HomeMy WebLinkAboutContract 52790-A1 AMENDMENT NO. 1 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Police Department Property/Evidence Room & Fire Department Arson Unit Area Build Out at Bob Bolen Public Safety Complex STATE OF TEXAS 52790-A1 CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Elements of Architecture, Inc., (Consultant) made and entered into City Secretary Contract No. 52790 (The Contract) which was administratively executed the 16th day of September, 2019, for Police Department Property/Evidence Room & Fire Department Arson Unit Area Build Out at Bob Bolen Public Safety Complex— Schematic Design Phase Services; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement to complete the balance of the original professional services proposal for Design Development, Construction Document, and Construction Administration Phases. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional design services for the design and detailing of Build Out Area in the existing Bob Bolen PSC. The cost of this additional service is $177,150.00 plus $5,400.00 in reimbursable expenses. The scope of services is described more fully in Elements of Architecture, Inc.` s letter dated September 22, 2020 (Revised October 16, 2020), subject: "Proposal for A/E Services, Amendment #01 to Existing Contract, Bob Bolen — Police and Fire Evidence and Storage Room". 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "C". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "C". However the total fee paid by the City shall not exceed a total of $217,550.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX CFW Std.Agreement for Prof.Services AMENDMENT(Rev.20 Mar 2020) Page 1 of 2 Police&Fire Departments—Build Out at B.Bolen PSC—Amendment No. 1 October 2020 Executed effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and bay gWy&6� administration of this contract, including By: Dana Burghdoff( v2,2D 1:29 CST) ensuring all performance and reporting Name: Dana Burghdoff, AICP requirements. Title: Assistant City Manager Date: Nov 2, 2020 Approval Recommended: Name: Brian Glass Title: Architectural Services Manager .'&elz Approved as to Form and Legality: By: Steve Cooke(Oct 21,2020 14:52 CDT) Name: Steve Cooke Title: Director, Property Management Dept. t p{� dp4Upq qa�FORT �d By: p JB Strong(Nov 1, 02015:SS CST) Attest: �°°°° ro o°dd Name: John B. Strong ono o�id Title: Assistant City Attorney EX0000-0000. Contract Authorization: September 1, 2020 Il4dd44 By: M&C: M&C 20-0626 Name: Mary J. Kayser HB 1295: 2020-618082 Title: City Secretary VENDOR: Elements of Architecture, Inc. V By: Name: Debbie Fulwiler, AIA Title: President Date: Oct 21, 2020 OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX CFW Std.Agreement for Prof.Services AMENDMENT(Rev.20 Mar 2020) Page 2 of 2 Police&Fire Departments—Build Out at B.Bolen PSC—Amendment No. 1 October 2020 ELEMENTS of Architecture, Inc. September 22, 2020 Revised October 16, 2020 Mr.Alfonso Meza City of Fort Worth 401 West 13th Street Fort Worth,TX 76102 Re: Proposal for A/E Services Amendment#01 to Existing Contract Bob Bolen Renovations — Police and Fire Evidence and Storage Rooms Dear Alfonso; Elements is pleased to provide to you this proposal for services associated with the renovations to the existing facility in support of the new Police and Fire Evidence Rooms to be located within the existing Bob Bolen Facility. This proposal is based on the SD phase completed and the scope determined which includes the plans attached. We anticipate the scope of services for this project is as follows: SCOPE OF SERVICES DD/CD Phase 1. From approval of the SD Phase, develop construction documents for a bid set. 2. Update the Opinion of Probable Construction Costs. 3. Submit construction documents for review only. 4. Modify documents as required per City review. 5. Final Construction Documents and provide to the city for distribution. 6. Submit documents for TDLR review. 7. Submit documents for permitting to the city and coordinate this effort through receipt of building permit for general construction. Construction Administration Phase 1. Assistance with bidding of the project to include: a. A Pre-Bid Meeting b. Issue of any addenda to address comments c. Assistance with review and recommendation of bidders 2. Bi-weekly OAC meetings via virtual meetings during construction with an assumption of 8 months of construction for a total of 16 meetings. To review pay apps,we have assumed that one meeting a month will be on site for review of site conditions. 3. Respond to any RFI's for clarification to the documents. 4. Review of Shop drawings and other submittals as stipulated in the construction documents. Page 1 of 3 Elements of Architecture, Inc. 1 1201 6'Avenue,Suite 100, Fort Worth,Texas 76104 1 817.333.2880 5. Punchlist of space to review conditions and generate a list of deficiencies to design intent. 6. Prepare record documents from as-built documents. Exclusions and Qualifications to This Proposal: 1. We have also assumed that the existing facility is already TAS compliant and no modifications outside of our defined area of work is included or anticipated. We will address the accessible path as it relates to this project. 2. Proposals for each consultant are attached with the information included as if provided within this proposal. 3. We are assuming that civil engineering is not required for this project and not included within our fee proposal. 4. Documents will be prepared using AutoCAD. 5. Both project areas (police and fire)will be as one set of documents and not divided into phases with one GC selected for the project. PROPOSED FEE Labor We propose to provide our services as identified in this proposal on an hourly basis with the not to exceed amounts as follows: DD/CD Phase Architectural $ 69,400.00 Structural Engineering $ 12,000.00 MEP Engineering $ 44,250.00 Total DD/CD Phase $125,650.00 Construction Administration Phase Architectural $ 29,250.00 Structural Engineering $ 3,500.00 MEP Engineering $ 18,750.00 Total CA Phase $ 51,500.00 Project Total Labor $177,150.00 Expenses Reimbursable expenses are in addition to the labor fees listed above and include costs incurred as required for the project such as TDLR submittal, Permit application, printing costs, etc. Expenses are estimated at$5,400. These will be invoiced based on costs incurred with a 10% markup for processing. For a summary of the contract amounts see below: Original Contract Amendment#01 Total New Contracted Amounts Amounts Amounts (SD Phase - (this proposal DD-CA (matches original Completed) Phases) proposal fees) Labor 33,900.00 177,150.00 21 1,050.00 Reimb Expenses 1,100.00 5,400.00 6,500.00 TOTAL 35,000.00 182,550.00 217,550.00 If you have any questions or need to discuss, please call me. Thank you for this opportunity to provide our services to you and we look forward to working with you on this project. Sincerely, Debbie Fulwiler,AIA President Attachments: Approval Layout from SD Phase Wv € oga�oF Cam. N 0 N O m w a1 Q > �_LL 00 Vr a i - -------------------- ------- I I I - = I I I I I i �= i i i --- ———— -— — - ---�-- ------------�j -- i LL ; I ; I I i i I I i I i i i i i i I I I I I I I I I I I I I I - L I I I I I I I i w i - I i i I i ; i p Q ❑ o - - -- - -- 49--------- I I - i I 0 i i I Eo ok `C 11/20/2020 M&C Review Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FoRT�� DATE: 9/1/2020 REFERENCE M&C 20- LOG 21 POLICE PROPERTY ROOM & FIRE NO.: 0626 NAME: ARSON UNIT FACILITIES DESIGN CODE: C TYPE: NOW PUBLIC NO CONSENT HEARING: SUBJECT. (CD 9)Authorize Execution of Amendment 1 to the Architectural Services Agreement with Elements of Architecture, Inc., in the Amount of$182,500.00 for a Total Contract Price of $217,550.00, and a Total Project Budget of$3,750,000.00, to Provide Design and Construction Administration Services for the Police Property Room and Fire Arson Unit Facilities RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment 1 to the architectural services agreement with Elements of Architecture, Inc., in the amount of$182,500.00, for a total contract price of$217,550.00, and a total project budget of$3,750,000.00, to provide design and construction administration services for the Police Property Room and Fire Arson Unit facilities. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize the execution of Amendment 1 to the architectural services agreement with Elements of Architects, Inc., in the amount of$182,500.00, for a total contract price of$217,550.00, providing design and construction administration services for the Police Property Room and Fire Arson Unit facilities. These facilities will be located in the unfinished portions of the Bob Bolen Public Safety Complex and will fill current needs of the Police and Fire Departments with a total project budget of$3,750,000.00. A request for Statements of Qualifications (SOQ)was advertised in the Fort Worth Star-Telegram on Thursday, January 17 and January 24, 2019 and The SOQs were due February 14, 2019. The City received eight (8) SOQs from qualified architectural firms. The selection committee included representatives from the Fort Worth Police Department, Office of Business Diversity and the Property Management Department. The firms submitting SOQs were; Elements of Architecture, Inc., Hahnfeld Hoffer Stanford, Komatsu/Rangel, Inc. d/b/a Komatsu Architecture, Quorum Architects, Inc., Randall Scott Architects, Inc., RPGA Design Group, Inc., Schwarz-Hanson Architects. After reviewing the SOQs, the committee met on March 8, 2019 to selected four of the eight firms for interviews based on their rankings in a qualifying matrix. The interviews took place April 16, 2019 and the following is a summary of the results of the interview process: Elements of Komatsu Quorum RPGA Design Interview Scores Architecture Architects Architects, Group, Inc. Inc_F_ - . _F Technical Approach f 36 36 33 33 Design Professional 19 16 15 14 Qualifications Project 19 17 19 18 Management F Fort r orth 10 10 F10 10 Experience 7 MWBE Score 1 9 7 8 8 93 86 85 83 TOTALS apps.cfwnet.org/council_packet/mc_review.asp?I D=28195&councildate=9/l/2020 1/3 11/20/2020 M&C Review Based on this selection, city staff administratively executed an architectural services agreement(City Secretary Contract No. 52790), in the amount of$35,000.00, with Elements of Architecture to initiate a programing and estimating for this project. This Schematic Design Phase has been completed and the project is ready to advance to the final phases of design. Staff recommends that the Mayor and City Council authorize the execution of Amendment 1 to the architectural services agreement with Elements of Architecture, Inc., in the amount of$182,500.00. Estimated Costs: The overall budget for the project is as follows: PROJECT COST Amount Design Contract 1 $217,550.00 Construction Contract (Including Owners Construction $2,862,000.00 Contingency Allowance) Staff Time, Materials Testing, IT, Security, Fixtures $6701450.00 Furnishings and Equipment (FF&E), Contingency, etc. I F Total Project Cost $3,750,000.00 The impact to operating and maintenance cost associated with this project begins in Fiscal Year 2022, and is expected to be $77,000.00 annually. Building Permits - In accordance with the City Code of Ordinances, Part II, Chapter 7-1 Fort Worth Building Administrative Code, Section 109.2.1, Exception 2; "Work by non-City personnel on property under the control of the City of Fort Worth shall be exempt from the permit fees only if the work is for action under a contract that will be or has been approved by City Council with notes in the contract packages stating the fee is waived." M/WBE OFFICE—Compliance with the City's Business Diversity Enterprise (BDE) Ordinance has been achieved by the following method; Elements of Architecture, Inc. is in compliance with the City's BDE Ordinance by committing to 51\% SBE participation on this project. The City's SBE goal on this project is 10\%. Additionally, Elements of Architecture, Inc. is a certified M/WBE firm. The Police Property Room and Fire Arson Unit facilities will be located in the Bob Bolen Public Safety Complex, in COUNCIL DISTRICT 9. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the CCPD Capital Projects for the PD Bob Bolen Property Room Expansion project to support the approval of the above recommendation and amendment to the architectual services agreement. Prior to any expenditure being incurred, the Property Management Department has the responsibility to validate the availability of funds. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2) Submitted for City Manager's Office by_ Dana Burghdoff(8018) Originating Department Head: Steve Cooke (5134) Additional Information Contact: Brian Glass (8088) apps.cfwnet.org/council_packet/mc_review.asp?I D=28195&councildate=9/l/2020 2/3 11/20/2020 M&C Review ATTACHMENTS apps.cfwnet.org/council_packet/mc_review.asp?I D=28195&councildate=9/l/2020 3/3