Loading...
HomeMy WebLinkAboutContract 39090-A3 r cmr SECRETARY AMENDMENT No.3 CONYMM� TO CITY SECRETARY CONTRACT WHEREAiS, the City of Fort Worth (CITY) and Freese and Nichols, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 39090, (the CONTRACT) which was authorized by M&C C-23714 on the 11t' day of August, 2009 in the amount of $840,000 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $49,550. 00 which was administratively authorized on April 5, 2012, Amendment No. 2 in the amount of $343,881 . 00 which was authorized by M&C C-26437 on July 24, 2012 ; and WHEREAS, the CONTRACT involves engineering services for the following project: Design of Eastside Pump Station and general construction representation for fifty-four inch Eastside II Water Main; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 24, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $262,582 . 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and be an amount of $1,4 9 6, 013 . 0 0 . OFFICIAL RECORD CITY SECRETARY Page _IT."W",TX ECEl V E® t t!°t 2 2011 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER / FREESE AND NICHOLS, INC. Fernando Costa Thomas Haster, P.E. Assistant City Manager Principal DATE: /„� DATE: � 12,4 3 APPR RECOMMENDED: S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: C-26437 q 6 a Date: 9/17/2013 Douglas W. Black Assistant City Attorney ATTEST: ®� F®►/Q,, V °;0 ry J. serer City Secretary ACAS OFFjCjgt RECORD CIS►$F Page -2- FC��R�Fr. �r F , FREESE 1 � 4055 international Plaza,Suite 200 • Fort Worth.Texas 76109 • 817-735-7300 • fax 817-735-7491 .rr.'rras ce July 24,2013 Susan L.Schwinger, P.E. Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth,Texas 76102-6311 Re: Additional Engineering Services(Amendment No.3)for East Side Pump Station Improvements,Project Number 00369 Dear Ms.Schwinger: This letter describes scope and fee for the remaining and additional engineering services for preparing the Preliminary Design Report for the East Side Pump Station,Construction Management Assistance for Phase I and III of the East Side 54" Water Main, design of the water and sewer lines along Avenue B, and design of the East Side Pump Station Suction Header. 1. East Side Pump Station Preliminary Design Report In August 2010, FNI provided the City with a Preliminary Design Report for the East Side Pump Station. The original scope of work was for a technical memo with a preliminary pump station floor plan and site plan to fit within the existing site. The City had asked FNI to perform a site study to evaluate using the existing site,the site just west of the existing pump station and the site just north of the pump station. FNI prepared a draft Preliminary Design Report including the site study and Electrical and SCADA preliminary design. 2. Construction Phase Management Assistance The City requested that FNI provide part-time Construction Management Assistance for the construction of Phase I and III of the East Side 54"Water Main in November 2012. 3. Design of Water and Sewer lines along Avenue 8 During the construction of the East Side Pump Station Discharge Header it was discovered that the 36"water line in Avenue B does not match the record drawings from 2006. The old cast iron tees connecting to the existing pump station discharge header were not replaced as shown on the record drawings. The City asked FNI to design the replacement of these tees and to realign about 110 feet of 36"water line. The realignment of the 36" water line moved the 36" water line further away from the proposed 54"water line. In order to realign the 36"water line the existing sewer line needed to be lowered to meet TCEQ requirements. FNI provided the [FTW0936814\Resources\OLaOAFort Worth\FTW093fiAAmend N3\Revised 2013-07-19\Admendment letter Phase 3.doa Ms.Schwinger July 19,2013 Page 2 of 6 redesign of 300 feet of 8" Sewer line along Avenue B. In addition to this redesign,the City requested design to replace 140 feet of sewer line at the apartment complex east of the East Side Pump Station. Also during the construction of the East Side Pump Station it was discovered that the water service lines to the apartments east of the pump station were connected to the discharge header and not the 36"water line in Avenue B. The City asked FNI to design a new 8"water main to serve the apartment service lines. The City requested that this proposed 8"water line connect to two water transmission lines, so that if one transmission line is shut-down for maintenance the apartment complex would still have water service. FNI designed an additional 360 feet of 8"water line. 4. East Side Pump Station Suction Header. The City decided to postpone the construction of the new East Side Pump Station for another 10 years or more and is working on the design to rehabilitate the existing pump station. The City has asked FNI to provide a design to replace the existing suction header with a new 42" header,pump suction pipe, and to replace approximately 200 feet of 24"water line in Avenue B. The City will make the electrical and equipment improvements utilizing city forces. 6.Special Services Deductions There is remaining budget that will not be utilized for the following special services:Subsurface Utility Engineering(SUE), Public Involvement for the Pump Station, Coordination Meetings with TRVA, Environmental Permitting,Geotechnical Engineering, Corrosion Engineering, Environmental Information Document,Surveying(including easement documents), and Plating the East Side Pump Station Site. Contract fees for these services will be applied to the additional services and remaining construction phase effort. SCOPE OF SERVICES BASIC SERVICES FNI shall render the following professional services in connection with the development of the Project: A. East Side Pump Station Preliminary Design Report: In August 2010 FNI provided the City with a Preliminary Design Report for the East Side Pump Station. Evaluated two additional sites for the pump station that were not in the original scope of work. Evaluate construction sequencing to improve the existing pump station site to allow utilization of one half of the old and new pump station during construction to allow partial utilization. The Preliminary Design Report included a site study and Electrical and SCADA preliminary design. B. Design of Water and Sewer Lines alone Avenue B: FNI designed an additional 110 feet of 36" water line along Avenue B. FNI also design an additional 360 feet of 8" water line to provide Ms.Schwinger July 19,2013 Page 3 of 6 a distribution main to serve the apartment complex. FNI provided the redesign of 300 feet of 8" Sewer line and design to replace 140 feet of sewer line at the apartment complex east of the East Side Pump Station by pipe-enlargement or cured in place liner. FNI submitted draft plans on March 18, 2013. The March 18, 2013 submittal included the design the 8" water line to connect the water transmission mains on Avenue A and Avenue B. After this submittal the City requested to change the draft design to connect the 8" water line to the existing 36"water transmission main in Beach Street in-lieu of connection to the main in Avenue A. FNI submitted revised draft plans on April 10, 2013 based on comments FNI received at the meeting on April 4, 2013 including the realignment of the 8"water line. FNI submitted revised plans on April 18, 2013 per the comments received on April 17, 2013. FNI met with Fort Worth Water Department on April 30, 2013 to review the plans. At the meeting FNI was asked to extend the sewer line design to include replacing the sewer line at the apartment complex by means of pipe enlargement or cured in place liner. FNI submitted a final draft on May 3, 2013 which included the additional sewer line replacement at the apartment complex. FNI received comments on May 8, 2013 to remove the sewer line and to submittal final drawings to the City. FNI submitted final plans on May 9, 2013. C. Design of East Side Pump Station Suction Header: FNI will provide a design to replace the existing suction header with a new 42" header, and to replace approximately 200 feet of 24"water line in Avenue B. The Opinion of Probable Construction Cost for these improvements is$591,400. a. FNI will provide design submittals at the design points of 60%and 90%. FNI will have one review meeting with the city for each submittal. b. FNI will provide construction phase services in accordance with the scope in the original contract for an additional construction phase for Phase 5 with the exception that the number of site visits will be limited to 4 site visits for Phase 5. D. Remaining Construction Phase: Contract fees for these services will be applied to the additional services and remaining construction phase effort. SPECIAL SERVICES A. Construction Management Assistance : FNI shall provide services of Senior Resident Project Representative(Ted Gay) for 20 hours per week for 11 months during the construction of Phase I and Phase III of the 54" Water Main Project. Ms.Schwinger July 19,2013 Page 4 of 6 B. Subsurface Utility Engineering for Pump Station Suction Header: FNI will retain and monitor efforts of a subsurface utility engineering firm (The Rios Group)to provide Quality Level B Subsurface Utility Engineering along the 24"water line (approximately 200 feet) and along the suction header. Using the proposed piping design and utility designation, propose a plan for(up to six)test holes at critical areas. At these locations, utilize non-destructive vacuum excavations to locate the horizontal location and vertical depth of the utility. C. Survey for Pump Station Suction Header: FNI will retain and monitor efforts of a surveying firm (Pacheco Koch)to provide a topographic survey the area of the pump station site where the discharge heard will be replaced. SPECIAL SERVICES DEDUCTIONS There is remaining budget for the follow special services that are no long required by the project: A. Subsurface Utility Engineering: There Is budget remaining in the SUE task for the pipeline project that will not be used. B. Public Involvement: Remove the public meeting for the pump station project now that a new pump station will not be construction in the near future. C. Coordination Meetings with TRAV: There is budget remaining in this task for the pipeline project that will not be used. D. Environmental Permitting: There is budget remaining in in the Environmental Permitting task for the pipeline project that will not be used. E. Geotechnical Engineering: There is budget remaining in the Geotechnical Engineering task for the pipeline project that will not be used. F. Corrosion Engineering: There is budget remaining in the Corrosion Engineering task for the pipeline project that will not be used. G. Environmental Information Documents: This budget remaining in this task for the pipeline project that will not be used. H. Survey:There is budget remaining in the surveying task for easements and the survey for future pump station site and Vickery that will not be used for this project. I. Platting the ESPS Site: This task item is being removed from the scope of the project. Ms.Schwinger July 19,2013 Page 5 of 6 FEE COMPENSATION A summary of the remaining effort and additional services are shown in the table below. Basic Services are proposed on a lump sum basis and Special Services are proposed on a not to exceed basis. Item Proposed Fees Basic Services A. East Side Pump Station Preliminary Design Report $72,745 B. Design of Water and Sewer Lines along Avenue B $27,261 C. Design of East Side Pump Station Suction Header $45,736 D. Remaining Construction Phase $15,000 Total Basic Services $160,742 Special Services A. Construction Management Assistance $182,269 B. Subsurface Utility Engineering for Pump Station Suction Header $11,385 C. Survey for Pump Station Suction Header $3,300 Total Special Services ' -v $196,954 Special Services Deductions A. Subsurface Utility Engineering ($30,217) B. Public Involvement ($2,273) C. Coordination Meetings with TRVA ($12,681) D. Environmental Permitting ($5,712) E. Geotechnical Engineering ($8) F. Corrosion Engineering ($12,617) G. EID ($217) H. Survey ($9,424) I. Plating the ESPS Site ($21,963) Total Special Services Deductions ($95,114) Total Basic and Special Services less Special Services Deductions $262,582 Original Contract Amount $840,000 Amendment No.1 $49,550 Amendment No.2 $343,881 Amendment No.3 $262,582 Contract Amount to Date _ $1,496,013 Ms.Schwinger July 19,2013 Page 6 of 6 Freese and Nichols, Inc. appreciates this opportunity and we would like to meet with you at your convenience to discuss these additional services. Sincerely, Freese and Nichols, Inc. Z5 Robert F. Pence,P.E. BCEE President and CEO L\Resources\OICR\FCC Fife:FTWO9368\3.10 M&C Review Page 1 of—2 Official site of the City of Fort Worth, Texas CITY COUNCILAGENDA FORTrTI# COUNCIL ACTION: Approved on 9/17/2013 DATE: 9/17/2013 REFERENCE NO.: **C-26437 LOG NAME: 60EPS54WA3-F&N CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 3 in the Amount of$262,582.00 to City Secretary Contract No. 39090 with Freese and Nichols, Inc., for a Revised Total Contract Amount of $1,496,013.00 for Design of Eastside Pump Station and General Construction Representation for Fifty-Four Inch Eastside II Water Main (COUNCIL DISTRICT 8) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 3 in the amount of$262,582.00 to City Secretary Contract No. 39090 with Freese and Nichols, Inc., for design of Eastside Pump Station and general construction representation for fifty-four inch Eastside II Water Main, thereby increasing the contract amount to $1,496,013.00. DISCUSSION: A Water Master Plan prepared by Freese and Nichols, Inc., in May 2005 identified the need to increase the capacity of the Eastside Pump Station (ESPS) to meet projected future water demand. A subsequent study determined a 54-inch Eastside II water transmission main should be constructed to provide supplemental capacity for the existing 42-inch water main. This will satisfy the projected water demand from wholesale customers and also the northern portion of the Eastside Pressure Plane. On August 11, 2009, (M8C C-23714) the City Council authorized an Engineering Agreement with Freese and Nichols, Inc., in the amount of$840,000.00 to perform preliminary design for the Eastside Pump Station and preliminary/final design and general construction representation for the 54-inch Eastside II Water Main. The Agreement was subsequently revised by two amendments totaling $393,431.00 that are further described as follows: Amendment No. 1: $49,550.00; administratively approved by the City Manager on April 5, 2012 and Amendment No. 2: $343,881.00; M8C C-25766, July 24, 2012. To expedite construction, the project was divided into the following three phases: Phase 1 - 54-inch water main from Scott Avenue, north to the connection to the existing 36-inch and 42-inch water mains north of the West Fork Trinity River. Phase 2 - New Eastside Pump Station and associated distribution piping in the vicinity of the pump station site. Phase 3 - 54-inch water main from Scott Avenue to the Eastside Pump Station site. Amendment No. 3 will provide compensation for the following additional services that are necessary on the project: East Side Pump Station preliminary design report as requested by the City for site evaluation and SCADA preliminary design. Design of water and sanitary sewer mains on Avenue B to replace the deteriorated mains that were encountered during construction. Suction header design for the East Side Pump Station to include a new 42-inch header, pump suction pipe and replacement of a segment of 24-inch water main in Avenue B. http://apps.cfwnet.org/council packet/mc rev iew.asp?ID=18942&counciIda... 9/17/2)013 M&C Review Page 2 of 2 Construction phase management assistance for construction of phases 1 and 3. Freese and Nichols, Inc., proposes to provide the necessary additional work for a lump sum fee of $262,582.00. Staff considers this amount to be fair and reasonable. M/WBE Office -A waiver of the M/WBE goal was granted for this Amendment No. 3 because the design of the project is 92 percent complete with virtually no subcontracting opportunities available. This project is located in COUNCIL DISTRICT 8, Mapsco 64W, 78A, and 78E. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects fund. TO Fund/AccounVCenters FROM Fund/AccounVCenters P265 531200 608160036931 $78,775.00 P265 531200 608160036932 $157,549.00 P265 531200 608160036933 $26,258.00 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8246) Additional Information Contact: Susan Schwinger (6529) ATTACHMENTS 60EPS54WA3-FN MAP.pdf http://apps.cfwnet.org/council packet/mc review.asp?ID=1$942&counciida... 9/17/2013