WHEREAS, the City of Fort Worth (CITY) and Neel-Schaffer, Inc. ,
(ENGINEER) made and entered into City Secretary Contract No. 51385, (the
CONTRACT) which was authorized by M&C on the lath day of September, 2018
in the amount of $ 267, 709 . 00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $18, 945 . 00 which was administratively authorized on
February 19, 2019; Amendment 2 in the amount of $16, 270 . 00 which was
administratively authorized on July 29, 2019; Amendment Number 3 in the
amount of $21, 342 . 00 which was administratively authorized on 12th day of
December, 2019; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Keller Haslet Road Culvert Improvements; and
WHEREAS, it has become necessary to execute Amendment No. 4 to the
CONTRACT to include an increased scope of work and revised fee .
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1_
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $26, 534. 00. (See Attached Funding
Breakdown Sheet, Page -4-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $350, 800. 00.
3 .
City of Fort Worth 101492 Keller Haslet Road Drainage improvements
Professional Services Agreement Amendment Template
Revised:March9,zozo image i of a OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below_
APPROVED:
City of Fart Worth ENGINEER
Neel--Schaffer, Inc.
Dana BUrandoff
Dana Burghd off ct22,202017:02CDT)
Dana Blerghdoff acres F. Amick
Assistant City Manager Engineer Manager
DATE: Oct 22, 2020 DATE: 1 f-Zr?Z 0
APPROVAL RECOMMENDED:
William Johnson, -
Director, Transportation and .Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that T am the person responsible for the
monitoring and administration of this contract, including ensuring all
performanc and reporting requirements_
Mike r]n
Proj t Manager
City of Fort Worth 101492 Keller Haslet Road Drainage Improvements
Professional Services Agreement Amendment Template
Revised,March 9,2020 Page 2 of a OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
APPROVED AS TO FORM AND LEGALITY: M&C: NA
U�'z' Date:
DBlack(Oct 22,202016:57 CDT)
Douglas W. 131ack
Assistant City Attorney
4.d44URn�
pbot F°°Rt��a
p S°
ATTEST: ado ° °�pAd
C—
Pvo . 0
ddd* °,
�D!'�D`laG�� C70`11.�G2I °aa r�p54aa
'for Ronald P.Gonzales(Oct 23,2020 09:59 CDT) �buuaagq
Mary J. Kayser
City Secretary
City of Fort Worth 101492 Keller Haslet Road Drainage improvements OFFICIAL RECORD
Professional Services Agreement Amendment Template
Revised:3 �rtar�9,zoza CITY SECRETARY
Page 3 of 4
FT. WORTH, TX
FUNDING BREAKDOWN SHEET
City Secretary No. 51385
Amendment No. 4
Department Fund-Account-Center Amount
TPW 52002 0200431 5330500 101492 002830 $26, 534 . 00 �
J
Total: $26, 534 . 00 �
City of Fort Worth 101492 Keller Haslet Road Drainage Improvements
Professional Services Agreement Amendment Template
Revised:March 9,2020
Page 4 of 4
III NEEL-SCHAFFER
: Solutions you can build upon
September 21, 2020
Mr. Mike Bennett, P.E.,PMP
Project Manager
City of Fort Worth—TPW Capital Delivery
200 Texas Street
Fort Worth, Texas 76102
Reference: Keller Haslet Road Culvert Improvements Contract Amendment 4
Dear Mike:
Neel-Schaffer, Inc. offers additional Professional Engineering Services for this project. These
additional services were requested by the City of Fort Worth to address the moving head cut.
That head cut has moved approximately 200' in the last two years.
This work generally falls into two categories. The first relates to the overflow channel. The
second addresses the low flow culvert and existing stream.
The overflow channel, with limited Contractor supplied field data, will be modified to deepen it
(to match the newly eroded stream flowline) and shorten it (to reduce the amount of excavation
and save money). It will also include relocating the drop structure from the old location of the
head cut to the end of the newly installed box culverts. There are areas where no additional field
data have been provided that will be generalized in the revised plan. Field modification will be
required to match the concept being developed. Another task related to the overflow channel is to
redesign the culvert apron (also being relocated downstream of the drop structure) and the ACB
and TRM erosion protection measures. This requires modifications to sheet 13 (Concrete
Structure Details) and sheet 15 (Drainage Channel Plan/Profile). New sheets 27 (Revised
Overflow Channel Plan/Profile) and 28 (Revised Downstream Concrete Apron Details) will also
be required.
The second category includes addressing the head cut in the existing stream. The 36" low flow
culvert will be extended about 50' to the end of the existing grouted rock rip rap. From there the
existing streambed will be lowered about 3' for another 50' to tie in the current location of the
head cut. Erosion control measures will be provided for culvert outfall. There are AT&T
facilities in the area of the stream grading that might be impacted. This work will require
modifications to sheets 14 (Concrete Structure Details), and also sheet 15 (Drainage Channel
Plan/Profile). A new sheet 29 (36" Culvert Extension and Existing Stream Modifications Plan
with special pipe connection details) will also be needed. The 36" pipe extension will be
profiled.
O:Vobs\14799-Fort Worth Keller Haslet Road Culvert\Admin\Contract\Am 4\Amendment 4 Letter.doc
ARLINGTON • DALLAS • FORT WORTH • HOUSTON
engineers • planners • surveyors • environmental scientists • landscape architects
515 Houston St., Ste. 751 • Fort Worth, TX 76102 • phone: 817-870-2422 • fax: 817-870-2489 • www.neel-schaffer.com
Mr. Mike Bennett,P.E., PMP
September 21, 2020
Page 2
The head cut has now exposed part of the newly constructed sewer manhole. Erosion protection
measures will be designed for that manhole. These will be shown on the new sheet 29.
The Section 404 Permit will have to be revised and resubmitted to the U.S. Army Corps of
Engineers for approval. This is included.
No survey work is included. The Contractor provided a few shots to assist with the redesign. No
other revisions to sheets are included. No other permitting (road closure, trees, grading, etc.) is
included.
The proposed increase to the contract is $26,534.00 for these additional services. All additional
services will be performed in accordance with the original contract dated October 10, 2018 (City
Secretary Contract No. 51385).
Summary of Contract Fee
Original Contract Amount $267,709.00
Amendment No. 1 $18,945.00
Amendment No. 2 $16,270.00
Amendment No. 3 $21,342.00
Proposed Amendment No. 4 $26,534.00
Revised Contract Amount $350,800.00
If you have any questions or we may be of further service,please call me at 817/870-2422.
Sincerely,
NEEL-SCHAFFER, IN .
eamesAmick, P.E.
Engineer Manager
TBPE Firm Reg.No.F-2697
TBPLS Firm Reg.No. 10027200
W N N 0 0 0 0 0 0 10 10 O O O O O O O O 10 10 v A O�O O O o V z
NN CD�'��BOO Af0 CON �OOOW CD M ANO 10 M O
C eDMM �NO)��OO M A A A AOM� N �A 10 10NR 10
F NNN eD��CM N NNN M N NN 1()CM N m CO N N NO e0
a NNNN en N MNN N N N N N
NJ
Y
W
W
m V N N O O O O O O 10 10 O O O O O O O O 10 10 W Lp m C
M F»C9 N F»F»F»C9 F»F»F»C9 N LO C9 F»F» LR C)F»F» E a �cW ° a
O.e. N N N 2 LR J m y y Co p_,V
N �q N fA U) r�r�W C C 0 m
O a r
O m F H a a y a Q
0 Q 12cnvi wa
NN � N C9C9NC NN � n yyow FO
w
u
v' �z
C
a O
m z
a
oen oen n n N n
o N N
w �
c ~
m
wJU oen oen oen vooi LQ vooi
C =i N NN N
C
O
C z
0 eon eon eon eon O
a W
NJ
ate+ u o00 000000000 0 00 00 00000
co N 00 . N O fON .Of0 W
C a C4 4 Q! M A A A N�M� A
M NNN m N a Q%N Q NNN e7 N NN W, N e9
eH V N NNNN N N NNN N
Z C F
Z ` m O N CD CDN N a
10
Q.W V > C c
U) IX Z Z E
-tm mv �.
WoIx N d N O N M 10 co CD
C0' O .o N
c = tM'woCa �
01 N d +,
d _ 0 O O O O O
_ W
L
01 t
G1 O 10 O O O o co w
a 1O
cl
Y WuoN
J m C
O'cl
a` e
w
O O CD N N-N N a s a a s N
en N
u N
o W
P e
a �
O N- �0 �--t N--t- "t N N M N N
V N a C) 0
m N
'O m
a` o
� d o
m '2 ~
r O
n m
e o w W c
W w m W � L
a g a W y 2 2
u W o W C W fmA O W 0
o ro '>.� O ui mm m o;a
m An
a > 3 w cl
0 3 3 € 2 € c
YW Ow m.0 O•— co L N_ W mu1 m W
F CO C C W Q d uJ a(n> >C C_ U g a _m
C W-`
L p O.N
W (�U O U p O m O(n W+� m W W n
� m� ai3p3V2U � 2 ' � �❑ cE2° v)o
uno c '- oLL p(nC2 W 2ma c a Cao
mLD > art W >mLL WmQ � mm E�mm O
a 00 Jw-UO❑ �U ILW- xo❑
O O A N
Z >N N A OD co
Y --—--CD co O B OO OM N 1010 J N
W O O co[M[M coM M M c o O f 0 O O O O O O
F e+i eD 01 m
f0
11 m
EO
O U
> co
v¢n