HomeMy WebLinkAboutContract 37036-A8 CSC No.37036-A8
AMENDMENT No. 8
i
TO CITY SECRETARY CONTRACT
YME(l K&S, the City of Fort Worth (CITY) and TranSystems Corporation d/b/a f
TranSystems Corporation Consultants, (ENGINEER) made and entered into City
Secretary Contract No. 37036, (the CONTRACT) which was authorized by M&C C-
22766 on the 15th day of April, 2008 in the amount of $946,500 . 00; and
VVYffi[MEAN, the CONTRACT was subsequently revised by: Amendment No. 1 in
the amount of $1, 900, 000 . 00 which was authorized by M&C C-23915, on, November
17, 2009, Amendment No. 2 in the amount of $118, 979. 00 which was authorized
by M&C C-24279, on June 22, 2010, Amendment No. 3 at no additional expense
which was administratively authorized on December 15, 2010, Amendment No. 4
in the amount of $1, 032, 969. 00 which was authorized by M&C C-25295 on November
15, 2011 and Amendment No. 5 in the amount $881, 466.00 which was authorized
by M&C C-26819 on June 3, 2014, Amendment No. 6 in the amount of $660, 980 . 00
which was authorized by M&C C-28253 on June 6, 2017 and Amendment No. 7 in
the amount of $0 .00 which was administratively authorized on February 5, 2020;
and
Vy]HIEMPIAN, the CONTRACT involves engineering services for the following
project:
Storm Water and Franchise Utility Relocations for the Trinity River
Vision-Central City Project and Trinity Uptown Service Area, Phase 1A -
Bridge and Channel Relocations .
VIME EM, it has become necessary to execute Amendment No.8 to the
CONTRACT to include an increased scope of work with no revised fee.
NOW ffMi EFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional engineering
services specified in the proposal which is attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $0 . 00 .
2.
Article II of the CONTRACT is amended to provide for an increase in the
fee to be paid to Engineer for all work and services performed under the
Contract, as amended, so that the total fee paid by the City for all work and
OFFICIAL RECORD
Page -I- CITY SECRETARY
FT.WORTH, TX
services shall be an amount of $5,540,8944 . 00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory, below.
APPROVED: ENGINEER
City of Fort Worth TranSystems Corporation d/b/a
Tra stems Corporation Consultants k '
OAN4,�uNglu�o f
Dana Burghdoff( v7,20 9:03CST \
Dana Burghdof£ Raul Pena III, P. E. ,
Assistant City Manager Principal
DATE: Nov 7,2020 DATE: 10-30-2020
�I
APPROVAL RECOMMENDED:
CG iA&?/�eL 6w-d2l
ChristopherH rder(Nov6,202013:52CST)
Chris Harder, P.E. j
Director Water Department II
Contract Compliance Manager:
I
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
perf/ormancen andp reporting requirements .
Limon Conlon
Project Manager
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
�l Date N/A
Mack(Nov 6,202017:50 CST)
Douglas W. Black
Senior Assistant City Attorney
�o-ov�nnb
ATTEST: p�-o
oo FoR oo_a�
° pd
lV )o d
- 09 GvI o=d
Mary J. Kayser ��a A—" a� OFFICIAL RECORD
a
��nanaa4�
City Secretary CITY SECRETARY
FT.WORTH, TX
Page -2-
Date:October 1,2020 syste,IIIs
Liam Conlon
Project Manager
City of Fort Worth
1000 Throckmorton Street
Fort Worth,TX 76102-6311
RE: Amendment 8(Phase 6)Storm Water&Franchise Utility Relocations for Trinity River Vision
City Project No.00969
Dear Mr.Conlon,
TranSystems appreciates the opportunity to provide this scope of services and budget modification for the above referenced
project to better fit the current needs in the TRVA program. These scope and budget modifications are needed to facilitate the
changes to the schedule,addition of scope/tasks,construction plan repackaging and redesigns that meet the current TRVA
program needs. Below is a summary of each contract and amendment.
Summary of the Contract and Amendments
Original Contract $ 946,500.00 (Phase 1A)
Amendment 1. $1,900,000.00 (Phase 1B)
Amendment 2 $ 118,979.00 (police impound and zoning surveys)
Amendment 3 0,00 (swap environmental for stormwater planning)
Amendment 4 $ 1,032,969.00 (Phase 2)
Amendment 5 $ 881,466.00 (Phase 3)
Amendment 6 $ 660,980.00 (Phase 4)
Amendment 7 $ 0.00(Project Scope Modification/Re-Allocation)
Contract Total $ 5,640,894.00
Below is a breakdown of the individual projects and budget modifications necessary due to the change in scope for specific
projects.The attached spread sheet summarizes the budget adjustments.The budget modifications made in this amendment do
not impact the MWBE commitments made in the original contract and previous amendments.
Contract Value Contract Adjustment Revised Contract Value
Franchise Utilities
Henderson Street Bridge $ 198,300.99 $ $ 198,300.99
Main Street Bridge $1,253,318.17 $ (14,000.00) $1,239,318.17
White Settlement Bridge $ 792,637.96 $ (9,452.77) $ 783,185.19
Gateway Park $ 87,265.13 $ (87,265.13) $ 0.00
Riverside Oxbow $ 39,665.97 $ $ 39,665.97
Beach $ 79,331.94 $ (60,024.93) $ 19.307.01
SegmentA $ 232,063.88 $ 23,000.00 $ 255,063.88
Segment B $ 109,498.96 $ 28,452.77 $ 137,951.73
Segment C $ 59,498.96 $ (39,498.96) $ 20,000.00
Segment D $ 46,095.93 $ (6,095.93) $ 40,000.00
Franchise Total $2,897,677.89 $(164,884.95) $2,732,792.94
1
Drainage
Henderson $ 72,475.93 $ $ 72,475.93
Grand Avenue Phase 1 $ 111,462.79 $ $ 111,462.79
Grand Avenue Phase $1,122,160.95 $ $1,122,160.95
Grand Avenue Phase 2 Lateral
North under RR $ 196,368.91 $ $ 196,368.91
8�h Avenue $ 96,441.01 $ $ 96,441.01
Cemetery Bypass $ 346,698.64 $ 24,664.95 $ 371,363.59
Houston Street $ 89,473.88 $ $ 89,473.88
Viola $ 286,575.00 $ $ 286,575.00
Left Bank Study $ 202,580.00 $ $ 202,580.00
New Main Street Outfall $ 0.00 140 220.00 $ 140,220.00
Drainage Total $2,524,237.11 $164,884.95 $2,689,122.06
Police Impound Lot $ 118,979.00 1 $ 118,979.00
Contract Total $5,540,894.00 $0 $5,540,894.00
The project specific scope changes/additions are listed below. The items listed below were in addition to the original
contract/scope and amendments to date.
Franchise Utilities
Main Street Bridge
Franchise utility coordination at this project location is complete, There is no additional funding needed.The remaining fee
associated with this task has been reallocated to other projects
White Settlement Bridge
Franchise utility coordination at this project location is complete. There is no additional funding needed.The remaining fee
associated with this task has been reallocated to other projects
Gateway Park
Franchise utility coordination at this project location is complete. There is no additional funding needed.The remaining fee
associated with this task has been reallocated to other projects
Beach
The reduction of funding for the Beach scope is reduced due to the revised TRV schedule. The funding for this project will be
included in a future amendment.There is no anticipated coordination efforts needed at this time.
Segment A
Reallocation of funding to the Segment A project is a result of:
• Continued coordination with Oncor and ATT to finalize the utility relocations within the channel segment
Seqment B
Reallocation of funding to the Segment B project is a result of:
• Continued coordination with Oncor to finalize the utility relocations within the channel segment
Segment C
The reduction of funding for the Segment C scope is reduced due to the revised TRV schedule. The funding for this project will
be included in a future amendment. The fee remaining is for preliminary coordination with franchise utilities.
Segment D
The reduction of funding for the Segment D scope is reduced due to the revised TRV schedule. The funding for this project will
be included in a future amendment. The fee remaining is for preliminary coordination with franchise utilities,
2
Drainage
Cemetery Bypass Outfall
Reallocation of funding to the Cemetery Bypass Outfall project is a result of the following additions in scope
• USACE updates to specifications.
® Updates to plans due to updated design standards and specifications.
New Main Street Outfall at TRWD Gate
Reallocation of funding to the New Main Street Outfall project is a result of the revised TRV schedule. The project was not part
of the original program,scope or fee. A general description of the project scope includes:
• Design of a new storm drain outfall from 8th Ave and Calhoun St thru the existing USACE levee to the Trinity River
• Design of a new sluice gate structure
• Design of stilling basin at the outfall
• Design coordination with the City of Fort Worth,USACE,TRWD and TRVA
The design level of effort for the New Main Street Outfall is attached to this proposal package. The design fee is estimated at
$239,271.00.Amendment 8 as proposed allocates$140,220.00 to the New Main Street Outfall project which will allow the design
to progress to a 60%level. The reduction of scope or delay in franchise utility projects allows for the$140,220.00 to be allocated
to drainage projects/scope. A separate/future amendment will be needed to fund the designs of the remaining storm drain and
franchise utility projects.
Additionally,the attached spread sheet tilled TranSystems Ultimate Contract Summary provides the additional fees not currently
under contract to finish the designs only for each individual project associated with the Trinity River Vision franchise utilities and
storm drainage.
If you have any questions or require additional information please give me a call.
Sincerely,
TranSystems Corporation Consultants
Michael Hobbs,PE
Project Manager
3