��
APPROVAL RECOMMENDED:
e Cooke
Interim Director, Transportation/Public Works Department
ATTEST: �'
ry
City SLtetyyary 'l , "y
APPROVED AS TO FORM AND LEGALITY:
Qaek--- M&C C- &
Douglas W. Black Date:
Senior Assistant City Attorney
Contract Compliance Manager:
By signing I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Ad YVAol
Michael Weiss, P.E.
Senior Professional Engineer
City of Fort Worth
Hemphill Street Construction Contingency/Allowance Request No. 11
City Project No. 00141
Customer Change Order
C.O.#21 P1
Date: 06/13/2019
Project Name: Hemphill Connector Architect's Project No:
Project No: 002119.000
To Contractor: McCarthy Building Companies, Inc.
The Contract is hereby revised by the following items:
Hemphill Connector Change Order#21
CPR Description Amount
Wall Embankment $0.00
The Original Contract Value was $35,408,258.00
Sum of changes by prior Change Orders ($73,092.00)
The Contract Value prior to this Change Order was $35,335,166.00
The Contract Value will be changed by this Change Order in the amount of $0.00
The new Contract Value including this Change Order will be $35,335,166.00
McCarthy Building Companies, Inc. City of Fort Worth
BY: BY:
Date: 1 zl I I Q Date:
Printed On: 6/19/2019 4:24:45 PM Page 1 of 1
Change Proposal Request
123
Date:5/16/2019/V1 I I I J
Project Name: Hemphill Connector Architect's Project No.:
Project No.002119.000 Cost Issue Ref It:34
Attached is an itemized quotation for changes In the Contract sum and/or time on subject Project as described
herein. This document,when fully executed, as accepted, shall constitute authorization to proceed with the work
described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change
Order, The Owner agrees that McCarthy Building Companies, Inc. will be reimbursed monthly for the cost of this
work as completed,whether or not the Change Order has been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
Wall Embankment
SCOPE:
As directed by the City of Fort Worth, McCarthy proposes to backfill the retaining wall located behind the CMAR
construction trailer at the end of the Project and have it seeded by C. Green Scaping to provide the retaining wall
extra stability.
REFERENCE:
Pricing Details
Company Name Description Amount
C Green Scaping LP 40: WC#4 LANDSCAPING $2,769.00
McCarthy Building Companies, Inc. 20:WC#2 EXC&WALLS $51,397.00
McCarthy Building Companies, Inc. 100: CONTRACTORS CNTGNCY $2,111.00
McCarthy Building Companies, Inc. 41: C-ROW LANDSCAPE ($11,949.00)
McCarthy Building Companies, Inc. 65:A-OWNERS ALLOWANCE ($44,328.00)
Net Amount of This Proposed Change $0.00
Net Change in Calendar Days Due To This Proposed Change
Schedule impact to be evaluated at a later date
McCarthy Building Companies, Inc. City of Fort Worth
✓Accept _Accept
Do Not Accept —Do Not Accept
BY: Z/�, _ BY:
Date: LT!1 p Date:
Printed On: 6/19/2019 4:18:36 PM Page 1 of 1
!
Project: City of Fort Worth Hemphill Street Underpass
Location: Fort Worth,Texas
Dare: May 16,2019
Hemphill Street Under ass GMP2-Change Order 21
GMP2
Line Work DESCRIPTION Unit Change Order Previous New Budget
Package Quantity Measur Unit Price GMP2 Total Amount Change Orders Total
10 WC1 Subcontractor Work Category#1 Bridge&Track-McCarthy 1.00 LS $11,814,000 $11,814,000 $202,696 $12,016,696
11 Allowance Potential Bridge&Track Contractor Downtime 100.00 Days $5,432 $543,200 $543,200
12 Contingency Painting of Exterior Rallroad Bridge Beams 1.00 LS $27.560 $27,560 ($27,560) $0
20 WC2 Subcontractor Work Category 42 Excavation&Walls-McCarthy 1.00 LS $7,745,000 $7,745,000 $51,397 $404,579 $8,200,976
21 Subcontractor Artwork Installation-McCarthy 1.00 LS $75,511 $75,511 $75,511
22 Allowance Additional Artwork Support for Sub/Artist changes 1.00 LS $15,102 $15,102 $15,102
23 Contingency Painting of Concrete and Block Walls with color for 1.00 LS $77,568 $77,568 ($77,568) $0
consistent and anti-graffiti coatings
24 Allowance Potential Walls and Excavation Contractor 50.00 Days $2,517 $125,850 $125,850
Downtime
30 WC3 Gentingeney Work Category#3 Electrical&Lighting 1.00 LS $1,678.000 $1,678,000 $80,245 $1,758,245
40 WC4 Subcontractor Work Category#4 Landscaping-C.Green 1.00 LS $360,167 $360,167 $2,769 $29,041 $391,977
Sca in LP
41 Contingency Landscaping of ROW/CMAR Yard 3.00 Ac $17,800 $53,400 ($11,949) $41,451
42 Allowance Owners Landscape Allowance 10% Bid $360,167 $36,017 $36,017
50 WC5 Subcontractor Work Category#5 Paving-McCarthy 1.00 LS $1,667,000 $1,667,000 $81,427 $1,748,427
Chesapeake Extended driveway and gate
51 Contingency 1.00 LS $46,200 $46,200 ($46,200) $0
reconfiguration
60 CMAR General Conditions-30 Months 1.00 LS $4,023,374 $4,023,374 $19,453 $4,042,627
61 Contingency Sandblasting&painting of the underside of the 1.00 LS $184,555 $184,555 ($184,555) $0
9 y IH30 bridge for consistent coloration
62 Allowance Identify&Locate Existing&Abandoned Utilities 1.00 LS $150,000 $150,000 ($38,363) $111,637
63 Allowance Remove,relocate and/or demolish existing utilities 1.00 LS $1,750,000 $1,750,000 ($99,279) $1,650,721
within the right of way
64 Allowance Potential Project delays due to Railroad and/or 1.00 LS $750,000 $750,000 ($540,834) $209,166
Existing Utilities within the right of way
65 Allowance Owners Allowance 1.00 LS $867,727 $867,727 ($44,328) ($37,537) $785,862
Subtotal Cost of Work $31,990,231 $31,753,665
70 Performance&Payment Bonds 0.82% $264,271 $264,271
80 Pollution Insurance Wrap Policy 1.00 LS $41,646 $41,646 $41.646
80 Railroad Protective Insurance 0.35%, $112,785 $112,785
80 Builders Risk Insurance 0.22% $72,535 $72,535
80 General Liability&Umbrella Insurance 0.841% $295,300 $295,300
Subtotal Cost of Work+CMAR GC+Insurance $32,776,768 $32,540,202
90 Construction Fee 3.50% $1,147,187 ($7,445) $1,139,742
Subtotal Cost of Work+CMAR GC+Insurance+
$33,923,955 $33,679,944
Construction Fee
Construction Contingency-Construction Contingency o
100 has NOT been added for"Allowances"above 5.00/o $29,686,059 $1.484,303 $2,111 ($165,639) $1,320,775
101 McCarthy Shared Savings from Contingency $274,183 $274,183
500 Subcontractor Credits $60,264 $60,264
Subtotal Cost of Work+CMAR GC+Insurance+
Construction Fee+CMAR&CFW Contingency $35,408,258 $0 573,092 $35,335,166
Page I G I
6251N I9 ]:JI AV
McCarthy-CMAR
Jab. 11-PNISt"d Cpnn o" U—IpUnre 1yNiEmbanlmuri
Dato: ILO7N/
68n H.,. Unkcoala ToNlCwla
Iam Deacripllon quan0y UON NW Unlul Total Labor BupoMabn MW Eyalp SW Labor SugMFlan 61bi Erpdp Pub LNp
UNI NH M71 f f $
f f S i f ; f Total
I KC— by BultlFj Companlaa WCl L00 LS $_..-, 6I,597
$ O.Onan PupinU•LP WC 4 1_00_.. .l8, .-.._ _..__ _ $ 7.769 $ - $ _. ?...._ $ - $.._.. 2.769 $ $,769
To1a1HP5 O00 SUBTOTAL $ $ $ S S4,166 $ SI,166
EVEt,OP,aPAR7i: m00% OF$ $ - OFEWA $ $
OVEPUtAEFACTOA: Tom% OF$ $ - OF LOP � $
IASOABUADO4: 46.009 OF$ $ - OFLPR $
EOHIULIAPiE1 10.00% OF$ $ - OFPAAT $
SAFETY $0.19 PEA ROUA 0 OFLBR $ $
SEAALLTOOLS 10.00% OF$ $ - OFMR
TAX 175% OF S S OFMTt/FUEL S $
SUBTOTAL ; f S 3 f N,111 S 6/,111
S.b,.t Wbood 0tm% $ $
OufdaOl6ak 00000% $ $
AddlVo lSord Prt4um DA000% $ S
CotlofNak 0.0000% $ S
SUBTOTAL i i f is f1,168 i P4,188
CUARF- $.a% f
CHAR CnnMUaney 6% $ 2,991 '......
TOTAL 6B,277
Customer Change Order
J C.O.# 13
Date: 06/14/2019
Project Name: Hemphill Connector - Self Perform Architect's Project No:
Excavation and Walls
Project No: 002119.002
To Contractor: McCarthy Building Companies, Inc.
The Contract is hereby revised by the following items:
Hemphill Connector- Self Perform Excavation and Walls Change Order# 13
CPR Description Amount
Wall Embankment $51,397.00
The Original Contract Value was $7,820,511.00
Sum of changes by prior Change Orders $331,017.00
The Contract Value prior to this Change Order was $8,151,528.00
The Contract Value will be changed by this Change Order in the amount of $51,397.00
The new Contract Value including this Change Order will be $8,202,925.00
McCarthy Building Companies, Inc. McCarthy Building Company-
Dalias
BY: BY:
Date: (./Z( �19 Date:
Printed On: 6/19/2019 4:25:17 PM Page 1 of 1
Change Proposal Request
I Vji
Date:5/16/19
Project Name:Hemphill Connector-Self Perform Excavation and Walls Architect's Project No.:
Project No.002119.002 Cost Issue Ref It:30
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described
herein.This document, when fully executed, as accepted, shall constitute authorization to proceed with the work
described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change
Order. The Owner agrees that McCarthy Building Companies, Inc.will be reimbursed monthly for the cost of this
work as completed,whether or not the Change Order has been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
Wall Embankment
SCOPE:
As directed by the City of Fort Worth, McCarthy proposes to backfill the retaining wall located behind the CMAR
construction trailer at the end of the Project and have it seeded by C. Green Scaping to provide the retaining wall
extra stability.
REFERENCE:
Pricing Details
Company Name Description Amount
McCarthy Building Companies, Inc. CO21 WALL EMBANKMENT(E) $25,234.00
McCarthy Building Companies, Inc. CO21 WALL EMBANKMENT(L) $16,357.00
McCarthy Building Companies, Inc. CO21 WALL EMBANKMENT(M) $5,287.00
McCarthy Building Companies, Inc. LD/HL ROCK EXCAV(M) ($2,850.00)
McCarthy Building Companies, Inc. Change Order Markup(F) ' $7,369.00
Net Amount of This Proposed Change $51,397.00
Net Change in Calendar Days Due To This Proposed Change
[] Schedule impact to be evaluated at a later date
McCarthy Building Companies, Inc. McCarthy Building Company-Dallas
V_-A—ccept _Accept
_D of Ac pt —Do Not Accept
BY: BY:
Date: G 2 /f Date:
Printed On: 6/19/2019 3:55:34 PM Page 1 of 1
McCARTHY WC 2
Job: H..'Mustmtc-"Uan OttertpUan: Wad Embanlmanl
Data: 05/11119
Man Houn UnP Caab Total Coale
It.. 0....Iptlon WunUrf UOM MW UnUd Tail Labu SUPINISIan Mhl Egldp Bub Lnb., 8upetHabn Hui Egutp Sub Lim
Unit MH MH i t $ 3 S $ i i i TWO
1 Matedab ____ — S S S S .:.:S.• -� S l
iaplc/ 141 CY 3A53
IXHb rNdH1-Ocouct.... -% LO I $ _-_.iCO$•y$ S. _. s S ,600 $ 96C0)
O.A.Tr%xHm•TOS:WVt]®--- 62 SW ISSD $ !$ $ _-----_,t,{ $ 3,100 $ 3,100
On la TncUrg•TO Gnban/mud 73 HR - S SO S.._._. S S _. { .... .--_$ 3,650 $ 31AO
-._. shape sloJ9di IIlS CY Mot' ....-,73 S- 2/ $ _...4741 f $ - f - $ 1.742
lane-SlotlgSebVhl CmbaNrcard IiIS CY DA4 _._.---74 3 14 S _-..1,796 S 1716
— --—CY O .2,17E S.._
PloaarFC9mpad FIE tau A; 91$ it ,,,,,_- _, S $ - S - 2,i70
8preodfFttsh Ta 103 1279 SY RAS _, 66 S 14 ,., S ,--�a i5 $ - $ = S-,___$ 1$96
a0anhroWalaMO l/e CCF Olt_..__._. ........t20 f.._21_................_.._. $�..Xs33 $ S $ - $ S 2.1113
... lmdcr 1 NO S 3,750 S ......' S S $ 9,750
t WK .__........—._..._ ._.. S ions $ .__'_ $ ',..,..
dobT-1. 2 WK .. .._._ S 310
Do:er[aede 050K 2 WK ..._... $ 1,1f6 S _ - S -S - $ ;409 { - $
2 L30 ...__...-. .............—__ $ 7,550 $ .....__- S tS S S,SW S._ - S 1W ',..
SNO SIetr 1 WK ,. - $ 34a S $ $ $ _�I i36 � - S 696 '
totallNi 414 SUBTOTAL $ ig1As $ S 3AS3 $ Ismo; $ 11,65 S 24333
FUEt,«I,BFARM SOAO% OF$ $ 15,94554 OF EQM 7973 S 7973
«/EATUdEFACTON 10A0% OF$ $ 1g16455 OFUIR 1,016 S X014
IABQ3lUADEH: 46.00% OF$ $ 31,20144 OF10A f SAS4 %154
CONSUMAIIIES low% OF$ S 3.05300 OF RUT 305 305
sum $069 PEA HOUR 424 a IIR 5 293 233
SMALLTOOLS low% OF S $ 16,15142 OFUR $ 1,636 $ 1435
TAX'' USK OF$ $ 23,204.37 OF M51/FUEL $ t,31G $ 1,316 '..
SUBTOTAL S 11,137 i t U17 i 29.114 t Rolf i 44.02T
SthantraGluaotul O'DWO% S
lcldm NR OA[00% $
AdHdonll Wind Piem'un1 DADWIS $
C.ndltak 0A000% $
SUBTOTAL $ 11,267 i - IF kill i 21,234 t (2.131) $ 44,027
SubceNn<IerMar3up 5'00% 330
SaVP4lToma MFAUp 16.00
TOTAL $ 51397
WC 4-Landscaping
Job: UomphlO Stied C—tion DaoerlpUon: Wnl EmWnkmant
Oalo: 05119110
IN.Iloun U,dl COIN TOMI COIN
IN. D...dpUon Quanliry UOM fIW UWW Tolal L.bur Sup.M.lon I,141 Equip Sub Labor Suprr.hw Mbl Equip Sub Llna
Unll ilil MH S f S 3 $ S 3 $ S $ TOW
A acum6caph,g I _ _ S $ S - IS - $
FlAk—rdl u5D7 6F S O20 S_ _ - I$ _ $ l,Tul S T.wL
$ S I$ +0a S 400
—S S $ - 13 - I$ S
row UI1S 0 SUBTOTAL $ $ $ $ S 2,705A0 2,701
FUEL,014 S•PARTS: 50.00A OF$ $ OFEQM $ S
OVERTIMEFACTON 10.020 OF$ $ - OFLSR $ $
ffOt.F: LAOORat1ROEll: 661k7% OF$ $ - OF LLR $
AO $
].fiil—vichbW unit piko bxr—ed by 10.09 perSFdue CORSUMLES 10.00'/. OF $ Of MAT
dd, $ S
lO&a11.of erwllon weird on O,elb SAFETYp,d a— SAFETY $0.69 PERU= 0 OFISR $ $
2.Aht—tW 64d Rem:Sermud2 Sod h S.0 Of IIIdromuk-h SIMU.YOOlS 10.D03 OF$ $ OF MR $
2r$O.afl/SF fn a t,Nl or$4,603 TAX: 3.25% or.$ $ OFMTI/FUEL $ $
SUBTOTAL 3 3 $ S $ 2,701A0 f 2.701
Sub---tar Sold 2.S000% S 61
Shcders M31 O.000O% $
AddlWat Dead P.emiom 0.0000% S
CaLLdPhk o.000o% $
SUBTOTAL S $ Is 111 3 2,701.e0 S 2,769
6ubwnlnalorhinkup 5.001, S
8.11 Pad—l,la,kup 16.00X 3
TOTAL $ 2,769
Customer Change Order
1 C.O.#22
Date: 06/17/2019
Project Name: Hemphill Connector Architect's Project No:
Project No: 002119.000
To Contractor: McCarthy Building Companies, Inc.
The Contract is hereby revised by the following items:
Hemphill Connector Change Order#22
CPR Description Amount
North Side Soil Credit $0.00
The Original Contract Value was $35,408,258.00
Sum of changes by prior Change Orders ($73,092.00)
The Contract Value prior to this Change Order was $35,335,166.00
The Contract Value will be changed by this Change Order in the amount of $0.00
The new Contract Value including this Change Order will be $35,335,166.00
McCarthy Building Companies, Inc. City of Fort Worth
BY: —L�J, / J& BY:
Date: I Z l�I S Date:
Printed On: 6/17/20191:55:49 PM Page 1 of 1
Change Proposal Request
M
Date:06/17/2019
i f J 1 11 J I
Project Name:Hemphill Connector Architect's Project No.:
Project No.002119.000 Cost Issue Ref It:35
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described
herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work
described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change
Order. The Owner agrees that McCarthy Building Companies, Inc. will be reimbursed monthly for the cost of this
work as completed,whether or not the Change Order has been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
North Side Soil Credit
SCOPE:
During McCarthy's bidding process, McCarthy Bid all soil waste as Class 1 hazardous material. The test results of
the excavated material were classified as Class 3 or Class 2 soil. The difference in bid unit prices is being offered
as a credit back to the Owner.
REFERENCE:
Pricing Details
Company Name Description Amount
McCarthy Building Companies, Inc. 10:WC#1 BRIDGE&TRACK ($326,400.00)
McCarthy Building Companies, Inc. 20:WC#2 EXC&WALLS ($455,317.00)
McCarthy Building Companies, Inc. 90: INITIAL MARKUP ($27,360.00)
McCarthy Building Companies, Inc. 500: WC 1 SUBCONTRACTOR CREDIT $337,824.00
McCarthy Building Companies, Inc. 500:WC 2 SUBCONTRACTOR CREDIT $471,253.00
Net Amount of This Proposed Change $0.00
Net Change In Calendar Days Due To This Proposed Change
[] Schedule Impact to be evaluated at a later date
McCarthy Building Companies, Inc. City of Fort Worth
_✓Accept _Accept
Do Not Accept _Do Not Accept
BY: BY:
Date: I Z I 1 Date:
Printed On: 6/17/20191:56:12 PM Page 1 of 1
t
Project: City of Fort Worth Hemphill Street Underpass
Location: Fart Worth,Texas
Dale: June 17,2019
Hemphill Street Under ass GMP2-Change Order 22
GMP2
Line Work DESCRIPTION Unit Change Order Previous New Budget
Package Quantity Measur Unit Price GMP2 Total Amount Change Orders Total
10 WC1 Subcontractor Work Category#1 Bridge&Track-McCarthy 1.00 LS $11,814,000 $11,814,000 ($326,400) $202,696 $11,690,296
11 Allowance Potential Bridge&Track Contractor Downtime 100.00 Days $5,432 $543,200 $543,200
12 Contingency Painting of Exterior Railroad Bridge Beams 1.00 LS $27,560 $27,560 ($27,560) $0
20 WC2 Subcontractor Work Category#2 Excavation&Walls-McCarthy 1.00 LS $7,745,000 $7,745,000 ($455,317) $455,976 $7,745,659
21 Subcontractor Artwork Installation-McCarthy 1.00 LS $75,511 $75,511 $75,511
22 Allowance Additional Artwork Support for Sub/Artist changes 1.00 LS $15,102 $15,102 $15,102
23 Contingency Painting of Concrete and Block Walls with color for 1.00 LS $77,568 $77,568 ($77,568) $0
consistent and anti-graffiti coatings
24 Allowance Potential Walls and Excavation Contractor 50.00 Days $2,517 $125,850 $125,850
Downtime
30 WC3 Genl+ngeney Work Category#3 Electrical&Lighting 1.00 LS $1,678,000 $1,678,000 $80,245 $1,758,245
40 WC4 Subcontractor Work Category#4 Landscaping-C.Green 1.00 LS $360,167 $360,167 $31,810 $391,977
Sca In LP
41 Contingency Landscaping of ROW/CMAR Yard 3.00 Ac $17,800 $53,400 ($11,949) $41,451
42 Allowance Owners Landscape Allowance 10% Bid $360,167 $36,017 $36,017
50 WC5 Subcontractor Work Category 45 Paving-McCarthy 1.00 LS $1,667,000 $1.667,000 $81,427 $1,748,427
51 Contingency Chesapeake Extended driveway and gate 1.00 LS $46,200 $46,200 ($46,200) $0
reconfiguration
60 CMAR lGeneral Conditions-30 Months 1.00 LS $4,023,374 $4,023,374 $19,453 $4,042,827
61 Contingency Sandblasting&painting of the underside of the 1.00 LS $184,555 $184,555 ($184,555) $0
IH30 bridge for consistent coloration
62 Allowance Identify&Locate Existing&Abandoned Utilities 1.00 LS $150,000 $150,000 ($38,363) $111,637
63 Allowance Remove,relocate and/or demolish existing utilities 1,00 LS $1,750,000 $1,750,000
Within the right of way ($99,279) $1,650,721
64 Allowance Potential Project delays due to Railroad and/or 1.00 LS $750,000 $750,000
ExistingUtilities within the right of way ($540,834) $209,166
65 Allowance Owners Allowance 1.00 LS $867,727 $867,727 ($81,865) $785,862
Subtotal Cost of Work $31,990,231 $30,971,948
70 Performance&Payment Bonds 0.82% $264,271 $264,271
80 Pollution Insurance Wrap Policy 1.00 LS $41,646 $41,646 $41,646
80 Railroad Protective Insurance 0.35% $112,785 $112,785
80 Builders Risk Insurance 0.22% $72,535 $72,535
80 General Liability&Umbrella Insurance 0.841% $295,300 $295,300
Subtotal Cost of Work+CMAR GC+Insurance $32,776,768 $31,758,485
90 Construction Fee 3.50% $1,147,187 ($27,360) ($7,445) $1,112,382
Subtotal Cost of Work+CMAR GC+Insurance+
$33,923,955 §32,870,867
Construction Fee
100 Construction Contingency-Construction Contingency 5.00% $29,686,059 $1,484.303
has NOT been added for"Allowances"above ($163,528) $1,320,775
101 McCarthy Shared Savings from Contingency $274,183 $274,183
500 Subcontractor Credits 1 1 $809,077 $60,264 $869,341
Subtotal Cost of Work+CMAR GC+Insurance+
Construction Fee+CMAR&CFW Contingency §35,408,258 §0 §73,092 b35,335,166
Pa�etclf
E25/�19 1.Jp A'.1
MCCAR7'HY- CMAR
ob: H.mphill alna l Conn.dbn OafulpUen:
con•I2oNR aid.sco cadR
NIr. OF717N0
Man It... _ _ UdI C..0 T.Ul Cg11
a O.fulpUon O—Illy UOM MM UnNfF UNI Labc7 aup.Mflon Mid Equip Bub Labor BupavBb. Mbl Equip aub Lln.
Una ADI MIT S f f S ! i f f S T.Ul
,.:.. ..�
7 LSX dW8uldlnq C..pn.lu,I.fWCl) 140 IS ,• '
... _.. _ ..._ $ (326,i00 S ..:.,5 S ,S s (726,000j
.] IdcCcrliry BuBHn Com nelar,IR7 C] ]AO 1 IS $ (4S6,3171$ $ .._.. $ F - F 45631 �___ (455,317)
$
To,IHRs OAO aUBTOTAL $ $ S S S (781,717) 1781,7171
1I1EI,OIL.A PARTS: S000% OF$ OF S $ OF EOM $ $ $
OVERTIME FACTOR: IOXV% OF S OF$ $ OF IBA $ $
IASORSURDEN: 46.00% OE S OF$ $ - OF IRR I
EOHIUAWRE3 loA0% OF S OF$ $ OFAUT $ S
SAFETY $0.69 PERHOUR PERHOUR 0.00 OF LBR
'WAUTOOIS lof" OF$ OF S $ - OF18N s S
TAX: 2.211% OF$ OF$ $ - OFMTI(FOEL $ $ $ S
AUSTOTAL $ f f S S (YUJI? S (761,7171
Submn11"llc1 0.0000%
tort q(KoL o.ee00% $ F
Bul4grsRbk 0.1900% s S
Pa l—n—R Pap-1 Bonds 09soolA S S
a UBTOTAL 3 S S S f 1/61,71Jj 81,7i7
OMARF.. $.50%
C—ftudbn Conllo0...y 5.00% $
TOTAL $ 839.077
Customer Change Order
C.O.#5
A U1
Date: 06/17/2019
Project Name: Hemphill Connector - Self Perform Bridge Architect's Project No:
and Track
Project No: 002119.001
To Contractor: McCarthy Building Companies, Inc.
The Contract is hereby revised by the following items:
Hemphill Connector - Self Perform Bridge and Track Change Order# 5
CPR Description Amount
North Side Soil Credit ($326,400.00)
The Original Contract Value was $11,814,000.00
Sum of changes by prior Change Orders $202,696.00
The Contract Value prior to this Change Order was $12,016,696.00
The Contract Value will be changed by this Change Order in the amount of ($326,400.00)
The new Contract Value including this Change Order will be $11,690,296.00
McCarthy Building Companies, Inc. McCarthy Building Company-
Dallas
BY: BY:
Date: Date:
Printed On: 6/17/2019 2:28:16 PM Page 1 of 1
Change Proposal Request
1111 NXil I I,i I I J Date:06/17/2019
Project Name:Hemphill Connector-Self Perform Bridge and Track Architect's Project No.:
Project No.002119.001 Cost Issue Ref It:17
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described
herein. This document,when fully executed, as accepted, shall constitute authorization to proceed with the work
described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change
Order. The Owner agrees that McCarthy Building Companies, Inc. will be reimbursed monthly for the cost of this
work as completed,whether or not the Change Order has been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
North Side Soil Credit
SCOPE:
During McCarthy's bidding process, McCarthy Bid all soil waste as Class 1 hazardous material. The test results of
the excavated material were classified as Class 3 or Class 2 soil. The difference in bid unit prices is being offered
as a credit back to the Owner.
REFERENCE:
Pricing Details
Company Name Description Amount
McCarthy Building Companies, Inc. HAUL TO WASTE (M) ($326,400.00)
Net Amount of This Proposed Change ($326,400.00)
Net Change In Calendar Days Due To Thls Proposed Change
[] Schedule impact to be evaluated at a later date
McCarthy Building Companies, Inc. McCarthy Building Company-Dallas
_✓Accept Accept
_Do Not Accept _Do Not Accept
BY: BY:
Date: b I Lt 111 Date:
Printed On: 6/17/2019 2:21:34 PM Page 1 of 1
UNIT PRIC1J5`VVC Ill:T CK A R— CD
Tito Prol►oset'A0111er gBrees that tha projeot Is to be paid ns n ltuup snm for tho IYorlc show,,in the contract doomunts
gild that If fl�o qunfititle's
difforc tco Of'ljl�nlnt IL S rttulllj IiCd by the WOW listed TJrilt:Pflces�oposHl 1Y111;bo g(�jttsted by nu ,
n►nountemtn t
Tito U111tr600s sitnll bo bond )Poll the specifledmitorlals n►td Auothods Oflnstallndott,
The Uttlt Prices shall inolttdo the necossnry labor, cqulpmeatt,rttnterJnls,suporvisiot►, ovorltond,batul, profit gild other
general expenses to fabrionto laid lustall in place titles jotod othavilso in tiro unit prioe(lesoription,
`1'Itao shall bo DO glom titnu 25% (lifferenee botweeu Add and Dodnet nutounts of the sntno Uhtit k'I'loe based upon the
lower ntttount.
131d1tem iQescrl►(Ioti MAR s/Oilt,Abll �/lUn1t>deduct
AC KW
1, Sllc Clenrin XX
2, 13xilorator Exonvoli6nofl3xislhtgUtilides EA.
3, Retnove Existing Tr'acjc TF `, } ,7
41 Romovo Signal Box X?A � �~ M
IA
S. Removo COtterete Ri Ra
Cy
6, Rdmovechalumi1110oneo LF �d
7. Retrtove Pavement
g, Rowove,Existing Retnining Wnl1
9. Install&Removo TQan orar Shorht
10, Tam polar R(lu Crossing
EEI.
11, Uuolnssified 13xcavatiott and Haul off CY
12, TCJ;C�t':In�s 1 1l'n:,l:Lt,ra�ati��n aud)(aul o(l_ CY tot � ..
13, TCEQ Class 2 Wasto)3xcavatiou and haul off. CYor-
14, ' 'L'C BU( la;s 3 11'ns[�l;xan�'n— and—11nt�1 uIL CSC
— —
15, EmbnnkaientVe
16, SubbnllnstCY
17. Bgllast �.
18, cY
Ir
?G�
Tl�
19. RallInstallatioll j o
20, Conoreto Ties EA }�S✓
21. Wood Ties EA .
22, 60"17r111 Shalt Lp
23. 42"Drlli Shnft LF
Ill "
T 24, 36"Drill Shalt
Lit 'mil
25, 301Dr111Shnft LF
LF
26, 24"Drill Shaft
Ivy,sum
97, 11ypo 1 Fot►ndatiou for Light Polo Lp '2 o9osostt
McCARTHY-WC 9 Wrack&Bridge
ob: H—PNJSU+ot C9na+c0. D+a<Agion: 11.0 old.8.1 Cr+utt
1)la; OVi71(f
Non H.— MR C. T91a1Co+U
A.
O++crtPVon QuanUy U061 NIU UniW T. L+bor Ofporrhlnn FAA EgWp dub tabor 6op+rrhion Nlri EgWp Sob tJns
Ndl LUI Nil { i f f i i S S -,. TWO
5 JOUCl+t111,0—Cl SC+tl11
tmskyE uw6o) UIS
CY $ (673515( _ 674515
f 9o0ctamm�Roncmn:AadiOm •---,.-.- _
N.0 SN+acs'%%I. ._ 1569 'CY
1 Jdl Clns+lOc+Jon Clo++J Addlden It
Ab1A sms E[nww .._ 6T46 CY $ 27.50 S_,_- S $ $ $ 75).9T5 $ 251,975
$
6 S $ _-----
IIVIHAS OSO SUBTOTAL S It S S S (32 S (326.4W}
it,
OQSPAR"5 I:SO.W Of S OF S $ - Or TOAI S
OWRTVAE FACTO& 10.0% Of$ OF$ $ OFUA S - ,,,,,-.,• S
UeOROVROUt 4009 Of$ OF$ S - OFLtUI
COIOMAKES 7OM% OF$ Of$ S OMIT
SAFEIT $0,69 PERHOUR FIR NOVA 0.00 OFLO(t S S
SMALLTOOIS 10.00X OF$ OF S S OFLRA S S
TAIL J.IS% OF S OF$ S - OFM71(FUIL
SUBTOTAL i f J J { 13U,t00 J (31J.409
co Nakup 16.00X S ''..
Sahm.kup 6.00% $
TOTAL s (91$,400
Customer Change Order
C.O.#22
Date: 06/17/2019
Project Name: Hemphill Connector o Self Perform ArChitect'S Project No:
Excavation and Walls
Project No: 002119.002
To Contractor: McCarthy Building Companies, Inc.
he Contract is hereby revised by the following items:
Hemphill Connector m Self Perform Excavation and Walls Change Order# 22
CPR Description Amount
North Side Soil Credit ($455,317.00)
The Original Contract Value was $7,820,511.00
Sum of changes by prior Change Orders $331,017.00
The Contract Value prior to this Change Order was $8,151,528.00
The Contract Value will be changed by this Change Order in the amount of ($455,317.00)
The new Contract Value including this Change Order will be $7,696,211.00
McCarthy Building Companies, Inc. McCarthy Building Company
Dallas
BY: BY:
Date; � IL, Ili Date:
Printed On: 6/17/2019 2:45:35 PM Page 1 of 1
Change Proposal Request
Date:06/17/2019
Project Name:Hemphill Connector-Self Perform Excavation and Walls Architect's Project No.:
Project No.002119.002 Cost Issue Ref 1/:31
Attached Is an itemized quotation for changes in the Contract sum and/or time on subject Project as described
herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work
described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change
Order. The Owner agrees that McCarthy Building Companies, Inc. will be reimbursed monthly for the cost of this
work as completed,whether or not the Change Order has been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
North Side Soil Credit
SCOPE:
During McCarthy's bidding process, McCarthy Bid all soil waste as Class 1 hazardous material. The test results of
the excavated material were classified as Class 3 or Class 2 soil. The difference In bid unit prices is being offered
as a credit back to the Owner.
REFERENCE:
Pricing Details
Company Name Description Amount
McCarthy Building Companies, Inc. HAUL TO WASTE (M) ($455,317.00)
Net Amount of This Proposed Change ($455,317.00)
Net Change In Calendar Days Due To This Proposed Change
[] Schedule impact to be evaluated at a later date
McCarthy Building Companies, Inc. McCarthy Building Company- Dallas
✓Accept _Accept
_D of Acc pt _Do Not Accept
BY: BY:
Date: G Z 1 19 Date:
Printed On: 6/17/2019 2:39:39 PM Page 1 of 1
Addondtnll No.2
Issued 4/25/2017
V NXT]p'RfCES'WC lilt 1;XCA'V'AT.10N ANn'UYA><,LS
The proposer ilMW ngroes that file project is to be Paid ns a I11111P sum for the work.s1101*!u.in file oolltmot(loo"nleuls
nud that If the(lnnntiQos of Worlr Sllall obAtlge At the(11801,0t1011 of the o�vller,the Baso Proposal Nvili be Adjusted by an nnloutlt equal to the net([iffel•ellce of qunntitios D1111601ed by fire below listed Uultl'>'loes,
The ujilt p lum shnll be base([upon the spco;f;ed nlntorlals nud methods of instnllattolt,
The rol ex rl nsesltolfabdu to al die Insfall i�Plnoe 1ltllet 11010d otllerlvlse in tlto wiltl>loo(losoriPtion1'profit nud other
genaral expel
There shalt be tto lnorelltan 25%diffore)ioo betwoon Acid nud Deduct Amounts of tlto same IYAPrlee based"Poll rho
lower 011101111t,
131d[(tom )nesct'I ltloit Tluft $/UnftADD $/'Unit Deduct
Site Clenrlug ACRBi�
Exploratory BxoAvotiat ofBxlsNng Utlllilos BA 101' D
3.
4.
Removal of Pipe LF 5V�;� A ��n�
5,
Removal of Inlets And/or'Moultoles BA (5 mf I
Roltzpve Sldewnlic SF
6'
Remove Chnin Litlt(l?enoe LF �p7. •-�
Roomove Colwroto Foundation LF .'7` WA
Remove Couorete.ravenlont SY
10, Remove Aspl►altpnvemout SX
Remove Treo BA
11,
�2. Remove Bxlslingztetnlulug•Walt Z,F � ��
Ronlove Brlok Pavers nud Salvage SY
i . >;OG
rt>staR Briolc Pavers
14. N)A
SativotltPnvenlout-,FullbePtit LF
16, Bxoavnttou of Rook CY O
,,y rh dr
Unalnsstfiod Excavation And Haul off CY
'fC:I'Q Criss I Wastr L'xcavalinl►and)-Taut of' CY ��P •
111, �b°v--, 4'$
19. ot�
TC13Q Class 21N'asto 13xoavaHon nud Haut off CY
t'I(Q Class.► ,.'[lilt'11a•caValio,I aII I I��ul ui �Y j, `ri l r�, �
Bu1ba111(mel►t CY
21,
ControlledLo�v Strength Material-(Plowable CY �pca r�ebb
212, r;;u
Selcot Baolcftll(Type X3S � (6) CY ,
23, "�' r"'
RoWNWAncllors }3A 4> '7g7.
24,
*"E Addendtall No.2 Material
McCARTHY-WC 2 Excavation& Walls
.b: H-phligug I Con uon V—dpflon; Hodh SW M CmdII
CGIVII
U..Houn U;,ItCu
am D.—IP41- 0-11ty UOU Ulm UNIV UW Labor Sup.M.1- M IP a Ld EIIub L.b. mul VVP Sub U..
NH I I I S 4 $ $ $ S S TOW
I C,.dR
3527M 37.50 ...... 432_161 437,763
RUATOTAL S (ASS,3171
FUE1,04I.&FAM MOO OF S OF OF Qm MIXTIbit FACFOA. IQW)i 0; or 3 S OFMA
IMOMADM: 4600% OF S OF$ OFLbR CO,,SUMADLES J0M% OF 6 OF$ OFMAT
WEN $M69 FERIIOUA PrAIJOUR obo OF LUR S.mu TOOLS IM07Y OF S or$ WIPA
7ft &2S% OF OF or WOUEL
SUBTOTAL S i 3 S f (4K31 S (45-kw)
CON.A.P 16.00%
UbMsftp 6.00% S
TOTAL $ 465,317
Customer Change Order
E a--
1 v C.O.#23
Date: 06/21/2019
Project Name: Hemphill Connector Architect's Projoct No:
Project No. 002119.000
To Contractor: McCarthy Building Companies, Inc,
The Contract is hereby reVised by the following items:
Hemphill Connector Ghange Order# 23
CPR Description Atnount
T&M Concrete Footing Demolition $0.00
The Original Contract Value WAS $35,408,258.00
Sum of changes by prior Change Orders ($73,092.00)
The Contract Value prior to this Change Order was $35,335,166.00
The Contract Value will be changed by this Change Order in the amount of $0.00
The new Contract Value including this Change Order will be $35,335,166.00
McCarthy Building Companies, Inc, City of Fort Worth
` BY:
BY: .1 )A
Date: (o 1 211 1 1 Date:
Printed On: 6/21/201911:15158 AM Page 1 of 1
Change Proposal Request
1 CPR//23
Project Name: Hemphill Connector Architect's Project No.:
Project No.002119.000 Cost Issue Ref It:36
Attached Is an itemized quotation for changes in the Contract sum and/or time on subject Project as described
herein. This document,when fully executed, as accepted, shall constitute authorization to proceed with the work
described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change
Order. The Owner agrees that McCarthy Building Companies, Inc. will be reimbursed monthly for the cost of this
work as completed,whether or not the Change Order has been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
T&M Concrete Footing Demolition
SCOPE:
During excavation of the roadway cut, McCarthy encountered several abandoned concrete structures which had
to be demolished and hauled off. Time and Material expenditures were tracked via tickets which were
reviewed/signed off by inspector.
REFERENCE:
Pricing Details
Company Name Description Amount
McCarthy Building Companies, Inc. 20:WC#2 EXC&WALLS $13,907.00
McCarthy Building Companies, Inc. 65:A-OWNERS ALLOWANCE ($14,602.00)
McCarthy Building Companies, Inc. 100: CONTRACTORS CNTGNCY $695.00
Net Amount of This Proposed Change $0.00
Net Change In Calendar Days Due To This Proposed Change
[] Schedule impact to be evaluated at a later date
McCarthy Building Companies, Inc. City of Fort Worth
_Accept
_Do Not Accept
BY: BY:
Date: G 121 I I Date:
Printed On: 6/21/201911:15:17 AM Page 1 of 1
t
Project: City of Fort Worth Hemphill Street Underpass
Location: Fart Worth,Texas
Dare; June 19,2019
Hemphill Street Under ass GMP2-Change Order 23
GMP2
Line Work DESCRIPTION Unit Change Order Previous New Budget
Package Quantity Measur Unit Price GMP2 Total Amount Change Orders Total
10 WC1 Subcontractor Work Category#1 Bridge&Track-McCarthy 1.00 LS $11,814,000 $11,814,000 ($123,704) $11,690,296
11 Allowance Potential Bridge&Track Contractor Downtime 100.00 Days $5,432 $543,200 $543,200
12 Contingency Painting of Exterior Railroad Bridge Beams 1.00 LS $27,560 $27,560 ($27,560) $0
20 WC2 Subcontractor Work Category#2 Excavation&Walls-McCarthy 1.00 LS $7,745,000 $7,745,000 $659 $7,759,566
21 Subcontractor Artwork Installation-McCarthy 1.00 LS $75,511 $75,511 $75,511
22 Allowance Additional Artwork Support for Sub/Artist changes 1.00 LS $15,102 $15,102 $15,102
$13,907
23 Contingency Painting of Concrete and Block Walls with color for 1.00 LS $77,568 $77,568 ($77,568) $0
consistent and anti-graffiti coatings
24 Allowance Potential Walls and Excavation Contractor 50.00 Days $2,517 $125,850 $125,850
Downtime
30 WC3 Gentingeney Work Category#3 Electrical&Lighting 1.00 LS $1,678,000 $1,678,000 $80,245 $1,758,245
40 WC4 Subcontractor Work Category#4 Landscaping-C.Green 1.00 LS $360,167 $360,167 $31,810 $391,977
Scaping,LP
41 Contingency Landscaping of ROW/CMAR Yard 3.00 Ac $17,800 $53,400 ($11,949) $41,451
42 Allowance Owners Landscape Allowance 10% Bid $360,167 $36,017 $36,017
50 WC5 Subcontractor lWork Category#5 Paving-McCarthy 1.00 LS $1,667,000 $1,667,000 $81,427 $1,748,427
51 Contingency Chesapeake Extended driveway and gate 1.00 LS $46,200 $46,200 ($46,200) $0
reconfiguration
60 CMAR General Conditions-30 Months 1.00 LS $4,023,374 $4,023,374 $19,453 $4,042,827
61 Contingency Sandblasting&painting of the underside of the 1.00 LS $184,555 $184,555 ($184,555) $0
9 y IH30 bridge for consistent coloration
62 Allowance Identify&Locate Existing&Abandoned Utilities 1.00 LS $150,000 $150,000 ($38,363) $111,637
63 Allowance Remove,relocate and/or demolish existing utilities 1.00 LS $1,750,000 $1,750,000 ($99,279) $1,650,721
within the right of way
64 Allowance Potential Project delays due to Railroad and/or 1.00 LS $750,000 $750,000
ExistingUtilities within the right of way ($540,834) $209,166
65 Allowance Owners Allowance 1.00 LS $867,727 $867,727 ($14,602) ($81,865) $771,260
Subtotal Cost of Work $31,990,2311 $30,971,253
70 Performance&Payment Bonds 0.82% $264,271 $264,271
80 Pollution Insurance Wrap Policy 1.00 1 LS $41,646 $41,646 $41,646
80 Railroad Protective Insurance 0.35% $112,785 $112,785
80 Builders Risk Insurance 0.22% $72,535 $72,535
80 General Liability&Umbrella Insurance 0.841% $295,300 $295,300
Subtotal Cost of Work+CMAR GC+Insurance $32,776,768 $31,757,790
90 Construction Fee 3.50%1 $1,147,187 ($34,805) $1,112,382
Subtotal Cost of Work+CMAR GC+Insurance+
$33,923,955 $32,870,172
Construction Fee
100 Construction Contingency-Construction Contingency 5.00% $29,686,059 $1,484,303 $695
has NOT been added for"Allowances"above ($163,528) $1,321,470
101 McCarthy Shared Savings from Contingency $274,183 $274,183
500 Subcontractor Credits $869,341 $869,341
Subtotal Cost of Work+CMAR GC+Insurance+
Construction Fee+CMAR&CFW Contingency $35,408,258 $0 $73,092 $35,335,166
Pa3elUl
ERSR019 7.51 A`A
McCARTHY CMAR
Job: H-ph3l SUMI C—cUon Oafcripllon: TSN Contral.F.0100fmo141on
Oala: OUINHI
Man Hour BAIT Cmta TOM C.M.
Ilam Cwvlplton Q-01y UOIA MITI UnIUI ToWI Lobo, BupoMfbn NI,I EqU Sub Labor SupeMslon MVI EquTP SW Llna
Unil FO1 IT S S 3 i 3 i i S $
3 TOUT
1 D—IldonofUw Contral.Foamy __ _ �_ S $ S S �$ __S
-- � u7 Pn +f- aCenhy Bu7frg
CcmpanLa,lnc IAO_ LS _ 3 13,907 $_ S $ S _ $ 13,907 $ 13„O7
S $ $ I$ $ $
Tobl nAS aC0 SUBTOTAL S $ $ ms
S 13,90633 $ 13,507
FUNO144PARTS: Sa00% OF$ OF$ $ - OF ECM S
OVERTIME FACTOR: Ia00% OF$ OF$ $ Of UOA $ $
LOW BUADU/: 46.00% OF S OF$ $ OF UOR $
LOUSUMABLES 10.00% or S OF$ $ OF MAT S
SAFETY $069 PER IIOUA PEA Iloun 0 OFLBR $ $
SIAMLTOOL9 IMOOY. OF$ OF$ $ OF LOB $ $
1AR: 173% OF$ Or$ $ nfMn/Fun $ S
SUBTOTAL $ $ 3 3 3 13,101.60 S 13,107
SubwnVaclor D.-W ao000% S $
Bdldan Rhk 0.I900% S S
AddiUOnal Band Pr&Wum 0.9500% S
—I.IRbk 0.1400% S $
SUBTOTAL 3 Is i i S 13,60&.68 $ 13,907
CFUR Foa 3.60% $
ConflnKUen CenunOancy 6.1, 696
TOTAL 1$ 14,602
Customer Change Order
R C.O.# 15
Date: 06/21/2019
Project Name: Hemphill Connector - Self Perform Architect's Project No:
Excavation and Walls
Project No: 002119.002
To Contractor: McCarthy Building Companies, Inc.
The Contract is hereby revised by the following items:
Hemphill Connector- Self Perform Excavation and Walls Change Order# 15
CPR Description Amount
T&M Concrete Footing Demolition $13,907.00
The Original Contract Value was $7,820,511.00
Sum of changes by prior Change Orders $0.00
The Contract Value prior to this Change Order was $7,820,511.00
The Contract Value will be changed by this Change Order in the amount of $13,907.00
The new Contract Value including this Change Order will be $7,834,418.00
McCarthy Building Companies, Inc. McCarthy Building Company-
Dallas
i
BY: BY:
Date:— (1 Z I1/ Date:
Printed On: 6/21/201911:14:49 AM Page 1 of 1
Change Proposal Request
CPR#15
Project Name:Hemphill Connector-Self Perform Excavation and Walls Architect's Project No.:
Project No.002119,002 Cost Issue Ref#:32
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described
herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work
described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change
Order. The Owner agrees that McCarthy Building Companies, Inc. will be reimbursed monthly for the cost of this
work as completed,whether or not the Change Order has been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
T&M Concrete Footing Demolition
SCOPE:
During excavation of the roadway cut, McCarthy encountered several abandoned concrete structures which had
to be demolished and hauled off. Time and Material expenditures were tracked via tickets which were
reviewed/signed off by inspector.
REFERENCE:
Pricing Details
Company Name Description Amount
McCarthy Building Companies, Inc. T&M CONCRETE STRUCTURE DEMO (E) $9,128.00
McCarthy Building Companies, Inc. T&M CONCRETE STRUCTURE DEMO (L) $2,643.00
McCarthy Building Companies, Inc. T&M CONCRETE STRUCTURE DEMO (M) $322.00
McCarthy Building Companies, Inc. Change Order Markup(F) $1,814.00
Net Amount of This Proposed Change $13,907.00
Net Change in Calendar Days Due To This Proposed Change
[] Schedule impact to be evaluated at a later date
McCarthy Building Companies, Inc. McCarthy Building Company- Dallas
_Accept
BY: BY: Do Not Accept
1
Date: I2 f ( ( g Date:
Printed On: 6/21/201911:14:38 AM Page 1 of 1
McCARTHY-WC 2
hb: II.mpN181no1 Conn l.U.n D...Upilurn 7871Contnt.F..Un9D.mdRlon
Dale: 0U25111
N.n Noun Unit Co.l. Tohl C.,t.
Il.m Dwcdpllon Q-0ty UON MW UnNI T.W Lob., Sup.Obl.n Mid Equip Sub Lobo, Sup.nblon Mbl Egolp Sub lJno
Unit MII NH 1 $ 6 i S S S i 1 S Toll
I
1 D.ndNonof N.ConcrH.FooBnD _ _ S _ S - S S - _ S S
NCCiRrj B.Vj C-p.N.s,H_ D IS _____$
$
Won(Opu.ler) - -- 25.0 1 torts I -- 15.0 S 20.0 i f 340 S - S S - S f 300
!J—AuMp(Fmm.n) 20.0 'tDtS - 20.0 24A $ 4t0 S - I S S $ $ 410
29.5 FIRS 29.5 $ 27S �1 S 'S_. _ f - $ $ 661
�Nu4 RLh(Corfcrnk,) LS I HEIR_ Ls $ 22.5 $ 34 It $ $ - $ $ 34
l0ut.rmo IEueno(C.N4+dn) -. �. 2/-5 _ HRS —_-- MS S 99.0 $ 333 $ $ $ If - $ _-._. 333
37S 3,378 375
S - S 37Q
Cn{qn9 H 2.0 VAYS I S 79 $ $ - I$ S 15S S f 153
$ $
T.IAHRS 6350 SUBTOTAL $ 1,810 $ $ $ 5,768 $ It 71$76
NEt.011,t PARTS: MODY. OF$ OF$ S 5,76SCO OF FOAL S 2.594 It 2,314
OVERTIME FACTOR: IBM% Of$ OF$ $ I,Slom OFUIR $ S
LABORBURUIH: 46.00% OF$ Of S $ 1,810.00 OFLOn gm $ $33
COIIWI.UILES IOA3P. of$ Of$ $ - OF MAT $ $
SAFETY $0.69 MHOUR PER HOUR 44 OF LSR $ SQ $ •�
SAIALL700L5 IOAO% OF$ Of$ $ 2.02.00 OFUR S 264 $ 264
TAX: S2s% OF S of$ S 0,974.22 OFMTL/FUEL S It 476 $ 476
SUBTOTAL S 2.643 6 6 3t2 S 1,128 $ S 12,093
Sabconwct.,DaN BLO00tr% S It
"Arden N,L 0.0000% $ $
7dS11-11 Dand P,Ndum 0OC00% $ S
Co.t of R6k BOCOD% S $
SUBTOTAL S t,641 f f 3tt S 1,116 S $ 12,093
Subcmlrietar M.,tup 6% $
Q06Pularm Mukup 15% S 1,6/4
TOTAL $ 13,907
l -
WORK AUTHORVATWN FORM
❑ Extra Work-70000 ® Extra Work-00000
❑ Extra Work-90000 ❑ eackcharge From McCarthy
Work Authorization .2I/q, UDZ
Job NO. Work Item No,
WORK AUTHORIZATION
The undersigned authorizes p McCarthy or CI to perform the following work:
Aeitsoim-1 m� �'r�rtrYto)r SE✓Ur rr ,� �e,J r/aY E�Ctava�,'nrt �1a .mil �)n
Charges for this work will be billed to the undersigned for payment on regular 30 day terms.
C i ry o-p- F41, Wo R-k By%/ 4,.0,-A4!zk!= Date />"
Company Name slaneture
By:
Ee orm na Work
TIME 8t MATERIAL.SHEET
Project I-mk(?tirW S re 02muef;url Project No. 41/Z oo :<
Date Nt—lo'
Charge To G I-Y roF r4. W 4-ti Associated with:
' Subcontractor
This Section to be com rletod daily as Worlc Is rorformed
Date Labor MateriallEclulpment
Em to eo Craft Hours Dascrl lion Quantity _ DV
-0--�8 osc oP r
Hours&Quantities Verified By ! W Date
cc: Subcontfactor
Project Director
No
Work Aulirorizallon Form 010101R
WORK AUTHORIZATMIM FORM
❑ Extra Work--70000 Extra VJork-00000
❑ Extra Work-00000 Backchor0e From McCarthy
WorlcAuthorization 1,21137.0014 - kg�ao,OOL)E oo�
Job No. Work Itom No.
WORK AUTHORIZATION
The undersigned authorizes M McCarthy or t] J to perform the following woric
n�Ua! d/ )A ✓),o UlAg (�r_ Duftit,1 a5¢�: e2� fain
Charges for this work will be billed to the undersigned for payment on regular 30 clay terms.
G ty ar r4-. "r*k T Date
CompanyNamo Signature
By:
P ormrng Work
TIME 81. IVIATERIAL.SHEET
Project llemrA i II Gfinek Cortnech`or t Project No. y: CvP-
Date .2-Iq-/8
Charge To QV c W WOA-K Associated with,
Subcontractor
This Beotion to bo completed dally as work is porformed
Date labor Material/Equipment
Em to eo Craft Hours Doscri Icon Quantity DV
09,4 $ jo se c VAID
r
Hours&Quantities Veri led By, e"ta D' & Date
co: Subcontractor
Project Dlreclor
Fla
Work Aurhorizalton Form 010101R
WORK AUTHORIZATION FORM
® Extra Work—70000 Extra work-00000
Extra Work-00000 Rackcharge From McCarthy
Work Authorization L jP OO 1900,00.0.00.5, 00
Job No. Work Item No.
WORK AUTHORIZATION
The undersigned authorizes PS McCarthy or C1 to perform the following worts:
�8'�I' a u�.�Ad,L�o� � r'S�-:Ko� /,o►2C�'Y>� SF1��/� I'� J�.�Ord/-� 2}cPa i �ti'n.;�
90-Ho
Charges for this worts will be billed to the undersigned for payment on regular 30 day terms.
G rY 0141-1 F byuy%-), By Sato
companyx8nia, yt signature
By:
.-P rfomirrglri'ork
TIME & MATERIAL SkEET
Project jkmp hr(( 66-e& COgae—c(i tt� Project No%&9r nb
Date oZMlS'--18
Gharge To t' j► (�� , t tiU✓ Associated with.
Subcontractor
This Section to be completed daily as work Isperformed)
Date Labor Material/Equipment
Em :o eo craft How DOW Von Quan0ty DV
Hours&Quantities Verified By. Date
W. Suboontractor
PIP 60 D)rector
Fla
Work Authodxallon Form 010101R
1. Print Form
A f 0 Rl�,K U'fl'fi-10 X 1-1,\'f 1110 N r o A n 11PTIP-U -I- -
❑ Exira Work-70000 EExtm Work-00000
❑ Exiro Work-00000 ❑ Rockchorpo from McCarthy
Worl(/Authorization
Job No. Work Item No. I
WORK AU T M g NX/ A AON
The Undersig
n
ed authorizes o McCarthy or Cl A / l to perform the followingwork:
�n'�'O 1"eM.f7✓� [�� el r S�o C.Osy C/•.0 Y S �/�.ti/WR. �/� ►✓'�.--r �'J�QC vn a�/�C�t
Charges for(this work will be])]lied to the undersigned for payment on regular 30 clay terns.
r7' ✓ / a�f h r—o��� By Date
Co1rpany Nsma Slflnalure
By: I
PartyPorrormrN Work
TIM EL- 8, MATERIAL SHEET
Project �• ���! as�!°� Project No. M .GYs oZ
Date
Charge To C �� �. Associated with:
Subcontractor
This Sectlon to be completed dally as woric is performer]
Date labor Material/Equipment
Em 'o oo Crarl Hours Doscrp lion DV
141I1 ( a, or_s��v, L1 .}dp. r AtvrmoQ eCA-All"A
n /� rw�C
1` 4 /aAL C usl Coo�✓t �t/�Uvv I
�/(Sr �� /1 Cr�+'� O/�� e�G `/ Jib►" �J''N�, ��!'�ti4✓�( F— - - -
r
Hours&Quanlilles Verlfled By Y'l — Datmn e, //
cc: Submniractor
Project Director
File
Work Authorization Form 010101R
Print Form
WORK AUTHORIZATION
1 �
(� Extra Wo►k-70000 D'Exlra Wotk-00000
0 Exire Work-00000 (] Bookohorgo from McCarthy
Work Authorization
Job No. Work Item No.
WORK AUTHORIZATION
ION
The undersigned authorizes 0 McCarthy or ® / to perform the following work:
"/ j & X
Charges for this work will be billed to the undersigned for payment on regular 30 day terms.
"
By Date
c?,P) yNV� frame ,/ — Signature
By: ` el
reirty reffoming wofk
TIME & MATERIAL SHEET
Project a^ Project No. Go -
Date 4( 14 lC
Charge To ���/ I^oi �ar � Associated will):
Suboontraclor
This Section to be oom leted daily as work Is performed
Date Labor Material/Equipment
EA1 :o ea craft Hours Dsufi lion / L( Quantil nv
L�l�p �� ...� dS�s � /.r „ Inlf'.,•- .S� f�c�wa'.N Cmen. .�. Stra+T��
,416 A Iq l�W^f!y de- I 4 23 •S V11 1 /riV' IA i
Hours&Quantities VedAed av Q Date
co; Subconlraclor
prolect Dt►oclo-
He
V/omk Aulhofizallon Fomi MOIR
1r
WORK AUTHORIZATION FORM
❑ Extra Work—70000 0 Extra Work•80000
❑ Extra Work-90000 ❑ Bookcharge From McCarthy
Work Authorization �l�f'd�' - + v°ate ��"'�'o�•vu
{ �rAUTHORIZATION
r r Job No. Work Itenr No,
WORK AUTH lRI AT# N
The undersigned authorizes Cl-'McCatlhy or Q to perform thefollowing work:
4.-'�,r'•1�1s /6c�Gvr I? p �T— -C�ts� �'/�e.w�'�- S*n-oF•w� t� i"•-r�v�..• f��CCo✓•sa7•h1..
(ss r w�.t� / 7�n aG� C�crc�� 7Fa
Charges for this work will be billed to the undersigned for payment on regular 30 day terms.
�• B l �i To�� �✓�r tt(. y bate
Company Nomo S�gnaNra
By: Party PodormingWork
TIME & MATERIAL, SHEET
Project—u"''j0-4'61 S r-1 Project No.
Date
Charge To � o�f t,. Associated with:
subwntfactor
Thla Section to be completed daily as work isperformed)
Date labor Mate rlatlEquipmont
e Em to ea Craft Hours Deacrf tion uad DV
hated✓./1A, 4 PA firstlC '
Hours&Quantilles Verified By Date
co: Subcontractor
Prolact Director
F1la
Work Authorization Fomr 010101111
AUTHORIZATIONWORK 1 �
❑ F.xtra work--70000 ❑ Fxtra Work-80000
❑ Extra V'lork-00000 ❑ Backcharge From McCarthy
Work Authorization �J13.au�� - (AW06.
Job No. Work!torn No.
WORK AUTHORIZATION
The undersigned authorizes t"McCarthy or Q / to perform the following work:
/Jtr►w /. lJ��„� s �/`✓tf�Y6 1„ / �74���., 6( ii..(�.. 3
Charges for this work will be billed to the undersigned for payment on regular 30 day terms.
(;r 4 j far�- wvl�1, By Date
Company Nanie Stgnaturo
thY.,
PartyPartorming Work
TIME & MATERIAL SWEET
Prgjeot h��,04, s��� � een , (z", Project No.
Dale
Charge To e,!�( Associated with:
Subcontractor
Tills Section to be completed daily as work isperformed)
Date Labor Materiallf;qulpment
�}Eniployao Craft Hours DOS0 [r,9on Ownli DV
Ll�� �{SAS /¢' [+i/t/ 1 � ��I/ � rl�CAV1��lr1 r/V� ��• f
Hours&Quantities Vedfied By Date
co: SubconVactor
Pmlect Dlractor
Flo
WotkAulhortzation ornt 01MIR
WORK AUTHORIZATION FORM
a '
E] Extrawork-70000 El'Extra Work-80000
❑ Extra Wmk•90000 0ackcharge From MoCeHhy
WorkAuthorizatton °�<<�'�'��— - $6 •6iDanBtvp
Job No. Welk Item No.
WORK AUTHORIZATION
The undersigned authorizes U McCarthy or a to perform the following%vork:
/
nl��,..6 't)L%S++rrc S 6.PP- w•, A�..}� I +�^+��. I I )JW,c- "J- e ll t'•Ae
e- otr,44 L � lbGe l'P f X J� �v� �y A r./Lutn, hl K 64J to I A'C`
pvY _t v- &n.crul~C 4y 4.f'J'4-
Charges for this work will be billed to the undersigned for payment on regular 30 day terns,
C`t-% &/ � ta�rFI• By Date
Compr any Name 819nalute
By:
P&r 1Perfo1m1ng Wok
TIME & MATERIAL SHEET
Project 4"1A s "I Project No. oLl j 9.Uv
Charge To 7' rr
Date y�2 3117
drib G✓or�� Associated with:
Su oonlractor
This Section to be completed dally as work is arformed
Date Labor Material/Equipment
Employee Craft 11Hoursr nw S I"d Descd lion _ QuanFl DV
>�Vi tQ•a lr4iva hAd I
r�.w c.✓. it
N v ck ( ..x
huts.
N L'3 J N,.a /nl o uvh� ,Jr �u .d� Ltn�JL .
Hours&Quantities Vedflod By pate
co: SubconUaotor
Project hV
File
Work Authorization Form 010101R
II
AUTHORIZATIONWORK
0 Extra Work—70000 Extra Work-80000
El Extra Work-00000 t3ackobarge From McCarihy
Work Authorization 1,1411-Uy�X
Job No. work Item No.
WORK AUTHORIZATION
The undersigned authorizes CYt McCarthy or U to perform the following work:
�ln%S4v�J'(Q 6tr'. J S�tvov/uti aS t, /�yv�, L✓d— a��S ��✓ref/' oy
�� ��►� r"Gnr�•,.
Charges for this work will be billed to the undersigned for payment on regular 30 day terms,
�•�'�i v� �iF yrrF1� B pate
panyNamo y sfgnoturo
By:
PartyParformtng Work
TIME & MATERIAL SHEET
Pro)ect��ya�►•�� Sb'a� `a%Af, 'rw. i=ro)ectNo. .��jg-�V�"
�I ) Date_
Charge To f .4 FI Associated with;
Subcontractor
t
This 8eotlon to be oom feted daily as work Isperformed)
I
pate labor Material/Equipment
Em to ae Craft Hours Dosat lion Want DV
�l�y s l-►S'!v J�� Rif ✓l p S/c�/` /J �ft-V--
-Y�`r (g /'v�/' U �Ll� �tr r.� a/�•-t,v.G� cv..r�r,.l'
.�-
Hours&Quantities Verified Hy
ca subcontractor �^--
Project
DI Qf
F110
Work Aulho&allon Form 010101R
WORK AUTHORIZATION FORM
[] Extra Work--70000 [ "Extra Work-80000
[] Extra Wark-00000 d Backchar0e From McCarthy
Work Authorization
Job No. Wakrtem 110.
WORK AUTHORIZATION
The undersigned authorizes C IINIcCa/rthy or C1 L to perform the followiing work:
[A IIA.G /p•c�tno� ` �'f i �✓+t. `®.�GG/t 7�Ne /*-Y��.�✓ea'� !I\
It$,t/-,-A44- / 4,a
Charges for this work will be billed to the undersigned for payment on regular 30 day terms.
C <�`/ v s •,r� 1-�a✓�� By [3ate
omp�ma sianaluro
By:
Party PArforminp Wok c
TIME & MATERIAL SHEET
Project ,c,..,P�. l Sk'ee'� Projeot No,?119.ay 2
QaIe�SJ/�
Charge To r Y v v� � ����� Associated with:
Subwnlractor
This Seotion to be completed daily as work is performed
Date labor Material/Equipment
Employee Craft Hovra Desat 1bn Quanta DV
6-A 3
Hours&Quantities Ve a pats
Sr�ntrACbr
Project Director
Ftta
Work Authortzallon form 01010112
List of Responsibilities
® Minutes for Owners Meeting- Blake
® Agenda Update for owners meeting-Blake
® Tracking dirt quantities-Blake
® Signs and Striping-Blake
® Drone Photos/Videos-Blake
® Owner's Summary for Monthly Owners Meeting-:R/eke
® Send weekend work email by Thursday
i Update Dig Tickets every 2 weeks(Next update needed by 6/28/19)
® .000.002 LCPR
SWPPP Inspections
® Drone Video Update every 6 Months, next one will be needed by Dec,2019(used free editing
software Lightworks to put together)
® Schedule Update in 136--it is up to date as of now
® Schedule Narrative
® Send Schedule Update Submittal Monthly
® Provide Dru with Monthly Schedule Narrative and Month Billing Information
• Monthly Pay Applications and route thru city via BIM 360
• K&A, CMC,Oscar Orduno Pay Applications
® Executive Summary due every 15th
Customer Change Order-
C.O.#24
Date: 06/21/2019
Project Name: Hemphill Connector Architect's Project No:
Project No: 002110.000
To Cootractot: McCarthy Building Companies, Inc.
The Contract is hereby revised by the following items:
Hemphill Connector Change Order# 24
CPR Description Amount
Weld Testing Reimbursembnt $0.00
The Original Contract Value,was $36,408,250.00
Sum of changes by prior Change Orders ($73,092.00)
The Contract Value prior to this Change Order was $35,335,166.00
The Contract Value will be clianged by this Change Order in the amount of $0.00
The new Contract Value including this Change Order will be $35,336,166.00
McCarthy Building Companies, hic. City of Fort'Worth
BY:
BY:
Date: ��.f 1 Q Date:
Printed On: 6/21/2019 5:20:32 PM Psge I of 1
Change Proposal Request
UVM11ATE
CPRtt 24
Project Name:Hemphill Connector Architect's Project No.:
Project No.002119.000 Cost Issue Ref It:37
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described
herein. This document,when fully executed, as accepted, shall constitute authorization to proceed with the work
described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change
Order. The Owner agrees that McCarthy Building Companies, Inc. will be reimbursed monthly for the cost of this
work as completed, whether or not the Change Order has been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
Weld Testing Reimbursement
SCOPE:
McCarthy's original proposal for WC #1 Track & Bridge as well as CMAR GMP proposal excluded any weld
testing. During construction it was discussed that Rone did not do weld testing and It would be easiest for
McCarthy to handle it and get reimbursed. This change order is meant to reimburse the actual cost incurred from
weld testing.
REFERENCE:
Pricing Details
Company Name Description Amount
McCarthy Building Companies, Inc. 10:WC#1 BRIDGE&TRACK $6,290.00
McCarthy Building Companies, Inc. 65:A-OWNERS ALLOWANCE ($6,604.00)
McCarthy Building Companies, Inc. 100: CONTRACTORS CNTGNCY $314.00
Net Amount of This Proposed Change $0.00
Net Change in Calendar Days Due To This Proposed Change
[] Schedule impact to be evaluated at a later date
McCarthy Building Companies, Inc. City of Fort Worth
_Accept
_Do Not Accept
BY: BY:
Date: L 12 1 1 P Date:
Printed On: 6/21/2019 5:13:28 PM Page 1 of 1
f
Project: City of Fort Worth Hemphill Street Underpass
Location: Fart Worth,Texas
Date: June 19,2019
Hemphill Street Under ass GMP2-Change Order 24
Work Unit G Change Order Previous New Budget
Line package DESCRIPTION Quantity Unit Price GMP2 Total
Measur Amount Change Orders Total
10 WC1 Subcontractor Work Category#1 Bridge&Track-McCarthy 1.00 LS $11,814,000 $11,814,000 $6,290 ($123,704) $11,696,586
11 Allowance Potential Bridge&Track Contractor Downtime 100.00 Days $5,432 $543,200 $543,200
12 Contingency Painting of Exterior Railroad Bridge Beams 1.00 LS $27,560 $27,560 ($27,560) $0
20 WC2 Subcontractor Work Category 42 Excavation&Walls-McCarthy 1.00 LS $7,745,000 $7,745,000 $14,566 $7,759,566
21 Subcontractor Artwork Installation-McCarthy 1.00 LS $75,511 $75,511 $75,511
22 Allowance Additional Artwork Support for Sub/Artist changes 1.00 LS $15,102 $15,102 $15,102
23 Contingency Painting of Concrete and Block Walls with color for 1.00 LS $77,568 $77,568 ($77,568) $0
consistenc and anti-graffiti coatings
24 Allowance Potential Walls and Excavation Contractor 50.00 Days $2,517 $125,850 $125,850
Downtime
30 1 WC3 Gentingeney Work Category#3 Electrical&Lighting 1.00 LS $1,678,000 $1,678,o00 $80,245 $1,758,245
40 WC4 Subcontractor Work Category#4 Landscaping-C.Green 1.00 1 LS $360,167 $360,167 $31,810 $391,977
Scaping,LP
41 Contingency Landscaping of ROW/CMAR Yard 3.00 Ac $17,800 $53,400 $11,949) $41,451
42 Allowance Owners Landscape Allowance 10% Bid $360,167 $36,017 $36,017
50 WC5 Subcontractor Work Category 45 Paving-McCarthy 1.00 LS $1,667,000 $1,667,000 $81,427 $1,748,427
51 Contingency Chesapeake Extended driveway and gate 1.00 LS $46,200 $46,200 ($46,200) $0
reconfiguration
60 CMAR General Conditions-30 Months 1.00 LS $4,023,374 $4,023,374 $19,453 $4,042,827
61 Contingency Sandblasting&painting of the underside of the 1.00 LS $1 a4,555 $184,555 ($184,555) $0
9 y IH30 bridge for consistent coloration
62 Allowance Identify&Locate Existing&Abandoned Utilities 1.00 LS $150,000 $150,000 $38,363) $111,637
63 Allowance Remove,relocate and/or demolish existing utilities 1.00 LS $1,750,000 $1,750,000 ($99,279) $1,650,721
within the right of wa
64 Allowance Potential Project delays due to Railroad and/or 1.00 LS $750,000 $750,000 ($540,834) $209,166
Existin Utilities within the right of way
65 Allowance Owners Allowance 1.00 LS $867,727 $867,727 ($6,604) ($96,467) $764,656
Subtotal Cost of Work $31,990,231 $30,970,939
70 Performance&Payment Bonds 0.82% $264,271 $264,271
80 Pollution Insurance Wrap Policy 1.00 LS $41,646 $41,646 $41,646
80 Railroad Protective Insurance 0.35% $112,785 $112,785
80 1 IBuilders Risk Insurance 0.22% $72,535 $72,535
80 General Liability&Umbrella Insurance 0.841% $295,300 $295,300
Subtotal Cost of Work+CMAR GC+Insurance $32,776,7681 $31,757,476
90 Construction Fee 3.50% $1,147,187 ($34,805) $1,112,382
Subtotal Cost of Work+CMAR GC+Insurance+ $33,923,955 $32,869,858
Construction Fee
100 Construction Contingency-Construction Contingency 5.00% $29,686,059 $1,484,303 $314 ($162,833) $1,321,784
has NOT been added for"Allowances"above
101 McCarthy Shared Savings from Contingency 1 $274,183 $274,183
500 Subcontractor Credits $869,341 $869,341
Subtotal Cost of Work+CMAR GC+Insurance+ $35,408,258 $6 -$73,092 $35,335,166
Construction Fee+CMAR&CFW Contingency
Pdge i d� 7S2 AV
6nY1919
McCARTHY CMAR
Jab: II.mpNO 91"M CN-411On 0.scrlp11on: Wad Testing Hoimb--,Bl
B.W OWNS
Ilan Hours UNI Casts; To1si C0.1.
Rem O.scdpllon pu+nliy UOM MW UnRsl Toll Lebo, Dup.O7.W Nld E4ulp Dub Lsbor Dup.,lslm Mbl EyAp Sub U.UNI MH HH S S S $
S S S S S S W.l
1_15V.Id h.WOF'+rlorm.d on OrN0.8 Tracks - - (_ _ - I
WCSIT.a&BAdge-I.YCaNy Bu6SAg C&np&A%9,M& 2.00 lS _ S 6.290 S S - $ S $ 6,290 S _M90
$
$ - IS S $
TuW HR9 000 SUBTOTAL $ S $ $ f 2A950 $ 6.290
IUEI,
011,
6 FARTS SAWX OF$ OF$ $ - OF EOM S S
GWRIU.IEFACFOD: 1DA01U OF$ OF S $ Or UOR S $
IABOAOUAOCIY. 4000% OF$ OF S S CT UDR S S
COH9UMAOLCS 10MY, OF$ OF$ $ - OF RUT
WCTY $469 'ER
HOUR FER HOUR 0 OFLUFI $ $
YA4UL70W 1OADX OF$ OF S $ - Or ten $ s
TA%: 8.29% OF$ OF$ S OF MIL/FULL $ $ S
SUBTOTAL S i S S 3 6,26A60 S 9,110
S,Ac.w,wl.nd 0.0009 S $
IWTdnlAlsk 0.2900% s
A43ILb.l Sondr.nJum 019500% $ $
Cost OFMA 0.8400% $
SUBTOTAL 3 S is S 1,239.601$ 6,290
CIEAH F.. 0.60;G j
ConslrvcOon COnUnB.lsry 6.00% j 714
TOTAL 1$ 0,004
MU
Customer Change Order
C.O,#6
Date: 06/21/2019
Projeot Name: Hemphill Connector .. Self Perform Bridge Architect's Pro)ect No:
and Track
Project No: 002119.001
To Contractor: McCarthy Building Companies, Inc.
The Gontract is hereby revised by the following items:
Hemphill Connector�Self Perform Bridge and Track Change-Order#6
CPR Description Amount
Weld Testing Reimbursement $6,290.00
The Original Contract Value was $11,814,000.40
Sum of changes by prior Change Orders $0.00
The Contract Value prior to(his Change Order was $11,814,000.00
The Contract Value will be changed by(his Change Order in the amount of $6,290.00
The new*C.ontract Value including this Change Order will be $11,820,290.00
McCarthy Buiitlintl Comppoles, We. MoCarthy Building Company
Dallas
BY: BY:
Date: , Date:
)rinted On: 6/21/2019 4:58,06 PM Page 1 of I
Change Proposal Request
IN&
1 �
CPR#6
I a
Project Name:Hemphill Connector-Self Perform Bridge and Track Architect's Project No.:
Project No,002119.001 Cost Issue Ref It: 18
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described
herein. This document,when fully executed, as accepted, shall constitute authorization to proceed with the work
described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change
Order. The Owner agrees that McCarthy Building Companies, Inc. will be reimbursed monthly for the cost of this
work as completed, whether or not the Change Order has been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
Weld Testing Reimbursement
SCOPE:
McCarthy's original proposal for WC #1 Track & Bridge as well as CMAR GMP proposal excluded any weld
testing. During construction it was discussed that Rone did not do weld testing and it would be easiest for
McCarthy to handle it and get reimbursed. This change order is meant to reimburse the actual cost incurred from
weld testing.
REFERENCE:
Pricing Details
Company Name Description Amount
McCarthy Building Companies, Inc. CO 24 WELD TEST REIM (S) $5,990.00
McCarthy Building Companies, Inc. Change Order Markup(F) $300.00
Net Amount of This Proposed Change $6,290.00
Net Change In Calendar Days Due To This Proposed Change
[] Schedule impact to be evaluated at a later date
McCarthy Building Companies, Inc. McCarthy Building Company-Dallas
_Accept
Do Not Accept
BY: BY:
Date: L 1 /�p Date:
Printed On: 6/21/2019 4:55:08 PM Page 1 of 1
McCARTHY-WC I
Jeb: II,mphR181r„tConn„Ilon
Dab: L1111115 D.."Ipuw,: WAd TaUnp R,ImWnM nt
AYn Ilo,n� UMI Co.[. TN.1 C.I.
I,m Dosurpdon I1vanNd UOM MID m"d Told Lalwr Bup,Mdon MN Equlp Bub Libor SuplM,bn Mbl Equ,p tub llnr
UNI MH MH i S S f S S i i $ S Tow
1 Wild D111npPAHcrrnldonBrldpeBTn,Ls - $ f $ $
$ f $
'Bkd BnFc,las of Tertr,lx. I LS _ _ $ 5,990 $ $
Totil HAS 000 SUBTOTAL f S 3 f $ 5,950 S 4990
MI.OIL.S R:PAR 50,00% OF$ OF$ $ - OF E0J.1 $ $
OVEROAIE FACTOR: 10.00% OF$ OF$ $ OFIBA $ S
IAOOR BURDEN: 4DDO% OF$ Of S $ OFLBR $ $
OOHSUTAADLES low% OF$ OF$ $ OFWT $ $
SAEEIT $0.69 PERHOUR PEA HOUR 0 OFLBR $
SMALLTOOLS 1000% Or$ OF 6 S - OFLB.R 3 S
,. TAX: 5.15% OS$ OT S $ OF MTL/FUEL $ $ S
SUBTOTAL 1 S 3 S 3 5,110 S 6,110
Su ..,W..d MOR00% $
Buld""'k 0.ODD0% $
M,13 11.M P-0— 01D000% $ $
fi,[orM,L 04000% S $
SUBTOTAL i 3 S f i 4110 $ 5,990
BuBconU�ctorMUlup S $ 300
Bd6PFrb,m MF IV 11 $
TOTAL $ 6,290
(Page 1 of 1)
Steel hiispedoirs of Texas, Me.
P n Box 150987
Fort Worth, TX 76108
(817) 246-8096 Fnx (817)246-5889
ATTENTION:Accounts Payable �
McCarthy Building Companies DATE INVOICE I/
Hemphill Street Connection W2110
660 W Vickery Blvd
fort Worth,TX 76104 G/G/ZOIR 1326G4
PROJECT
PO fV0
UP Railroad
Hemphill Rall
TLItA1S
scrVice Dato Reference lJ Descrlpflon Units Rnte Amount
6/16/2018 72124-8 Ullrasonlc Inspection 115 25.00 2,876,00
6/18/2018 72183.8 Ultrasonic Inspection 28 25.00 700.00
All jLflyzi
r
.-.� /,G✓JCrns Tam
Terms:Total Involca duo upon receipt of Invoice. Accounts not paid within 30
days after invoice dale are subject to a 1 112%late charge per month until paid. Total v3,575.00
(Page 1 of 1)
11111g][wo ton Of '11,0,xam, if me,
P 0 Box 150987
roil Worth, TX 76108
(817) 246-8096 Fax (817) 246-5889
ATTLNTIOM Accouufs I'nynblo W
McCaithy 8ullding Comti nles�� c EATC INVOICE//
klomphlll Street Connection//2119
660 W VICkery Blvd
Fort Worth,TX 76104 =7/3/20 132844
I
1'ROJL C7' PO NO
UR Rallroad
I-lemphlll Rall
j Teltnls
? I�1
SDI-vice Wo Hercrence ll Aeserlpfion Unhs Itnlo Amount
6/W010 72569.8 Ultrasonic Inspection 6 26.00 160.00
6/23/2018 72800.8 Ultrasonic Inspection 6 26.00 160.00
a//Z),
UG C). vva 3, roc), v
74
Terms:Total Invoice due upon receipt of invoice. Accounts not paid within 3.0 $300.00
(lays after Invoice date are subject to a 1 1/2%late chnrge per month until paid. Total
(Page 1 of 1)
� �of
]I e?,u.ttg, 1.m'.
P 0 Box 150987
Fort Worth, TX 76108 I
(817) 246-•8096 Fax (817) 246 5889
ATTE,NTrON;Accounts PAYAio T
McCarthy Building cornpanles J I�A7 U rrrvo�cr li
I-lernphlll Street Connec11011#2.119 -
660 W Vickery Blvd
Fort Worlh,TX 76104 L-7/31/2�08 133027
3 s
PROJECT
I PO NO
UP Railroad
Hemphill Rail
'fl;Rn4S
;c vhoDnle RefcrencoI/ Descripllon WIN Me Amount
7/10/2018 73077-8 Ultrasonic Inspections 6 26.00 160.00
7/23/2018 73064-0 Ultrasonic Inspection 6 25,00 160.00
rD
Iv�
Torms,Total Invoice due upon receipt of Invoice. Accounts not pall within 30 Total $300.00
days after invoice dale Are subject to a 1 112%late charge per month unlll pall.
(Page 1 of 1)
P O Box 150987
Fort Worth, TX 76108
(817) 246-8096 Fax (817) 246-5889
ATTENTIONi Accounts Pnynhle�
McCarthy Building Companies DATE INVOICE I/
Hemphill 81reet Connection#2119
650 W Vickery Blvd \
Fort Worth,TX 76104 10/2G/2018 133GIb
PROJECT
PO NO
UP Railroad
Hemphill foal{
T:Ertnis
ServIecDnte Refcrenco/I Description Units Este Amount
10/2/2018 74507-8 Magnetic Particle Inspection 4 75.00 300.00
10/212018 Material 1 20.00 20.00
w�c� Te S A'.1-1 P^ Aacu (A i`r !'1A/1K
0,9- sG . v,vv y. Da an
Terms;Total Invoice duo upon receipt of Invoice. Accounts not paid within 30
clays after invoice date are subject to a 1 112%late charge per month unlit paid. Total 320.00
(Page 1 of 1)
Ste'e'1l In8pedolm o `feluaN, R1nC"
P o Box 150987 �c�l
Fort worth, Tx 76108
(817)246-8096 Fax (817)246-5889
dv
ATTENTION:Accounts Payable
McCarthy Building Companies pATG INVOICE//
Hemphill Street Connection 42119
660 W Vickery Blvd (1�
Port Worth,TX 76104 - ✓ 2/5/2019 13434E
02896.0204.00.00
Ph 2 Bridge Testing
PROM CT
PO NO 2119.001-1537
UP Railroad
EI;Rnil
Service Date Referencoll Description Units 110e Aniount
117/,2019 80055-0 Magnetic Particle Inspection 4 75.00 300,00
1/7/2010 Material 1 20.00 20.00
6e �
b
6
l
P
P
Terms:Total invoice due upon receipt of Invoice. Accounts not patd within 30
clays after invoice date are subject to a 1 112%late charge per month until paid. Total �320.00
Steel[ 11111spcctors of Texas, R"Co
P O Box 150987
Fort Worth, TX 76108 Jn. 002119,001
(817) 246-8096 Fax (817) 246-5889 Co. 60000.0122.30.00
Phase3 Weld Testing
(Bridge &Track)
AT-rENTION,Accounts Pnynblc
McCarthy Building Companies DATE INVOICE 0
Hemphill Street connection#2119
660 W Vickery Blvd 1�\
Fort Worth TX 76104 �"j 4/2/2019 134788
PROJECT PO NO
UP Railroad
TERMS
servlco Dnle Reference 11 Descripllou Unlls Rnte Amount
3/16/2019 81097-9 Magnetic Particle Inspection 10 26,00 260.00
3/21/2019 81174-9 Ultrasonic Inspection 14 26.00 360.00
3/26/2019 81230-9 Ultrasonic Inspection 1 26.00 26.00
3/27/2019 81248-9 Ultrasonic Inspection 2 26.00 60.00
Pis
Terms:Total invoice due upon receipt of invoice. Accounts not paid within 30 $676.00
days after invoice date are subject to a 1 112%late charge per month until paid, Total
l / /
stee)1 11umpedonq o l exag, 11111co
P O Box 150987 =4e'ld
Fort Worth, TX 7G108 .00(817) 246-�8096 Fax (817) 246-5889 ting ')
AT'TNTIONI Accounts Payable I
McCarthy Bulldinc3 Companies
Hemphill Street Connection//211 J DATC INVOICE/1
650 W Vickery Blvd 1�
Fort Worth,TX 76104 5/1/2019� 134970
PROJECT
UP Railroad PO NO
T[?RiSiS
Sol-Vlee Dale Roference,0 Description Units hate Amount
4/0/2019 01424-9 Ma0netle-f'artlele-Inspeellon. Ultrasonic Inspection 4 26.00 100.00
4/10/2019 81610-9 Ultrasonic Inspection 10 26.00 260.00
4/22/2019 81690-9 Ultrasonic Inspection 1 25.00 26.00
Terms;Total Invoice due upon receipt of invoice. Accounts not paid within 30 $376.00
days after invoice date are subject to a 1 1/2% late change per month until paid. Total
v�J
002119.001 -'t��
60000.0122.30.0o Steel sectors of Tex As, Inc®
Phase 4 Bridge Doci<
Testing P'O Box 150987
Fort 'Worth, TX 76108
(817) 246-8096 Fax (817) 246-5889 '
ATTENTION:Accounts FIoyabie
McCarthy Building Companies DATE INVOICE 9
Hemphill Street Connection#2119
660 W Vickery Blvd
Fort Worth, TX 76104 F931/2019 135255
PROJECT
LPOW
UP Railroad
TERMS
Service Mite Reference# Description Units Itnto Amount
5/24/2019 82039-9 Magnetic Particle Inspection 6 25.00 126.00
Terms:Total Invoice due upon receipt of Invoice. Accounts not paid within 30 $126.00
days after invoice date are subject to a 1 1/2%late charge per month until paid. Total
Customer Change Order
EMME C.O.#25
Date: 06/21/2019
Project Namo: Hemphill Connector Architect's Project No:
Project No: 002119.00.0
To Contractor: McCarthy Building Companies, Inc.
The Contract is hereby ievl.sed by the following Items:
Hemphill Connector Change Order# 25
CPR Description Amount
Oncor Power Line Final Alignment ($205,253.00)
The Original Contract Value was $35,408,258.00
Sum of changes by prior Change Orders ($73,092.00)
The Contract Value prior to this Change Order was $35,33.5,166.00
The Contract Value will be changed by this Change Order in the amount of ($205,263.00)
The new Contract Value including this Change Order will be -$35,129,913.00
McCarthy Building Companies, Inc, City of Fort Worth
BY: BY:
Date: Date:
Printed On: 6/21/2019 3:43:12 PM Page 1 of 1
Change Proposal Request
M3
Date:06/21/2019
Project Name:Hemphill Connector Architect's Project No.:
Project No.002119.000 Cost Issue Ref It:38
Attached Is an itemized quotation for changes in the Contract sum and/or time on subject Project as described
herein. This document,when fully executed, as accepted, shall constitute authorization to proceed with the work
described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change
Order. The Owner agrees that McCarthy Building Companies, Inc.will be reimbursed monthly for the cost of this
work as completed, whether or not the Change Order has been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
Oncor Power Line Final Alignment
SCOPE:
The City of Fort Worth directed McCarthy to pay Oncor to remove overhead facilities along Lancaster Ave from
Lamar St. to Jennings Ave. This change order will reduce the overall contract value by$205,253.
REFERENCE:
Pricing Details
Company Name Description Amount
McCarthy Building Companies, Inc. 63:A-ROW UTILITIES ($198,312.00)
McCarthy Building Companies, Inc. 90: INITIAL MARKUP ($6,941.00)
Net Amount of This Proposed Change ($205,253.00)
Net Change in Calendar Days Due To This Proposed Change
[] Schedule impact to be evaluated at a later date
McCarthy Building Companies, Inc. City of Fort Worth
kept _Accept
Do Not Acc t Do Not Accept
BY: BY:
Date: Z J' t Date:
Printed On: 6/25/2019 7:10:16 AM Page 1 of 1
t
Project: City of Fort Worth Hemphill Street Underpass
Location: Fort Worth,Texas
Dare: June 19,2019
Hemphill Street Under ass GMP2-Change Order 25
GMP2
Line Work DESCRIPTION Unit Change Order Previous New Budget
Package Quantity Measur Unit Price GMP2 Total Amount Change Orders Total
10 WCi Subcontractor Work Category#1 Bridge&Track-McCarthy 1.00 LS $11,814,000 $11,814,000 ($117,414) $11,696,586
11 Allowance Potential Bridge&Track Contractor Downtime 100.00 Days $5,432 $543,200 $543,200
12 Contingency Painting of Exterior Railroad Bridge Beams 1.00 LS $27,560 $27,560 ($27,560) $0
20 WC2 Subcontractor Work Category#2 Excavation&Walls-McCarthy 1.00 LS $7,745,000 $7,745,000 $14,566 $7,759,566
21 Subcontractor Artwork Installation-McCarthy 1.00 LS $75,511 $75,511 $75,511
22 Allowance Additional Artwork Support for Sub/Artist changes 1.00 LS $15,102 $15,102 $15,102
23 Contingency Painting of Concrete and Block Walls with color for 1.00 LS $77,568 $77,568 ($77,568) $0
consistent and anti-graffiti coatings
24 Allowance Potential Walls and Excavation Contractor 50.00 Days $2,517 $125,850 $125,850
Downtime
30 WC3 6entingeney Work Category#3 Electrical&Lighting 1.00 LS $1,678.000 $1,678,000 $80,245 $1,758,245
40 WC4 Subcontractor Work Category 94 Landscaping-C.Green 1.00 LS $360,167 $360,167 $31,810 $391,977
Scaping.LP
41 Contingency Landscaping of ROW/CMAR Yard 3.00 Ac $17,800 $53,400 ($11,949) $41,451
42 Allowance Owners Landscape Allowance 10% Bid $360,167 $36,017 $36,017
50 WC5 Subcontractor Work Category#5 Paving-McCarthy 1.00 LS $1,667,000 $1,667,000 $81,427 $1,748,427
51 Contingency Chesapeake Extended driveway and gate 1.00 LS $46,200 $46,200 ($46,200) $0
reconfiguration
60 CMAR General Conditions-30 Months 1.00 LS $4,023,374 $4,023,374 $19,453 $4,042,827
61 Contingency Sandblasting&painting of the underside of the 1.00 LS $184,555 $184,555 ($184,555) $0
9 y IH30 bridge for consistent coloration
62 Allowance Identify&Locate Existing&Abandoned Utilities 1.00 LS $150,000 $150,000 $38,363) $111,637
63 Allowance Remove,relocate and/or demolish existing utilities 1.00 LS $1,750,000 $1,750,000 ($198,312) ($99,279) $1,452,409
within the right of way
64 Allowance Potential Project delays due to Railroad and/or 1.00 LS $750,000 $750,000 ($540,834) $209,166
Existing Utilities within the right of way
65 Allowance Owners Allowance 1.00 LS $867,727 $867,727 ($103,071) $764.656
Subtotal Cost of Work $31,990,2311 $30,772,627
70 Performance&Payment Bonds 0.82%, $264,271 $264,271
80 Pollution Insurance Wrap Policy 1.00 LS $41,646 $41,646 $41,646
80 Railroad Protective Insurance 0.35% $112,785 $112,785
80 Builders Risk Insurance 0.22%, $72,535 $72,535
80 General Liability&Umbrella Insurance 0.841% $295,300 $295,300
Subtotal Cost of Work+CMAR GC+Insurance $32,776,7681 $31,559,164
90 Construction Fee 3.50% $1,147,187 ($6,941) ($34,805) $1,105,441
Subtotal Cost of Work+CMAR GC+Insurance+ $33,923,955 $32,664,605
Construction Fee
100 Construction Contingency-Construction Contingency 5.00% $29,686,059 $1,484,303 ($162,519) $1,321.784
has NOT been added for"Allowances"above
101 McCarthy Shared Savings from Contingency $274,183 $274,183
500 Subcontractor Credits $869,341 $869,341
Subtotal Cost of Work+CMAR GC+Insurance+
C $35,408,258 5205,253 $73,092 $35,129,913
Construction Fee+CMAR&CFW Contingency
Pa5a1ul
1.5 AV
Fn52019
Tariff for Retail Delivery Service
Oncor Electric Delivery Company LLC
6.3 Agreements and Forms
Applicable: Entire Certified Service Area
Effective Date:September 21,2009 Page 1 of 3
6.3.5 Discretionary Service Agreement WRff s37767s
Transaction ID; 19383
This Discretionary Service Agreement('Agreement')is made and entered Into this 3rc day of June ,2019 by Oncor Electric
Delivery Company LLC('Oncor Electric Delivery Company"or'Company'),a Delaware limited liability company and distribution utility,and City
of Fort Worth('Customer),a municipal corporation,each hereinafter sometimes referred to Individually as'Party'or both referred to collectively
as the'Parlies'. in consideration of the mutual covenants set forth herein,the Parties agree as follows:
1. Discretionary Services to be Provided--Company agrees to provide,and Customer agrees to pay for,the following
discretionary services in accordance with this Agreement.
The City of Fort Worth has requested the removal of Oncor overhead facilities along Lancaster Ave fro Lamar St.to Jennings Ave.This DSA
covers the cost of the removal of the Overhead line and installation of new facilities to continue to provide service to Oncor customers,Oncor
will install a steel pole to concrete pole highway and railroad crossing to continue to provide service to Oncor customers.The price provided is
contingent upon received approved permits from DART and Union Pacific.The customer has agreed to pay$108,312.40(Labor$169,707.96+
Material$30,977.04+FF$7,627.40)
2. Nature of Service and Company's Retail Delivery Service Tariff--Any discretionary services covered by this Agreement
will be provided by Company, and accepted by Customer, In accordance with applicable Public Utility Commission of Texas ('PUCT')
Substantive Rules and Company's Tariff for Retail Delivery Service(Including the Service Regulations contained therein),as it may from time to
time be fixed and approved by the PUCT ('Company's Retail Delivery Tariff). During the term of this Agreement, Company is entitled to
discontinue service,Interrupt service,or refuse service Initiation requests under this Agreement in accordance with applicable PUCT Substantive
Rules and Company's Retail Delivery Tariff. Company's Retail Delivery Tariff Is part of this Agreement to the same extent as If fully set out
herein.Unless otherwise expressly stated In this Agreement, the terms used herein have the meanings ascribed thereto In Company's Retail
Delivery Tariff.
3. Discretionary Service Charges--Charges for any discretionary services covered by this Agreement are determined In
accordance with Company's Retail Delivery Tariff. Company and Customer agree to comply with PUCT or court orders concerning
discretionary service charges.
4. Term and Termination--This Agreement becomes effective upon acceptance by Customer and continues in effect unlli all
associated work by Company has been completed and reimbursement from Customer has been secured,with no allowances for betterment.
Termination of this Agreement does not relieve Company or Customer of any obligation accrued or accruing prior to termination.
6. No Other Obligations--This Agreement does not obligate Company to provide,or entitle Customer to receive,any service
not expressly provided for herein. Customer is responsible for making the arrangements necessary for it to receive any further services that it
may desire from Company or any third party.
6. Governing Law and Regulatory Authority--This Agreement was executed in the State of Texas and must in all respects
be governed by,Interpreted,construed,and enforced in accordance with the laws thereof. This Agreement is subject to all valid, applicable
federal,state,and local laws,ordinances,and rules and regulations of duly constituted regulatory authorities having jurisdiction.
7. Amendment--This Agreement may be amended only upon mutual agreement of the Parties,which amendment will not be
effective until reduced to writing and executed by the Parties. But changes to applicable PUCT Substantive Rules and Company's Retail
Delivery Tariff are applicable to this Agreement upon their effective date and do not require an amendment of this Agreement
a. Entirety of Agreement and Prior Agreements Superseded--This Agreement,Including all attached Exhibits,which are
expressly made a part hereof for all purposes, constitutes the entire agreement and understanding between the Parties with regard to the
service(s) expressly provided for In this Agreement. The Parties are not bound by or liable for any statement, representation, promise,
inducement,understanding,or undertaking of any kind or nature(whether written or oral)with regard to the subject matter hereof not set forth or
provided for herein. This Agreement replaces all prior agreements and undertakings,oral or written,between the Parties with regard to the
subject matter hereof and all such agreements and undertakings are agreed by the Parties to no longer be of any force or effect. It Is expressly
acknowledged that the Parties may have other agreements covering other services not expressly provided for herein,which agreements are
unaffected by this Agreement,
Tariff for Retail Delivery Service
Oncor Electric Delivery Company LLC
6.3 Agreements and Forms
Applicable: Entire Certified Service Area
Effective Dale:September 21,2009 Page 2 of 3
9. Notices--Notices given under this Agreement are deemed to have been duly delivered if hand delivered or sent by United
States certi(led mall,return receipt requested,postage prepaid,to:
(a) if to Company:
William Rienler
115 W.7Ih St. Suite 626
Fort Worhl,Tx,76102
817-215.6707
(b) If to Customer:
City of Fort Worth
200 Texas Street
Fort Worth Tx,76102
The above-listed names,titles,and addresses of either Party may be changed by written notification to the other.
10, invoicing and Payment—invoices for any discretionary services covered by this Agreement will be mailed by Company to
the following address(or such other address directed In writing by Customer),unless Customer Is capable of receiving electronic invoicing from
Company,in which case Company Is entitled to transmit electronic invoices to Customer.
City of Fort Worth
200 Texas Street
Fort Worth Tx,76102
If Company transmits electronic Invoices to Customer, Customer must make payment to Company by electronic funds transfer. Electronic
Invoicing and payment by electronic funds transfer will be conducted in accordance with Company's standard procedures. Company must
receive payment by the due date specified on the invoice. If payment is not received by the Company by the due date shown on the invoice,a
late fee will be calculated and added to the unpaid balance until the entire invoice is paid.The late fee will be 51%of the unpaid balance per
Invoice period.
11. No Waiver--The failure of a Party to this Agreement to Insist,on any occasion,upon strict performance of any provision of
this Agreement will not be considered to walve the obilgallons,rights,or duties imposed upon the Parties.
12. Taxes--All present or future federal,state,municipal,or other lawful taxes(other than federal income taxes)applicable by
reason of any service performed by Company,or any compensation paid to Company,hereunder must be paid by Customer.
13. Headings -- The descriptive headings of the various articles and sections of this Agreement have been inserted for
convenience of reference only and are to be afforded no significance in the interpretation or construction of this Agreement.
14. Multiple Counterparts--This Agreement may be executed In two or more counterparts, each of Which Is deemed an
original but all constitute one and the same instrument.
15. Other Terms and Conditions—
1) Customer has disclosed to Company all underground facilities owned by Customer or any other party that is not a public
utility or governmental entity, that are located within real property owned by Customer. In the event that Customer has
failed to do so,or In the event of the existence of such facilities of which Customer has no knowledge,Company,Its agents
and contractors,shall have no liability,of any nature whatsoever,to Customer,or Customers agents or assignees,for any
actual or consequential damages resulting from damage to such undisclosed or unknown facilities.
(11)Customer agrees that payment shall be made within 60 days of the date the project is completed or the date the Invoice
is received,whichever Is later.The estimated amount to be invoiced is$198.312.40
(ill)The Discretionary Service Charges provided in this agreement are for Oncor Electric Delivery facilities only and do not
include any charges related to the relocation of any facilities owned by a franchised utility,governmental entity,or licensed
service provider(Joint User). The customer must contact all Joint Users and make arrangements to have their facilities
transferred or relocated. Oncor Electric Delivery cannot complete the relocation/removal of facilities outlined in this
agreement until Joint user(s)remove their facilities attached to Oncor Electric Delivery Poles.
(tv)Construction scheduling will begin upon receipt of fully executed document at above referenced address,
Tariff for Retail Delivery Service
Oncor Electric Delivery Company LLC
6.3 Agreements and Forms
Applicable: Entire Certified Service Area
Effective Date:September 21,2009 Page 3 of 3
IN WITNESS WHEREOF,the Parties have caused this Agreement to be signed by their respective duly authorized representatives.
Oncor E ctrRc e{�y`e prppany LLC
Signature � /Ol ( ��
Craig Robicheaux
Printed Name
Metro West Design Manager
Title
06/04/2019 1 12:43:00 PM cDT
Dale
City of Fort Worth
A home-rule municipal corporation
APPROVAL RECOMMENDED: APPROVED:
Signature Signature
Mike Weiss
Printed Name Printed Name
Title Title
APPROVED AS TO FORM AND LEGALITY:
Signature
Printed Name
Title
ATTEST:
M&C#
Signature
Date:
Printed Name
Title
'CG)R
W&C Review Page I of 2
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA
FoamH
COUNCIL ACTION: Approved on 6/25/2019
DATE: 6/25/2019 REFERENCE **C-29170 LOG NAME: 20HEMPHILL UTILITY
NO.: RELOCATIONS
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize the Execution of Change Order No. 3 to the Construction Manager-at-Risk
Agreement with McCarthy Building Companies, Inc. (CSC No. 45717) for a Reduction in
the Amount of$198,312.40 from the Owner's Allowance and Authorize the Execution of a
Discretionary Service Agreement in an Amount Not to Exceed $198,312.40 with Oncor
Electric Delivery Company, LLC for the Installation of Permanent Overhead Electric
Utilities Across Union Pacific Railroad and Interstate Highway 30 Right-of-Way Related to
the Construction of Hemphill Street Connector Project from Lancaster Avenue to West
Vickery Boulevard (COUNCIL DISTRICT 9)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the execution of Change Order No. 3 to the Construction Manager-at-Risk
Agreement with McCarthy Building Companies, Inc. (CSC No. 45717) for a reduction in the
amount of $198,312.40 from the Owner's Allowance for utility relocations for the
construction of the Hemphill Street Connector Project from Lancaster Avenue to West Vickery
Boulevard; and
2. Authorize the execution of a Discretionary Service Agreement with Oncor Electric Delivery
Company, LLC in an amount not to exceed $198,312.40 for the installation of permanent
overhead electric utilities across Union Pacific Railroad and Interstate Highway 30 Right-of-
Way related to the construction of the Hemphill Street Connector Project from Lancaster
Avenue to West Vickery Boulevard.
DISCUSSION:
The Hemphill Street Connector Project extends from Lancaster Avenue to West Vickery Boulevard
under Union Pacific Railroad and Interstate Highway 30. This project includes constructing a new
4-lane arterial street with turn lanes, railroad bridge and tracks, excavation, retaining walls, paving,
storm drainage improvements, shared use path, sidewalks, streetlights, traffic signals, landscaping
and irrigation.
On March 13, 2018 the City administratively executed a Discretionary Service Agreement with Oncor
Electric Delivery Company, LLC (Oncor) in the amount of$70,620.16 (CSC No. 50374) for the
removal of approximately 400 feet of overhead electrical line on wood poles crossing Union Pacific
Railroad and IH-30 right-of-way to facilitate construction of the temporary shoo-fly tracks required
during construction of the new railroad bridge. The overhead electric line was temporarily relocated
within the City's Lancaster Avenue and Jennings Avenue right-of-way and there was no interruption in
electric services to the United States Post Office, T&P Warehouse, and the T&P train station. The City
authorized the use of allowance funds contained in the CMAR Agreement in the amount of$73,092.00
(CSC No. 45717-A3AR5) for removing, relocating, and/or demolishing existing utilities within the right-
of-way.
Under this new Discretionary Service Agreement, Oncor will install a new overhead electric line on
permanent concrete poles east of Hemphill Street across Union Pacific Railroad and Interstate
Highway 30 Right-of-Way clear of the railroad tracks and bridge. The total cost for this Agreement is
$198,312.40 and will be funded by reducing the Owner's Allowance designated for removing,
VI&C Review Page 2 of 2
relocating, and/or demolishing existing utilities within the right-of-way. City staff considers these costs
to be fair and reasonable for the proposed scope of services.
The Hemphill Street Connector Project is located in COUNCIL DISTRICT 9.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations, funds will be
available in the current capital budget, as appropriated of the Street Improvements Supplemental
Fund.
TO
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year (Chartfield 2)
FROM
Fund Department Account Project Program Activity Budget Reference# Amount
ID I I ID I I Year (Chartfield 2)
Submitted for City Manager's Office by: Susan Alanis (8180)
Originating Department Head: Steve Cooke (5134)
Additional Information Contact: Michael Weiss (8485)
ATTACHMENTS
20HEMPHILL UTILITY MAP.Pdf