HomeMy WebLinkAboutContract 49565-CO4 F(3I,-' o�;. City of Fort Worth CSC No.49565-CO4
` f Change Order Request
Project Name:1 Marine Creek Interceptor Improvements,Phase I City Sec No.: 1 49565
Project No.(s): 59607.0700430-CO1783 DOE No. 7214 City Proj.No,;1 02223
Project Description: Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine Creek
Basin beginning from Bowman Roberts Rd./Cromwell Marine Creek Rd.
Contractor William J,Schultz,Inc.dba Circle C Construclion Co. Change Order It Dale: 10/27/2020
City Project Mgr,I Waller Norwood,P.E, City Inspector; I Judy Die
Phone Number: (817)392-5026 Phone Number: (817)392-8452
Dept, Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $1,634,700.00 $1,634,700.00 320
Extras to Date $64,370.00 $64,370.00 0120
Credits to Date
Pending Change Orders(In M&C Process)
Contract Cost to Date $1,699,070.00 $1,699,070.00 440
Arnount of Proposed Change Order $0.00 $0.00 650
Revised Contract Amount $1,699,070.00 $1,699,070.00 1,090
Original Funds Available for Change Orders $81,800.00 $81,800.00
Remaining Funds Available for this CO $17,430.00 $17,430.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 3,94%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,043,375.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change Order No.4 will provide an additional 650 calendar days on the project for the following:
• Delay waiting for Atmos Energy to confirm ownership and adjust conflicting gas mains that were
encountered during construction.
. Extremely wet soil condition from rain events prevented the application of protective manhole coating to
manholes in close proximity to the creek.
Resolution of issues identified from the post construction TV inspection.
• Delay waiting for easements to be acquired to construct segments of the sewer main.
i
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Contractor Signature Date
wllllam J.Schultz.Inc.dba Circlo C Conslrucllon co. Teri SkellyF10/28/20k
ns ector Date Pro ect Manager Date
O
rector(Water Dept)' Date Consl cllon Supervisor(Water Dept) Date
Assistant City Attorney I Date Assistant City Manager Date
t!(A Oct 30,2020 ktnn S<<�/rd�/ of{ Nov 2,2020
Council Action If Required
M&C Number NIA M&C Date Approved A OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
Fo)1,-' V�rL))n iC iyi City of Fort W01111
--- _ - --- C:haiige Order Acid ii:iom
Project Name Marine Creek Interceptor Improvements,Phase I City Sec No.: 49565
Project No.(s): 59607-0700430-CO1783 DOENo.[= City Proj. No.: 02223
Project Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine Creek
Description Basin beginning from Bowman Roberts Rd./Cromwell Marine Creek Rd.
Contractor William J.Schultz. Inc.dba Circle C Construclion Co. Change Order:0 Date: 10/27/2020
City Project Mgr. Walter Norwood, P.E. City Inspector FJUdy Die
ADDITIONS
—I'I"EIVI— ESCRIPTION J DEPT J Oty IUnit Unit Cost I Total
Water
Sewer
Page 2 of 4 Additions Sub Total
FC3aT MVC3NZ-.14 City of Fort Worth
Change Order Deletions
Project Name Marine Creek Interceptor Improvements,Phase I City Sec No.; 1 49565
Project No.(s): 59607-0700430-CO1783 DOE No. 7214 City Proj.No.: 02223
Project Description Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine
Creek Basin beginning from Bowman Roberts Rd./Cromwell Marine Creek Rd.
Contractor William J.Schultz.Inc.dba Circle C Construction Co. Change Order: ® Date 10/27/2020
City Project Mgr. Walter Norwood,P.E. City Inspector; Judy Die
DELETIONS
ITEM DESCRIPT ION DEPT Qty Unit Unit Cost (Total
Water
Sewer
Page 3 of 4 Deletions Sub Total
iAMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
coif DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and adnunistration of this contract, including
ensuring all performance and reporting requirements,
Signature
�)IYAav knllwclo r
Naive of Binployee
Title
pooFOR'
00
a
ATTEST: a�o
d~o
o
o
$ Qo° dd
d�
Y 00oo0000�o a
Mary J. Kayser a ?EXpSoo
City Secretary nnuaa4o
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX