HomeMy WebLinkAboutOrdinance 24567-12-2020 ORDINANCE NO. 24567-12-2020
AN ORDINANCE ADOPTING A WATER MAIN
CAPACITY CHARGE PURSUANT TO SECTION 35-90 OF
THE CITY CODE FOR CITY INITIATED 24-INCH
WESTSIDE V WATER TRANSMISSION MAIN
("WESTSIDE V—PART 2—24& 16-INCH WATER MAIN"),
LOCATED AT 1129 FM 3325; MAKING THIS
ORDINANCE CUMULATIVE OF OTHER ORDINANCES;
REPEALING ALL ORDINANCES IN CONFLICT
HEREWITH; PROVIDING A SAVINGS CLAUSE; AND
PROVIDING AN EFFECTIVE DATE.
WHEREAS, Chapter 35 of the City Code, "Water and Sewers", Article III,
Division 4 entitled "Water Main Capacity Charges" provides for the adoption of Water
Main Capacity charges by City Council to allow for developers and the City to recover cost
incurred from installing water mains offsite of their development and to set forth the
method and procedures for assessing reimbursements from subsequent developers wishing
to connect to the offsite water mains; and
WHEREAS,the City of Fort Worth Water Department is constructing a water 24-
inch water main under the"Westside V—Part 2—24& 16-inch Water Main"project(CPN-
100378)located at 1129 FM 3325.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF
THE CITY OF FORT WORTH,TEXAS:
SECTION 1.
The City Council finds, in accordance with the Code of the City of Fort Worth as
amended (1986), Chapter 35 "Water and Sewers", Article III, Division 4, Sections 35-87
through 35-93, that the City has initiated construction of a 24-inch water main as part of
the project to construct the Westside V elevated storage tank located at 1129 FM 3325.
SECTION 2.
The City Council finds that$3,988,501.29 is the cost to construct the City initiated
24-inch diameter water transmission main. Therefore, $312,578.47 per MGD is the Water
Main Capacity charge to be assessed if the plat meets the definition of "Other
Development"as defined in Section 35-88 of the City Code.The City Council further finds
that the Water Main Capacity charge has been calculated in accordance with the
requirements of the Water Main Capacity Charge Policy. This water main capacity charge
will be reimbursed to the City of Fort Worth Water Department.
SECTION 3.
The City Council also hereby directs the City of Fort Water Department to review the plats
that are located in or around the boundary area as described in Exhibit"A"to determine if
a charge for reimbursement will be assessed in accordance with Section 35-93.
SECTION 4.
This ordinance shall be cumulative of all provisions of ordinances and of the Code
of the City of Fort Worth, Texas (1986), as amended, except where the provisions of this
ordinance are in direct conflict with the provisions of such ordinances and such Code, in
which event conflicting provisions of such ordinances and such Code are hereby repealed.
SECTION 5.
It is hereby declared to be the intention of the City Council that the sections,
paragraphs, sentences, clauses and phrases of this ordinance are severable, and, if any
phrase, clause, sentence, paragraph or section of this ordinance shall be declared
unconstitutional by the valid judgment or decree of any court of competent jurisdiction,
such unconstitutionality shall not affect any of the remaining phrases, clauses, sentences,
paragraphs and sections of this ordinance, since the same would have been enacted by the
City Council without the incorporation in this ordinance of any such unconstitutional
phrase, clause, sentence, paragraph or section.
SECTION 6.
This ordinance shall be effective upon adoption.
APPROVED AS TO FORM AND LEGALITY:
141 �0��0l1GfG� C7011�' 1
Christa R.Lopez-Reynolds(Dec 3,20 10: T) 'for Ronald P.Gonzales(Dec 3,202010:49 CST)
Christa R. Lopez-Reynolds Mary J. Kayser
Sr. Assistant City Attorney City Secretary
4F..FO!Q
ADOPTED & EFFECTIVE: December 1, 2020
•S
w m 3
WESTWIND �m➢O o �n METq Q•N_o _ v Sq w
O
~h / i -t 2 m CORON_A_ 2
` =WHITE SETTLEMENT m F
�IZ �p
t S� w
CHISHOLM HI-L•S
WHITE�SETTLEMENT
JOHN CH IS J
HOLM SYLVAN:V OJ
�AL•LEy =
I
I
Water Main Capacity
Charge Boundary
m
.------
w �
I I
'STAGY
I
r
2w i
,
CH i p fJ�
py �
ko
S 24-inch Water Line F°9c A2w P1/ 46 P. ,G �6.
VALLEY Extension
_ o Pm. OLD WEATHERFORD
;!. --
m
pl N a # P.
O.1 N Ci V °
?0.'47B d b e
6 t a
�� 0 e 0
Q ..TRAILER.,— REST 20 SERV a
AREAS ICE 36.
20 20 16" ''
Uj
,q ',MUIRFIELD S W `# a a
ti�y� PI z m yC+y 30`30.
;� i 3p } y}I NearMap
9/23/2020 Exhibit A FORT WORTH
COPYHIDUHT CT ON CITY IO FORTVIOLATION TH CWaterr�Maijn Capacity Charge
UNAUTHORIZED BEUSEDFORAISAPHIALPEPR SEWATION LAWS. WSJ Elevated Storage Tank 24-Inch
THIS DATA IS TOBEOT TO FORA ENIUSED AS
PRODUCE FOR
THE ACCURACY 5 NOT TO BE TAKEN/USED AE DATA PRODUCED FOR WATER /A
ENGINEERING PURPOSES OR B Y A REG IST^RED PROFESSIONAL LAND
SURVEYOR,THE CfTY OF FORT WORTH ASSUMES NO RESPONSIBILITY
FOR THE ACCURACY OF SAID DATA, 600 1.600 3,200
Feet
City of Fort Worth,Texas
Mayor and Council Communication
DATE: 12/01/20 M&C FILE NUMBER: M&C 20-0904
LOG NAME: 60WS5 EST 24-INCH WMCC
SUBJECT
(CD 3 and ETJ)Adopt Ordinance to Establish a Water Main Capacity Charge in the Amount of$312,578.47 per Million Gallons per Day for the
Westside V Elevated Storage Tank 24-Inch Water Transmission Main,Pursuant to Chapter 35,Article III,Division IV,Sections 35-90 through 35-92
of the City Code
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached ordinance to establish the water main capacity charge for the Westside V elevated storage tank 24-inch water
transmission main in accordance with Chapter 35,Water and Sewer,Article III, Division IV,Section 35-90 through 35-92 of the City Code;
and
2. Establish the boundary area for the water main to allow the Water Department to assess a reimbursement for the City pursuant to Section
35-93(c).
DISCUSSION:
This Mayor and Council Communication(M&C)is to authorize the establishment of a water main capacity charge for 24-inch water transmission
main(City Project No.100378)constructed in conjunction with the Westside V elevated storage tank project(M&C C-29015). This water line will
serve surrounding areas within the City of Fort Worth Westside V pressure plane.
The qualified costs used to establish this per acre charge are outlined below:
Design Costs $358,796.50
Easement Costs $1,074,195.04
Construction Costs $2,555,509.75
Total $3,988,501.29
The water main capacity charge for the 24-inch water transmission main is$312,578.47 per million gallons per day(MGD)in accordance with City
Code Section 35-92. This amount will be reimbursed to the City of Fort Worth Water Department. There is no restriction to the time period for the
reimbursement to the Fort Worth Water Department.
The boundary area,as shown in Exhibit A,is determined for the purpose of assessment review. The boundary is used as a guideline,not as a
definitive boundary for service area due to the possibility of varying lot sizes that may be proposed. If a plat meets the definition of other
development stated in the water main capacity charge policy,then the plat will be assessed the water main capacity charge even though the plat
may be located adjacent to,within,and/or outside the boundary area. The adoption of this charge is in accordance with Chapter 35,Water and
Sewer,Division IV,Water Main Capacity Charges.
The water main capacity charge boundary is located in the City's Extraterritorial Jurisdiction and Council District 3.
A Form 1295 is not required because:This M&C does not request approval of a contract with a business entity.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendation and establishment of the charge,funds will be deposited into
the Water&Sewer Fund. The Water Department(and Financial Management Services)is responsible for the collection and deposit of funds due
to the City.
Submitted for City Manager's Office by: Dana Burghdoff 8018
Originating Business Unit Head: Chris Harder 5020
Additional Information Contact: Wade Goodman 7139
Matt Kusnir 8219