Construction Allowance Request
ProjectNamel HMAC Surface Overlay(2019-6) City Sec# 1 53393
Client Project#(s)l 102098
Project Cement stabilized 8"of existing pavement and add new hot mix asphalt.Replace damaged curb&gutter,driveways,sidewalk and non compliant curb
Description ramps.
Contractor Peachtee Construction Ltd City Inspector Brian McGill
Funding Allocation Account TP Select DayW Totals Type
Original Contract Amount 1,079,975.00 1,079,975.00
Extras to Date
Credits to Date
Current Contract Amount $1,079,975.00 $1,079,975.00
Amount of Proposed Allocation $11,883.69 $11,883.69
Original Allowance Available for Allocation y' S'�Coc�c+•cto i( .17 TV0 77
Allowance Funds Previously Allocated
Remaining Funds Available for this Allocation S;orv) 'tA q A st 6CeN r?1p
JUSTIFICATION(REASONS)FOR CHANGE,ORDER
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and materials per the attached proposed
Construction Allowance Request(with attachments)to the Construction Allowance Request.This construction allowance is for addtional cost that the contractor incurred due
to two water main breaks on 5th Avenue during construction.Contractor had to perform addtional regrading work and remove damaged material.This construction allowance
is to compensate for labor and material costs,including 10%overhead.Contractor's quote and email regarding this addtional work are attached to this document.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Contractor amAw Contract Signature Date
PEACH i REE CONS UC i tON,L i►D. I BARRY CLARK e,Z S,
ul
Ins ctodins eclion Su ervisor NlVote., Project Mana er/Pr LV Manager Date
a f
Assistant Director Dept) ,., Dale; Director,Contracti bepartment Depi) Date
Assistant City Attorney Date Assistant City Manager Date
Council Action if required)
M&C Number M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth
Construction Allowance Additions
Project Name I HMAC Surface Oveday 2019-6 City Sec# 53393__
Client Project# 1 102098
Contractor Peachtee Construction Ltd Inspector Brian McGill
ADD1T10N5
y Unit UnitCost Total
RegraMing—Wo7rerformed on bth Ave due to Water Main Elreak
TPW $11,883.69
Sub Totaldwns 8 .
Change Order Additions Page 2 of 4
FORT WORTH City of Fort Worth
ir- Construction Allowance Deletions
Project Name HMAC Surface Overlay(2019-6) City Sec# 53393
Client Project# 102098
Contractorl Peachtee Construction Ltd Inspector Brien McGill
ITEMS TO BE REDUCED AND CREDITED TOWARD CONSTRUCTION ALLOWANCE
Unit Unit Cost I o a
TPW $0.00
u o—t aT D a eUons
Change Order Deletions Page 3 of 4
M/SBE Breakdown for this Construction Allowance
Total rb.QO
Previous Construction Allowance
Total
PEAGUR
ME CON
5801 Park Visa Or. - K Ucr,'I'\ 76244 * (817) 741-4658 -fiix (817) 741-46418
August 10,2020
City of Fort Worth
Attn: TariquI Islam
Re: 5Tn Ave Extra Work
Mr. Islam,
Regarding the work performed on 51"Avenue when the water maid was designated as needing replacement,
costs were incurred by Stabile and Winn that will need,to be recovered.Attached are 2 break downs for this
work.
Extra Work#1 Cost with contractor markup$5,,531.59
Extra Work#2 Regrading Cost with contractor inarkup$5,687.66
Barricades during water line replacement Cost with contractor markup$664.44
Total Cost-$,11,883:69
Sincerely,
Brendan Taylor j
Peachtree*Construction
i
I
j
t
fF�
E
i
Specializing in 11MAC Paving E
WORKSHEET FOR DAILY CREW COST
JOB NAME. HMAC Overly 2019-6-Fifth Street
CITY(STATE.
PERIOD.
Materials
$0.00
$0.00
Total Materials $0.00
Misc.Cost
$0.00
$0.00
$0.00
Total Misc:Cast $0.00
Labor $1,090.27
I
Eauipment Unit HRS Rate Total
MOTOR GRADER HR 8 $80.00 $640.00
COMPACTOR HR 6 $85,00 $5%00"
MIXER HR 4 $150.00 $600.00'
RUBBER TIRE BACKH(HR 8 $65.00 $520.00
WATER TRUCK HR 4 $60,00 $240.00'
PNEUATIC ROLLER HR 0 $50.00 $0.00
Formans Pick-Up pY 1 $376,00 $375.00
Truck HR 0 $85 00 $0.00 ;
i
Total Equipment $2,885.00
i
4
Sub-Total Cost $3,975.27
Overhead 16.00% $596 29 i
I
Total Cost $4,571,56
Mark-Up 10.00% $457.16
Total $6,028.72
3
i
t
WORKSHEET FOR DAILY CREW COST
JOB NAME: HMAC Overlay 2019.6-Regrading 5th
CITY/STATE; Fort Worth,Texas
PERIOD:
l
Materials
$0.00
$0.00
Total Materials $0.00
Misc.Cost
Dump Fee 4 LDS $120.00 i
$0.00
$0.00
Total Misc.Cost $120.00
Labor $1,079.43
i
3
3
Equipment Unit HRS Rate Total
MOTOR GRADER HR 8 $80.00 $640.00 ,
COMPACTOR HR 4 $8500 $340.00
MIXER HR 0 $160.00 $0.00
RUBBER TIRE BACKH(HR 8 $66.00 $520.00
WATER TRUCK HR 4 $60.00 $240.00 j
PNEUATIC ROLLER HR 2 $60.00 $100.00
Formans Pick-Up DY 1 $375;00 $375.00 j
Truck HR 8 $8500 $680.00
Total Equipment $2,896.00
Sub-Total Cast $4,087.43 j
F
Overhead 15.00%a $613.1.1
Total Cost
$4,700,54
i
Mark-Up 10.00% $470.05
Total $6,110.60
i
I
3
t
f
CrossRoadsy
v 0NNQV
L3arrica >;<TrafSafetySenrloss Invoice lid: RT 60003
5012 DaM Sthckiand Rd.fort Worth,TeXas 70119
Voice:(817)634-0( 14 Fa)C(0i7)6344M8 19261
www.crossroadslp.com Invoice Date: 7/31/2020
Customer PO Jab Mart Date: 6/27/2020
Job Number., Job Close pate
........ ......... ..,.......,........,,.......
Job Name; City of Fort Worth 2019-6 .......,,
Job Address/Location: 6th Ave&Allen Ave W Fort Worth, TX
REMIT PAYMENT TO
Crossroads, L.P.
TO Peachtree Construction, LTD. i 5801 Park Vista Cir. 5012 David Strickland Rd.
Keller,TX 76244 Fort Worth,Texas 76119
;.
Please return one copy with payment.
.. .........................................................
ONE
i
' a -
WIT
7!1/2020 7131/2020 $. SIGN-WOOD-ECG-60 X 30-ROAD CLOSED Ta �3'1 � 0.75 186.00
THRU TRAFFIC
7/1/2020 7/3112620 8 TUBULAR MARKER-42"EG OWOW SHEETING W130# 31 0.55 136:40
BASE
i
I
7/1/2020 7/31/2020 4 TYPE III-EG-WOOD-LEFT-O/W 31 0.95 117.80
711/2020 7/31/2020 4 TYPE III-EG,-WOOD-RIGHT=O1W 3.1 0.05 117.$0 �
Terms:Net 30 data Sub Total $ 650.00
Tax $ 46.04
Thank you for choosing CrossRoads,L.,P for your barricade and traffic safety needsl Invoice Total $ 604.04
1
i
i
i
t
f
I
i
l
page 1 of i
1
10/19/2020 BIM 360 Document Management
B AUTODESr BIM 360' fortworthgov>102098-HMAC SURFACE OVERLAY 2019-6- A TI
Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES
Reviews > Review detail
CLOSED #14 Construction Allowance Approval Workflow
Export Report . This review is closed.
Name Description Version Markup Comments PROGRESS
TI TariquTOct 1,10:33 AM
Construction AllowanceRequest_H MAC 2019-6.pdf — V1 0 Nocomme <tariquLislam@fortworthtexas.gov,
FW_Sth Ave Work_Email.pdf Vl 0 No comme Submitted to Reviewer 1
Reviewer 1 Initial Review 1
JP Jeffrey Perrigo Oct 2,9:21 PM
<j effrey.pe rri go @fo rtworthtexas.g ova
Submitted to Reviewer 2
Reviewer2 InitialReview2
LZ Lane Zarate Oct 5,9:56 AM
<la n e.za ra to @ fo rtwo rth texa s.g ov
Submitted to Reviewer 3
Reviewer3 InitialReview3
LP Lauren Prieur Oct 5,10:12AM
<lauren.prieur@fortworthtexas.gov>
Submitted to Reviewer 4
Reviewer4 InitialReview4
WJ William Johnson Oct 5,11:31 AM
<wi Ilia m.iohnson @fortworthtexas.gov
Submitted to Reviewer 5
Reviewer 5 Initial Review 5
DB Douglas Black Oct 8,1:39 PM
<doug.black@fortworthtexas.gov>
Submitted to Approver
Approved based on review of
document provided separately by
Tariq because the BIM 360
program is non-functioning and
does not allow DWB a clean look at
the embedded docs.
Approver Final Review
DB Dana Burghdoff Oct 9,3:53 PM
OFFICIAL RECORD <dana.burghdoff@fortworthtexas.gov,
CITY SECRETARY Review ended
FT. WORTH, TX
Review closed
hftps://does.b360.autodesk.com/projects/eOe9c88c-c8cl-4a4c-8d62-d51 ed6b597a7/reviews/201 Cal da-4734-43cf-9235-4b2b4194ddac 1/1
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Tariqul Islam / T-", tf'G (�
Name of Employee/Signature
Project Manager
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
pd-p4Udn��
V FO.o �4;
o
O
d p—` d
° •I d
ovo =
ATTEST: Q*o °o*'
b
for Ronald P. Gonzales
for Ronald P.Gonzales(Oct 20,202012:32 CDT)
Mary J.Kayser,City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX