Loading...
HomeMy WebLinkAboutContract 53179-AR5 CSC No.53179-AR5 FCF�T WDRTH City of Fort Worth Construction Allowance Request Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 53179 Client Project#(s) CO2101 Project Silver Creek Roadway Improvements Phase 2 between Brewer High School and Live Oak Description Contracto Texas Bit/Texas Materials Group,Inc. CA# 5 Date 9/16/2020 City Project Mgr.Alejandra Ayala City Inspector John Crowley Dept. UNIT I UNIT II Contract Time Totals (CD) Original Contract Amount $3,507,396.93 $1,411,506.71 $4,918,903.64 Extras to Date Credits to Date Current Contract Amount $3,507,396.93 $1,411,506.71 $4,918,903.64 Amount of Proposed Change Order $66,678.76 $0.00 $56,678.75 Original Allowance Available to Allocation $200,000.00 $100,000.00 $300,000.00 Allowance Funds Previously Allocated $77,739.60 $85,687.05 $163,426.65 Remaining Funds Available for this Allocation $112,237.95 $14,312.95 IL 1 $126,550.90 JUSTIFICAAMONS)FOR CH E ORDER IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all labor and materials for the construction of the commercial driveway into Silver Creek Materials. The City obtained a Right-of-Way Donation from Robert L.Dow(Owner)on May 7,2019. The northernmost existing commercial driveway entrance was to be removed and relocated as part of the construction project which also included adding a left turn lane into Silver Creek Materials. The Owner donated right-of-way to the City with an understanding that the City would reconstruct the commercial driveway which is approximately 500 linear-feet long by 42-feet wide. The City included the plan and profile of the commercial driveway into the set of plans as part of the construction of the roadway improvements. The inclusion of this plan was the Owner's acknowledgement that the City would construct the commercial driveway. During the construction of the commercial driveway the materials that were originally specified in the set of construction plans were revised to include a suitable driving surface for the type of heavy commercial trucks that enter and exit the facility on a daily basis. Attached is the plan and profile sheet for this construction allowance. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Construction Allowance Request. Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Changer Order,if necessary. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. ontractor's Company Name (Name) ontract Signature Texas Bit/Texas Materials Group,Inc. Pedro Alonso "/2020 Inspector/Inspection Supervisor Date Project Manager Dat 90uti O7w+s4 Oct 1,2020 "�"''�"� Oct 1 2020 Program Manager Date Date b Oct13,2020 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date Oct 14,2020 Oct 14,2020 Assistant City Attorney Date Assistant City Manager Date Pa-loaza---CPn Oct23,2020 Teua�B Oct23,2020 d4vopp o' FoRr� 4 M&C Number N/A M&C Date Approved N/A F1 0 o°.� ..*;Y d 00, ATTEST: o'A.tP Ronald P.Gonzales V 8 =G Ronald P.G—la(Ot26,2 16W CDT) p�0*'o o*�d MaryJ.Kayser,City Secretary adds QE00000o o Ronald P. Gonzales Assistant City Secretary OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX City of Fort Worth Construction Allowance Additions Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 53179 Client Project# CO2101 Contracto Texas Bit I Texas Materials Group,Inc. PM Al.Ondra Ayala Inspector John Crowley Construction Allowance Submittal# 0 Date 12020 AIJUITIONS y Unit UnitCost o a Driveway Reconstruction at Silver Greek Materials UNIT I $66,678.76 UNIT II 0.00 Sub Totalitions Change Order Additions Page 2 of 4 FoRi WoRi n City of Fort Worth --- Construction Allowance Deletions Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 53179 Client Project# CO2101 Contracto Texas Bit I Texas Materials Group,Inc. PM Alejandra Ayala Inspector John Crowley Construction Allowance Submittal# Date 9I1612D2D DELETIONS y Unit Unit Cost I ota Construction Allowance 00000000 UNIT I 66,678.76 UNIT II $0.00 bub Totaleetions $66,6 8. 6 Change Order Deletions Page 3 of 4 MISBE for this Construction Allowance MISBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Construction Allowances co# DATE AMOUNT Total $0.00 r--------------------------------------------- EXISTI (\ 0,SILVER CREEK RD 4" PIPE \ \ REVISIONS \ E SWALE FL 614"75' wrmvcoo rvrs.ITa EXIST GRATE o Mq IpX Iry 34 E%I ST 4"PIPE FL 614. 4' (0 - — — - irvi AB" FLEXBASE OVER B' CTB W/ Im•n PRIVATE DRIVEWAY 5 °R.T.`c0°.r. z SPRAY COAT OF EMULSIFIED DUST For Review Only / A SUPPRESSANT moray°/ SWALE (123 SY)) �\ ° \y \ (SEE DETAIL A) F. I I. .e z`\ d \ —rnrRO PEaI tP— fie,— ND DR VEWAY CONSTRUCTION r6•a—.10°� 'aalre or —T rn ] "I a°rmn P"rP°_. CNLED 1.a1. �o.6 TCH ISTING DRIVEWAY OSI/VErvr No.ozaelzreos ss 1Oo, LIVE pAK CREEK RD p.a.r.c.r� z S STA 5.86.66 PAVEMENT LEGEND LIVE OAK CREEP RD PREVPoUS ONNER VOc 2, 02 � PROP.6'HMAC W/%'CTB I + PROP.]'CONC W/X•CTB \ �_ ..._... ... —_ PROP,4'HMAC W/6•CTB PROP,V CONC DRIVEWAY o CITY OF FORT WORD \\\��� _ ^' _ _ S 77° 56' 97.E 5_'W - -y- - �- I PROP.3'MIWOVERLAY 0 - CALLED 130.30 AC. \2.�y0� A R LIVE OAK CREEK RD 5+p0 TREE REMOVAL REQUIRED X VOL.519 PG.622 `7 .5�/ TREE REMOVAL IF NEEDED J( 0712711917 h\ 0 - R 13/ I D.R.T.C.T. Yy END 6•CONC. DRIVEWAY APPROACH STA 4.63.9 BEGIN 8" FLEXBASE DRIVE �4N4STCppL11P - BEGIN DRIVEWAY CONSTRIJGTI \\\ \ STA 0.96.59 45•SKEW 0.5%WITH MATCH SILVER CREEK$OAD r �FELEXBASE OR FLEXAMAT ON It LIVE OAK CREEK RD A \\\ DRAACHIN END AND GRADE TO STA 0.2$�00 DRAIN -LEI IE.CALL BEFGRE—YoAU1?I2WE.T ! \\\ \ ,pGpy CHEEK aDgtpN T. / G.LIVE OAK CREEK,RD-B I CONSTRUCTION NOTES x0 ITS1ov OR[v0u oio.°a a VOE.,ipg-Ip5 p6. / o<u o"art..."nwi s.ua ae *REMOVE EXIST ­11®Texas One Call System 4r \\\ // DRIVEWAY aEXIST DRIVEWAY MATERIAL TO BE RECLAIMED - °.,"o,oEo"m",or.... reo.o o.F ra- 1-800-DIG-TESS ,� \\ .�/jCE B FLEXBASE AS BASE FOR NEW DRIVEWAY LOCATION. °„L<no. Cro,�o.xc.T..T°e" s 111m 1. C "C a o"ucT m o°x rzv ova Cno°o�x.no"s tenl m,-exsz &.Ecmllcrs:iss o `- o"°o zoienlzs-cn.6 e IiEsrl° oo-,�ss" O - rdCHORIZONTAL&VERTICAL CONTROL O si% a si z,R4•,R R:aai�aTM" C E K LVERD R N r/ozror STA R 5 66.2 0 STA= 2+10.00 EL = 616.53' ° �^cr/ N e = .03' W KX=3 Q = 30° a FORT WORTH „620 fizo STA =4+60.00 620 > , ROPOSE1 CL ez =613.13' END DRIVEWAY CONSTRUCTION LEVATION X--41 57' MATCH EXISTI G DRIVEWAY 0.50% BEGIN ORIVEW Y CONSTRUCTIO �/ 00 •`�-% =- i,g6 L - 136.00' CITY OF FORT WORTH,TEXAS j MATCH SILVER CREEK ROAD TRANSPORTATION AND PUBLIC WORKS O STA- 0+5 .00 �L) ;L_ _('j 1•y�/ EXISTING CLEL CAPITAL A uDEuvERv oMisiorvF m 61 0 610 ex-0606'33 ELEVATION 61 OEm R; MV Engineering,Inc. o L - 30. 0' QI .nm^� •rvl Pm Pinsxv.wii ° STA 4+63.91 rL 1IZpN�P uFs SILVER CREEKROAD W rL 09.BB DS FROM BREWER OR TO SILVER CREEK BRIDGE w - - DRIVEWAY PLAN&PROFILE-UNIT I ° LIVE OAK CREEK ROAD j a 6v1 600 600 D J ur20' nY 2019 52s0i139 N —— ———————————————————————-