1---� CSC No. 49565-FP1
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES 51o0 11 CO as a.3
NOTICE OF PROJECT COMPLETION G 5 2� 9 S'�S
DOE. Ns: N/A
Regarding contract 49565 for
Marine Creek Interceptor Improvements Sanitary Sewer Replacements Phase I Part I as required by the Water
Department as approved by City Council on 8/151/17 through M&C C-28340 the Director of the Water Department,
upon the recommendation of the Sr. Capital Projects Officer,Capital Projects Delivery,Water Department,has accepted
the project as complete.
Original Contract Prices: $1,634,700.00
Amount of Approved Change Orders: $64,370.00 Ns 4
Revised Contract Amount: $1,699,070.00
Total Cost Work Completed: $1,542,989.00
Less Deductions:
Liquidated Damages: Days @$650.00/Day
Other Deductions(see comments):
Total Deduction Amount: $0.00
Total Cost Work Completed: $1,542,989.00
Less Previous Payments: $1,512,129.22
Final Payment Due $30 859.78
ToA SJv � 12 l Z
Recommended for Acceptance Date
Assistant Director, Water Department
L'� �yef" Dec 8 2020
Christopher arder(Dec8,202009:45Cs� 7
Accepted Date
Director, Water Department
Dana Bur h Dec 8 2020
Dana Burghdoff(15ec8,202009:47CsT) 7
City Manager Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Project Name: DOE. Ns:N/r',
Marine Creek Interceptor Improvements Sanitary Sever Replacements Phase I Pa
Comments:
Non-PO voucher paying retainage
$30,859.78 - 56011--2060000--0O2223-CPETAN--
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name Marine Creek Interceptor Improvements Phase I Sanitary Sewer Replacement Pa
Contract Limits Council District 2
Project Type Sewer
City Project Numbers 02223
DOE Number W022
Estimate Number 14 Payment Number 14 For Period Ending 3/15/2020
CD
City Secretary Contract Number 49565 Contract Time 1090:D
Contract Date 8/15/2017 Days Charged to Date 318
Project Manager Fu Contract is 89.000 Complete
Contractor CIRCLE C CONSTRUCTION COMPANY
PO BOX 40328
FORT WORTH, TX 76140
Inspectors Johnson / Garcia
Tuesday,December 01,2020 Page 1 of 5
City Project Numbers 02223 DOE Number W022
Contract Name Marine Creek Interceptor Improvements Phase I Sanitary Sewer Replacement Estimate Number 14
Contract Limits Council District 2 Payment Number 14
Project Type Sewer For Period Ending 3/15/2020
Project Funding -
Sewer
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-------- ---------------------- ---------
I Remove Fence 100 LF $15.00 $1,500.00
2 Remove 15"Sewer Line(CO#3) 220 LF $25.00 $5,500.00 335 $8,375.00
3 Remove 4'Sewer Manhole(CO#3) 0 EA $1,000.00 $0.00
4 Concrete Encase Sewer Pipe 30 CY $200.00 $6,000.00 40 $8,000.00
5 Site Clearing 1 LS $35,000.00 $35,000.00 1 $35,000.00
6 SWPPP>1 acre 1 LS $15,000.00 $15,000.00 1 $15,000.00
7 4'Wide Asphalt Pvmt Repair,Arteria 350 LF $50.00 $17,500.00 140 $7,000.00
8 Smooth Wire Fence,Metal Posts 100 LF $15.00 $1,500.00
9 Pre-CCTV Inspection 5550 LF $8.00 $44,400.00
10 Post-CCTV Inspection 5550 LF $4.00 $22,200.00 5677 $22,708.00
11 Manhole Vacuum Testing 21 EA $200.00 $4,200.00 20 $4,000.00
12 Bypass Pumping 1 LS $165,000.00 $165,000.00 1 $165,000.00
13 Exploratory Excavation of Existing U 12 EA $1,500.00 $18,000.00 12 $18,000.00
14 Trench Safety 1500 LF $3.00 $4,500.00 5319 $15,957.00
15 Utility Markers 1 LS $1,500.00 $1,500.00
16 Concrete Collar 21 EA $400.00 $8,400.00 21 $8,400.00
17 Trench Water Stops I EA $1,500.00 $1,500.00 1 $1,500.00
18 21"Sewer Pipe,Point Repair(CO#3) 0 LF $200.00 $0.00
19 24"Sewer Pipe,Point Repair(CO#3) 0 LF $200.00 $0.00
C20 18"to 24"Pipe Enlargement(CO#1) 1512 LF $210.00 $317,520.00 1512 $317,520.00
21 15"to 21"Pipe Enlargement 2400 LF $185.00 $444,000.00 2400 $444,000.00
22 21"Sewer Pipe(Open-Cut) 1500 LF $112.00 $168,000.00 1407 $157,584.00
23 8"Sewer Service,Reinstatement 1 EA $2,500.00 $2,500.00 2 $5,000.00
24 Epoxy Manhole Liner(SpectraShield) 300 VF $250.00 $75,000.00
25 4'Manhole 16 EA $4,500.00 $72,000.00
C26 4'Extra Depth Manhole(CO#2) 65 VF $150.00 $9,750.00
27 5'Manhole 5 EA $5,500.00 $27,500.00 17 $93,500.00
28 5'Extra Depth Manhole 50 VF $250.00 $12,500.00 46.5 $11,625.00
29 Traffic Control 1 MO $3,500.00 $3,500.00 1 $3,500.00
30 Portable Message Sign 14 WK $500.00 $7,000.00
31 10"Sewer Service,Reinstatement 1 EA $3,500.00 $3,500.00
Friday,August 28,2020 Page 2 of 5
City Project Numbers 02223 DOE Number W022
Contract Name Marine Creek interceptor Improvements Phase I Sanitary Sewer Replacement Estimate Number 14
Contract Limits Council District 2 Payment Number 14
Project Type Sewer For Period Ending 3/15/2020
Project Funding
32 12"Sewer Service,Reinstatement 2 EA $4,500.00 $9,000.00 3 $13,500.00
33 Constriction Staking 1 LS $3,000.00 $3,000.00 1 $3,000.00
34 Constriction GPS As-built I LS $3,000.00 $3,000.00
C35 Allowance(CO#2) 0.25 LS $40,000.00 $10,000.00
A36 24-Inch PVC Sewer Line installed BOTOC 188 LF $700.00 $131,600.00 188 $131,600.00
A37 Remove and reinstall 24-Inch SS BOC 468 LF $65.00 $30,420.00 468 $30,420.00
A38 Remove and reinstall 4'MH I EA $5,300.00 $5,300.00
A39 MH abandonment 6 EA $1,000.00 $6,000.00 6 $6,000.00
A40 Sewer Line Grouting 300 CY $140.00 $42,000.00 120 $16,800.00
------------- ------------------ --------
Sub-Total of Previous Unit $1,734,790.00 $1,542,989.00
--------------------------------------
Friday,August 28,2020 Page 3 of 5
City Project Numbers 02223 DOE Number W022
Contract Name Marine Creek Interceptor Improvements Phase I Sanitary Server Replacement Estimate Number 14
Contract Limits Council District 2 Payment Number 14
Project Type Server For Period Ending 3/15/2020
Project Funding
Contract Information Summary
Original ContractAmount $1,634,700.00
Change Orders
Change Order Number 1 $56,400.00
Change Order Number 2 $7,970.00
Change Order Number 3 $0.00
Total Contract Price $1,734,790.00
Date /O- -2 o Total Cost of Work Completed $1,542,989.00
Contr tor Less 0 %Retained $0.00
Date
�(,.�� Net Earned $1,542,989.00
)
Ins ection UPC is r Earned This Period $30,859.78
�"07.7 A f4 r 1Retainage This Period $0.00
Xf P
12ocWoo) Date �2 " t /ZO
Less Liquidated Damages
Project Manager
Days @ /Day $0.00
N 1 A Date LessPavement Deficiency $0.00
Asst.Director/TPW Less Penalty $0.00
Clrirervt�ier Hsir�J�
Christopher rder(Dec8,2o2oW:uCST) Date Less Previous Payment $1,512,129.22
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $30,859.78
Friday,August 28,2020 Page 4 of 5
FORTWORTH rev03/05/07
WATER ENGINEERING&FISCAL SERVICES
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:14
NAME OF PROJECT: Marine Creek Interceptor Improvements Phase I Sanitary Sewer Replacement Phase I Part I
PROJECT NO.: 2223 CONTRACTOR: Circle C Construction Co.
CITY PROJECT 2223
PERIOD FROM.10/09/17 TO: 03/15/20 FINAL INSPECTION DATE: 12/12/2019
WORK ORDER EFFECTIVE:I0/9/2017 CONTRACT TIME: 380 0 WD Q CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5• 20.
6. 21.
7. 22.
S. 23.
9• 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
THIS &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
PERIOD 1 0 0
PREVIOUS
PERIOD 318 318
TOTALS
TO DATE 318 318
*REMARKS:
/f g•Z�
CONTRACTOR DATE INS ECTOR DATE
Capital Projects Delivery,Water Department
The City of Fort Worth• 1000 Throckmorton Street•Fort north,TX-76012-6311
(817)392-4477•Fax:(817)392-8460
REV:02/20i07
Capital Projects.Delivery,Water Department
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name ofCont actor Project Maine
Circle C Construction Company Marine Creek S.S.Rep].Phase I Part I
Water Engineering Inspector DOE Number
Virginia Wade/David Johnson NIA
Water Engineering Inspector Project Manager
❑Water•[D Waste Water ❑Storm Drainage ❑Pavement Robert Sauceda/Walter Norwood
Initial Contract.4mount Project D1661culty
$1,634,700.00 O simple oQ Routine ®Complex
Final Contract Antortnt Date
$1,699,070.00 110/7/2020
ED PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(X) APPLICABLE(Y/N) RATING(0-4) IMAX SCORE ISCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 428
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 428
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS]*100%) 428 / 448 = 96%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION Or,BONUS POINTS AWARDED)
Signature Inspector - Signature Contractor
Signature Inspector's Supervisor
CONTRACTOR'S COMMENTS
Capital Projects Delivery,Water Department
The City of Fort Worth•1000 Throckmorton Street a Fort Worth,TX 76012-6311
(817)392-4477 o Fax:(817)392-8460
FORTWORTH REV:02/22/07
Capital Projects Delivery,Water Department
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 7-Oct-20
Name of Contractor Project Name
rDOENumber
e C Construction Com any 11
Marine Creek S.S.Re lac.Phase I Part I
Mater Engineering Project Manager
nia Wade/David Johnson Robert Sauceda/Walter Norwood
Project OlfTcult}, Type of Go?tract
0 Slmple OQ Routine 0 Complex ❑Water ❑J Waste Water ❑Storm Drainage ❑Pavement
Initial Contract Amount Final Contract Amount
$1,634,700.00 $1,699,070.00
H)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT I RATING ELEMENT RATING
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector I 1 Accuracy of Plans to Existing Conditions Y
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 1 13 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs I I Knowledge And/Or Problem Resolution
ADMINISTRATION 12 Availability ofProiectManager
1 Change Order Processing Time 13 Communication
2 Timliness of Contractor Payments 14 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe g/
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature Inspector
Signature Inspector's Supervisor
INSPECTOR'S COMMENTS
Capital Projects Deliveiy,Water Department
The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817)392-4477-Fax:(817)392-8460
FORTWORTH
WATER ENGINEERING &FISCAL SERVICES
PIPE REPORT FOR:
PROJECT NAME: Marine Creek Interceptor Sanitary Sewer Replacements Phase I Part I
PROJECT NUMBER: 2223
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
FIRE HYDRANTS: VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
SEWER 24-Inch HDPE 1512
SEWER 24-Inch PVC 188
SEWER 21-Inch HDPE 2400
SEWER 21-Inch PVC 1500
PIPE ABANDONED SIZE TYPE OF PIPE LF
SEWER 18-Inch Concrete 1700
SEWER 15-Inch Concrete 3900
DENSITIES: 8
NEW SERVICES:
WATER ENGINEERING&c FISCAL SERVICES
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-4477•Fax: (817)392-8460
V _li J' City of f ol'f 11Uoj'th CSC No.49565-CO4
Change Order Request;
Project Name: Marine Creek Interceptor Improvements,Phase I City Sec No.; 1 49565
Project No.(s); 59607-0700430•CO1703 DOE No. 7214 CIIyPrcJ.No.:J 02223
Project Descripllon: nita
Pipe enlargement to upgrade and replace an existing deteriorated sary server main located within the Marine Creek
Basin beginning from Bowman Roberts Rd./Cromwell Marine Creek Rd.
Conlractord William J.Schultz.Inc.dba Circle C Construction Co. Change Order 11 Date: 10/27/2020
City Project Mgr.1 Walter Norwood,P.E. City Inspector: I Judy Die
Phone Number: (817)392-5026 Phone Number: (817)392-8452
Dept, Water Sewer Totals Contract Time
(Calender clays)
Original Contract Amount $1,634,700.00 $1,634,700.00 320
Extras to Date $64,370.00 $64,370.00 0120
Credits to Dale
Pending Change Orders(In M&C Process)
Contract Cost to Dale $1,699.070.00 $1,699,070.00 440
Autount of Proposed Change Order $0.00 $0.00 650
Revised Contract Amount $1,699,070.00 $17699,070.00 1,090
Original Funds Available for Change Orders $81,800.00 1 800.00
Remaining Funds Available for this CO $17,430.00 $17,430.00
Additional Funding(If necessary)
:J
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 3.94%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,043,375.00
JUSTIFICATION(REASONS).FOR,CIIANGE ORDER
Change Order No.4 will provide an additional 650 calendar days on the project for the following:
• Delay waiting for Atmos Energy to confirm ownership and adjust conflicting gas mains that were l
encountered during construction.
Extremely wet soil condition from rain events prevented the application of protective manhole coating to
i manholes in close proximity to the creek.
• Resolution of issues identified from the post construction TV inspection.
Delay waiting for easements to be acquired to construct segments of the sewer main.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incldenlal to,lice above Change Order.
Contractor's Company Name Contractor Name LonlractorSignature Dale
wllllam J.Schultz.Imo.dba Circlo C Conslruclion Co. Ted Skelly 0
Tns ector Dale Pro ect'Manager Date
r �O
rector Water Dept)' Date Consl cllon Supervisor.Water'De l Dale
T
Assistant City Attorney Date Assistant City Manager Dale
RNR Oct 30,2020 -D�L�R/(�f/�� Nov 2,2020
Council Action If Required
M&C Number NIA M&C Date Approved NIA OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
IF(Da-r Wci)]tz-i-x City of Fori:Worfh
am...' Change Ordei-Additions
Project Name Marine Creek Interceptor Improvemenls,Phase I City Sec No.: 495G5
Project No.(s): 59607-0700430-CO1703 77 DOE No. 7214 City Proj.No.: 02223
Project Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine Creek
Description Basin beginning from Bowman Roberts Rd./Cromwell Marine Creek Rd.
Contractor William J.Schultz.Inc.dba Circle C Construction Co. Change Order: Dale: 10/27/2020
City Project Mgr. Walter Norwood,P.E. I City Inspector Judy Die
ADDITIONS
—ITEM-1 BSCItII'1T0 DEPT Glty Unft Unit Cost I Total
Water
Sewer
Page 2 of 4 Additions Sub Total
F<3a C' V-Vru a-ri i City of Fort Worth
Change Order Deletions
Project Name Marine Creek Interceptor Improvements,Phase I City Sec No.: 49565
Project No.(s): 59607-0700430-001783 DOE No. 7214 City Proj.No.: 02223
Project Description Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine
Creek Basln beginning from Bowman Roberts Rd./Cromwell Marine Creek Rd.
Contractor William J.Schultz.Inc.dba Circle C Construction Co. Change Order: IE Dale 10/27/2020
City Project Mgr. Waller Norwood,P.E. City Inspector: Judy Die
DELETIONS
ITEM IDESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
Page 3 of 4 Deletions Sub Total
NIIVVBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this WO
Total $0,00
Previous Change Orders
co It DATE AMOUNT
Total $0,00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I ant the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements,
Signature
oel Aa-y All y io6lo C�
Name ofBrnployeo
Title
Ir
4,a4vuntin�
Aaoo o OR T mad
ATTEST: a�0 0
O1`o
.00 d
$ o1
d
Mary J. Kayser �Pa an 00
000000000
aaa 4���
City Secretary
i;
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
I
FORTWORTH
October 07,2020
Circle C Construction Co
P. O. Box 40328
Fort`Worth,TX 76140
Re:Acceptance Letter
Project Name: Marine Creek Interceptor Improvements Sanitary Sewer Replacement Phase I Part I
Project Type: Sewer
Project Ns: 02223
D.O.E. Ns: N/A
Contract N-r 49565 Dated: 8/15/2017
Gentleman:
On December 12,2019 a final inspection was made on the subject project. There were no punch list items
identified at the time. The final inspection indicates that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on December 12,2019,which is the date of final
inspection and will extend for(2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance,please feel free to contact me at(817) 392-6054
Yours Truly,
�OA o ti
Tony Sholola,P.E.,Assistant Director Water Department
Mp /
cc: Chris Harder,P.E.,Director,Water Department
Laura Wilson,P.E.,Deputy Di ector,\Vater Department
Captain Michael Strains,Fire Department
Roger Hauser,Field Operations Superintendent,Vlater Department
Bill Lundvall,Field Operations Superintendent,%V/aste Water Department
Robert Sauceda,P.E.,Walter Norwood,P.E.,Project Manager
HDR,Consultant
Circle C Construction Co.,Contractor
David Johnson,Inspection Supers,isor,'Nater, Engineering and Fiscal Services
Virginia Garcia Wade,David Johnson,Inspector,Water Engineering and Fiscal Services
File