HomeMy WebLinkAboutContract 54713 CSC No. 54713
STATE OF TEXAS
COUNTY OF TARRANT
SEWER DISCHARGE AGREEMENT
This agreement is made and entered into by and between Enercon Services, Inc. (ENERCON),
(On behalf of The City of Fort Worth), Fort Worth, Texas, and the City of Fort Worth (CITY).
For and in consideration of the covenants and promises contained herein, the parties hereto agree
as follows:
I. RECITALS
1. ENERCON requests approval for the sewer discharge of contaminated stormwater from
Brennan Service Center Remediation Activities, The City of Fort Worth, located at 2500
Brennan Ave., Fort Worth, Texas, 76106. ENERCON, proposes performing analysis of
the stormwater to identify characteristic pollutants known or reasonably expected to be
present in the wastewater. ENERCON, also proposes to treat said wastewater for such
pollutants to the levels described herein prior to discharge into the sanitary sewer.
2. The proposed discharge would enter the sewerage system of CITY.
II. COVENANTS
1. The CITY agrees to receive pretreated effluent from a wastewater recovery and
pretreatment system operated by ENERCON (on behalf of The City of Fort Worth) &
2500 Brennan Ave., Fort Worth, Texas.
2. ENERCON, agrees to install and operate a pretreatment facility as needed for the
treatment of water prior to discharge into the public sanitary sewerage system. The
pretreatment system shall (at a minimum) consist of-
a) A facility to treat water to acceptable and safe limits prior to discharge to the
sanitary sewerage system;
b) Sample points installed on influent and effluent lines for water quality
monitoring; and
c) A flow meter installed to totalize effluent volume in cubic feet.
OFFICIAL RECORD
Revised 3-14-17 CITY SECRETARY
FT.WORTH,TX
Effluent discharged from the pretreatment system will not exceed the following limitations:
All discharges shall be compliant with any ordinance requirement.
Parameter Effluent Concentration
Limit
(mg/L)
Arsenic 0.25
Cadmium 0.15
Chromium 5.0
Copper 4.0
Lead 2.9
Mercury 0.01
Nickel 2.0
Silver 1.0
Zinc 5.0
Oil&Grease 200
Cyanide 1.0
SGT-HEM 10.0
MTBE 2.0
MEK 1.0
BTEX 1.0
TTO (EPA 624, 625 and 2.13
608 compounds)
H 5-12
Limits for other parameters will be added based on the contaminants present in the
wastewater.
All discharges shall be compliant with any ordinance requirement of the CITY or
requirement of the Publicly Owned Treatment Works (POTW), and any state and/or
federal laws, regulations, codes, or requirements.
If any other parameters are expected or if contaminants are unknown EPA Methods
624/625 and 608 will be performed, limits will be established for those parameters present.
Revised 3-14-17 2
3. ENERCON, agrees that the sewer discharge shall not exceed a rate of 200 gpm (gallons
per minute); if an increase is desired, ENERCON, will request an increase in writing.
The CITY will endeavor to respond within 30 days from date of receipt of such request.
CITY reserves the right to refuse such request if, in the sole opinion of the CITY such
requested increase will adversely affect the CITY's treatment plant or collection system.
4. ENERCON, agrees to discontinue discharges if the sewer lines receiving the discharge
are found at any time to contain an atmosphere equal to 10% of the lower explosive limit
and/or exhibit a petroleum-like nuisance odor. ENERCON, will be permitted to resume
discharge if sampling and investigation show that ENERCON, treated wastewater
discharge is not the source of nuisance odors and/or sewer LEL levels equal to or greater
than 10%.
ENERCON, also agrees to discontinue discharges that violate the discharge requirements
established by this Agreement and may recommence discharge only when compliance is
assured.
5. ENERCON, agrees to collect and analyze samples of the influent (prior to treatment) and
the effluent(discharge after treatment) and report all results to the CITY.
Sample collection, analytical and notification procedures must conform to methods
approved by the U.S. Environmental Protection Agency, listed in 40 CFR 136 and 40
CFR 403.12(o)(1)(2), (p)(1)(2)(3)(4). CITY must receive analysis results within thirty
(30) days from sampling date.
ENERCON, agrees that although a minimum sampling frequency is stated herein that
continuous and consistent compliance is ENERCON's responsibility and ENERCON,
will act accordingly to insure continuous and consistent compliance. CITY agrees
insofar as permitted by law, to keep all these reports and results confidential and will
endeavor to provide ENERCON, with copies of any request from a third party for this
information.
6. ENERCON, agrees to procure prior to discharge, and maintain during the life of this
agreement contract, Environmental Impairment Liability (EIL) insurance which is site
specific at a minimum limit of $3,000,000 each occurrence. The EIL insurance shall
include but not necessarily be limited to, coverage as follows:
a) Sudden and/or accidental environmental impairment, contamination or pollution,
and for gradual emissions.
b) Clean-up costs.
c) Defense costs.
Revised 3-14-17 3
d) Damage incurred to any party or to any property while groundwater is being
discharged and carried by Fort Worth's sewer transportation system to the Village
Creek Wastewater Treatment Plant.
e) Coverage under the EIL policy shall be maintained for a period of two (2) years
after termination or expiration of this agreement.
f) CITY shall be endorsed as an additional insured and a waiver of subrogation in
favor of the CITY.
g) A thirty (30) day notice of cancellation shall be provided to the CITY.
h) Maximum deductible of$5,000 per occurrence unless otherwise approved by the
CITY.
i) Certificates of Insurance are required to provide proof of insurance and shall be
provided to the CITY prior to discharge being permitted.
7. ENERCON, agrees to provide the CITY with access to the monitored site so that the
CITY may monitor/sample at its discretion. CITY agrees, insofar as permitted by law, to
keep all results of these samples confidential.
8. ENERCON, agrees to compensate the CITY for the cost of doing business in the
following amounts:
a) Monitoring Fee: A payment of$500 for the cost of administering and monitoring
the discharge during the agreement period.
b) Transportation Fee: A discharge fee based on the CITY billing rates for the
volume of wastewater discharged. Current billing rate is $4.06 per CCF (100
cubic feet=748 gallons). The City requires 24 notification and approval of batch
discharges and volumes in lieu of a meter.
The Monitoring Fee shall be paid to the CITY prior to the commencement of discharge.
The Transportation Fee shall be paid to the CITY upon receipt of a bill for services.
9. Except as a party may otherwise direct by written notice to the other, all correspondence
and reports shall be directed as follows:
City of Fort Worth ENERCON
Ms. Laly Joseph,REM Mr.Darren Lovvorn
Pretreatment Services Enercon Services, Inc.
Fort Worth Water Department 15770 North Dallas Parkway, Suite 400
920 Fournier Street Dallas,Texas 75248
Fort Worth,Texas 76102
Revised 3-14-17 4
III. INDEMNIFICATION
ENERCON, covenants and agrees to, and does hereby, indemnify and hold harmless and defend
the CITY, its officers, agents, and employees, from and against any and all suits or claims for
damages or injuries, including death, to any and all persons or property, resulting from any
negligent act of omission or commission on the part of ENERCON, its officers, agents, servants,
employees or subcontractors in the performance of this Agreement, and ENERCON, does hereby
assume all liability and responsibility for injuries, claims or suits for damages, to persons or
property, of whatsoever kind of character, whether real or asserted, occurring during or arising
out of the performance of this Agreement, as a result of any negligent act of omission or
commission on the part of ENERCON, its officers, agents, servants, employees or subcontractors
in the performance of this Agreement, provided, however, that ENERCON liability shall be
limited to that established in Article 6252-19, Texas Revised Civil Statues, and other applicable
state statutes and constitutional provisions.
IV.AMENDMENT AND TERMINATION OF AGREEMENT
1. This Agreement may be amended in writing by mutual agreement of the parties hereto.
2. This Agreement shall terminate after the discharge of 100,000 gallons of stormwater
located at the facility. If further discharge of treated water is required after the end of this
Agreement, ENERCON, may request renewal of this Agreement.
3. The CITY may terminate this Agreement without notice at any time if, in its sole opinion,
the discharge authorized thereunder is adversely affecting the CITY's treatment plant or
collection system. In addition, this Agreement may be terminated by the CITY if and
when the CITY determines that ENERCON, wastewater discharge will subject the CITY
to fines, penalties, administrative orders or any enforcement action by state or federal
agencies, or require CITY to perform treatment to remove toxicity, including any
additional biomonitoring requirements for compliance with CITY's NPDES permit.
VENUE
Venue and jurisdiction of any suit, right, or cause of action arising under, or in connection with,
this contract shall lie exclusively in Tarrant County, Texas.
IN WITNESS WHEREOF,the parties hereto have made and executed this Agreement this
day of Oct 22,2020 , A.D., 20 Oct 22,2020
pdovaoq��
City of Fort Worth F FORT�oadd
pro o=°
faYRandld P. Gonzales °aa��EZP54ap
Attest. for Ronald P.Gonzales(Oct 21,202012:01 CDT) By: Dana Burghdoff(0 21,2020 0:52 CDT)
City Secretary Ms. Dana Burghdoff
OFFICIAL RECORD
Revised 3-14-17 5 CITY SECRETARY
FT.WORTH,TX
Title: Assistant City Manager
Christopher ffgrder
By: Ch0stopher Harder(Oct 21,2020 09:06 CDT)
Mr. Chris Harder
Title: Water Director
Fort Worth Water Department
Approved as to Form and Legality:
11_94K� Ile Oct 22, 2020
Christa R.Looez-Reynolds(Oct 21.2 0 09• DTI Date:
Ms. Christa Lopez-Reynolds
Title: Sr. Assistant City Attorney
Enercon Services, Inc.
f
L
By: a.:- Title: Division Manager, Texas Region
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the monitoring and administration of
this contract, including ensuring all performance and reporting requirements.
Name of Employee
Environmental Program Manager
Title
OFFICIAL RECORD
Revised 3-14-17 6 CITY SECRETARY
FT.WORTH,TX