Loading...
HomeMy WebLinkAboutContract 52806-FP1 City Secretary 52806 -FP1 Contract No. FORTWORTH., Date Received Dec 1,2020 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: NORTH CITY ADDITION PHASE I City Project No.: 102049 Improvement Type(s): ® Paving ® Drainage ❑ Street Lights ® Traffic Signals Original Contract Price: $681,050.97 Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: $681,050.97 Camstt,&s tL Dec 1 2020 Carmen Estep(Dec 1,200 08:29 CST) f Contractor Date Office Manager Title Jackson Construction, Ltd Company Name Eg2t2( is Andrade,Tr Dec 1 2020 _ustorgioA drade,Jr(Dec1,202008:51CST) f Project Insp`Q'e or Date vo shPatei,P.E.(Dec1,202009:a48ST) Dec1,2020 Project Manager Date L4aecs-L 4- Dec 1 2020 Laurie Lewis(Dec 1,202012:05 CST) f CFA Manager Date Dana BurAhdaf� Dec i 2020 `anaBurghdoff ec 1,2020 12:27 CST) f Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT.WORTH, TX Notice of Project Completion Project Name: NORTH CITY ADDITION PHASE I City Project No.: 102049 City's Attachments Final Pay Estimate Change Order(s): ❑ Yes ® N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 365 WD Days Charged: 401 Work Start Date: 10/16/2019 Work Complete Date: 11/19/2020 Page 2of2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name NORTH CITY ADDITION PHASE I Contract Limits Project Type STORM DRAIN&PAVING City Project Numbers 102049 DOE Number 2049 Estimate Number 1 Payment Number 1 For Period Ending 11/30/2020 WD City Secretary Contract Number Contract Time 365VD Contract Date Days Charged to Date 401 Project Manager NA Contract is 100.00 Complete Contractor JACKSON CONSTRUCTION LTD 5112 SUN VALLEY DRIVE FORT WORTH, TX 76119 Inspectors OWEN / ANDRADE Monday,November 30,2020 Page 1 of 5 City Project Numbers 102049 DOE Number 2049 Contract Name NORTH CITY ADDITION PHASE I Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 11/30/2020 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 24"RCP CLASS III 63 LF $66.00 $4,158.00 63 $4,158.00 2 20'CURB INLET 1 EA $9,700.00 $9,700.00 1 $9,700.00 Sub-Total of Previous Unit $13,858.00 $13,858.00 PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 4"CONC SIDEWALK 10041 SF $6.00 $60,246.00 10041 $60,246.00 2 BARRIER FREE RAMP 6 EA $2,600.00 $15,600.00 6 $15,600.00 3 6"CONC CURB&GUTTER 1984 LF $2.00 $3,968.00 1984 $3,968.00 4 8"CONC PVMT 2822 SY $57.00 $160,854.00 2822 $160,854.00 5 6"LIME TREATMENT 2822 SY $14.50 $40,919.00 2822 $40,919.00 6 REMOVE CONC CURB&GUTTER 1843 LF $7.00 $12,901.00 1843 $12,901.00 7 REMOVE 20'CURB INLET 1 EA $5,000.00 $5,000.00 1 $5,000.00 8 SEEDING,HYDROMULCH 2910 SY $1.00 $2,910.00 2910 $2,910.00 9 TOPSOIL 485 CY $15.00 $7,275.00 485 $7,275.00 10 BLOCK SOD PLACEMENT 900 SY $7.00 $6,300.00 900 $6,300.00 11 4"SLD PVMT MARKING HAS 1104 LF $1.50 $1,656.00 1104 $1,656.00 12 12"SLD PVMT MARKING HAE 710 LF $6.00 $4,260.00 710 $4,260.00 13 24"SLD PVMT MARKING HAE 211 LF $8.00 $1,688.00 211 $1,688.00 14 REMOVE 12"PVMT MARKING 449 LF $2.00 $898.00 449 $898.00 15 REMOVE 24"PVMT MARKING 118 LF $2.00 $236.00 118 $236.00 Sub-Total of Previous Unit $324,711.00 $324,711.00 TRAFFIC SIGNALS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 FURNISH/INSTALL CONDUITE SCH 80 PVC 3 115 LF $25.81 $2,968.15 115 $2,968.15 2 FURNISHANSTALL CONDUITM SCH 80 PVC 3 485 LF $51.62 $25,035.70 485 $25,035.70 3 3-SECT SIGNAL HEAD ASSEMBLY 15 EA $1,792.46 $26,886.90 15 $26,886.90 4 5-SECT SIGNAL HEAD ASSEMBLY 3 EA $2,724.54 $8,173.62 3 $8,173.62 Monday,November 30,2020 Page 2 of 5 City Project Numbers 102049 DOE Number 2049 Contract Name NORTH CITY ADDITION PHASE I Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 11/30/2020 Project Funding 5 PED SIGNAL HEAD ASSEMBLY 8 EA $932.08 $7,456.64 8 $7,456.64 6 AUDIBLEPEDESTRAINPUSHBUTTON 8 EA $1,433.97 $11,471.76 8 $11,471.76 7 FURNISHANSTALL HYBRID DETECTION 4 AP $10,324.58 $41,298.32 4 $41,298.32 SYSTEM 8 FURNISH/INSTALL HYBRID DETECTION 1059 LF $8.60 $9,107.40 1059 $9,107.40 CABLE 9 FURNISHANSTALL MODEL 711 PREEMPTION 4 EA $1,720.76 $6,883.04 4 $6,883.04 DETECTOR 10 FURNISH/INSTALL PREEMPTION CABLE 1042 LF $7.17 $7,471.14 1042 $7,471.14 11 4/C 14 AWG MULTI CONDUCTOR CABLE 80 LF $2.51 $200.80 80 $200.80 12 5/C 14 AWG MULTI CONDUCTOR CABLE 1026 LF $3.58 $3,673.08 1026 $3,673.08 13 7/C 14 AWG MULTI CONDUCTOR CABLE 42 LF $4.30 $180.60 42 $180.60 14 20/C 14 AWG MULTI CONDUCTOR CABLE 820 LF $9.32 $7,642.40 820 $7,642.40 15 3/C 14 AWG MULTI CONDUCTOR CABLE 1640 LF $3.58 $5,871.20 1640 $5,871.20 16 NO 8 INSULATED ELEC CONDR 850 LF $2.87 $2,439.50 850 $2,439.50 17 NO 8 BARE ELEC CONDR 690 LF $2.51 $1,731.90 690 $1,731.90 18 GROUND BOX TYPE D,W/APRON 2 EA $1,720.76 $3,441.52 2 $3,441.52 19 INSTALL 10'-14'PED POLE ASSEMBLY 5 EA $2,867.94 $14,339.70 5 $14,339.70 20 FURNISH/INSTALL TYPE43 SIGNAL POLE 1 EA $12,188.74 $12,188.74 1 $12,188.74 21 FURNISH/INSTALL TYPE 45 SIGNAL POLE 3 EA $21,509.54 $64,528.62 3 $64,528.62 22 FURNISHANSTALL MAST ARM 40'-48' 1 EA $5,735.88 $5,735.88 1 $5,735.88 23 FURNISH/INSTALL MAST ARM 52'-60' 3 EA $17,207.63 $51,622.89 3 $51,622.89 24 TY 1 SIGNAL FOUNDATION 5 EA $358.49 $1,792.45 5 $1,792.45 25 TY 4 SIGNAL FOUNDATION 1 EA $573.59 $573.59 1 $573.59 26 TY 5 SIGNAL FOUNDATION 3 EA $716.98 $2,150.94 3 $2,150.94 27 DISPOSE OF POLE AND MAST ARM ASSEMBLY 4 EA $2,150.95 $8,603.80 4 $8,603.80 28 FURNISHANSTALL ALUM SIGN MAST ARM 4 EA $860.38 $3,441.52 4 $3,441.52 MOUNT 29 INSTALL ALUM SIGN MAST ARM MOUNT 1 EA $179.25 $179.25 1 $179.25 30 CATS ETHERNET CABLE 210 LF $8.60 $1,806.00 210 $1,806.00 31 PTZ CAMERA 1 EA $3,584.92 $3,584.92 1 $3,584.92 -------------------------------------- Sub-Total of Previous Unit $342,481.97 $342,481.97 -------------------------------------- Monday,November 30,2020 Page 3 of 5 City Project Numbers 102049 DOE Number 2049 Contract Name NORTH CITY ADDITION PHASE I Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 11/30/2020 Project Funding Contract Information Summary Original Contract Amount $681,050.97 Change Orders Total Contract Price $681,050.97 Total Cost of Work Completed $681,050.97 Less %Retained $0.00 Net Earned $681,050.97 Earned This Period $681,050.97 Retainage This Period $0.00 Less Liquidated Damages Days @ /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $681,050.97 Monday,November 30,2020 Page 4 of 5 City Project Numbers 102049 DOE Number 2049 Contract Name NORTH CITY ADDITION PHASE I Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 11/30/2020 Project Funding Project Manager NA City Secretary Contract Number Inspectors OWEN / ANDRADE Contract Date Contractor JACKSON CONSTRUCTION LTD Contract Time 365 WD 5112 SUN VALLEY DRIVE Days Charged to Date 401 WD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded -------------------------------------- Total Cost of Work Completed $681,050.97 Less %Retained $0.00 Net Earned $681,050.97 Earned This Period $681,050.97 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $681,050.97 Monday,November 30,2020 Page 5 of 5 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS November 19, 2020 Jackson Construction, Ltd 5112 Sun Valley Drive. Fort Worth,Texas 76119 RE: Acceptance Letter Project Name: North City Addition, Lots 1 thru 8, Block 1 Project Type: Paving,Storm, and Traffic Signals City Project No.: 102049 To Whom It May Concern: On November 19, 2020 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on November 19, 2020,which is the date of the final inspection and will extend of two(2)years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 647-2524. Sincerely, YAefh &te� YYo sh Patel,P.E.(Dec 1,2020 09:48 CST) Yogesh Patel, P.E., Project Manager Cc: Eustorgio Andrade,Jr., Inspector Mark Owen, Inspection Supervisor Edwin Rodriguez,Sr., Senior Inspector Victor V.Tornero,Jr., P.E., Program Manager Winkelmann &Associates, Inc.,Consultant Jackson Construction, Ltd., Contractor Steve Mckeever NTP, LP, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev.08/20/19 CONSTRUCTION LTD. 51 1 Z SUN VALLEY DRIVE FORT WORTH,TX 76119 TEL: 817-572-3303 FAX:817-478-0443 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Troy L. Jackson, President Of Jackson Construction, Ltd, known to me to be a credible person, who being by me duly sworn,upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; North City Addition PH 1 BY >i Troy L ackson, President Subscribed and sworn before me on this date 30th of November, 2020. Not lic Tarrant, Texas � ,� CARMEN L. ESTEP 2a.►�:..,. Notary Public,State of Texas - Comm.Expires 04-06-2024 '�.;tooF% Notary ID 2910611 11 CONSENT OF SURETY OWNIM ❑ TO FINAL PAYMENT ARCHITECT 0 Su.RMY Bond No. 1074801 C3THFR C) TO OVISIBEL. ARCHITI crs PROJECT No.: 102049/CFA 19-0035 INamrarxda&bM) City of Fort Worth/NTP35, LP C"'O'NTRACf FO&Water,Sanitary Sewer,Drainage,Paving and Traffic Signals PROJECT- CONTRACT i./A,TM, 0&,trrrruvd ad&wo North City Addition Phase I In accordance witb the provisions of the Contract between die Owner SPA the Contractor as indicated atxwe,the thin Y nwrre.atsd awivn fSr+r ts) The Hanover Insurance Company 440 Lincoln Street Worcester, MA 01653 SURF.Ty' on bond of jdns�xr rrasn�attrl tsaicfr��.s ct/'Gorssraetrr) Jackson Construction, Ltd. 5112 Sun Valley Drive Fort Worth,TX 76119 CONTRACTOR, hereby approves of the final payment to the Contracmr,and agrees that final payment to the Contractor shalt not relies the Surety of any of Im obligations to 011wrfmameaudaddms4fCrwn ) City of Fort Worth/NTP35, LP as set forth in said Surety's b rKL IN WITNESS WH1~REOrF,the Surety has hereun€o set its hand on d-is date: November 23, 2020 (dtr P!fir dtD9fdx the 1)W1)tbJW1C 'ed 41-9x nmama'kdaxeaxrrf r¢ar d The Hanover Insurance Company {�Zrxt+tY) BY; r- (S`{�frrmrsrofurNhex�+xad rxpxrraenrarirr} Attest: (Se$l): �a/Le Teuta Luri Attorney-in-Fact Shend Sharani, Witness �Px7tNederraxrrettxn]ditlrx Surety Phone No. 508-853-7200 x-4476 THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA POWER OF ATTORNEY THIS Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated. KNOW ALL PERSONS BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY,both being corporations organized and existing underthe laws of the State of New Hampshire,and CITIZENS INSURANCE COMPANY OF AMERICA,a corporation organized and existing under the laws of the State of Michigan,(hereinafter individually and collectively the"Company")does hereby constitute and appoint, Steven R.Foster,Jack M.Crowley,Laurie Pflug,and Teuta Luri Of Willis Towers Watson Insurance Services West,Inc of Dallas,TX each individually,if there be more than one named,as its true and lawful attorney(s)-in- fact to sign,execute,seat,acknowledge and deliver for,and on its behalf,and as its act and deed any place within the United States,any and all surety bonds, recognizances,undertakings,or other surety obligations.The execution of such surety bonds,recognizances,undertakings or surety obligations,in pursuance of these presents,shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company,in their own proper persons.Provided however,that this power of attorney limits the acts of those named herein;and they have no authority to bind the Company except in the manner stated and to the extent of any limitation stated below: Any such obligations in the United States,not to exceed Thirty Five Million and No/100($35,000,000)in any single instance That this power is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company,and said Resolutions remain in full force and effect: RESOLVED: That the President or any Vice President,in conjunction with any Vice President,be and they hereby are authorized and empowered to appoint Attorneys-in-fact of the Company,in its name and as it acts,to execute and acknowledge for and on its behalf as surety,any and all bonds, recognizances,contracts of indemnity,waivers of citation and all otherwritings obligatory in the nature thereof,with powerto attach thereto the seal ofthe Company. Any such writings so executed by such Attorneys-in-fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons. RESOLVED:That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto,granted and executed by the President or Vice President in conjunction with any Vice President of the Company,shall be binding on the Company tothe same extent as if all signatures therein were manually affixed,even though one or more of any such signatures thereon may be facsimile.(Adopted October 7,1981— The Hanover Insurance Company;Adopted April 14,1982—Massachusetts Bay Insurance Company;Adopted September 7,2001—Citizens Insurance Company of America and affirmed by each Company on March 24,2014) IN WITNESS WHEREOF,THE HANOVER INSURANCE COMPANY,MASSACHUSETTS BAY INSURANCE COMPANYand CITIZENS INSURANCE COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals,duly attested by two Vice Presidents,this 10th day of January,2020. THE HANOVER INS E COMPANY T►dE:HANQWR INSURANCE COMPANY MASSAS'HUSEM. Y RANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS Ins 33A E A NY Of AMERICA GIT(ZENS INSUURANCE COMPANY OF AMERICA f3rya€�J V Prel"OtInt J H Kawjacks.VAice President N_ f� 07', THE COMMONWEALTH OF MASSACHUSETTS ) COUNTY OF WORCESTER )ss. On this 101h day of January, 2020 before me came the above named Executive Vice President and Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America,to me personally known to be the individuals and officers described herein, and acknowledged that the seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company,Massachusetts Bay Insurance Company and Citizens Insurance Company of America, respectively,and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said instrument by the authority and direction of said Corporations. a"CA ARLEEN V. S"IMONS i7.kl Motary Pub3cc 1 COMMO l W&TH Of AtAWACIMETr5 im *, iXS k' My commission ExFirvs A een`' -Son t�far etc June ts,zoa #sty Commis5iJon Expires Jane 16,20,23 1,the undersigned Vice President of The Hanover Insurance Company,Massachusetts Bay Insurance Company and Citizens insurance Company of America, hereby certify that the above and foregoing is a full,true and correct copy of the Original Power of Attorney issued by said Companies,and do hereby further certify that the said Powers of Attorney are sail in force and effect. GIVEN under my hand and the seals of said Companies,at Worcester,Massachusetts,this 23rd day of November 2020 CERTIFIED COPY THE HANOVER WSURAHCK COMPANY M t;HUSETTS SAY JN URTsf CE C A*Y z�Ns taysr�x��VyarauAtrr of A:MFRtL:A Garnsx.A.Bm.y3,,:...