Loading...
HomeMy WebLinkAboutContract 54842 Received Date: 11/16/2020 Received Time: 9:03 AM Developer and Project Information Cover Sheet: Developer Company Name: FLennar Homes of Texas Land and Construction,Ltd. Address, State,Zip Code: 1707 Marketplace Blvd, Ste 100,Irving,TX,75063 Phone&Email: 469 587-5293,Jennifer.EllerALennar.com Authorized Signatory,Title: Jennifer Eller,Authorized Agent Project Name: Primrose Crossing Phase 5 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: Southwest of the intersection of W. Risinger Rd and Fawn Creek Dr. Plat Case Number: FP-15-0065 Plat Name: [PrimroseCrossing Mapsco: Council District: 3 CFA Number: CFA20-0073 City Project Number: 102721 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth,Texas Page 1 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI CSC No.54842 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between The City of Fort Worth ("City"), a home-rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and Lennar Homes of Texas and Construction, Ltd ("Developer"), acting by and through its duly authorized representative. City and Developer are referred to herein individually as a"party"and collectively as the"parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Primrose Crossing Phase 5("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement("Community Facilities"or"Improvements"); and WHEREAS,as a condition of approval of the Project,Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land,pay fees or construction costs,or meet other obligations that are not a part of this Agreement.; and WHEREAS,the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exist between the terms and conditions of this Agreement and the CFA Ordinance,the CFA Ordinance shall control. 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been accepted by the City ("Engineering Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide City of Fort Worth,Texas Page 2 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: ® Exhibit A: Water ® Exhibit A-1: Sewer ® Exhibit B: Paving ® Exhibit B-1: Storm Drain ® Exhibit C: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). City of Fort Worth,Texas Page 3 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement,becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors,or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including,but not limited,to being prequalified,insured,licensed and bonded to construct the Improvements in the City. City of Fort Worth,Texas Page 4 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an oblige, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions,Chapter 2253 of the Texas Government Code,and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider,which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight (48)hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed,and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. 11. Easements and Rights-of-Way Developer agrees to provide,at its expense,all necessary rights-of-way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. City of Fort Worth,Texas Page 5 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO,AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS,AGENTS AND EMPLOYEES FROM ALL SUITS,ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED,BROUGHT FOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS,INCLUDINGDEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN,PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERL Y SAFEGUARD THE WORK, OR ON ACCOUNT OF ANY ACT,INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCHINJURIES,DEATH OR DAMAGESARE CAUSED,IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS,SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH,RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR ERPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts Upon completion of all work associated with the construction of the Improvements,Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors,along with an assignment of all warranties given by the contractors,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. City of Fort Worth,Texas Page 6 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees,and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars($50.00),the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre-approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtainproof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand- delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: DEVELOPER: Development Coordination Office Lennar Homes of Texas and Construction, Ltd City of Fort Worth 1707 Marketplace Blvd. Ste 100 200 Texas Street Irving, TX, 75063 Fort Worth, Texas 76102 With copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 City of Fort Worth,Texas Page 7 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of three(3)years after final payment under the contract,have access to and the right to examine any directly pertinent books, documents,papers and records of such contractor, involving transactions to the contract, and further,that City shall have access during normal working hours to all of the contractor's facilities,and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants,officers,contractors,subcontractors,and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co-employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and City of Fort Worth,Texas Page 8 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors,and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas,Fort Worth Division. 20. Non-Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose,their attorneys,have had the opportunity to review and comment on this document;therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. City of Fort Worth,Texas Page 9 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. The term"boycott Israel"has the meaning ascribed to it by Section 808.001 of the Texas Government Code. The term"company"has the meaning ascribed to it by Section 2270.001 of the Texas Government Code. To the extent that Chapter 2270 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of this Agreement. 26. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES,SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 27. Amendment No amendment,modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 28. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 29. No Third-Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise,to any other person or entity. City of Fort Worth,Texas Page 10 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] 30. Compliance with Laws,Ordinances,Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 31. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order,resolution,ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 32. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original,but which together will constitute one instrument. 33. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder,and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth,Texas Page 11 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] 34. Cost Summary Sheet Project Name: Primrose Crossing Phase 5 CFA No.: CFA20-0073 City Project No.: 102721 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 378,510.00 2.Sewer Construction $ 346,623.50 Water and Sewer Construction Total $ 725,133.50 B. TPW Construction 1.Street $ 695,157.75 2.Storm Drain $ 275,803.00 3.Street Lights Installed by Developer $ 146,245.00 4. Signals $ - TPW Construction Cost Total $ 1,117,205.75 Total Construction Cost(excluding the fees): $ 1,842,339.25 Estimated Construction Fees: C. Construction Inspection Service Fee $46,060.00 D. Administrative Material Testing Service Fee $14,798.00 E. Water Testing Lab Fee $1,350.00 Total Estimated Construction Fees: $ 62,208.00 Choice Financial Guarantee Options,choose one Amount Mark one Bond= 100% $ 1,842,339.25 x Completion A reement= 100%/Holds Plat $ 1,842,339.25 Cash Escrow Water/Sanity Sewer= 125% $ 906,416.88 Cash Escrow Paving/Storm Drain=125% $ 1,396,507.19 Letter of Credit=125% $ 2,302,924.06 City of Fort Worth,Texas Page 12 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC) IN WITNESS WHEREOF,the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH DEVELOPER Lennar Homes of Texas Land and ,2a&-ez Construction,Ltd Dana Burghdoff(Nov 13,2 10:13 Cs Dana Burghdoff io-y Jennifer Eller(Nov 13,2020 07:32 CST) Assistant City Manager Name: Jennifer Eller Date: Nov 13,2020 Title: Authorized Agent Recommended by: Date: Nov 13,2020 a6b( Rode, Evelyn Froberts(Nov 13,202008:25CST) Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Approved as to Form &Legality: Richard A.McCracken(Nov 13,2020 08:42 CST) Richard A.McCracken Contract Compliance Manager: Sr.Assistant CiW/Akttorney M&C No. By signing, I acknowledge that I am the person Date: responsible for the monitoring and administration of this contract,including Form 1295: N/A ap�VoRr��a ensuring all performance and reporting oo ° °oo, requirements. 0 G op d ATTEST: v o o= p o d Ldurie Lewis % °o Laurie Lewis(Nov 13,2020 08:30 CST) ti Name: Laurie Lewis Mary J.Kayser/Ronald Gonzales Title: Interim Development Manager City Secretary/Assistant City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth,Texas Page 13 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Attachment 2—Phased CFA Provisions ❑ Attachment 3 —Concurrent CFA Provisions ® Location Map ® Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Exhibit B: Paving Improvements ® Exhibit B-1: Storm Drain Improvements ® Exhibit C: Street Lights and Signs Improvements ® Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Page 14 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] ATTACIEMENT"I" Changes to Standard Community Facilities Agreement City Project No. 102721 None City of Fort Worth,Texas Page 15 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] ATTACHMENT "2" Phased CFA Provision City Project No. 102721 The improvements being constructed by Developer pursuant to this Agreement will connect to improvements Developer is constructing under a separate Community Facilities Agreement that have not been completed and accepted by the City. Therefore, this Agreement shall be considered a"Phased CFA"and the provisions contained in this section shall apply to this Agreement. The improvements being constructed by Developer under the separate Community Facilities Agreement shall be defined as the "Parent Project." The improvements being constructed by Developer under this Agreement shall be defined as the "Child Project." Developer acknowledges and agrees that due to Developer's election to construct a Phased CFA, the potential exists for technical, delivery, acceptance or performance problems (hereinafter "Construction Problems"). Construction Problems may include, but are not limited to: failure of the improvements to comply with the approved plans or City Specifications; failure of the improvements in the Parent Project and the Child Project to properly connect to each other; changes to the design or construction of the improvements in the Parent Project that impact the design and construction of the improvements in the Child Project; construction delays, delay claims, or claims for liquidated damages; increased costs for the Developer; failure of the improvements to pass inspection or material testing; or rejection by the City of some or all of the improvements and Developer having to remove and reconstruct the improvements at Developer's expense. In addition, Developer understands and agrees that disputes may arise between Developer's contractors or their subcontractors relating to responsibility for the Construction Problems. Developer shall be solely responsible for resolving disputes between contractors or disputes between contractors and subcontractors. Developer further acknowledges and agrees that Developer has notified all of Developer's contractors for the Project that Developer has elected to construct a Phased CFA, the provisions of this section, the risks associated with a Phased CFA, and that the City shall not bear any responsibility for Developer's decision to proceed with a Phased CFA. Developer shall not make the final connection of the improvements in the Child Project to the improvements in the Parent Project until the improvements in the Parent Project have been constructed and accepted by the City and the City has consented to Developer making the connection. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more single family residential homes or structures, the City will not record the plat related to the Project until the improvements are constructed and accepted City of Fort Worth,Texas Page 16 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] by the City. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more commercial buildings or structures, the Developer shall not receive a Certificate of Occupancy from the City for the building(s)related to the Project until the improvements in this Agreement are constructed and accepted by the City. Developer further understands and agrees that completion of the improvements under this Agreement does not entitle Developer to obtain a final plat of the property until all other requirements of Federal law, State law, or the City Code relating to the filing and recording of a final plat have been met by Developer. BY CHOOSING TO CONSTRUCT A PHASED CFA, DEVELOPER ASSUMES ALL RISKS AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL DAMAGES, INCLUDING BUT NOT LIMITED TO ANY AND ALL ECONOMICDAMA GES PROPERTYLOSS,PROPERTYDAMAGESANDPERSONAL INJURY, (INCLUDING DEATH OFANYKIND OR CHARACTER, WHETHER REAL OR ASSERTED. DEVELOPER HEREBYEXPRESSLYRELEASESAND DISCHARGES CITY FROM ANY AND ALL LIABILITY FOR DAMAGES, INCLUDING, BUT NOT LIMITED TOANYANDALL ECONOMICDAMAGES,PROPERTYLOSS,PROPERTY DAMAGE AND PERSONAL INJURY(INCL UDING DEATI1)ARISING OUT OF OR IN CONNECTION WITH,DIRECTLY OR INDIRECTLY, THE CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S DECISION TO CONSTRUCT A PHASED CFA. DEVELOPER,AT ITS SOLE COSTAND EXPENSE,AGREES TO AND DOES HEREBY INDEMNIFY, DEFEND PROTECT, AND HOLD HARMLESS CITY, AND CITY'S OFFICERS, REPRESENTATIVES, AGENTS, EMPLOYEES, AND SERVANTS FOR, FROMANDAGAINSTANYANDALL CLAIMS(WHETHER ATLA W OR INEQUITI9, LIABILITIES, DAMAGES (INCLUDING ANY AND ALL ECONOMIC DAMAGES, PROPERTYLOSS, PROPERTYDAIVIAGES AND PERSONAL INJURIES INCLUDING DEATH LOSSES, LIENS, CAUSES OF ACTION, SUITS, JUDGMENTS AND EXPENSES (INCLUDING, BUT NOT LIMITED TO, COURT COSTS, ATTORNEYS' FEES AND COSTS OF INVESTIGATION), OF ANY NATURE, KIND OR DESCRIPTION ARISING OR ALLEGED TO ARISE BY OR IN ANY WAYRELATED TO CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA, OR (2) BY REASON OF ANY OTHER CLAIM WHATSOEVER OF ANY PERSON OR PARTY OCCASIONED OR ALLEGED TO BE OCCASIONED IN WHOLE OR IN PART BY THE CONSTRUCTIONS OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH,ITS OFFICERS SERVANTS, OR EMPLOYEES. City of Fort Worth,Texas Page 17 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] DEVELOPER: LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION ,LTD Jennifer Eller(Nov 13,2020 67:32 CST) Name: Jennifer Eller Title: Authorized Agent City of Fort Worth,Texas Page 18 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPC] 0042 43 DAP-BID PROPOSAL Pagc 1 ore SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Primrose Crossing,Phase 5 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section No. Unit r Bide Quantity No. Measur Unit Price Bid Value N UNIT I:WATER IMPROVEMENTS 1 3311.0001 Ductile Iron Water Fittings w/Res 33 11 11 TON 1.90 $4,500.00 $8,550.00 2 3311.0241 8"Water Pipe 33 11 10,33 11 12 LF 4840.00 $34,00 $184,560,00 _r.__ w ... .- - - . 3 �331io6l)-f0ire Hydrant 331240 EA 11.00 $4 250.00 $46,750.00 31 4 32.0117 Connection to Existing 4"-12 Water Main 33 12 25 EA 4.00 $1 000.00 $4,000.00 5 3312.2003 1'Water Service 33 12 10_� $950 EA 134.00 .. .. _ 00 $127,300.00 6 3312.3003 8"Gate Valve 33 12 20 EA 17.00 $1,300.00 $22,100'00 7 9999.0001 1"Water Service to Existing Water Main 00 00 00 EA 3.00 $1 750 OQ $5 250.00 ............. .-. -_... 8 10 11 12 13 14 15 16 __17 18 19 20 21 22 23 24 _._.. 25 26 27 28 29 30 31 32 -_- 33 34 35 _... 36 37 38 39 40 41 42 43 _. 44 45 TOTAL UNIT 1:WATER IMPROVEMENTS $378,510.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS.DEVELOPER AWARDED PROJECTS Form Version May22,2019 Com69er 004243_Bid Proposal DAP.Alx 00 42 43 DAP-BID PROPOSAL Pap 2 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Primrose Crossing,Phase 5 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No, Measure Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 1 3301.0002 Post-CCTV Inspection 3301 31 LF W 3120.00 $3.00 $9,360.00 2 3301.0101 Manhole Vacuum Testing 33 61 26 EA 23.00 _ $150,,00 $3,450.00 3 3305.0106 Manhole Adjustment,Major 33 05 14 EA 3.00 $2,500.00 _$7,500.00 4 3305 0107 Manhole Adjustment,Minor 33 0514 EA 4.00 $1 000 00 $4,000.00 5 3305.0109 Trench Safety 33 05 10 LF 6 3331.3101 4"Sewer Service 3331 50 EA 110.00 $650.00 $71,500.00 7 3331,4115 B"Sewer Pipe-SDR 26 33 11 10,33 31 12,33 31 LF 20 3120.00 $40.00 $124,800.00 33 31 33 31 12, 8 3331.4116 8"Sewer Pipe,CSS Backfill 33 11 10, LF 20 60.00 $52.00 $3,120,•00 16 3339.0001 Epoxy Manhole Liner 33 39 60 VF 111.40 $385.00 $42,889.00 11 3339.1001 4'Manhole 33 39 10,33 39 20 EA 15.00 $3,800.00 $57,000.00 12 3339.1002 4'Drop Manhole 33 39 10,33 39 20 EA 1.00 $5.000.00 $5,000.00 13 3339.103 0 4 Extra Depth Manhole 3339 10,333920 VF 23.70 $185.00 $4,384.50 02 14 9999.00 Connect to Existing Line 0000 00 EA 6.00 $1,200.00 $7,200,00 1 B 9999.0003 4"Sewer Service to Existing Sewer Main -00 00 00 EA 2.00 $1 650;00 $3,300.00 17 20- -22.- 23 24 25 T 26 48 -_ 30 31 --•32 --- - 33 _.- ..35 - --36.. - 37- _ 38 R-40 41 - 43 TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $346,623.50 CnY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fonn Version May 22,2019 Commr 004243_Bid Proposal_DAP.xlsx 00 42 43 DAP-BID PROPOSAL Pago 3 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Primrose Crossing,Phase 5 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Q Description Specification Section No. Unit of Bid Unit Price Bid Value No. Measure uantity UNIT III:DRAINAGE IMPROVEMENT 1 3305.0109 Trench 30 Safety 330510 10 LF 2333.00 $1.00 $2,333.00 -. 2 35.0112 Concrete Collar 33 05.17 EA 4.00 $500.00 $2,000.00 34 3 31.0201 21"RCP,Class III 33 41 10 LF 291.00 $55.00 $16,01111 5.00 4 3341.0265 24"RCP,Class III 33 41 10 LF 630.00 $60.00 _ $3 7,800.00 5 3341.0208 27"RCP,Class III 33 41 10 LF 25.00 $65.00 _ $1,625.00 6 3341.0302 w'RCP,Class III 33 41 10 _ LF 712.00 $70.00 $49,840.00 7 3341.0305 33"RCP,Class III 33 41 16 LF 270.00 $1 .00 $212,950.00 8 3341.0309 36"RCP,Class III 33 41)6 LF 218.00 $100,00 $21,800.00 9 3341.0462 42"RCP,Class III _ 33 41 10 LF 187.00 $140.00 $26,180.00 10 3349.0001 4'Storm Junction ox B 33 49 10 EA 4.00 $5,000.00 $20,000.00 11 3349 0062 5 Stonn Junction Box _33 49 10 EA 1.00 $6,000.00 _ „$6,000.00 12 3349.50D1 10'Curb Inlet 33 49 20 EA 5.00 $3,200.00 $16,000,00 13 3349 5002 15'Curb Inlet 33 49 20 EA 6.00 $4 200.00 $25,200.00 14 3349 8002 15'Type 2 Inlet 33 49 20 EA 1 00 $5 200.00 $5,200.00 15 9999.0004 Inlet Protection 00 00 00 EA 14.00 $1510.0.0 $2,100.00 16 9999.0005 Remove Existing 30"Headwall 00 00 00 EA 1.00 $500.00 $500.00 17 9999.0006 Connect to Existin 30"RCP 00 00 06 EA 1.00 $-000.00 $1,000.00 _ _ 18 9999.0007 24"Rock Riprap w/6"Bedding 00 OD DO SY 46.00 $95.00 $4,370.00 19 9696.0008 Connect to Existing 42"RCP 00 00 00 SY 1.00 $1,000.00 $1,000.00 20 9999.0009 Modified 15'Inlet(4.5'Deep) 00 00 00 EA 2.00 $5,200.00 $10,400.00 21 9999.0010 30'4:1 Sloped End Headwall 00 00 00 EA 1.00 $3.500.00 $3,500.00 22 _ .. 23 24 25 26 27 28 29 30 31 32 34 .35, 36 37 e -37_. _. 40 41 43 T TAL UNIT III:DRAINAGE IMPROVEMENTS1 $275,803.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 Comtser_00 42 43 Bid Proposal_DAP.XIsx 00 42 43 DAP-BIDPROPOSAL Page 4 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Primrose Crossing,Phase 5 UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. Measure Quantity UNIT IV:PAVING IMPROVEMENTS 1 0241.0100 Remove Sidewalk 0241 13 SF 232.00 $2.00 $464.00 2 _ 3211 0400 Hydrated Lime(32 Ibstsy) 32 11 29 TN 271.00 $180.00 $48,780.00 3 3211 0501 6 Lime Treatment 32 11 29 _ SY _ 1692 5.0 0 ,_.._--_-,.$2 75 $46,543 75 4 3212 0101 6"Conc Pvmt _T _ 32 13 13 SY 15860.00 $35.00 $555,100.00 5 3213 0302 5'Conc Sidewalk 32 13 20 SF 295.00 $4 00 $1.,180.0,0 6 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 4.00 $1,500.00 _$6,000.00 7 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 12.00 $1,200.00 $14,400100 8 3471,0001 Traffic Control 34 71 13 MO_ ..2.00 $. 1,500,.00 $3,000AO, 9 9999.0011 Concrete Pavement Header 00 00 0o LF 29.00 $20.00 $580.00 ^1 o 9999A012 Concrete Street Barricade (Type'"III 000000 11 9499-0013 Remove Barricade and Connect to Existing 00 00 00 EA 3.00 $500.00 $1,500.00 12 9999 0014 Sawcut 8 Remove Existing Curb 00 00 00 LF 58.00 $20,00 $1,166.00 13 9999.0015 Stop Signs(R1-1) 00 00 00 EA 9.00 _,$650.00 $5 850.OD 14 9999.0016 Street Name Blade(D3-1 f 00 00 00 EA 40.00 $256.00 $10,000.00 15 16 17 18 19 20 21 22 23 24 - 25 26 27 28 µ 29 30 31 32 33 34 35 36 37 38 ~39 40 41 42 43 1 1 1 TOTAL UNIT IV:PAVING IMPROVEMENT- $695,157.75 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 Coretur_00 42 43 Bid Prop—]DAR.b., 00 42 43 DAP-BID PROPOSAL Page 5 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Primrose Crossing,Phase 5 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Unit of Bid No. Description Specification Section No. Measure Quantity Unit Price TBid Value UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.3015 2"CONDT PVC SCH 80(T) 260533 LF 2665.00 $10.00 $26,650.00 2 3441 3002 Rdwy Illum Assembly TY 8 11 D-25,and D-30 34 41 20 EA 24.00 $3,000.00 $72-000.00 3 3441.3201 LED Lighting Fixture(50W) 34 41 20 EA 24.00 $6150.00 $15,600.00 30 4 3441.31 Rdwy Illum Foundation TY 1,2,and 4 $1 000.00 $24,000.00 34 41 20 EA 24 00 5 9999.0017 3-#10 Copper Wire 00 00 00 LF 2665.00 $3.00 $7,995.00 6 9 — 16 12 - 13 14 15 16 1719 —� v 18 20 --- ---- 21 22 23 25 2 - 2 _.. ._ 7 28 _ 29 30 31 32 _. 36 34 .35 36 37— 38 39 40 .4.2.. — TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $146,245.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 Courser 00 42 43_Bid PrWosal_DAP.xlax 00 42 43 DAP•BID PROPOSAL Page 6 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Primrose Crossing,Phase 5 UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal BidllisrtoItem Unit of Description Specification Section No. Measure Bid Unit Price Bid Value Quantity Bid Summary UNIT I:WATER IMPROVEMENTS $378,510.00 UNIT II:SANITARY SEWER IMPROVEMENTS —m ^$346,623.50 UNIT III:DRAINAGE IMPROVEMENTS $275,803.00 UNIT IV:PAVING IMPROVEMENTS $695,157.75 UNIT V:STREET LIGHTING IMPROVEMENTS $146,245.0 Total Construction Bid $1,842,339,25 This Bid is submitted by the entity named below: BIDDER: BY: p�+jlL %4 Q f rfS Conatser Construction TX,L.P. J lk 5327 Wichita Street TITLE: �..Jt.�`�l e11- Fort Worth,TX 76119 DATE: a T 9/21/2020 Contractor agrees to complete WORK for FINAL ACCEPTANCE within �sa working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 Cowtser 004243 Bid Proposal DAP.zlsr LIMIT DIRKS FORT WORTH CITY L l p uHtr 'Q.f a HIR ALTA MESA 0 BRAN INGSHIR a o �9 Re J � ti�Vs Longhorn z p Park o �Fc^ �fi pox � �TN a w 3 a s COLUMBU u ¢BARB RY i STARRY Ely DROP MORNING PROJECT LOCATION Em VORTH r CITY FRANCIS VILLAGE O rc E KY � N a cky o ee ark 1" = 3000' MAPSCO NO. 102T COUNCIL DISTRICT NO. 6 CPN 102721 VICINITY MAP PRIMROSE CROSSING PHASE 5 CPN 102721 OWNER/DEVELOPER IPRC20-0082 LENNAR HOMES OF TEXAS LAND wA Engineering, Inc. `J� AND CONSTRUCTION LTD. 9' 1707 MARKETPLACE BLVD. STE.100 6060 North Central Expressway Phone 469.621.0710 IRVING, TX 75063 Suite 440 214-325-9696 Dallas, Texas 75206 FRN - F-1386 CPN 102721 IPRC20-0082 N / EXISTING PRIMROSE SCALE:1" = 250' CROSSING PHASE 4 / CPN 100534 / O ax 3a 35 O u 39 REMOVE PLUG s If CONNECT TO / WATER 41 is 37 uUNE PRUROSE 1143 30 CROSSING PHASE 2 / t7 74 CPN 02733 14 ta t3 29 � / � 13 t9 tY +6 tY NO t1 / 47 Yt 70 tt b T / +9 to 70 EXISTING 10 +a ° a PRIMROSE CROSSING PHASE 2 CPN 02733 7 / ol ea 57 a 73 a 21 7 74 4 Z? � 9 a 76 Y � so m O t7 Y Y< � st t Ya fY \ s t9 73 2 t REMOVE PLUG & 04 u 4 CONNECT WATER \ 76 a O aQ PRIME)Cs OSOROLINE / \ ee 7° to 00 — PRIMROSE CROSSING PHASE 2 CPN 02733 a, tt FUTURE PRIMROSE / w tY tcts�"pp0 CROSSING PHASE 6 t �/ CPN 102851 O ,z. \ \ REMOVE PLUG /Y \) CONNECT TO D WNo WATER LINE W. RENDER ROAD LEGEND INSTALL END AND PLUG PROPOSED WATER LINE \ 3 EXISTING WATER LINE a LIMITS OF � m PROJECT WATER EXHIBIT 'A' PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE INDICATED PRIMROSE CROSSING PHASE 5 o CPN 102721 OWNER/DEVELOPER IPRC20-0082 LENNAR HOMES OF TEXAS LAND LJA Engineering, Ina `,A x AND CONSTRUCTION LTD. 6060 North Central Expressway Phone 469.621.0710 N 1707 MARKETPLACE BLVD. STE.100 IRVING, TX 75063 Suite 440 v- 214-325-9696 Dallas, Texas 75206 FRN - F-1386 CPN 102721 IPRC20-0082 EXISTING �7 PRIMROSE lr CROSSING PHASE 4 C 10 SEWER OFFSITE TEE / CPN 100534 SCALE:1" = 250' SIwRARY SEWER aK35 \ 30 37 x a // 40 +9 3+ / 41 3, a0 REMOVE PLUG&CONNECT / 17 t4 ffi 4a TO EX61 SEWER LINE 44 +s to CPN 101482 OFFSRE / is t9 +Y SANRARY SEWER40 49 +Y m +t / 47 70 21 70 +t ffi 49 79 tS +0 16 • 24 EXISTING / A. 9 +s 7 1 PRIMROSE / 94 +t 7 79 a 29 CROSSING PHASE 2 5 — CPN 02733 9 +a 9 Yt Ze 7 +4 4 4 O ffi , +9 a m �\ °9 � ° 76 a Ys � ao 00 +0 O4 77 1 at \ \ 11 a +9 t 0 EX 8'SEWER LME 6X \ 92 tY 4 +9 +a sa� 74 9 4 a Y ii t 9 +9 ° +0 0 � +1 +2 ROMP FUTURE PRIMROSE O CROSSING PHASE 6 X CPN 102851 \ REMOVE PLUG &CONNECT TO EXISRNG SEWER LINE SANRRAY SEWER CPN 02733 PHASE 2 STUBOUT 3 o% LEGEND PROPOSED SANITARY SEWER SEWER EXHIBIT 'Al ' z- EXISTING SANITARY SEWER PRIMROSE CROSSING PHASE 5 LIMITS OF PROJECT — — CPN 102721 IPRC20-0082 OWNER/DEVELOPER 1A o LENNAR HOMES OF TEXAS LAND WA Engineering, Inc. a AND CONSTRUCTION LTD. N 1707 MARKETPLACE BLVD. STE.100 6060 North Central Expressway Phone 469.621.0710 IRVING, TX 75063 Suite 440 E z 214-325-9696 Dallas, Texas 75206 FRN - F-1386 CPN 102721 IPRC20-0082 O - EXISTING N PRIMROSE O � m` CROSSING SCALE:1" = 250' PHASE 4 37 34 CPN 100534 O az�� ao / / 47 +s 403 u +e +a ffi � +a +e +z / +z zo ++ O 4701 4+ +0 � 74 ++ +0 z, / EXISTING 00 +o +s ° PRIMROSE O ffi 67 a 77 - ° 7 m CROSSING PHASE 2 a ze CPN 02733 D s +3 Oa z+ O zs 7 +4 4 ffi � a ze \ O • Os +e a 1 23 130 00 70 � 77 2 e+ 6X 14 ez \ +zO z +e +3 �� + 4 a 4 1 1s � 7 ae � s ee +e ° ++O tz ,coW O +a FUTURE PRIMROSE CROSSING PHASE 6 CPN 102851 LEGEND PROPOSED ROADWAY/5O'ROWROW 6" THICKNESS PROPOSED 5' SIDEWALK (BY DEVELOPER) PROPOSED 5' SIDEWALK ---- (BY HOMEBUILDER) ------ PROPO SED P R)RAMPS O PAVING EXHIBIT ' B ' LIMITS of PROJECT --- PRIMROSE CROSSING PHASE 5 CPN 102721 O o OWNER/DEVELOPER IPRC20-00821A LENNAR HOMES OF TEXAS LAND WA Engineering, Inc. AND CONSTRUCTION LTD. 6060 North Central Expressway Phone 469.621.0710 1707 MARKETPLACE BLVD. STE.100 Suite 440 z IRVING, TX 75063 214-325-9696 Dallas, Texas 75206 FRN - F-1386 v� CPN 102721 IPRC20-0082 REDONE Pip& EXISTING CONNECT M DWN0 PRIMROSE N PRUMM LNG — CROSSING , PRaE 4 CPN 10OW4 PHASE 4 CPN 100534 Oax / SCALE:1" = 250' m D 3+ 2 +8 4 30 +7 +4 20 43 44 +8 +3 Y �8 +3 +9 +2 +2 20 +1 / 47 11 2+ 10 i� 74 ffi � 49 76 70 EXISTING ao � PRIMROSE CROSSING PHASE 2 7 7° ° O CPN 02733 72 9 m n � 6 01 9 ,a as7 14 22 14 4 av �8 +8 3 4 +7 2 24 � a+ 1 ffi aK — \ 62 72 2 +9 �� +s 3 2 + 8 64 Q� is 0 00 ea 9 s +2 ,tow \ m +3 P�Q RENCVE MJ It STOFUTURE PRIMROSE � EwwsnNRISNf,�R R CROSSING PHASE 6 CPN 102851 o, LEGEND N PROPOSED STORM DRAIN LINE o PROPOSED INLET STORM DRAIN EXHIBIT ' B 1 ' z EXISTING INLET & STORM DRAIN LINE PRIMROSE CROSSING PHASE 5 LIMITS OF PROJECT CPN 102721 OWNER/DEVELOPER IPRC20-0082 LENNAR HOMES OF TEXAS LAND WA Engineering, Inc. `A a x AND CONSTRUCTION LTD. 6060 North Central Expressway Phone 469.621.0710 1707 MARKETPLACE BLVD. STE.100 IRVING, TX 75063 Suite 440 vs 214-325-9696 Dallas, Texas 75206 FRN - F-1386 CPN 102721 IPRC20-0082 EXISTING PRIMROSE �7 CROSSING lr O % PHASE 4 CPN 100534 SCALE:1" = 250' 33 39 j +0 70 31 / 47 1a / 17 14 29 ss 1e� 1s 39 / „ u 19 u 12 zo 11 / 47 4e „ 70 �O 2 z 10 • e0 9 ?aO 19 1e 87 9 17 a z~ 25 / 7 / s< 11 7 1f 0 as zo EXISTING 12 ` O " PRIMROSE +s a 21 CROSSING 0e 7 „ • PHASE 2 e ,a 3 � 3 3 CPN 02733 2 \ so 10 4 77 ® 31 1z\ a 2 19 13 63 74 ' 4 a 2 + K e 1a 7 ea e 16 9 '\ ae . 10 Q 11 1z �� a 13 FUTURE PRIMROSE CROSSING PHASE 6 CPN 102851 3 LEGEND STREET LIGHTS & SIGNS PROPOSED SINGLE STREET LIGHT EXHIBIT ' C ' LIMITS OF PROJECT PRIMROSE CROSSING PHASE 5 �o PROPOSED STREET SIGN A CPN 102721 IPRC20-0082 a o OWNER/DEVELOPER LENNAR HOMES OF TEXAS LAND WA Engineering, Inc. a AND CONSTRUCTION LTD. 6060 North Central Expressway Phone 469.621.0710 1707 MARKETPLACE BLVD. STE.100 Suite 440 IRVING, TX 75063 Dallas, Texas 75206 FRN - F-1386 214-325-9696 CPN 102721 IPRC20-0082