Loading...
HomeMy WebLinkAboutContract 53049-FP4 City Secretary 53049 -FP4 Contract No. FORTWORTH., Date Received Oct 30,2020 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: VENTANA PHASE 4 City Project No.: 102239 Improvement Type(s): ❑ Paving ® Drainage ❑ Street Lights ❑ Traffic Signals Original Contract Price: $1,141,608.70 Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: $1,141,608.70 Zi?#/w cafto#t Daniel Cannon(Oct 29,202013:14 CDT) OCt 29,2020 Contractor Date Project Manager Title KCK Utility Construction, Inc Company Name Ramon Chavez(Oct 2, 13:15CDT) Oct 29,2020 Project Inspector Date Patrick a ley(Oc 9,202014:15CDT) Oct 29,2020 Project Manager Date Laurie Lewis Laurie Lewis(Oct 29,202015:49 CDT) Oct 29,2020 CFA Manager Date Dana Burghdoff(Oct 29,20 7:33CDT Oct29,2020 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT.WORTH, TX Notice of Project Completion Project Name:VENTANA PHASE 4 City Project No.: 102239 City's Attachments Final Pay Estimate Change Order(s): ❑ Yes ® N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 100 CD Days Charged: 323 Work Start Date: 11/20/2019 Work Complete Date: 7/1/2020 Page 2of2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name VENTANA PHASE 4 Contract Limits Project Type STORM DRAIN City Project Numbers 102239 DOE Number 2239 Estimate Number 1 Payment Number 1 For Period Ending 10/28/2020 CD City Secretary Contract Number Contract Time 1WD Contract Date Days Charged to Date 323 Project Manager NA Contract is 100.00 Complete Contractor KCK UTILITY CONSTRUCTION 103 N.ALLEN DRIVE ALLEN, TX 75013 Inspectors OWEN/ CHAVEZ Wednesday,October 28,2020 Page 1 of 5 City Project Numbers 102239 DOE Number 2239 Contract Name VENTANA PHASE 4 Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN For Period Ending 10/28/2020 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 REMOVE EXISTING RIP RAP 338 SY $16.00 $5,408.00 338 $5,408.00 2 REMOVE PROPOSED 24"STORM LINE 15 LF $20.00 $300.00 15 $300.00 3 REMOVE EXISTING TXDOT CH-FW-0 1 EA $1,300.00 $1,300.00 1 $1,300.00 WINGWALL 4 REMOVE PROPOSED 24"SLOPED END 1 EA $1,300.00 $1,300.00 1 $1,300.00 HEADWALL 5 LARGE STONE RIPRAP,DRY 794 SY $99.00 $78,606.00 794 $78,606.00 6 POST CCTV INSPECTION 4249 LF $2.20 $9,347.80 4249 $9,347.80 7 TRENCH SAFETY 4249 LF $0.10 $424.90 4249 $424.90 8 CONCRETE COLLAR 1 EA $450.00 $450.00 1 $450.00 9 18"RCP 140 LF $47.00 $6,580.00 140 $6,580.00 10 21"RCP 891 LF $52.00 $46,332.00 891 $46,332.00 11 24"RCP 1725 LF $60.00 $103,500.00 1725 $103,500.00 12 30"RCP 10 LF $77.00 $770.00 10 $770.00 13 36"RCP 100 LF $97.00 $9,700.00 100 $9,700.00 14 5'X4'BOX CULVERT 825 LF $235.00 $193,875.00 825 $193,875.00 15 2-6'X4'BOX CULVERT 127 LF $604.00 $76,708.00 127 $76,708.00 16 2-8'X4'BOX CULVERT 152 LF $846.00 $128,592.00 152 $128,592.00 17 4'STORM JUNCTION BOX 8 EA $6,600.00 $52,800.00 8 $52,800.00 18 8'X5'STORM JUNCTION BOX 1 EA $7,565.00 $7,565.00 1 $7,565.00 19 8'X8'STORM JUNCTION BOX 3 EA $8,550.00 $25,650.00 3 $25,650.00 20 4'STACKED MANHOLE 1 EA $6,600.00 $6,600.00 1 $6,600.00 21 10'CURB INLET 20 EA $4,840.00 $96,800.00 20 $96,800.00 22 15'CURB INLET 10 EA $5,720.00 $57,200.00 10 $57,200.00 23 20'CURB INLET 2 EA $6,600.00 $13,200.00 2 $13,200.00 24 4'DROP(AREA)INLET 1 EA $4,200.00 $4,200.00 1 $4,200.00 25 4'GRATE INLET 1 EA $4,620.00 $4,620.00 1 $4,620.00 26 5'X4'TXDOT 2 EA $20,570.00 $41,140.00 2 $41,140.00 27 12'X4'TXDOT 2 EA $29,100.00 $58,200.00 2 $58,200.00 28 16'X4'TXDOT 2 EA $36,050.00 $72,100.00 2 $72,100.00 29 21"SLOPED END HEADWALL 2 EA $2,420.00 $4,840.00 2 $4,840.00 30 24"SLOPED END HEADWALL 4 EA $2,640.00 $10,560.00 4 $10,560.00 Wednesday,October 28,2020 Page 2 of 5 City Project Numbers 102239 DOE Number 2239 Contract Name VENTANA PHASE 4 Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN For Period Ending 10/28/2020 Project Funding 31 24"CH-FW-45 HEADWALL 1 EA $2,420.00 $2,420.00 1 $2,420.00 32 36"SLOPED END HEADWALL 1 EA $3,520.00 $3,520.00 1 $3,520.00 33 CONNECT TO EXISTING STORM RCP 2 EA $1,000.00 $2,000.00 2 $2,000.00 34 SEEDING,BROADCAST 1 LS $15,000.00 $15,000.00 1 $15,000.00 Sub-Total of Previous Unit $1,141,608.70 $1,141,608.70 Wednesday,October 28,2020 Page 3 of 5 City Project Numbers 102239 DOE Number 2239 Contract Name VENTANA PHASE 4 Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN For Period Ending 10/28/2020 Project Funding Contract Information Summary Original Contract Amount $1,141,608.70 Change Orders Total Contract Price $1,141,608.70 Total Cost of Work Completed $1,141,608.70 Less %Retained $0.00 Net Earned $1,141,608.70 Earned This Period $1,141,608.70 Retainage This Period $0.00 Less Liquidated Damages Days @ /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,141,608.70 Wednesday,October 28,2020 Page 4 of 5 City Project Numbers 102239 DOE Number 2239 Contract Name VENTANA PHASE 4 Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN For Period Ending 10/28/2020 Project Funding Project Manager NA City Secretary Contract Number Inspectors OWEN/ CHAVEZ Contract Date Contractor KCK UTILITY CONSTRUCTION Contract Time 100 CD 103 N.ALLEN DRIVE Days Charged to Date 323 CD ALLEN, TX 75013 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded -------------------------------------- Total Cost of Work Completed $1,141,608.70 Less %Retained $0.00 Net Earned $1,141,608.70 Earned This Period $1,141,608.70 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,141,608.70 Wednesday,October 28,2020 Page 5 of 5 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS October 19, 2020 KCK Utility Construction Inc. 1024 S. Greenville Ave.,Suite 100 Allen,TX 75002 RE: Acceptance Letter Project Name:Ventana Phase 4 Project Type: Developer City Project No.: 102239 To Whom It May Concern: On October 7, 2020 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on October 14, 2020. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on October 14, 2020, which is the date of the punch list completion and will extend of two (2)years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-2443. Sincerely, Patrick a ley(oct49,202014:15 CDT) Patrick Buckley, Project Manager Cc: Ramon Chavez, Inspector Billy Owen, Inspection Supervisor Joseph Rogers,Senior Inspector Victor Tornero, Program Manager UA Engineering, Consultant KCK Utility Construction Inc., Contractor Green Brick, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev.8/20/19 KCK U'T I L,I T'Y G(D"S'TF U4=0' rIaH 1 024 G. GREENVILL-E AVE., SUITE 100 ALLEN, TEXAS 75002 (214) 547-91 52 OFF-(21 4) 547-9 1 63 FAX BILLS PAID AFFIDAVIT STATE OF TEXAS COUNTY OF COLLIN BEFORE ME, the undersigned authority, on this day personally appeared Jerry Covington,Jr., known to me to be a credible person and officer of KCK Utility Construction., Inc., a Texas Corporation(hereinafter called "Contractor"), and who, being duly sworn, upon his oath declares and acknowledges as follows: 1. I am the duly authorized agent for the said Contractor, which has authorized me to make this affidavit, and all of the recitations herein are true and correct. 2. Pursuant to an agreement-dated 6-18-2019 between KCK Utility Construction,Inc.,and GRBK EDGEWOOD,LLC, has supplied materials and performed labor in connection with the construction of improvements upon certain real property owned by the Owner in Tarrant County,Texas. Said improvements are more particularly described as Water,Sanitary Sewer and Storm Drainage improvements for Ventana Phase 4(the "Improvements"). 3. Contractor has actual knowledge that all bills owed by Contractor to others for materials supplied or labor performed in connection with the Improvements have been fully paid and satisfied except for contractual rtainage. Contractor does further warrant that should any claim or lien be filed for material supplied or labor performed by virtue of Contractor's participation in the construction of said Improvement,Contractor will immediately furnish a bond pursuant to Texas Property Code, Sections 53.236 through 53.238, for release of each such lien, and obtain settlement of any such liens and furnish Owner written full release of such liens. Should Contractor be unable to obtain such release, Contractor agrees to fully indemnify and hold harmless the Owner for any and all costs they may incur by reason of such lien. EXECUTED this 13`4 day of October, 2020. KCK UTILITY CONSTRUCTION, INC. By: Name: J ry Co on Title: President SUBSCRIBED AND SWORN TO BEFORE ME by the said Jerry Covington,Jr., on this the 1 P day of October, 2020,to certify which witness my hand and seal of office. I ESJAM:ESDOUGLAS WILSON y 10#124492049 ota lic in and for the State of Tcxasmmission Expires rCl 22. 2023 OD b2 19-t MATNTENANCH BOND Page 1 of Bond No.2296056 l SECTION 00 62 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we,KCK Utility Construction, known as"Principal"herein and 8 North American Specialty Insurance Company ,a corporate surety(sureties, if more than 9 one)duly authorized to do business in the State of Texas,known as"Surety"herein(whether one 10 or more),are held and firmly bound unto the Developer,GRBK EDGEWOOD, LLC,authorized 11 to do business in Texas("Developer")and the City of Fort Worth,a Texas municipal corporation Two Million,Six Hundred Thirty-Seven 12 ("City"),in the sum of Thousand Fifty-Three&10/100 Dollars 13 ($ 2,637,053.10 },lawful money of the United States,to be paid in Fort Worth, 14 Tarrant County,Texas,for payment of which sum well and truly be made jointly unto the 15 Developer and the City as dual obligees and their successors,we bind ourselves, our heirs, 16 executors,administrators,successors and assigns,jointly and severally, firmly by these presents. 17 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth by and through a Community Facilities 20 Agreement,CFA Number CFA 19-0105;and 21 WHEREAS,the Principal has entered into a certain written contract with the Developer 22 awarded the day of ,20_,which Contract is 23 hereby referred to and a made part hereof for all purposes as if fully set forth herein,to furnish all 24 materials,equipment labor and other accessories as defined by law, in the prosecution of the 25 Work,including any Work resulting from a duly authorized Change Order(collectively herein, 26 the"Work")as provided for in said Contract and designated as ventana, Phase 4;and 27 28 WHEREAS,Principal binds itself to use such materials and to so construct the Work in 29 accordance with the plans,specifications and Contract Documents that the Work is and will 30 remain free from defects in materials or workmanship for and during the period of two(2)years 31 after the date of Final Acceptance of the Work by the City("Maintenance Period"); and 32 CITY OF FORT WORTH Ventana,Phase 4 STANDARD CITY CONDITIONS—DEVELOPER AWARDED PROJECTS CAN#102239 Revised January 31,2012 006219-2 MAINTENANCE BOND Page 2 of 3 1 WHEREAS,Principal binds itself to repair or reconstruct the Work in whole or in part 2 upon receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 5 NOW THEREFORE, the condition of this obligation is such that if Principal shall 6 remedy any defective Work,for which timely notice was provided by Developer or City,to a 7 completion satisfactory to the City,then this obligation shall become null and void;otherwise to 8 remain in full farce and effect. 9 10 PROVIDED,HOWEVER, if Principal shall fail so to repair or reconstruct any timely 11 noticed defective Work,it is agreed that the Developer or City may cause any and all such 12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 13 by the Principal and the Surety under this Maintenance Bond;and 14 15 PROVIDED FURTHER,that if any legal action be fled on this Bond,venue shall lie in 16 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 17 Worth Division;and l8 19 PROVIDED FURTHER,that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 21 22 23 CITY OF FORT WORTH Ventana,Phase 4 STANDARD CITY CONDITIONS—DEVELOPER AWARDED PROJECTS CPN#102239 Revised January 31,2012 006219-3 MAINTENANCE BOND Page 3 or 3 l IN WITNESS WI•IEREOF, the Principal and the Surety have each SIGNED and S13ALED this 2 instrument by duly authorized agents and officers on this the —day of 3 , 20 4 5 PRINCIPAL.: 6 KCK Utility CaaMI-LIC lan,Inc. 7 _. 8 9 BY: to Signature 11 ATTEST: 12 13 _ 14 (Principal)Secretary _ Name and Tit le 15 16 Address:—1�29� ticuYiilt�dtis uuc.SttillglL-- 17 Allcu,TX 75002 _ 18 19 20 Witness as to Principal 2 t SURETY: 22 North Amcrk:M)Stiacia ly lasurance Company 23 24 25 BY 26 Signature 27 28 Andrea Rose Crawfurd,Ataorney-in-Fact 29 ATTEST: Name and Tide 30 .y1 -% / 31 yV��. j •.`•t`�• -� w Address: 1200 Maio Slrect.suilc 800_ 32 ( ur ty)Secretary TK¢msns City,MO 64105 33 --- 34 35 Witness as to Surety Teleplionc Number: 913-676.5200 36 -- 37 *Note: if signed by an officer of the Surety Company, there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation, If 39 Surety's physical address is different from its mailing address, both must be provided. 40 41 The date of the bond shall not be prior to the date the Contract is awarded. 42 CITY OF FORE'V'OR'1]1 Vemansa,Phase 4 S'l'ANDARD CITY CONDITIONS—DEVELOPER AWARDED PROJECTS CPN N102239 Revised Janutaty 31,2012 SWISS RE CORPORATE SOLurIONS NORTH AMERICAN SPECIALTY INSURANCE COMPANY WASHINGTON INTERNATIONAL INSURANCE COMPANY WESTPORT INSURANCE CORPORATION GENERAL POWER OF A'1"rORNEY KNOW ALL MEN BY II MS]."PREiSIiNTS,'I'f IAT North American Specialty Insurance Company,it corporation duly organized and existing under laws of the State of New I lampshire,and having its principal office in the City of Kansas City,Missouri and Washington International Insurance Company it corporation organized and csisling under the laws of the State ofNew I lanipshire and having its principal oflice in the City of Kansas City,Missouri,and Westport Insurance Corporation.or'anl%cd Under the laws ofthe Statc of Missouri,and having its principal office in the City of Kansas City,Missouri does hereby make,constitute anf ilppoint: SAMMY JOF MULLIS,JR.,JOHN WILLIAM NEWBY,CHERI LYNN 1RBY,MICI[AF.L L.TULLIS,SANDRA LI-'F RONFY,DEBRA LET.MOON,ANDRFA ROSE CRAWFORD, MARY JO%AKRZtFWSKI,JAMI:S 11.ROOERS,JR.,'I'ROY RUSSI?Lt.KIIY,LINDA uIIC118LL1i S"I'AE.11RIi.CHKIS'1'(H'IlEilt C•ARI. WND11liRG amIJOSIMA 1).l'Rrr3'JOINTLY OR SEVERALLY Its true and lawful Atlorney(s)-in-Fact,to make,exceufc,seal and deliver,for and on its bell a]fand as its acl and deed,bonds or other writings obligatory 11n[lie nature ol'a bond oil behalf of each of said Companies,as Surely,oil contracts of suretyship as are or may be required or perlllllled by law,regulation,contract or otherwise,provided that no bond or undertaking or contract rn'sitrc(yship executed under this authority shall exceed the amount ol': TWO 1IUNDRL=D MILLION($200,000,000.00)DOLLARS ']'his Power of Attorncy is granted and is signed by facsimile tender and by the authority of the hollowing Resolutions adopted by the Bmirds of Directors or North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held on March 24,2000 and Westport Insurance Corporation by written consent of its Eixeculivo Committee dated July 18,2011, "RESOLVED,that any two of the President,any Senior Vice['resident,any Vice President,any Assistant Vice President, the Secretary or any Assistant Secretary be,and each or any of 1hcm hereby is authorized to execute a Power of Attorney qualifying the attorney nailed in the given Power of Attorncy to execute on behalfof the Company bonds,undertakings and all contracts of surety,and that each or any of them hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company, and it is FUIU 1 IFR RESOLV1iD,that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or lausinlile still shall be binding upon the Company when so affixed and in the future with regard to any bond,undertaking or contract of surety to which it is attaehed." ¢11G11AL17Yjl//!/�/ �a ?liONfur �� kt� �% '2iElttlL? "'Q'G,,., Hs//� �Ci oAPo l ysg ( t�J._...... }L...... " b h:•G Rqj.I By / �C+ C 'W G �'y j -0 L�r�L fi` W S(cr.•n .,er ersnn.,color oec nesr e11u ostngmu menni Mom nsurance Compnny �..• ? �T r SEAL :O`• -e: y : &senior�'icr I'rrsiden,ur NarUr Amnricun Slteel.Jiy Insurance Company 4: � •r�, ,7�, W%'L 1973 yri m a tr'J •ns$ &seeeier Yire Presideist of 1Yrsgwrl Lrxu rmiec Cnrparnlinu ] , Woo t11ke A,llo.Stnlur Vice I'Mident of iYo�in€euu tmanunimmi iusunurce Cam ixn k�•' /llfllll111515 »mnyiet„uns'�' ] Y 1b &Seutor Vice President ur\nrm Ameriuno Specially Insurance Company lJi3lkllYsf &Senior Vice Presidem or Wcsy,arl huuntace Corporation IN WH NESS W[IERtSOF,North American Specialty Insurance Company,Washington International Insuraticc Complllly and Westport Insurance Corporation have caused their official seals to be hereunto affixed.and these presents to be signed by their authorized ollicers this- this 3rd day of_ September ,20 19 North American Specialty Insurance Company Washington I rlternational Insurance Company State of Illinois Wcstllort Insurance Corporation County of Cook ss: On this 3rd day of September 20 19,belbre inc,it Notary Public personally appeared_ Stcvcn P.Anderson ,Senior Vice Presidem of Washington Inicrflational Insurance Company and Senior Vice President ofNorih American Specialty Insurance Company and Senior Vice]'resident of Westport Insurance Corporation and Michael A. Ito Senior Vice President of Washington International lttsuritnce Company and Senor Vice]'resident of-North American Specialty Insurance Company and Senior Vice President of Westport Insurance Corporation, personally known to inc,who being by me duly sworn,acknowledged Ilia(they signed the above Power of Attorncy as officers of anti acknolvlcdged said instrument to be the voluntary act and deed of their respective companies. OFF-10M.SIAL m KENNY N:,:ary••^ul:iir-Slat:,u!IIGa+:: ''---- -..__.--....-.-.-- h41LuM"Mivn:opir^ ' �zro�sozl M.Kenny,Nolary Public I, Jeffrey 0oldber r , the duly elected Vice President and Assistant Secretary ol'North American Specialty Insurance Company,Washington International Insurance Company and Westport Insurance Corporation do hereby ecrtily that the above and lilrcgoing is a true and correct copy of a Power ol'Attorney given by said North American Specialty Insurance Company,Washington International Insurance Company and Westport Insurance Corporation which is still in full force and Oka IN WI'IT]ESS WI[]iRl;Ol',[have set illy hand and affixed the seals Of the Companies this_day of ,20 Jea'ruY CJald11ar.Vice picsiduni&ABsiBlant Secretory ar wkoioainu Inlcmational lnsomrs u Company& Xnnh:5uswrem,Rpuciahy Insurnnc.•Company&Vice Yresnlom ,Assiv:nn Secretary of We;tpmt Insurance C•ogmmlion North American Specialty Insurance Company Washington International Insurance Company Westport Insurance Corporation TEXAS CLAIMS INFORMATION IMPORTANT NOTICE ADVISO IMPORTANTE In order to obtain information or make a complaint: Para obtener informacion o para someter un queja: You may contact Jeffrey Goldberg,Vice President Puede comunicarse con Jeffrey Goldberg,Vice - Claims at 1-800-338-0753 President- Claims,al 1-800-338-0753 You may call Washington International Insurance Usted puede Ilamr at numeeo de telefono gratis de Company and/or North American Specialty Insurance Washington International Insurance Company and/or Company's and/or Westport Insurance Corporation North American Specialty Insurance Company's and/or toll-free number for information or to make a Westport Insurance Corporation para informacion o complaint at: para someter una queja al. 1-800-33 8-07 53 1-800-3 3 8-07 53 You may also write to Washington International Usted tambien puede escribir a Washington Insurance Company and/or North American Specialty International Insurance Company and/or North Insurance Company and/or Westport Insurance American Specialty Insurance Company and/or Corporation at the following address: Westport Insurance Corporation al: 1450 American Lane 1450 American Lane Suite 1100 Suite 1100 Schaumburg,IL 60173 Schaumburg,IL 60173 You may contact the Texas Department of Insurance Puede escribir al Departmento de Seguros de Texas to obtain information on companies, coverages, para obtener information acerca de companias, rights or complaints at: coberturas,derechos o quejas al: 1-800-252-3439 1-800-252-3439 You may write the Texas Department of Insurance: Puede escribir al Departmento de Seguros de Texas: P.O. Box 149104 P.O. Box 149104 Austin,TX 78714-9104 Austin,TX 78714-9104 Fax: (512)475-1771 Fax: 1512)475-1771 Web: httn://www_jdj,srate.tx.us Web: Email:ConsumerProtection@tdi.state.tx.us Email:Cons umerProtection@tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS 0 RECLAMOS: Should you have a dispute concerning your premium Si tiene una disputa concerniente a su prima o a un or about a claim you should first contact the reclamo,debe comunicarse con el Washington Washington International Insurance Company and/or International Insurance Company and/or North North American Specialty Insurance Company and/or American Specialty Insurance Company and/or Westport Insurance Corporation. If the dispute is not Westport Insurance Corporation primero. Si no se resolved,you may contact the Texas Department of resuelve la disputa, puede entonces comunicarse Insurance. con el Departmento de Seguros de Texas. ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POLIZA This notice is for information only and does not Este aviso es solo para proposito de infromacion y no become a part or condition of the attached se converte en parte o condition del documento document. adjunto.