Loading...
HomeMy WebLinkAboutContract 39095 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary (� G COUNTY OF TARRANT § Contract No. l 1 WHEREAS,the undersigned"Developer"desires to make certain improvements(refer to the name of the project at the bottom of the page)an addition to the City of Fort Worth, Texas;and 1 WHEREAS,the said Developer has requested the City of Fort Worth,a home-rule I municipal corporation situated in Tarrant,Denton,Parker,and Wise Counties,Texas,hereinafter called"City",to do certain work in connection with said improvements. Developer Information: Developer Company Name: CVS Pharmacy,Inc.,a Rhode Island Corporation Authorized Signatory: Michael B.Nulman j Title: Assistant Secretary Senior Legal Counsel Project Name: CVS Pharmacy-Longhorn Crossing Addition Project Location: Southeast Corner of Longhorn&Marine Creek Additional Streets: Plat Case No. FP 009-017 Plat Name: Longhorn Crossing Addition Mapsco: 47B Council District: 7 City Project No:01390&01377 To be completed b taff, l Received by: Date: �[',�` 2� vQ CFA: DOE:6262&5290 OFFiGIAL RECORD' 1 CITY SECRETARY FT WORTH., TX L NOW,THEREFORE,KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub-contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X Sewer (A-1) _A_,, Paving (B) Storm Drain (B-1) , Street Lights&Signs(C)— E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II,of the Policy. Combined CFA final Sept 12,2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253,Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City, v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre-Construction Meeting, The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City- issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department, G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in coimection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such inIm les, death or damages are caused, in whole or in part, by the alleged negligence of the City of Combined CFA final Sept 12,2008 4 Fort Wodlo, its o frcers,servants, or employees. I M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers,agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, In whole or in mart, by the alleeed neelikence of the City of Fort Worth, its officers,servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended thud party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. 5 iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i, The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy,this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction,the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12,2008 6 Cost Summary Sheet Project Name: CVS Pharmacy-Longhorn Crossing Addition CFA No.: DOE No.: An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 26,250.00 2.Sewer Construction $ 130.367,00 a. Water and Sewer Construction Total $ 155,607.00 B. TPW Construction 1.Street $ - 2.Storm Drain $ 64050.00 TPW Construction Cost Sub-Total $ e,0%oo Total Construction Cost(excluding the fees): $ 181,867.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 3,112.14 D. Water/Sewer Material Testing Fee(2%) $ 3,112.14 Sub-Total for WaterlSewer Construction Fees $ e,224.28 E. TPW Inspection Fee(4%) $ 242.00 F. TPW Material Testing(2%) $ 121.00 G. Street Light Installation/inspsec8on Cost H. Street Signs Installation Cost Sub-Total for TPW Construction Fees $ 363.00 Total Construction Fees: $ 8,687.26 Choice Financial Guarantee Options,choose one Amount ck one Bond=100% $ 161 657.00 Completion Agreement=100%/Holds Plat $ 161,657.00 Cash Escrow Water/Sanity Sewer-125% $ 194 508,75 Cash Escrow Paving/Storm Drain r-125% $ 7,562.60 Letter of Credit=125%w/2yr expiration period $ 202 071.25 1 --=- 7 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City Secretary,with the corporate seal of the City affixed,and said Developer has executed this instrument in quadruplicate,at Fort Worth,Texas this = day of 200 I _. CITY OF FORT WORTH-Recommended by: Water Department Transportation & Public Works Department � 0lzzai Wendy C - abulal,EMBA,P.E. William A Ve•lcest,P.E Develop m Engineering Manager DIrector Approved as to Form&Le lity.• Approved by City Manager's Ofj?ce Ck11 Amy J.kj1nisey Fernando Costa AssistantiCity Attorney Assistant City Manager i 1 ATTES u f,n arty Hendrix NO M&C REQUIRED �ity Secretary ATTEST CVS Pharmacy,Inc. SignaNgianie K. Luker Signature (Print)Name: Assistant Secretary Print Name:Michael B.Nulman Title:Assistant Secretary Combined CFA final Sept 12,2008 8 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A:Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ❑ Exhibit B:Paving Improvements ❑ Paving Estimate ® Exhibit 13-1: Storm Drain Improvements ® Storm Drain Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 9 O� C� y S I T E �? LOCATION LOCAU ON Map MAPSCO 47B NOT TO SCALE wgffiIk3Rmmm mlm & A0000A 3tse, Hm e. CANSUUING CIVIL ENGINEERS ■ SURVEYORS ( 972 ) 490•-7090 FAX (972 ) 490-7099 A.F. ALBRIGHT SURVEY, ABST. NO. 1849 LOCATION MAP SHEET Scale : N.T.S. CITY OF FORT WORTH ®NGH® N CR®SSENG ' Pate :08/04/09 TARRANT COUNTY, TEXAS r onnata: ARMSTRONG DEVELOPMENT L®4® BLOCK � Dwg. Fite : 4389�CFAEXH.OWG OF 222 W. LAS COLfNAS BLVD., SUITE 3610 FEEL No. : 43895.01(10) IRVING, TEXAS 75039 FORT TORTH, TARRANT COUNTY, TEXAS , P w — - — — — — — — — — — — — — — — — — — — — — — — .� t Ex. 16" RCCP Wtr F-628 =733.5 SIGN WTR 2A� I n L ONGHO RN RD. �y •PcA TELE OR VA LT Ex. 24" Wtr F-187————————————— —— —————————-- TTI —— — ————————-- � � - � R I 0o N CONNECT TO EX. x •�T I rn 16" WATER N Z CMpharmacy 0' 30' 60' 12,900 SF ' 1.877 AC.81,775 S.F. Scale: 1"=60' I. F.F.E.= 663.00 SERVICE CONNECTIONS 2 II ASPHALT f 0 T: PROPOSED CLASS 'A' & 'B' METER BOXES I 6" FIRE LINE — — — — I I\ CONNECTION \ \ I \ PROPOSED FIRE \ \ HYDRANT 6" FIRE HYDRANT ICONNECTON INSTALL 12" GATE VALVE \ \ 11 rn INSTALL \ 112- PLUG I \ 1 PERMANENT 35' SEWER FACILITY EASEMENT t (BY SEPARATE INSTRUMENT) ( \ 1 1 � "� � Aoo®c$a�moo II>mc. A.F. ALBRIGHT SURVEY, ABST. NO. 1849 EXHIBIT 'A' SHEET CITY OF FORT WORTH WATER IMPROVEMENTS TARRANT COUNTY, TEXAS LONGHORN CROSSING ARMSTRONG DEVELOPMENT ADDITION OF 222 W. LAS COLINAS BLVD.. SUITE 1610 LOT 1. ®LOCI( I IRVING, TEXAS 75039 FORT WORTH, TARRANT COUNTY, TEXAS 7 WWinkeimann &Associates, Inc. CONSUITOO CNl ENGSIEEM■SUNVETORS Longhorn Crossing Addition Community Facilities Agreement Water Estimate August 4,2009 Item Description Quantity U/M Unit Total A. Connect to Existing 16"Water 1 Ea. $3,500.00 $3,500.00 B. 12" PVC Water Line 236 L.F. $24.00 $5,664.00 C. 12"Gate Valve 2 Ea. $1,200.00 $2,400.00 D. 6"PVC Water Line 20 L.F. $20.00 $400.00 E. 6"Gate Valve 2 Ea. $800.00 $1,600.00 F. Fire Hydrant 1 Ea. $3,200.00 $3,200.00 G. Fittings 0.5 Tons $3,500.00 $1,750.00 H. 2"Domestic Service connection 1 Ea. $1,000.00 $1,000.00 I. Class"B"Meter Box 1 Ea. $500.00 $500.00 J. 1"Irrigation Service Connection 1 Ea. $1,000.00 $1,000.00 K. Class"A"Meter Box 1 Ea. $500.00 $500.00 L. Traffic Control 1 L.S. $2,000.00 $2,000.00 M. Trench Safety 236 L.F. $1.00 $236.00 N. Testing 1 L.S. $1,500.00 $1,500.00 Total Water $25,250.00 * Since there is no control over the cost of labor,materials,and equipment or over contractor's method of determining prices,or over competitor's bidding or market conditions,this estimate of probable cost is made on the basis of our professional experience and represents our best judgment as a firm familiar with the construction industry. We cannot and do not guarantee proposals,bids on the project costs will not vary from the above estimate. Prepared by: � f Michael T. r' ett, P.E. Winkelmann&Associates, Inc. 6750 Hillcrest Plaza Dr.,Ste.325 Dallas,TX 75230 (972)490-7090 (972)490-7099 fax mdoggett@winkelmann.com 1S 6750 Hilicrest Plaza Drive,Suite W Dallas,Texas 75230 (972)490-7090 Fax(972)490-7099 N 0' 100' 200' MARINE CREEK OF TEXAS IR JOINT VENTURE Scale: 1"--2 0 0' PARCEL N.4 VOL 11431.PG 293) I I LONGHORN RD. ' ; --- _— __-- _ a Utt Itf1 ICI ———————— C, PROP. 4' DIA. WASTEWATER I " MANHOLES (3) w/1-8" STUBOUT & PLUG AND m MARINE CREEK OF TEXAS 1-10" STUBOUT & PLUG JOINT VENTURE (VOL 11431,PG 29J) I a.,....,..,.n I OANMONT13986,LAND FOUR,LP. I I — — (VOL P0.0 ) ! \ \(VOL 14306.PG 0080080) \I \ 11G6G.ACRES I I \ \ YAWN-CPLIIf OF lf]IA] PARQL— Ha ('0.11 ut,PC 7AT) PROP. 4' DIA. WASTEWATER Ism MANHOLE w/2-8" STUBOUTS & PLUGS I A I I 938 L.F. PROP. I 10" WASTEWATER m PIPE MATCH LINE �nffi1�c�Il��ffiffi "' CONSULTING CIVIL ENGINEERS INSURVEYORS ( 972 ) 490-7090 FAX ( 972 ) 490-7099 A.F. ALBRIGHT SURVEY, ABST. NO. 1849 EXHIBIT A-l' SHEET CITY OF FORT WORTH SEWER IMPROVEMENTS y TARRANT COUNTY, TEXAS LONGHORN CROSSING ).,g. i ilo 4�8RK FA:XH.D'IJG DEVELOPER: ARMSTRONG DEVELOPMENT ADDITION OF 222 W. LAS COLINAS BLVD., SUITE 1610 LOT 1, BLOCK I "ojec- 'I. : = S5_•.0' iJl IRVING, TEXAS 75039 FORT WORTH, TARRANT COUNTY, TEXAS 2 MATCH LINE II PROP. 4' DIA. WASTEWATER MANHOLES (2) w/2-8" STUBOUTS & CLEANOUTS. vm _ 86 L.F. 8" BORE _ '� UNDER EXISTING \ w`r°.' 1001 L.F. PROP. GAS MAIN ` 8" WASTEWATER I 1 �\ PIPE 1 PROP. 4' DIA. WASTEWATER \ F4hjyE 1 '' II MANHOLES (2) \ — ftOQRA C40pO%�L _ 20 L.F. 8 WASTEWATER \ PIPE WITH CEMENT \ STABILIZED BACKFILL G \ 9 4" SEWER SERVICES WITH PLUGS TO FUTURE LOTS (30) \ \\ PROP. 4' DIA. WASTEWATER + MANHOLE \ \ 20 L.F. 8" WASTEWATER \ PIPE WITH CEMENT \ \ � STABILIZED BACKFILL ` \ \ an m 0' 100' 200' \ \ Scale: 1"-200' CONNECT TO EXISTING \ - SEWER. \ �Ilffi��Il��1ffiffi cis A®®®can tso, Ema. CONSULTING CIVIL ENGINEERS ■ SURVE"ORS 972 ) 490-7090 FAX ( 972 ) 690-7099 A.F. ALBRIGHT SURVEY, ABST. NO. 1849 EXHIBIT A-1' SHEET 1'•->I; CITY OF FORT WORTH SEWER IMPROVEMENTS 2 ^y 3/ ;/C TARRANT COUNTY, TEXAS LONGb0RN CROSSING nP9:L,t,�. il:-; 4'BD�:,^.FAEXN.D')JG AS DEVELOPMENT ADDITION OF LA COLIN 222 W. LAS COLINAS BLVD., SUITE 1610 d0`I� 1, BLOCK I ',ojec: IRVING, TEXAS 75039 FORT WORTH, TARRANT COUNTY, TEXAS 2 Winkelmann &Associates, Inc. CONSULTING CNII ENGMSRf■SURWYOU CVS Pharmacy-Longhorn Crossing Addition Community Facilities Agreement Sanitary Sewer Estimate August 4,2009 Revised August 20,2009 Item Description Quantity U/M Unit Total A. Trench Safety 1979 L.F. $1.00 $2,979.00 B. Standard 4'Manhole 9 Ea. $2,500.00 $22,500.00 C. 4"Sewer Service with Plug 18 Ea. $475.00 $8,550.00 D. 4"Sewer Service with Cement Stabilized backfiil with Plug 12 Ea. $625.00 $7,500.00 E. Double Sanitary Sewer Cleanout 2 Ea. $675.00 $1,350.00 F. 10"SDR 26 PVC Pipe 938 L.F. $28.00 $26,264.00 G. 8"SDR 26 PVC Pipe 1001 L.F. $24.00 $24,024.00 H. 16"Ductile Iron Casing Pipe for Bore under Gas 86 L.F. $150.00 $12,900.00 1. 8"Ductile Iron Carrier Pipe for Bore under Gas 86 L.F. $50.00 $4,300.00 J. 8"SDR 26 PVC Pipe with Cement Stabilized backfill 40 L.F. $35.00 $2,400.00 K. Connect to Existing Main 1 L.S. $6,000.00 $6,000.00 L. Clay Dam 9 Ea. $100.00 $900.00 N. Erosion Control 1 L.S. $6,000.00 $6,000.00 o. Vacuum Testing 1 L.S. $4,000.00 $4,000.00 P. TV Inspection 2065 L.F. $1.00 $2,065.00 Q. 10"Plug 1 Ea. $175.00 $175.00 R. 8"Plug 3 Ea. $150.00 $450.00 Total Sewer $130,357.00 Since there is no control over the cost of labor,materials,and equipment or over contractor's method of determining prices,or over competitor's bidding or market conditions,this estimate of probable cost is made on the basis of our professional experience and represents our best judgment as a firm familiar with the construction industry. We cannot and do not guarantee proposals,bids on the project costs will not vary from the above estimate. Prepared by: Michae T.Do tt,P.E. Winkelmann&Associates,Inc. 6750 Hillcrest Plaza Dr.,Ste.325 Dallas,TX 75230 (972)490-7090 (972)490-7099 fax mdoggett@winkelmann.com 6750 Hillcrest Plaza Drive,Suite 100 Dallas,Texas 75230 (972)490-7090 Fax(972)490-7099 --------------- :s 4. — — — — — — Ex. 16" RCCP WtrF-62fl — — — — =733.51 sD 4SIGN WTR _-- {D INSTALL LONGHORN RD. x DROP INLEETT �, INSTALL 30 L.F. - rELE IoR — VAULT 24" RCP STORM wtr F-4 V f / J-1-1-4d -- -- — _-------- -- fl Zo L N CVS/pharmacy 0' 30' 60' 12,900 SF -_.-__�■ t� -- — .1,77 AC, 775 S.F. Scale: 'I"=60' F.F.E.= 663.00 ASPHALT -t"D. P I 1 � \ PERMANENT 35 SEWER FACUTY EASEMENT--�I\� \ 1 (BY SEPARATE INSTRUMENT) �I17Il�®Ilffi�lI'D1ffi �,� � Aga®c�nffi�®�➢ IIffi�" CONSUL1114G CIVIL ENGINEERS ■ SURVS:1'ORS (�7x ) .9o--70e0 rnx (e7z )00-7009 A.F. ALBRIGHT SURVEY, ABST. NO. 1849 EXHIBIT 'B-1' SHEET Scole : 1"=60' CITY OF FORT WORTH STORM IMPROVEMENTS y TARRANT COUNTY, TEXAS Dote :08/04/09 LONGHORN CROSSING uEVZLOPM ARMSTRONG DEVELOPMENT A®®0TION Or Ov+g. File 43895CFAEXIi.UWG 222 W. LAS COLINAS BLVD., SUITE 1610 LOT 1, BLOCK I Project No. : 43895.01(10) IRVING, TEXAS 75039 FORT WORTH, TARRANT COUNTY, TEXAS ,e Winkelmann &Associates, Inc. CONSUITNO CML ENCPMEM■SURVEYORS Longhorn Crossing Addition Community Facilities Agreement Storm Drain Estimate August 4,2009 Item Description Quantity U/M Unit Total A. SYS'Drop Inlet 1 Ea. $4,000.00 $4,000.00 B. 24"Reinf.Concrete Pipe 30 L.F. $34.00 $1,020.00 C. Erosion Control 1 L.S. $500.00 $500.00 D. Trench Safety 30 L.F. $1.00 $30.00 E. Traffic Control 1 L.S. $500.00 $500.00 Total Paving $6,050.00 *Since there is no control over the cost of labor,materials,and equipment or over contractor's method of determining prices,or over competitor's bidding or market conditions,this estimate of probable cost is made on the basis of our professional experience and represents our best judgment as a firm familiar with the construction industry. We cannot and do not guarantee proposals,bids on the project costs will not vary from the above estimate. Prepared by: /l Michael T.r&Associates, .E. Winkelma Inc. 6750 Hiilcrest Plaza Dr.,Ste.325 Dallas,TX 75230 (972)490-7090 (972)490-7099 fax mdoggett@winkelmann.com 6750 Hillcrest Plaza Drive,Suite W* Dallas,Texas 75230 (972)490-7090 Fax(972)490-7099