Loading...
HomeMy WebLinkAboutContract 54841 Received Date: 11/16/2020 Received Time:9:01 AM Developer and Project Information Cover Sheet: Developer Company Name: FHorton-Texas,Ltd. Address, State,Zip Code: 1 6751 North Freeway,Fort Worth,TX,76131 Phone&Email: 817-230-0800,BMClarkAdrhorton.com Authorized Signatory,Title: I Ben Clark,Vice President of Land Acquisition and Development Project Name: Pioneer Point Phase 2 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: Boat Club Rd and Park Drive East Plat Case Number: Plat Name: Mapsco: Council District: 7 CFA Number: CFA20-0069 City Project Number: 102768 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth,Texas Page 1 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] CSC No.54841 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT("Agreement") is made and entered into by and between The City of Fort Worth("City"), a home-rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and DR Horton-Texas, Ltd. ("Developer"),acting by and through its duly authorized representative. City and Developer are referred to herein individually as a"party"and collectively as the"parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Pioneer Point Phase 2("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project,Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement("Community Facilities"or"Improvements"); and WHEREAS,as a condition of approval of the Project,Developer is required to meet the additional obligations contained in this Agreement,and Developer may be required to make dedications of land,pay fees or construction costs,or meet other obligations that are not a part of this Agreement.; and WHEREAS,the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exist between the terms and conditions of this Agreement and the CFA Ordinance,the CFA Ordinance shall control. 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been accepted by the City ("Engineering Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide City of Fort Worth,Texas OFFICIAL RECORD Page 2 of 19 Standard Community Facilities Agreement CITY SECRETARY Rev.10/5/19[NPC] FT.WORTH, TX at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: ® Exhibit A: Water ® Exhibit A-1: Sewer ® Exhibit B: Paving ® Exhibit B-1: Storm Drain ® Exhibit C: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). City of Fort Worth,Texas Page 3 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement,becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors,or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including,but not limited,to being prequalified,insured,licensed and bonded to construct the Improvements in the City. City of Fort Worth,Texas Page 4 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an oblige, in the amount of one hundred percent(100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions,Chapter 2253 of the Texas Government Code,and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider,which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight(48)hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed,and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. 11. Easements and Rights-of-Way Developer agrees to provide,at its expense,all necessary rights-of-way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. City of Fort Worth,Texas Page 5 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO,AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS,AGENTS AND EMPLOYEES FROM ALL SUITS,ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED,BROUGHT FOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS,INCLUDINGDEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN,PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERL Y SAFEGUARD THE WORK, OR ON ACCOUNT OF ANY ACT,INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCHINJURIES,DEATH OR DAMAGESARE CAUSED,IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS,SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH,RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR ERPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts Upon completion of all work associated with the construction of the Improvements,Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors,along with an assignment of all warranties given by the contractors,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. City of Fort Worth,Texas Page 6 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees,and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars($50.00),the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre-approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtainproof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand- delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: DEVELOPER: Development Coordination Office DR Horton-Texas, Ltd City of Fort Worth 6751 North Freeway 200 Texas Street Fort Worth, TX 76131 Fort Worth, Texas 76102 With copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 City of Fort Worth,Texas Page 7 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of three(3)years after final payment under the contract,have access to and the right to examine any directly pertinent books, documents,papers and records of such contractor, involving transactions to the contract, and further,that City shall have access during normal working hours to all of the contractor's facilities,and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants,officers,contractors,subcontractors,and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co-employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and City of Fort Worth,Texas Page 8 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors,and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas,Fort Worth Division. 20. Non-Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose,their attorneys,have had the opportunity to review and comment on this document;therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. City of Fort Worth,Texas Page 9 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. The term"boycott Israel"has the meaning ascribed to it by Section 808.001 of the Texas Government Code. The term"company"has the meaning ascribed to it by Section 2270.001 of the Texas Government Code. To the extent that Chapter 2270 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of this Agreement. 26. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'SEMPLOYEES,SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 27. Amendment No amendment,modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 28. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 29. No Third-Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise,to any other person or entity. City of Fort Worth,Texas Page 10 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] 30. Compliance with Laws,Ordinances,Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 31. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order,resolution,ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 32. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original,but which together will constitute one instrument. 33. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder,and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth,Texas Page 11 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] 34. Cost Summary Sheet Project Name: Pioneer Point Phase 2 CFA No.: CFA20-0094 City Project No.: 102768 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 545,280.50 2. Sewer Construction $ 1,027,176.20 Water and Sewer Construction Total $ 1,572,456.70 B. TPW Construction 1. Street $ 572,241.20 2. Storm Drain $ 365,780.00 3. Street Lights Installed by Developer $ 84,672.50 4. Signals $ - TPW Construction Cost Total $ 1,022,693.70 Total Construction Cost(excluding the fees): $ 2,595,150.40 Estimated Construction Fees: C. Construction Inspection Service Fee $61,250.00 D. Administrative Material Testing Service Fee $17,738.00 E. Water Testing Lab Fee $1,350.00 Total Estimated Construction Fees: $ 80,338.00 Choice Financial Guarantee O bons, choose one Amount Mark one Bond= 100% $ 2,595,150.40 x Completion Agreement= 100%/Holds Plat $ 2,595,150.40 Cash Escrow Water/Sanitary Sewer- 125% $ 1,965,570.88 Cash Escrow Paving/Storm Drain= 125% $ 1,278,367.13 Letter of Credit= 125% $ 3,243,938.00 City of Fort Worth,Texas Page 12 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC) IN WITNESS WHEREOF,the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH DEVELOPER DR Horton-Texas,Ltd,a Texas Limited Partnership Dana Burghdoff(Nov 13,2 10:31 C5 By: D.R.Horton,Inc., Dana Burghdoff a Delaware Corporation, Assistant City Manager its Authorized Agent Date: Nov 13,2020 ft wit C41#-1( Benjamin Clark(Nov 13,2020 08:54 CST) Recommended by: Name: Benjamin Clark Title: Assistant Vice President EveG_m Rode, Evelyn froberts(Nov 13,2020 08:55 CST) Date: Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Approved as to Form &Legality: ��— Richard A.McCracken(Nov 13,2020 09:31 CST) Richard A.McCracken Sr.Assistant City Attorney M&C No. /A Date: Contract Compliance Manager: Form 1295: nl i� Aag4FORp��ap By signing, I acknowledge that I am the person r•°7'r� /S' �0000000° ��►o° °op dd responsible for the monitoring and 0 0oA d administration of this contract including ATTEST: v o° _� ensuring all performance and reporting zci� Odd °°°°°°°°°°°° p requirements. nEXpSoA.d Mary J.Kayser/Ronald Gonzales Laurie Lewis City Secretary/Assistant City Secretary Laurie Lewis(Nov 13,2020 09:12 CST) Name: Laurie Lewis Title: Interim Development Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth,Texas Page 13 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ❑ Attachment 2—Phased CFA Provisions ® Attachment 3 —Concurrent CFA Provisions ® Location Map ® Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Exhibit B: Paving Improvements ® Exhibit B-1: Storm Drain Improvements ® Exhibit C: Street Lights and Signs Improvements ® Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Page 14 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] ATTACIEMENT"1" Changes to Standard Community Facilities Agreement City Project No. 102768 None City of Fort Worth,Texas Page 15 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] ATTACHMENT "3" Concurrent CFA Provision City Project No. 102768 The improvements being constructed by Developer pursuant to this Agreement will connect to improvements being constructed by Lennar Homes of Texas Land and Construction, Ltd, under a separate Community Facilities Agreement, City Secretary Contract No. 53550 (hereinafter the "Separate CFA"). Developer has requested and the City has agreed to allow Developer to begin the construction of the improvements contained in this Agreement before the improvements being constructed under City Secretary Contract No. 53550 are completed and accepted by the City. Therefore, this Agreement shall be considered a"Concurrent CFA" and the provision contained in this Attachment shall apply to this Agreement. The improvements being constructed under the Separate CFA shall be defined as the "Primary Project." The improvements being constructed by Developer under this Agreement shall be defined as the "Secondary Project." Developer acknowledges and agrees that due to Developer's election to construct a Concurrent CFA, the potential exists for technical, delivery, acceptance or performance problems (hereinafter "Construction Problems"). Construction Problems may include, but are not limited to: failure of the improvements to comply with the approved plans or City Specifications; failure of the improvements in the Primary Project and the Secondary Project to properly connect to each other;changes to the design or construction of the improvements in the Primary Project that impact the design and construction of the improvements in the Secondary Project; construction delays, delay claims, or claims for liquidated damages; increased costs for the Developer or the developer of the Primary Project; failure of the improvements to pass inspection or material testing; or rejection by the City of some or all of the improvements and Developer or the developer of the Primary Project having to remove and reconstruct the improvements at the expense of Developer, developer of the Primary Project, or both. In addition, Developer understands and agrees that disputes may arise between the contractors or subcontractors for the Primary Project and the contractors or subcontractors for the Secondary Project relating to responsibility for the Construction Problems. Developer shall be solely responsible for resolving disputes between contractors, disputes between contractors and subcontractors and disputes between Developer and the developer of the Primary Project. Developer acknowledges and certifies that Developer has entered into a written agreement with the developer of the Primary Project and said agreement: (1) provides Developer with any access needed through property owned by the developer of the Primary Project; (2)that Developer and the developer of the Primary Project shall resolve all disputes regarding the design and City of Fort Worth,Texas Page 16 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] construction of the Primary Project and the Secondary Project;and(3)the developer of the Primary Project will notify Developer of any all changes to the design or construction of the improvements in the Primary Project, including any field changes. Developer further acknowledges and agrees that Developer has notified all of Developer's contractors for the Project that Developer has elected to construct a Concurrent CFA, the provisions of this Attachment, the risks associated with a Concurrent CFA, and that the City shall not bear any responsibility for construction of the improvements or Developer's decision to proceed with a Concurrent CFA. Developer shall not make the final connection of the improvements in the Secondary Project to the improvements in the Primary Project until the improvements in the Primary Project have been constructed and accepted by the City and the City has consented to Developer making the connection. Developer agrees that by electing to execute a Concurrent CFA,Developer waives the right to use a completion agreement as the form of financial guarantee for the Project. Developer agrees that if this Agreement is for improvements relating to the construction,renovation or modification of one or more single family residential homes or structures,the City will not record the plat related to the Project until the improvements are constructed and accepted by the City. Developer agrees that if this Agreement is for improvements relating to the construction,renovation or modification of one or more commercial buildings or structures,the Developer shall not receive a Certificate of Occupancy from the City for the building(s) related to the Project until the improvements in this Agreement are constructed and accepted by the City. Developer further understands and agrees that completion of the improvements under this Agreement does not entitle Developer to obtain a final plat of the property until all other requirements of Federal law, State law, or the City Code relating to the filing and recording of a final plat have been met by Developer. BY CHOOSING TO CONSTRUCT A CONCURRENT CFA, DEVELOPER ASSUMES ALL RISKS AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANYANDALL DAMAGES,INCLUDINGBUTNOTLIMITED TO,ANYANDALL ECONOMICDAIVIAGES,PROPERTYLOSS,PROPERTYDAIVIAGESANDPERSONAL INJURY(INCLUDING DEATH OFANYKIND OR CHARACTER, WHETHER REAL OR ASSERTED. DEVELOPER HEREBYEXPRESSLYRELEASESAND DISCHARGES CITY FROM ANY AND ALL LIABILITY FOR DAMAGES, INCLUDING, BUT NOT LIMITED TO, ANY AND ALL ECONOMIC DAMAGES, PROPERTY LOSS, PROPERTY DAMAGE AND PERSONAL INJURY (INCLUDING DEATH ARISING OUT OF OR IN CONNECTION WITH, DIRECTLY OR INDIRECTLY, THE CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S DECISION TO CONSTRUCT A CONCURRENT CFA. DEVELOPER, AT ITS SOLE COST AND EXPENSE,AGREES TO AND DOES HEREBYINDEMNIFY,DEFEND,PROTECT,AND HOLD HARMLESS CITY, AND CITY'S OFFICERS, REPRESENTATIVES, AGENTS, City of Fort Worth,Texas Page 17 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] EMPLOYEES,AND SER VANTS FOR,FROMAND A GAINST ANYAND ALL CLAIMS (WHETHER AT LA W OR IN EQUITI9, LIABILITIES, DAMAGES(INCL UDING ANY AND ALL ECONOMIC DAMAGES, PROPERTY LOSS, PROPERTY DAMAGES AND PERSONAL INJURIESINCLUDINGDEATH),LOSSES,LIENS, CAUSES OFACTION, SUITS,JUDGMENTS AND EXPENSES(INCLUDING,BUTNOTLIMITED TO, COURT COSTS, ATTORNEYS'FEES AND COSTS OFINVESTIGATION), OF ANY NATURE, KIND OR DESCRIPTION ARISING OR ALLEGED TO ARISE BY OR IN ANY WAY RELEATED TO CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A CONCURRENT CFA, OR (2) BY REASON OF ANY OTHER CLAIM WHATSOEVER OF ANY PERSON OR PARTY OCCASIONED OR ALLEGED TO BE OCCASIONED IN WHOLE OR IMPART BY THE CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A CONCURRENT CFA, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CA USED, IN WHOLE OR IMPART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FOR T WORTH,ITS OFFICERS, SERVANTS OR EMPLOYEES. By signing below, Developer certifies that all statements contained in this Attachment"3" Concurrent CFA Provision are true and correct. DEVELOPER: DR HORTON-TEXAS,LTD A TEXAS LIMITED PARTNERSHIP BY: D.R.HORTON, INC., A DELAWARE CORPORATION, ITS AUTHORIZED AGENT ftGIW1�1 C41#-1f Benjamin Clark(Nov 13,2020 08:54 CST) Name: Benjamin Clark Title: Assistant Vice President City of Fort Worth,Texas Page 18 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] City of Fort Worth,Texas Page 19 of 19 Standard Community Facilities Agreement Rev.10/5/19[NPC] 00 42 43 DAP-BID PROPOSAL Page 1 of SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Specification No. Measure Quantity Unit Price Bid Value UNIT I:WATER IMPROVEMENTS 1 3311.0241 8"Water Pipe 3311 12 LF 4095 $27.00 $110,565.00 2 3305.0003 8"Waterline Lowering 33 05 12 EA 2 $4,450.00 $8,900.00 3 3312.2003 1"Water Service 33 12 10 EA 112 $890.00 $99,680.00 4 3312.2103 1 1/2"Water Service 33 12 10 EA 1 $1,700.00 $1,700.00 5 3312.2203 2"Water Service 33 12 10 EA 1 $1,800.00 $1,800.00 6 3312.3003 8"Gate Valve 33 12 20 EA 20 $1,380.00 $27,600.00 7 3312.0001 Fire Hydrant 33 12 40 EA 4 $4,400.00 $17,600.00 8 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 5 $4,300.00 $21,500.00 9 3305.0109 Trench Safety 33 05 10 LF 4095 $0.10 $409.50 10 0241.1118 4"-12"Pressure Plug 0241 14 EA 7 $150.00 $1,050.0.0 11 3312.0117 Connect to Existing 4"-12"Water Main 33 12 25 EA 2 $1,100.00 $2,200.00 12 9999.0001 Automatic Flush Valve 33 12 20 EA 1 $7,500.00 $7,500.00 13 3305.0202 Imported Embedment/Backfill,CSS 33 05 10 CY 33.6 $137.50 $4,620.00 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT I:WATER IMPROVEMENTal $305,124.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43 Pioneer Point Phase 2 Utilities Bid Fonn 1 00 42 43 DAP-BID PROPOSAL Page 2 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Specification No. Measure Quantity Unit Price Bid Value UNIT IA:24"WATER IMPROVEMENTS 1 3311.0641 24"Water Pipe 3311 j25 ,33 LF 1104 $158.00 $174,432.00 2 0241.1109 24"Pressure Plug 0241 EA 1 $1,000.00 $1,000.00 3 3312.3008 24"Gate Valve w/Vault 33 12 EA 1 $32,500.00 $32,500.00 4 3312.0108 Connection to Existing 24"Water Main 33 12 EA 1 $2,500.00 $2,500.00 5 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 2 $10,000.00 $20,000.00 6 3305.0109 Trench Safety 33 05 10 LF 1104 $1.00 $1,104.00 7 3471.0001 Traffic Control 3471 13 MO 1 $4,000.00 $4,000.00 8 3201.0127 10'Wide Asphalt Pvmt Repair,Arterial 3201 17 LF 22 $210.00 $4,620.00 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 UNIT IA:24"WATER IMPROVEMEbLTS1 $240,156.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43 Pioneer Point Phase 2 Utilities Bid Fonn 1 00 42 43 DAP-BID PROPOSAL Page 3 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Specification No. Measure Quantity Unit Price Bid Value UNIT II:SANITARY SEWER IMPROVEMENTS 1 3331.4115 8"Sewer Pipe 3331 20 LF 3615 $40.00 $144,600.00 2 3339.1001 4'Manhole 33 39 20 EA 13 $2,800.00 $36,400.00 3 3339.1002 4'Drop Manhole 33 39 20 EA 5 $4,400.00 $22,000.00 4 3305.0202 Imported Embedment/Backfill,CSS 33 05 10 CY 49.6 $137.50 $6,820.00 5 3339.1003 4'Extra Depth Manhole 33 39 20 VF 36.8 $150.00 $5,520.00 6 3339.0001 Epoxy Manhole Liner 33 39 60 VF 57.3 $340.00 $19,482.00 7 3331.3101 4"Sewer Service 3331 50 EA 112 $715.00 $80,080.00 8 3331.3201 6"Sewer Service 3331 50 EA 1 $750.00 $750.00 9 9999.0002 Connect to Existing Sanitary Sewer 00 00 00 EA 2 $700.00 $1,400.00 10 3305.0109 Trench Safety 33 05 10 LF 3615 $1.00 $3,615.00 11 3301.0002 Post-CCTV Inspection 3301 31 1 LF 3615 $3.60 $13,014.00 12 9999.0003 Post-CCTV Inspection Manholes 3301 31 EA 5 $300.00 $1,500.00 13 3301.0101 Manhole Vacuum Testing 3301 30 EA 18 $120.00 $2,160.00 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 UNIT II:SANITARY SEWER IMPROVEMENTS $337,341.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43 Pioneer Point Phase 2 Utilities Bid Fonn 1 00 42 43 DAP-BID PROPOSAL Page 4 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Specification No. Measure Quantity Unit Price Bid Value UNIT IIA:OFFSITE SANITARY SEWER IMPROVEMENTS 1 3331.4115 8"Sewer Pipe 3331 20 LF 5039 $56.00 $282,184.00 2 3305.3002 8"Sewer Carrier Pipe 33 05 24 LF 582 $67.00 $38,994.00 3 3331.4201 10"Sewer Pipe 3311 10,33 LF 126 $53.00 $6,678.00 4 3305.3003 10"Sewer Carrier Pipe 33 05 24 LF 140 $76.10 $10,654.00 5 3339.1001 4'Manhole 33 39 20 EA 19 $3,530.00 $67,070.00 6 3339.1002 4'Drop Manhole 33 39 20 EA 4 $5,240.00 $20,960.00 7 3339.1003 4'Extra Depth Manhole 33 39 20 VF 118.9 $150.00 $17,835.00 8 3339.0001 Epoxy Manhole Liner 33 39 60 VF 105.2 $340.00 $35,768.00 9 3305.1003 20"Casing By Open Cut 33 05 22 LF 219 $115.00 $25,185.00 10 3305.1103 20"Casing By Other Than Open Cut 33 05 22 LF 1 199 $538.00 $107,062.00 11 3305.0116 Concrete Encasement for Utility Pipes 33 05 10 CY 21.6 $381.25 $8,235.00 12 9999.0002 Connect to Existing Sanitary Sewer 00 00 00 EA 1 $1,000.00 $1,000.00 13 3305.0109 Trench Safety 33 05 10 LF 5887 $1.00 $5,887.00 14 3301.0002 Post CCTV Inspection 3301 31 LF 5887 $3.60 $21,193.20 15 9999.0003 Post-CCTV Inspection Manholes 3301 31 EA 7 $300.00 $2,100.00 16 3301.0101 Manhole Vacuum Testing 3301 30 EA 23 $120.00 $2,760.00 17 0241.2103 8"Sewer Abandonment Plug 0241 14 EA 5 $50.00 $250.00 18 3305.0110 Utility Markers 33 05 26 EA 18 $90.00 $1,620.00 19 3305.0112 Concrete Collar 33 05 17 EA 23 $300.00 $6,900.00 20 9999.0004 Hauloff of Spoils From Offsite Sanitary 00 00 00 LOAD Sewer 125 $220.00 $27,500.00 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 UNIT IIA:OFFSITE SANITARY SEWER IMPROVEMENTS $689,835.20 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43 Pioneer Point Phase 2 Utilities Bid Fonn 1 00 42 43 DAP-BID PROPOSAL Page 5 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Specification No. Measure Quantity Unit Price Bid Value UNIT III: DRAINAGE IMPROVEMENTS 1 3341.0402 42"RCP,Class III 3341 10 LF 582 $168.00 $97,776.00 2 3341.0309 36"RCP,Class III 3341 10 LF 130 $125.00 $16,250.00 3 3341.0302 30"RCP,Class III 3341 10 LF 438 $94.00 $41,172.00 4 3341.0205 24"RCP,Class III 3341 10 LF 343 $79.00 $27,097.00 5 3341.0201 21"RCP,Class III 3341 10 LF 314 $69.00 $21,666.00 6 3349.5001 10'Curb Inlet 33 49 20 EA 9 $4,000.00 $36,000.00 7 3349.5003 20'Curb Inlet 33 49 20 EA 2 $6,500.00 $13,000.00 8 3349.0001 4'Storm Junction Box 33 49 10 EA 4 $4,700.00 $18,800.00 9 3349.0002 5'Storm Junction Box 33 49 10 EA 3 $67.50 $202.50 10 3349.7003 6'Drop Inlet 33 49 20 EA 1 $7,200.00 $7,200.00 11 9999.0005 42"Sloping Headwall 00 00 00 EA 1 $3,300.00 $3,300.00 12 9999.0006 36"Sloping Headwall 00 00 00 EA 1 $2,800.00 $2,800.00 13 9999.0007 Pond Outfall Structure 00 00 00 EA 1 $70,000.00 $70,000.00 14 3137.0102 Large Stone Riprap,dry 31 3700 SY 62 $80.00 $4,960.00 15 3201.0127 10'Wide Asphalt Pvmt Repair,Arterial 3201 17 LF 22 $210.00 $4,620.00 16 3305.0109 Trench Safety 33 05 10 LF 1873 $0.50 $936.50 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT III: DRAINAGE IMPROVEMENTS 1 $365,780.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43 Pioneer Point Phase 2 Utilities Bid Fonn 1 00 42 43 DAP-BID PROPOSAL Page 6 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity Bid Summary UNIT I:WATER IMPROVEMENTS $305,124.50 UNIT IA:24"WATER IMPROVEMENTS $240,156.00 UNIT II:SANITARY SEWER IMPROVEMENTS $337,341.00 UNIT IIA:OFFSITE SANITARY SEWER IMPROVEMENTS $689,835.20 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $365,780.00 Total Construction Bid $1,938,236.70 This Bid is submitted by the entity named below: BIDDER: BY: Burnsco Construction Inc. 6331 Southwest Blvd Benbrook,Texas 76132 TITLE: Lhtis «IDe3 DATE: Q -b O)a v Contractor agrees to complete WORK for FINAL ACCEPTANCE within 120 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43 Pioneer Point Phase 2 Utilities Bid Form 1 00 42 43 DAP-BID PROPOSAL Page 1 o£2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Specification No. Measure Quantity Unit Price Bid Value UNIT IV: PAVING IMPROVEMENTS 1 3213.0101 6"Conc Pvmt 32 13 13 SY 12606 $35.45 $446,882.70 2 3213.0301 4"Conc Sidewalk 32 13 20 SF 3233 $5.75 $18,589.75 3 3211.0501 6"Lime Treatment 3211 29 SY 13475 $3.05 $41,098.75 4 3211.0400 Hydrated Lime 3211 29 TN 216 $175.00 $37,800.00 5 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 6 $2,050.00 $12,300.00 6 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 4 $1,700.00 $6,800.00 7 3217.0401 18"SLD Pvmt Marking HAE(W) 32 17 23 LF 14 $55.00 $770.00 8 3471.0001 Traffic Control 3471 13 MO 1 $1,500.00 $1,500.00 9 9999.0001 Remove End-of-Road Barricade 00 00 00 EA 2 $500.00 $1,000.00 10 9999.0002 End-of-Road Barricade 00 00 00 EA 2 $1,500.00 $3,000.00 11 3441.4003 Furnish/Install Alum Sign Ground Mount 34 41 30 EA City Std. 5 $500.00 $2,500.00 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT IV: PAVING IMPROVEMENTS $572,241.20 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43 Paving 00 42 43 DAP-BID PROPOSAL Page 2 of 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Unit Price Bid Value Section No. Measure Quantity Bid Summary UNIT IV:PAVING IMPROVEMENTS $572,241.20 Total Construction Bid $572,241.20 This Bid is submitted by the entity named below: BIDDER: B al@IBC at Gilco Contracting Inc 6331 Southwest Blvd Benbrook,Texas 76132 TIT SICK DATE: Contractor agrees to complete WORK for FINAL ACCEPTANCE within 50 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONS7'RucrioN SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43 Paring 00 42 43 DAP-BID PROPOSAL Page 1 of2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF 1350 $12.20 $16,470.00 2 3441.3050 Furnish/Install LED Lighting Fixture(70 watt 3441 20 EA Cobra Head) 19 $274.00 $5,206.00 3 3441.3301 Rdwy Illum Foundation TY 1,2,and 4 3441 20 EA 19 $1,125.00 $21,375.00 4 3441.3351 Furnish/Install Rdway Ilium TY 11 Pole 34 41 20 EA 19 $1,779.00 $33,801.00 5 3441.1646 Furnish/Install Type 33B Arm 3441 10 EA 19 $175.00 $3,325.00 6 3441.1410 NO 10 Insulated Elec Condr 3441 10 LF 4050 $1.11 $4,495.50 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 T- -T 44 45 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $84,672.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43 Pioneer Point Phase 2 Streetlights Bid Formpdf 00 42 43 DAP-BID PROPOSAL Page 2 of 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No Description Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT V:STREET LIGHTING IMPROVEMENTS $84,672.50 Total Construction Bid $84,672.50 This Bid is submitted by the entity named below: BIDDER: BY: 17 W Independent Utility Construction,Inc. 5109 Sun Valley Dr. ` Fort Worth,Texas 76119 TITLE: DATE: /y- 0�- ?�-7- Contractor agrees to complete WORK for FINAL ACCEPTANCE within 30 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43 Pioneer Point Phase 2 Streetlights Bid ForrnPdf PROJECT LOCATION W BAILEY-BOSWELL ROAD K � s9Ci2 L) 9� O �yj m y WJ BOAZ BU 287 W McLEROY BLVD Q� xm O c> m 0 CREEK RD K O ig O x FO LONGHORN RD m RE LAK MAPSCO NO. PAGE 32-X CITY PROJECT NO. 102768 OWNER: :.:. P E LOTO N L O CAT I O N MAP i LAND SOLUTIONS D. R. Horton 9800 HILLWOOD PARKWAY NORTH 6751 NORTH FWY. 50 NOT TO SCALE PIONEER POINT PHASE 2 FORT WORTH,TX76131 FORT WORTH,T SUIT ,TX 76177 PHONE#:817.230.0800 DATE: 7/28/2020 PHONE:817-562-3350 7! PARK RI Vr DEVE OPMENTAGR EMENT III ST.#D210281 12 C.R.T.C.T. 112 16, CENTEX ING LO 14,4 y HOMES 21 lo P` r-11m 24' W A 24"W 0 1 5 L,!ND;IT )Ri V,_ l Q-: -F T'- 2l zs s, z3IM2. l l 1 l -T m//v APE RO TIE,D ��w � '-RA t R0 TIE TIE1 I)SM"N 12 1 O I 0 DR H]ORTC)N- EX FR HORT( XA LT . JJFL UR ILL Ru)J -a-lvTrH- F-- F-- F--F—F-- F-- F-- Z LEGEND PROPOSED WATER LINE EXW EXISTING WATER LINE PROPOSED GATE VALVE EXW EXISTING GATE VALVE I& PROPOSED FIRE HYDRANT 1w NOTE: ALL PROPOSED WATER LINES EXW EXISTING FIRE HYDRANT ARE 8" UNLESS OTHERWISE NOTED. u EXHIBIT A WATER OWNER: PELOTON 0 NORTH 200' D. R. Horton LAND SOLUTIONS 9800 HILLWOOD PARKWAY 6751 NORTH FWY 250 PIONEER POINT PHASE 2 FORT WORTH,TX 76131 WORT SUITE H,TX 7617 GRAPHIC SCALE DATE: 7/2812020 PHONE M 817.230.0800 FORT PHONE:817-562-33507 w F U) w w ofI T w _ w A _ s Z' DEVE OPMENTAGR EMENT J 1 ST.#D210281 12 U L C.R.T.C.T. / CENTEX Aft A l �i M Y HOMES ®,. La I - I HORTON-TE AS LTD. :FFT Uj- L J�L .41 l -7 TESC RT11 ESA AL E TAl t I DR H RT N- EX �JR S L D. H RT N-T XA LT o FL U lL U _ SS I F TM FTT Jo F Tr 711 LEGEND low PROPOSED SANITARY SEWER LINE EX 33 � EXISTING SANITARY SEWER LINE NOTES: 1. ALL PROPOSED SANITARY SEWER LINES ARE 8" UNLESS OTHERWISE NOTED. 2. ALL SANITARY SEWER MANHOLES ARE 4' DIA UNLESS OTHERWISE NOTED. EXHIBIT Al - SEWER OWNER: P E LOTO N 0 NORTH 300' I I LAND SOLUTIONS D. R. Horton 9800 HILLWOOD PARKWAY PIONEER POINT PHASE 2 FORT WORTH,TX 131 SUITEH,T 7 GRAPHIC SCALE DATE: 7/2812020 PHONE M 817.230.0800 F PHONE:817-562-3350 "NOT EXISTING INFRASTRUCTURE" r NORTHPOINTE PHASE 1A CPN 102250 Oil S LEGEND A PROPOSEDSANITA \� SEWERRL NE \\ r \ EXISTING EX 33---�D-- SANITARY SEWER LINE NOTES: \ I z� 1. ALL PROPOSED SANITARY \ W SEWER LINES ARE 8" UNLESS J OTHERWISE NOTED. Uw 2. ALL SANITARY SEWER H� MANHOLES ARE 4' DIA �Q UNLESS OTHERWISE NOTED. EXHIBIT Al - SEWER OFFSITE OWNER: P E LOTO N O NORTH CJOO� I I LAND SOLUTIONS D. R. Horton 9800 HILLWOOD PARKWAY PIONEER POINT PHASE 2 FORT WORTH,TX 131 SUITEH,T 7 GRAPHIC SCALE DATE: 7/28/2020 PHONE#:817.230.0800 F PHONE:817-562-3350 =77 PARK K RI R V V Op ARK RI Vr DEVE OPMENT AGR EMENT I I ST# ST.#D210281 12 C.R.T.C.T. j I s, s s. ,�, �\ 112 sa 16, CENTEX as a EA ING LOON lAy HOMES 10 112 ......... ................................... ND/ G MINTER CAP D A 11 7R0 , TIE RSA,I N '�E �,W N WAt O DR HORT N- EX R H�RT 'L- XA LT N � �/ \--- _ LL Ru -T-- F-- F-- F---- -F-- F-- F-- r-- - -::] LEGEND 29- B-B/50' ROW (TYP) 29- B-B/60' ROW (TYP) SIDEWALK BY DEVELOPER SIDEWALK BY HOMEBUILDER 0 H.C. RAMPS BY DEVELOPER EXHIBIT B - PAVING OWNER: ... PELOTON LAND SOLUTIONS 0 NORTH 200' D. R. Horton 9800 HILLWOOD PARKWAY 6751 NORTH FWY 250 PIONEER POINT PHASE 2 FORT WORTH,TX 76131 WORT SUITE H,TX 7617 GRAPHIC SCALE DATE: 7/2812020 PHONE M 817.230.0800 FORT PHONE:817-562-33507 36"SLOPING HDWL 4'x4' JB_ 36" RCP 21" RCP 30" RCP / 6'x6' DROP INL 4'x4' J B PWRK 2-21" RCP DEVEI OPMENT AGRE EMENT 21" RCP 2-20' INL 2-21" RCP 11 JSTJD210281 12 5'x5' JB --- 2-10' INL C.R.T.C.T. / -5'x5' JB 24" RCP 5'x5' JB 42" RCP 42" RCP 42" RCP 36" RCP � 1 1a '" '" '" CENTEX \ 42"SLOPING HDWL 30" RCP A G O M Y HOMES 2-21" RCP 2-21" RCP �� �� 2-10' INL 24" RCP 2-10' INL 4'x4' JB I 24" RCP" 4'x4 JB� p E 7GE L l G \ \ HORTON-TE AS LTD. 30" RCP s 21" RCP 2-21" RCP J =• 10' INL 2-10' INL m v l T SCAELD R ESA AL 0 " � �J DR OR N- EX S L D. R H RT N-T XA LT . FL U IL U--------------- - 0 L LEGEND r PROPOSED STORM DRAIN INLET -------!JIM _-- EXISTING STORM DRAIN INLET PROPOSED STORM DRAIN MANHOLE ----< PROPOSED STORM DRAIN HEADWALL EXHIBIT B1 - STORM DRAIN OWNER: P E LOTO N 0 NORTH 300' I I LAND SOLUTIONS D. R. Horton 9800 HILLWOOD PARKWAY 50 PIONEER POINT PHASE 2 FORT WORTH,TX FORT WORT HH,T131 SUIT ,T PHONE#:8172300800 X 76177 . . GRAPHIC SCALE DATE: 7/28/2020 PHONE:817-562-3350 --rr7— PARK RI Vr DEVE OPMENTAGR EMENT I ST.#D210281 12 C.R.T.C.T. 112 CENTEX 21as a JE N76 LOON HOMES lo ly @ 'q pr OL E OLES LANDIVG i)Ri VE Q: 2. 2� L2l T�c MINTER CAP L D)5. I*- OKTIER IL W RO T 11 12 13 1,1 11 1. 'RA'- I -T- "sA4, TIE1 O DR HORTON- EXPSL-rD. R HORTON-T=-XA CUR I/LT T�Ru FL F T F TIT I/ - 11 1 1 F I F-F mLL Ll LEGEND PROPOSED STREET LIGHT 0 EXISTING STREET LIGHT PROPOSED STREET NAME SIGNS EXISTING STREET NAME SIGNS EXHIBIT C1 - STREET NAME SIGNS & STREET LIGHTS OWNER: ... PELOTON 0 NORTH 200' D. R. Horton LAND SOLUTIONS 9800 HILLWOOD PARKWAY 6751 NORTH FWY 250 PIONEER POINT PHASE 2 FORT WORTH,TX 76131 FORT WORTH ORT SUITE H,TX 76177 GRAPHIC SCALE DATE: 7/2812020 PHONE M 817.230.0800 PHONE:817-562-3350