Project Name-1 Ground Storage Tank Facilities Cell Towers City Sec No.: 54146
Project No.(s): 56002-0600430-CO1780 DOE No. F--N-/-A-----1 City Proj.No.: 02715
Project Description: Ground Storage Tank Facilities Cell Towers,Unit I Walsh Ranch;Unit II Stagecoach
Contractor: B-C Walker, Inc. Change Order# C= Date: 10/1/2020
City Project KIgr.1 J.Chris Underwood City Inspector: ER1ck Davis
Phone Number: 817-392-2629 Phone Number: 682-234-6931
Dept, Unit I Unit II Totals Contract Time
(Calender days)
Original Contract Amount $78,004.00 1;68,069.00 $146,073.00 12G
Extras to Date _
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $78,004.00 $68,069.00 $146,073.00 120
Amount of Prouosed Change Order $1,435.00 $8,355.00 _ $9,790.00 040
Revised Contract Amount $79,439.00 $76,424.00 $155,863.00 160
Original Funds Available for Change Orders $36,618.25 $36,518.25
Remaining Funds Available for this CO $36,518.25 $36,518.25
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS Y,OF ORIGINAL CONTRACT 6.70`Yo
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25916) 1$182,591,25
JUSTIFICATION(REASONS)FOR CHANGE ORDER
This change order will provide compensation for effort and material expended to remove unexpected unsuitable
material that was encountered during the preparation of the foundation for the Unit II Cell Tower site.The Unit I
Cell Tower site also requires acceptable fill material.The existense of the unsuitable material was not identified
in the geotechnical report for both sites.
Staff recommends the approval of 40 additional calendar days on the project.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
In full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name _Contractor i ature Dale
B-C Walker,Inc. Kevin Walker ui
Inspector Date Project Manager_, Date
Da tics 10/02/2020'
Director(Water Dept) Date Canstruclion Supervisor Date
7'S. Oct 5,2020
Assistant City Attorney Date Assistant City-Manager Date
Oct s,2020 Oct 9 2020
Council Action(If Required) OFFICIAL RECORD
M&C Number NIA M&C Date Approvers CITY SECRETARY
FT.WORTH,TX
F"yz-r W"P'x m City of Fort Worth
--- � - Change Order Additions
Project Name Ground Storage Tank Facilities Cell Towers City Sec No.: 54146
Project No.(s): 56002-0600430-CO1780 DOE No.[::N= City Proj, No.: 02715
Project Description Ground Storage Tank Facilities Cell Towers,Unit I Walsh Ranch;Unit II Stagecoach
Contractor B-C Walker, Inc. I Change Order:= Date: 10/112020
City Project Mgr. J.Chris Underwood City Inspector FRick Davis
ADDITIONS
DESCRIPTI DEPT Qty Unit Unit Cost Total
3 Foundation Installation Requirements Unit II 1.00 LS $8,355.00 $8,355.00
a)Remobilization
b)Remove rebar steel and form from foundation
c)Remove unwanted spoils from foundation
d)Supply base rock(SB2-1-1/2"crusher run)
e)Labor to grade and compact to desired density
f)Remove unwanted spoils and base from the site
3 a)Remobilization Unit 1 1.00 LS $1,435,00 $1,435.00
b)Select fill
I
Unit 1 $1,435.00
Unit II $8,355.00
Page 2 of 4 Additions Sub Total $9,790.00
FC3 P,Zr V'c)v"'•Il.]�-A City of Fort Worth
Change Order Deletions
Project Name Ground Storage Tank Facilities Cell Towers City Sec No.: 1 54146
Project No.(s): 56002-0600430-CO1780 DOE No. N/A City Proj, No,: 02715
Project Description Ground Storage Tank Facilities Cell Towers, Unit I Walsh Ranch; Unit II Stagecoach
Contractor B-C Walker, Inc. Change Order: F11 Date 10/1/2020
City Project Mgr. J.Chris Underwood City Inspector: Rick Davis
DFL ETIONS
ITEM IDESCRIPTION DEPT Qty Unit Unit Cost Total
i
�i
i
I
1
I
Unit I
Unit II
Page 3 of 4 Deletions Sub Total
MMBB Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $$0.00
Previous Change Orders
co# DATE AMOUNT
r
Total $0.00
I
i
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
o
S gnature
ea—woo
Name of Employee
Title
dpvo4p
a IF I' a
4�`8 og�-IP
ATTEST: , oQo 0o
yror sd
Ratut�7 A. �o�uzaCss� aQ
d
r Ronald P.Gonzales(Oct 1,202011:57CDT) �a�nEXA5o4p
Mary J. Kayser
City Secretary
I
4
I
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
B-C Walker Inc. C HAN r�Imo. ORDER
�� Ir;I�
7311 Kelley Lane ��LS lr� IS l�
Harrah, Oklahoma 73045 DATE PROPOSAL#
Phone: 405-454-1487 9/29/2020 2020-177
Fax: 405-454-1126
NAME/ADDRESS
CITY OF FORT WORTH-Water Dept
927 TAYLOR ST
FORT WORTH,TX 76102
ATTN: RICHARD DAVIS
PROJECT: STAGECOACH
PROJECT
GROUND STORAG...
DESCRIPTION QTY COST TOTAL
STAGECOACH
GROUND STORAGE TANK FACILITIES PROJECT
CITY PROJECT 902715
CONTRACT#54146
ADD BASE TO FOUNDATION DUE TO SPOILS NOT
APPROVED
1) RE-MOBILIZATION 1,500.00 1,500.00
2) REMOVE REBAR STEEL AND FORM FROM 600.00 600.00
FOUNDATION
3) REMOVE UNWANTED SPOILS FROM FOUNDATION 520.00 520.00
4) SUPPLY BASE ROCK (SB2-1 1/2"CRUSHER RUN) 695.00 685.00
5) LABOR TO GRADE&COMPACT TO DESIRED DENSITY 3,400.00 3,400.00
6) REMOVE UNWANTED SPOILS&BASE FROM SITE 1,650.00 1,650.00
*PLEASE REMIT PURCHASE ORDER UPON APPROVAL'
Thank you for your business.
TOTAL $8,355.00
i
{
B-C Walker Inc. CHANGE ORDER
7311 Kelley Lane
Harrah, Oklahoma 73045 DATE PROPOSAL#
Phone: 405-454-1487 9/30/2020 20-177-2
Fax: 405-454-1126
NAME/ADDRESS
CITY OF FORT WORTH-Water Dept
927 TAYLOR ST
FORT WORTH,TX 76102
ATTN: RICK DAVIS
PROJECT: WALSH
PROJECT
GROUND STORAG...
DESCRIPTION QTY COST TOTAL
WALSH
GROUND STORAGE TANK FACILITIES PROJECT
CITY PROJECT#02715
CONTRACT 454146
CHANGE ORDER
SELECT FILL FOR GROUND DITCHES
1) TEN(10)TONS OF SELECT FILL (LABOR&MATERIAL) 685.00 685.00
2) MOBILIZATION 750.00 750.00
*PLEASE REMIT P.O.AFTER APPROVAL*