WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols,
Inc. , (ENGINEER) made and entered into City Secretary Contract No.
39090, (the CONTRACT) which was authorized by M&C C-23714 on the 11t'
day of August, 2009 in the amount of $840,000 .00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment
Number 1 in the amount of $49,550 .00 which was administratively
authorized on April 5, 2012 , Amendment No. 2 in the amount of
$343, 881 .00 which was authorized by M&C C-26437 on July 24, 2012,
Amendement No. 3 in the amount of $262 ,582 .00 which was authorized
by M&C C-26437 on September 17, 2013; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Design of Eastside Pump Station and general construction
representation for fifty-four inch Eastside II Water Main; and
WHEREAS, it has become necessary to execute Amendment No. 4 to
the CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated April 25, 2014, a
copy of which is attached hereto and incorporated herein. The cost
to the City for the additional design services to be performed by
Engineer totals $24, 603.00.
2 .
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid
OFFICIAL RECORD
RECEiV"' 1�4'1 3 01014 Page -1- CITY SECRETARY
FT.WORTH TX
by the City for all work and services shall be an amount of
$1,591, 717.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED:
City of Fort Worth ENGINEER
FREESE AND NICHOLS . INC.
Fernando Costa Thomas Haster, P.E.
Assistant City Manager Principal
DATE: 114 DATE: 5-171201`4
APP RECOMMENDED:
J
S. Frank Crumb, P.E.
Director, Water Department
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
mavo>— Date: N/A
Douglas W. Black
Assistant City Attorney
�QFOr�
o°
ATTEST• �o° 0.0
0
Mary JelaY r � °°°O°City Setary �XAS OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page -2-
approachesInnovative
OutstandingFREESE Practical results
rMMo41uicHnLC,,%
4055 International Plaza,Suite 200 • Fort Worth,Texas 76109 • 817-735-7300 • fax 817-735-7491 www.freese.com
April 25,2014
Mr.Tony Sholola, P.E.
Project Manager
City of Fort Worth Water Department
311 W. 10th Street
Fort Worth,TX 76102-6311
Re: Additional Engineering Services (Amendment No.4)for East Side Pump Station
Improvements, Project Number 00369
Dear Mr.Sholola:
This letter includes scope and fee for the design of approximately 1,150 feet of new 16"water
line along Chicago Avenue from Rosedale Street to Hawlet Street.
SCOPE OF SERVICES
BASIC SERVICES
The summary of work for the design of the new 16" water line includes the following:
• Site visit to review survey and existing improvements.
• Prepare railroad crossing permit for the City to submit to Union Pacific Railroad.
• Prepare design drawings to be issued in a change order. One 60%design level will be
sent to the City for review. FNI will meet with the City to review the design. The
drawings include:
o Revise the Water Location Map Sheet
o Revise the Water Abandonment Sheet
o Three plan and profile sheets.
o Prepare additional detail sheets if needed.
SPECIAL SERVICES
A. SURVEYING: FNI will retain and monitor the efforts of a surveying firm (Gorrondona &
Associates, Inc.)to provide the following services:
Provide topographic design survey for approximately 1,200 feet along Chicago Avenue
from Rosedale Street to Hawlet Street. The survey width will be the full Right-Of-Way
width of Chicago Avenue.
Mr.Sholola
April 25,2014
Page 2 of 2
FEE COMPENSATION
A summary of the additional costs are shown in the table below. Special Services are on a not
to exceed basis.
Item Amount
Basic Services $17,547.00
Special Services
A. Topographic Survey along Chicago Ave. $7,056.00
Total Special Services $7,056.00
Total Special Basic and Special Services $24,603.00
Original Contract Amount $840,000.00
Amendment No. 1 $49,550.00
Amendment No. 2 $343,881.00
Amendment No. 3 $333,683.00
Amendment No.4 $24,603.00
Contract Amount to Date $1,591,717.00
Freese and Nichols, Inc. appreciate this opportunity and we would like to meet with you at your
convenience to discuss these additional services.
Sincerely,
Freese and Nichols, Inc.
Robert H. McGee, P.E.
Associate
CC: File:FTW09368\3.10
Attachments: Scope and fee proposals subconsultants
[0FF140411T:\Proposals\F\Fort Worth\Rosedale 16-inch Chicago WL\Backup\Admendment Letter 2014-04-04-no
geotech.docx
J
Level of Effort Spreadsheet
TASKMOUR BREAKDOWN
Design Services for
ESPS 54"Water Line Project Amendment for Chicago Ave.Water Line Replacement
City Project No.00369
Labor hours E,,p.nsa
Task No. Task Description Project Project Project FIT CADD Administrative Total labor Subconsultant Total Expense Task Sub Total
Director Mana er En ineer Cost Travel Reproduction Cost
a e s ...:.48Q `...:'t 4' ,_-.._f .0 C�:`.I$y MWBE Non-MWBE
1.0 Protect Management 0 6 2 0 0 0 1 364 0 0 0 33 5S 1 9
1.1.2 Hunt _ ',._.p�'. `.,. 4 .$723 $0 $0. $ a
Design Submittal Review Meetings(1 I"'
1.23 Meeting) f L 2 SeA¢ $5(3 S35. $8S $729
3.0 Preliminary Design 160 Per ent) p 0 0 f 0 0 000 a K 0 0 $0 $Q
3.2 Geotechnical Investgation/Pavement Design( _.0 0 S $0 $01 Ad
4.0 Final Design a 7 �14,f 30 _A 32 0+� Be Le>" $0 »$ Y»5a»ww $350 401
4.1 Data Collection and Site Visit [_,�-� ' ,3 4 6 8 $2.$28 $50 $105 S4 79
4.2 Final Draft(60%)Construction Plans ta..:_..'.� __ 8 20 20 S 0 8 $200 Op 6
4.3 Final(100%)Plans and Specifications 2 4 4 ifib $50
,.»�_:zm o-. uo�—, .,...ors ..:...,..„a..n :.,.�..r a. .„:u...-......w:- .m ,..,e..m�..,..,w,... .«,,,.. ..... u.wt.a -ww+u -
5.0 Bid Phase 0 a '0 0 0 - -.0" Sp" `$p. - $Q .50. - _
5.0 Construction Phase Services - 0 - 4 u�14 6 6 "0�, SA 008 �$0 HMO, 150 'S 0 90a 3 28
6.1 Construction Support
6.1.3 Project Site Visit11: 4 4 '$1188 $150 $20 7 $1. 5.;358
8A.4 Submittal Review - -J - ,.,.,;':,'A; 4 S74a $20 520. '$768
Request for Information/Change Order fy'...
6.1.5 Review (r } { 4 2 $088 $0 0 $968
6.2 Record Drawings �.1: 2 2 6 TJ 4 $100
7.0 ROW/Easement Services »».0»• 0 0•� 0 0 - U $0 ..fp
8.0 »,.. . ,,: e....a«„H,,. .w�: wra$$,S:a
8.0 Survey 0 -0 2- 0 .q 84 .$6.414' 0 SO .2a 8434 $6,966
8.1 Design Survey - - 2 0 4 $684 SS,414 $20
9.0 Permitting 0 v M2 v4.� %8 �6 0 �f 2006 Y $0 T ^SO 0w
zo z0 'z,ozs
City of Fort Worth,Texas
Attachment B-Level of Effort Supplement
PMO Official Release Date:8.09.2012
1 of 2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
ESPS 54"Water Line Project Amendment for Chicago Ave.Water Line Replacement
City Project No.00369
Labor(hoUrsl I Ex n
Task No. Task Description Project Proieet Project EIT CADD Administrative Total Labor guhconsulmnt se Total Expense Task Sub Total
Director Mana a En ineer Cost Trevel Repreduetion Cost
ate y 2Q0. qQ - '+1 MWBE I Non-MWBE
9.5 J _-'21 41 61 6 $2,008 $201 Sal_ $2,028
Tota s ul le] 6 r 3 fi, 8 0 6 7, ,fi
ro ect Summary
Total Hours 147
Total Labor $16,732
Total Ex nse $7,229
MBEISBE Suhconsultant $6,414
Non-MBE/SBESubconsultant $0
10% Sub Marku $642
MBE/SBE Participation 26.1%
Dial roiect Cost 503
Ciri of Fort Worth,Texas
Attachment B-Loral of Effort Supplement
PMO Offidal Releaae Data:8.09.2012
2 of2