HomeMy WebLinkAboutContract 49565-CO3 FORT WORTH City of Fort Worth
Change Order Request CITY SECRETARY
CONTRA yq5 Cu :3
Project Name: Marine Creek Interceptor Improvements, Phase I City Sec No.: 49565
'�► Project No.(s): 59607-0700430-CO2223-CC1783 1 DOE No. 7214 City Proi.No.: 02223
*C to E description; Pipe enlargement ro upgrade and replace an existing deteriorated sanitary sewer main located within the Marine Creek
N,�G 213 Basin beginning from Bowman Roberts Rd./Cromwell Marine Creek Rd.
C OCFegjax,ntractor: William J.Schultz,Inc.dba Circle C Construction Co. Change Order# Date: 8/15I2018
CCI'f SEGFt`�A
City Project Mgr,I Roberto Sauceda, P.E. City Inspector: Virginia Wade
Phone Number: 817-392-2387 Phone Number: 817-392-8455
Dept. Water Sewer Totals Contract Time
(Callender days)
Original Contract Amount $1,634,700.00 $1,634,700.00 320
Extras to Date $64,370.00 $64,370.00 060
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,699,070.00 $1,699,070.00 380
Amount of Proposed Change Order $0.00 $0.00
Revised Contract Amount $1,699,070.00 $1,699,070.00 380
Original Funds Available for Change Orders $81,800.00 $81,800.00
Remaining Funds Available for this CO $17,430.00 $17,430.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.94%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,043,375.00
JUSTIFICATION (REASONS)FOR CHANGE ORDER
Change Order No. 3 will provide for the following:
• The abandonment of three existing manholes that will be taken out of service.
• The grouting of a segment of an existing 15-inch sewer main that is to be abandoned.
• The deletion of pay item quantities that are no longer needed on the project.
1 O R
A by. a; �
6' 0:
M J.Wse City Secre
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name = Contractor Name ontractor Signature Date
William J.Schultz,Inc.dba Circle C Construction Co. Teri Skelly
Inspector Date Project M Date
L r� _ sf (S
As4istant Director(Water Dept) Date Con truction Supervisor(TPW Dept) Date
Assistant C' ttorney Date Assistant City Manager Date
Council Action(If Required)
M&C Number N/A M&C Date Approved N A
FC3RT V "RTx City of Fort Worth
Change Order Additions
Project Name Marine Creek Interceptor Improvements, Phase I City Sec No.: 49565
Project No.(s): 59607-0700430-CO2223-001783 DOE No. 7214 City Proj.No.: 02223
Project Pipe enlargement ro upgrade and replace an existing deteriorated sanitary sewer main located within the Marine Creek
Description Basin beginning from Bowman Roberts Rd./Cromwell Marine Creek Rd.
Contractor William J. Schultz, Inc.dba Circle C Construction Co. Change Order:= Date: 8/15/2018
City Project Mgr. Roberto Sauceda, P.E. City Inspector Virginia Wade
ADDITIONS
ITEM DESGRI TON
DEPT Qty Unit Unit Cost Total
39 MH abandonment Sewer 6.00 EA $1,000.00 $6,000.00
40 Sewer line grouting Sewer 300.00 CY $140.00 $42,000.00
Water
Sewer $48,000.00
Page 2 of 4 Additions Sub Total $48,000.00
0 t2T' WO ip,- r m City of Fort Worth
Change Order Deletions
Project Name Marine Creek Interceptor Improvements, Phase I City Sec No.: 49565
Project No.(s): 59607-0700430-CO2223-001783 DOE No. 7214 City Proj.No.: 02223
Project Description Pipe enlargement ro upgrade and replace an existing deteriorated sanitary sewer main located within the Marine
Creek Basin beginning from Bowman Roberts Rd./Cromwell Marine Creek Rd.
Contractor William J.Schultz, Inc.dba Circle C Construction Co. Change Order: Date 8/15/2018
City Project Mgr. Roberto Sauceda, P.E. City Inspector: Virginia Wade
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
2 Remove 15"Sewer line Sewer 1,280.00 LF $25.00 $32,000.00
3 Remove 4'Sewer MH Sewer 12.00 EA $1,000.00 $12,000.00
18 21"Sewer Pipe, Point Repair Sewer 10.00 LF $200.00 $2,000.00
19 24"Sewer Pipe, Point Repair Sewer 10.00 LF $200,00 $2,000.00
Water
Sewer $48,000.00
Page 3 of 4 IDeletions Sub Total $48,000.00
M1WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO ..
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Name of Employee
Title