WHEREAS, the City of Fort Worth (CITY) and CP&Y, Inc. , (ENGINEER)
made and entered into City Secretary Contract No. 48423 (the CONTRACT)
which was authorized by M&C C-27985 on the 8th day of November 2016 in the j
amount of $456,340. 00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1
in the amount of $13,098.36 administratively authorized July 3, 2017 and
Amendment No. 2 in the amount of $168,985 . 00 which was authorized by M&C
20-0168 on April 7, 2020; and
WHEREAS , the CONTRACT involves engineering services for the
following project:
Northeast Northside II 30-inch Water Transmission Main Along State
Highway 170 from North Beach Street to US 377 .
WHEREAS, it has become necessary to execute Amendment No.3 to the
CONTRACT to include an increased scope of work and revised fee.
i
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in the proposal attached hereto and
incorporated herein. The cost to City for the additional professional
services to be performed by Engineer totals $99,815.00 (Water) .
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $738,238.36.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
OFFICIAL RECORD
Page -1- CITY SECRETARY
FT. WORTH, TX
EXECUTED and EFFECTIVE as of the date last written by a signatory, below.
APPROVED:
City of Fort Worth ENGINEER:
CP&Y, Inc.
bay 8uMALO�K
Dana Burghdoff( v13,2 11:OT CST)
Dana Burghdoff Joh inahan, P.E.
Assistant City Manager Senior Vice President
DATE: NOV 13, 2020 DATE:
APPROVAL RECOMMENDED:
C�%Jt0,d 9 h'W-de,�-
Christopher H rder(Oct30,202015:33CDT)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the monitoring
and administration of this contract, including ensuring all performance and
reporting requirements.
for Scott Taylor, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
Date: N/A
�iorl 1295#: N/A
Mack(Nov 13,202010:39 CST)
Douglas W. Black
Senior Assistant City Attorney
ATTEST: FpRt���
a� °°°°°°°°°�aa�
�� �, d
O V o °�=�d
Mary J. Kayser 0, 0 o
°°°° °° /y
City Secretary da °°°°°° a
1 nEXA`--o
OFFICIAL RECORD
Page -2- CITY SECRETARY
FT. WORTH, TX
P&Y _ Puriners for a Relter Quality of Life
August 26, 2020
City of Fort Worth Water Department
311 W. 10th Street
Fort Worth, Texas 76102
Re; Northeast Northside II 30-inch Water Transmission Main
City Secretary Contract 48423 - Amendment #3
Dear Mr. Sholola,
As part of the TXDOT improvements along Highway 170, the 54-inch crossing previously
designed and constructed under this contract near Westport Parkway, as well as 4 other
waterline locations, have potential conflicts with the proposed TXDOT roadway
improvements. CP&Y is currently performing design services for these locations,
however additional Professional Engineering Services are required based on
coordination with the City of Fort Worth, TXDOT and their affiliates.
CP&Y proposes to revise the scope of services based on the attached scope of additional
services for the additional lump sum total of $99,815.00 for the additional design and
construction services related to the relocation of the crossings at Beach,Westport, Beach,
and Independence.
Summary of Contract Fee
Original Contract amount $ 456,340.00
Approved Amendment#1 $ 13,098.36
Approved Amendment #2 $ 168,985.00
Contract to Date $ 638,423.36
Requested Amendment #3 $ 99,815.00
Revised Contract Amount $ 738,238.36
If you have any questions or if I may be of further assistance, please contact me at
214-616-7902
i
I
Sincerely,
%z�,)tiwo�y�G1aV
Randy Bush, PE
CP&Y, Inc.
115 West 7th Street,Suite 1500
Fort Worth,Texas 76102
017.354.0189•817.354.4935 lax
www.cpyi.com
ATTACHMENTA
DESIGN SERVICES FOR
NORTHSIDE II 30•INCH WATERLINE AT STATE HIGHWAY 170
CITY PROJECT NO.:100261
ATTACHMENT A
Scope for Engineerinq Design Related Services for Water and/or SanitarV Sewer
Improvements
DESIGN SERVICES FOR
NORTHSIDE II 30-INCH WATERLINE AT STATE HIGHWAY 170
CITY PROJECT NO.: 100261
AMDENDMENT#3
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
Background
As part of the TXDOT improvements along Highway 170, ENGINEER was tasked with the
design the relocation of 4 crossing to an acceptable location and depth that is not in conflict
with the TXDOT changes, as specified by TXDOT. The locations of the four(4) crossings to
be relocated are approximately:
• 913 LF of 30-inch Water Line (541 LF of 54-inch casing) crossing Highway 170 near
Beach Street,
• 510 LF of 30-inch Water Line(490 LF of 54-inch casing) crossing Highway 170 near
Westport Parkway,
• 860 LF 16-inch Water Line (440 LF of 30-inch casing) crossing Highway 170 near
Independence Parkway,
• 510 LF of 16-inch Water Line(490 LF of 30-inch casing) crossing Highway 170 near
Alta Vista Drive
An additional water line crossing of Highway 170 near Victory Lane will need a utility grade
adjustments and extension of a concrete cap.
Amendment 43 Changes
Initial plans were to amend existing construction contracts with the new crossings to
accelerate the schedule. Based on the complexity of the design and cost of the
construction, it was decided to advertise these project traditionally. In addition, based on
discussions with the City of Fort Worth, TXDOT and their constituents, additions and
changes were made to the design of these segments from the previous agreement including
• Lowering/relocating/modifications to the design of the pipelines, and modification to
tunnel and blow-off valves based on updated design information,
Clty of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 1 of 3
ATTACHMENTA
DESIGN SERVICES FOR
SANITARY SEWER REHABILIATION
CITY PROJECT NO.:102
Field services modified to modify Geotechnical services, remove Land Acquisition
services, and add additional survey and SUE to Engineers scope of services.
• Additional coordination services with TXDOT and their constituents, as well as
extended contract time for design and construction.
® Development and Bidding of 2 Bid packages including development of additional
specification sections and design sheets.
Bidding of 2 Bid packages including development of additional specification sections
and design sheets.
Expanded Construction Services.
This amendment modifies the previous amendment based on the revised scope items.
SCOPE
ENGINEER will evaluate the existing locations and provide recommendation on the revised
relocation based on roadway plans provided by Others. Design will include the crossing of
the roadway improvements and re-connection to the existing pipeline,
ENGINEER will perform Geotechnical borings, laboratory tests, and engineering analysis for
evaluation of the trenchless crossing of Highway 170 at three locations (Westport, Alta
Vista, Independence) including 2 boring at each location, 6 borings total. In additional
ENGINEER will be provided the field and laboratory tests, and related engineering analysis,
determination of soil conditions, and geotechnical recommendations for trenchless pipe
installation. Geotechnical evaluation at Beach Street to be performed by others.
ENGINEER will evaluate the depth of crossing for the new pipelines at all 4 locations
(Beach, Westport, Alta Vista, and Independence), based on geotechnical data performed as
a part of contract and depth of proposed highway. ENGINEER will provide a design for the
crossing of Highway 170 that meets TXDOT and Fort Worth requirements.
ENGINEER will provide a 90% and 100%set of plans for City of Fort Worth review per Task
4 of the original contract. ENGINEER will not provide a Preliminary Design (30%) or 60%
Design review submittal, per Task 3 and Task 4 of the original contract.
ENGINEER will prepare complete plans and specifications for this project in 2 separate
packages,to be bid at 2 separate times. One bid package will include Beach Street, and
the other bid package will include the other three (3) crossings and Victory Lane.
ENGINEER will perform bid phase services for the 2 bid packages,
ENGINEER to perform Level "A" and "B"SUE at the bore pit locations at Westport, Alta
Vista, Independence. Utilities to be designated include gas, telecommunications, electric,
traffic signals, storm, water and sanitary sewer.
ENGINEER will be provided survey data from a 3rd party that documents all above ground
features in the area. The survey data will be sufficient to meet the requirements of Section
8.1 of the original contract. In areas where the design extends outside of the previously
defined TXDOT corridor, ENGINEER will be responsible for obtaining the additional survey.
Westport, Alta Vista, Independence
City of Fort Worth,Texas
Attachment A
PMO Release Date:08.1.2014
Page 2 of 3
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILIATION
CITY PROJECT NO.:102
ENGINEER will assist in the evaluation of shop submittal, RFI, change order during
construction, and site visits as directed by City of Fort Worth,
ENGINEER will provide record drawings for the project at the conclusion of construction.
ASSUMPTIONS
• ENGINEER will not submit monthly progress reports on the status of the project.
• ENGINEER will use City of Fort Worth standard specifications for the project and
supplement as needed.
• ENGINEER will not provide a Preliminary Design Report, 30% or 60% progress
drawings as part of this project.
• City of Fort Worth will primarily perform engineering service during construction
including shop submittal, RFI, change order, and pay applications. ENGINEER will
assist as needed based on the limited scope and budget developed.
• ENGINEER was provided with CAD files in Microstation format from a 3rd party
showing the extents of existing conditions and the proposed conditions for the
TXDOT redesign of Highway 170. This will include the existing and proposed ROW
for TXDOT and adjacent utilities,existing and proposed Highway layouts, as well as
vertical and horizontal location of known utilities within the pipeline design area.
• Easement documents to be used to obtain permanent and temporary easements
required to construct the pipeline improvements at the four(4) relocations will be
performed by others under separate contract. The City of Fort Worth will be
responsible for real property acquisition.
• SUE at Beach Street crossing will be performed by Contractor per the construction
agreement. No SUE at Beach Street to be performed by ENGINEER.
Geotechnical borings, laboratory tests, and engineering analysis for evaluation of the
trenchless crossing of Highway 170 at Beach Street to be performed by others under
separate contract. Engineer will be provided including 2 boring at each location, 6
borings total. In additional ENGINEER will be provided the field and laboratory tests,
and related engineering analysis, determination of soil conditions, and geotechnical
recommendations for trenchless pipe installation. !.
i
COMPENSATION
Additional Compensation for this amendment is a lump sum payment of$99,815.00, which
brings the total engineering fee for the Highway 170 Crossings (Amendment#2 and#3)to
$268,800.00
The overall contract amount is modified from$638,423.36 to $738,238.36 as part of this
amendment(Amendment#3).
f
I
I
i
City of Fart Worth,Texas
Attachment A
PMO Release Date:08,1.2014
Page 3 of 3
ExHIBITB-2
Level of Effort Spreadsheet
TASKIHOUR BREAKDOWN
Design Services for Northslde II 30-Inch Waterline at Slate Hlghmy 170-Amendment 03
Relocation of Waterlines crossing Hlghwmy 170(Beach,Independence,Westport and Alta Vista Comhlnnd)
City Pro ect No.100261
Labor e- Ea n
Taeklla. Task Deacdpllon Pdn[Ipal "'J,[I Weisel ER CADO AdminWlnWa TelaI labor Eubconsdlanl ae Total ETpertse Talk Sub Total
Mona v En Inee1 Cost T-al Repxoduellen Cwt
1! 22 S 91 5760 3130 3100 SJS IR'aE Noro1.R'NE
1.0 P end liana emenl 3 S6 41 36 0 10 $2773 SO We 330 s0 SUR $39,7P
1.1 SW-go 11-goM the Ttan W 4C 40 0 1 SA 16C 320.1
1.1.2 OAIOC 5 0 51,I0C ism 51.50C 52.
1.2 Cemm WOanaaM rl 0
21 Pre-Oea-WENru.eM 0
ion Dei Sibniwl Rea'Wwl,!e,' e 6 d 0 $3,84C 60 sm S3.9X
1.23 Pra ateanaMa S[h,drde 0
PRpare Merady Reg-Reports'Ah
1.74 66hedrte 0
Us Pra are Mardi!MOFJSOE Repeals e C S2 $2
2.0 Cance luel Dasl r 0 / 24 36 0 0 310613 10 33I1c 4400 10 13J00/ 144464
21 oat.Cdledbn 6 14 36 0 394 400 m sesam
22 Gedechr7ca 3 IO a 5116 3360 311r 3357
3.0 Pralmina DaEllin110 Pereanl' 0 0 0 0 0 0 !0 10 t to s0 10 to
4.0 Final Unl n 6 40 11J 297 300 0 $96.13 0 $t100 3100 337d $277J $98103
FNal Drag'.XJ CesWruNanP marl
4. 6 etliral'wa S
LI.1 Ceres 9 2 $IaX SI TC
4.1.2 Oa<ral la wA 1 U vut 1-.1 dn[Is 7 7 Is 6 33.65[ 33.
Plan and PbraPrene Sheers(6 dWin
41.3 shedL 3 de 1.1 24 64111'
7+ 3623a 1 325 IM.&I
4.1.1 3 ed6o3ern 2 0 10.79C 10.7
4." c mlmcDtn Esfinele 4 1 0 536 334.1.6 ComN Mll Real- 0 0 S1.3 4.1.7 UN.t 3 123 31` 3123
4.2 Final IDOX PWns aredS talealns 1t 5 SI 41 1° IM 313.4a CamW[Y.on Es6make lOnA 3 0 3165C 31SA Old Phu, 0 12 20 I6 0 11MIN 30 30 fO 326a St D S1432
&I BWS pd 0 0 0 30141.1 U dD,cumsnW to Ou2 4 31.53 sL53C
sea lud.v UscstneNa arW 1.'aWeh
A1.3 plan Pddarsa 7 1 4 $4. $1
5j.3MA Mind d Ope / t I6 5/13 11.1
MA NISM(Sd0[ri 3
5.1.5 TebWle B!dsaMRtwmm,rd Amrd 2 4 4 31.5 31,
5.2 kill.Draw a 2 D a I6 33 25W S34Y
did Cwti-lion Phase 5e1aic0 0 27 62 112 32 0 1309! s0 17s00 51000 loco $4100 131195
6.1 CemWUlan6 d m 62 92 0 526.74 25M Me 53W $29.21C
6.1.1 NI,M PreennWuclbn CoN,renee 4 4 01 31 5130C
6.1.2 All dFLbre it t 0
62 fteead D-imelm Bull 6 1 16 m 57, 60CSFLY SB4
7.0 ROA71Easemenl E,Mcef 0 0 0 0 C a 101 301 30 101 40 301 10
71 FUghal Ektumems 40f I ISO
72 Submleal Sol 0 3 30
7a Tem hl01 Fn SubmiWl
!.0 s elal3aMeas authedudasmMed D e 0 16 0 0 53610 s51 e30 SO 30 se toes 1319
41 spa senate 8 16 3364,5 ]L&iJ 0 371.DX:1�2.1
11/ 269 3s3 343 10 3114,a10 f11ps0 359,f00 31,e50 f]./7d 776.771639,0
M1e' ,Feal+ee 2,79 IDIX Pr ecl Eumma
sans Line Footage OX ToW 11 1,355
2.793 1157X Tdel Lobo 5164
Tent Esptn 37 M
VV Total Fie 5268.1500 MaFJ58E8JtwmlAw 531t3C
(BI euney Fea -331,4A NanAlOF335ESub-#un SA(C) TuW re[F)surrey Fee S234,050 IOX Bub mx'kw 37,1
NSly Fee 60Xe C{ I Ganes Fee 10 of Cl MEIMBE Padlri sy 11.8`A
5236,950.00 1 40,00 Total Pmeel Cost 52e1,100.
Dasedptlen %%? WA,r Serra' DMud Amendment 12 5169,68500
CoaC MIC„ 30X 31 J71.065.M 30,W fdldem{F.(Asne 4-d 01) 14J,dlrw
Prtrm Des xs 60 32 314t,17000 s.
Final Des n lo51 33 32363500 34W
'M tit "I.W.00 1 M.
fiubmld 526e.W0.00 30.00
Telel $26a,140,00
C4yof FMvkm,Texas
A-W,d a-Lea<I of Eaed Supplemenl
Typal VOWS old SearRaW 8.09.20
FlVMR Oft[i11 ReDau 031e:401.2a12
EXHIBIT B•2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for Nnrtllslde 11 30-Inch Waterline at Stale Highway 170•Amendment 03
Relocations of 30"Water Pipeline crossing Highway 170 near Beach Street
City Project No.100261
Labor ours E+enle
reek lie. Taek D...dpdon PdnclPai PI.In. P.Ole.l EIT CADD Adminlatra0ve Tobl labor Sube•nwitanl Tokl Eepeose Teak Sub ToUI
lead En Ina. C 1 travel Reproduetlen Cosl
RM $210 $193 $ISO 3130 Moo 377 I.IVlOE IIon�J14'dE
1.0 P.o«tM•na em..I 1 /1 31 M 0 t0 $27730 30 $t00 30 30 $300 S27230
1.1 13...grM the To- 40 40 30 10 $20.150 $20.150
1.1.2 CA/CC 1 $220 55C0 3220
1.2 Ca.meNofam and Re rtl
1.2.1 Pn-0•a' Ceerdrtafon Ak•f
1.22 Msi Svherilbl R•Newkta,6n a 3 a 3206o 52.060
1.23 P.P..Dastlne S N". 5o
Prap...ItoMely Reg,..R•p-ride
1.2.4 S.".
t.2.5 Pm m?Jorfty MBEISOE Re 3 6 1 Si3W
LO c-m.l Dal n 0 a 6 12 1 0 SMO5 30 SO $200 30 5200 $1303
2.1 Dab ca.cfen 2 3 17 1 $590 5200 S700 51,7
72 eIMIVW Don., 1 2 $515 5515
3.0 Prellmina Deal n tO P,.,.ti 0 0 0 0 0 0 70 $0 so s0 30 !0 10
4.0 Final Dul n 2 23 43 111 100 0 $31173 10 SSW $too 371 S975 717130
Final Draft(W%l Cona0u0on wane and
4.1 S dfc0.ns
3.1.1 C- 1 2 311a $330
4.1.2 0-9 L..0IbM 1.0.1 a ha 7 6 fa60 low
Plan e.d Plad➢m61a Sheet,(2 d..'9n
3.1.3 d-te.3 d.W.1-tel 16 24 FD 50 $25360 s5ca Sim 325 $925 525.9a5
4.1.0 SpedF tena 2 e IB 1 337M 33750
4.i.5 Car.a6uctlan Eefmak 2 e a 32.070 S2,070
3.1.6 CenahcU' •- 2 a S460 $130
di 7 Ut Ck.nnd 30 375 325 525
d.2 Fbul t00%Pl...nd Sjvd6 k- 2 fi a 12 33690 $25 325 31.515
4.3 Cen.W. nEefmal.a I0353 1 ] ] $775 S773
5.0 aid Phase 0 6 10 11 1 0 $1910 70 SO 30 $1000 $1000 16110
fll Old Sup,,ort
USA UpI..d D..-.Ub G.... 1 2 2 5775 s775
511C.tre lkelneueUandkI.W.Pla
5.1.2 Holde.e U.1 1 2 7 $775 ST75
5.1.9 law•Add.rda 2 + a $2070 $2.070
6.1.3 AW ekl0 rdn SO SO
al.$ Tebhte D:d•1nd Recommend Avmd 1 2 2 $775 $775
6.2 I.I beDnx3na I 1 0 $1515 $1.000 SLOW 3]515
6A C-trueaon Phase SeMcN 0 13 26 di a 0 1]46t 30 $1000 $900 SI00 $1100 $13393
6.1 ComOucdon Su .H 12 21 30 5113a0 St= SSW 313W 312Sa0
flit AIUnd PremnsWcW Col,.- 7 2 3650 3650
S.LIZ Amnd PYHk AIee'
6.2 R1 and Dmx'a LIM ault 1 2 d a 31.Em SI 31W S1035
7A R01Y/Easemenl9eMces a a 0 0 0 a 70 to 50 s0 30 70 70
7.1 R hW-En Oowma,Ae
7.2 Sub.dibl
7.3 Tim m fl hlal Submlbl
aD 9«.1 a-kes au0lerked ea needed 1 0 0 0 0 0 f0 SO $O 30 30 $0 30
a.t sw sen raa 30 5a SD
TObls ] 93 136 2l7 116 10 31]703 70 $2,000 3100 31,175 SAMS 317,760.00
µbur Une Faob9e 013 1006 Projects-
6-0
na F...g. 0% TebIH gas
913 100% T•bil• $63.705
Utel 33075
(A) ToUI Fee S07.%0 FIBEISBE SJ.wniJbn SO
(0) Surcey Faa 50 R.RJOEMESJxon.Jbn SOW
C) Takl Fa.Ft suvey Fee 187,90 10% Sub lbrhm 3200
NblafFe 60 oI CI Saxvr Fie I.,oI C) ?As EIS BE P.dd at, O.Ot4
507.emoo SQW Tolal Pm ecl Coal $47.160.01
Dasrfpl. µp µbur Sexvr
Co-L.1 D.Y n 30t3 al 310-- SO.W
P.elmhv D.e'n 6051 32 35L77G. so"
Fin.l Deg 10%1 33 SILMOM 30M
su,.y 51 1 40.00 s0D0
Subu'al $07,830.W SDDO
Total 157e60.W
Clyof FMNb.d%Tea.
ABaehmenl a•I.-I of Eff.d Svppi-Irt
Tyj 4-[waterend S.-R.Fl.-M
FNwrR OI5da1 Release D.U:a W.2012
EXHIBIT B-2
Level of Effort Spreadsheet
TASKIHOUR BREAKDOWN
Design Services for Norlhslde 1130•Inch Waterline at State Highway 170-Amendment#3
Relocations of Waterline crossing Highway 170 near Independence,Westport and Alta Vista
City Project No.100261
Lector oure Ea enact
T.011. reek 0...dpd. PdndPal Projeet Pr0jeel CAMAdminlatratlYe Tebl Lebor 9ube0nrvlbnl TObl Eepena<Taxk3ub Tabl
I.W.ea En Ineer Coal Travel Reproductlon Colt
Rare SIX 3193 Uce SIM 3100 $73 MWeE Illon4NIDE
IA Pfoeel Liana ement 1 a 0 12 0 0 51004 30 31000 350 SO $1050 $3040
1.1 Llene'n 0n T.I.
1.1.2 DAA7C I SOm 31.000 51.000 SLOE
12 CP-D.q,C-dd.f •M
121 Pre-0ai nCee�efon Alet'
1.22 Dad 50mOb1 Re11ew Wilypts 1 0 51030 550 350 $1.070
1.23 Pa ue O-Srw Sq?,.Ma
PrePan ManNr Pm9raee RePana Mlh
1.21 6dwdtda
1.25 Pre ate M-Ny MOUSSE R,jp, 1 1 1 31.300 $1.3Ul
To C.-NO Dell rl 0 .1 1e 21 0 0 37550 S0 f]]600 3200 30 333109 SII310
21 Nle Celktton 6 l0 21 35890 3200 3200 $6.0
2.2 Deetethdel R a 2 e St.6 533.600 511.600 535.27
3.0 Pfellmina Design10 Pereenl 0 0 0 0 a 0 30 30 30 30 So SO 50
4.0 FInel Deal n 1 17 71 700 200 0 431953 30 SI500 3300 $300 $2100 $61055
Finel DnR(Ctl A)Cenahxion Plana and
.1 S tl3aYcne 10
4.1.1 Cone, 0 nor0 31.030
4.1.2 ov-u Le out ItI-IL lea W MWII 2 2 18 52,790 $2.790
Phn erd PIe WNW.61neh(0 deign
4.1A ehtate.]debt eh-1 a /0 too 160 53e.960 31.500 Sma SI00 $1.fO0 130160
A.1A S dF"tkne 12 21 S5.020 35.040
A.tA CmsWW.tl Ealmale 2 d 1 31.550 31.550
4JA Cena0tr Ni ReMnv, 1 0 3520 Sew
4.1.7 Ut Clearanu $100 SRO Sloo
4.2 Fina WI4 Planeand5 da tone 1 12 21 10 39020 Sim 3160 39920
42 Cmabttfm Eatmalea 10014 1 1 1 3975 3675
S,0 91d Ph... 0 0 ]0 11 6 0 SSa10 SO f0 70 51,500 $1100 $7,410
5.1 Old 5 d
6.1.1 UNed 1 2 2 5773 ST75
Ed Cen0acl DOwmaAb and MilnW n Phl
5.1.2 Meld..lht 1 2 2 $775 $775
5.1.3 Me Addenda 2 1 0 $2070 32.070
6.1.4 AYcnd Old O ran 30
5,L5 TaWlata Odaeml Reow nd Av-d 1 2 2 $773 $773
5.2 tAl.,D., a 1 I 9 31.51! 31500 SI500 13.015
040 C-...den Ph.act a.Id", a 11 33 01 14 0 $21030 30 $1000 SS00 ff06 f7600 $33.530
6.1 Cmebutlm Su d I6 2a 52 311760 51.500 5500 S?000 S16.360
5.1.1 Albnd Pmm.a9vcVe.CeMeren<e 2 2 3650 3650
et.2 Atknd PWk M,.e.
6.2 R..M On•n+n JAa MAI 1 a 12 21 36.020 35M SS00 56.520
7.0 ROWIEeetme0ttlerv1tes 0 6 0 a 0 0 30 Sol, SO 30 30 SO 30
7.1 RI htaFEn Detumenn I I Sol I I SO 30
7.2 Subeilbl Sol I 1 30 30
7.3 T.-le Right of EnW 6Y1r61kl
0,0 9 Id Bervlcef euNodxed as needed 0 6 0 to 0 G $3610 3]1,1l0 f0 SO 30 331150 $35190
6.1 5pa a 0 10 53,810 531.M $31.6.50 335.190
TObII A. 69 US ]0 7]3 .1 3101.055 "IXUJ 3]7,600 51,050 $2300 S72,100 3173,1195.00
V%%.,Mne Feabge 1 1.690 100% Pneel aYm
S.-Lb,.Foobge 0% Tebl Hovn 760
1.610 IOWA T.tel lain 3101.095
Totel E+ n 37ZSW
(A) Tobl Fee 3180.610 MOFJSOE 6uboonadbn 331.050
(a) Sway Fee -331.850 nom1.IO Ere 0 E SWwnadbn 337.600
(C) TO:eIFee0m,y Feb 3110.090 10% SW M.,kw 36,915
KSler Re 60:I ofC1 3mv Fee 4(nIdC) MOEISOE Pertd et0 17.6!i
3100.090.00 1 $0.00 T041 Pr eat Coal SII01/0,00
Dawiptena
Wakr G.-Cenee Nal DeJ n A311697.00 $0.00
Pnimina Do0 r,MIA7a9]94.00 $0.00
FWIOe ,I IO'A31I69A00 3e0D
3- 3]I.aS0.0o 3000
Subtebl 1560.810.00 50.00
Ml 3160e10.00
I
Alud mt8-Level fs
AlbrJmenl O-LaYal oI Elfert SvPPl:m:nl
Typial K41er and Sre0r Rapiaeement
FWMR WWII Rd--Oak:OC%WIZ