Loading...
HomeMy WebLinkAboutContract 53215-AR1 CSC No.53215-AR1 PORT WORTH, City of Fort Wortlt 1� Construction Allowance Request Project Name KELLER-HASLET DRAINAGE IMPROVEMENTS City Sec# 1 53215 Client Projectff(s) 1 0 6697/1 01 4 9 2 Projecl Drainage Improvements for Keller-Haslel Road Description Contractor MCMAHON CONTRACTING L.P. CA111 1 1 Date[- 11/1512020 City Project IVIgr.1 Mike Bennett City Inspeclorl William Maltegal UNIT w DGPi IFAY vhter Sewer Totals ConlractTlnte CD Original Contract Amount 1 7 7 505.78 7 7 505.78 180 Extras to Dale $170188,52 178180.52 42 Credits to Date Current Contract Amount 1895694,30 1895694.30 222 Amount of Proposed Allocation 24 834.98 0,00 0,00 24 634.98 30 Original Allowance Available to AllocaUon $105,000.00 $105,000.00 252 Allowance Funds Previously Allocated $0.00 0.00 Revised Allowance Balance 80165.02 $0.00 $0.00 $80165.02 JUSTIFICATION(REASONS)FOR CONSTRUCTION ALLOWANCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments): There are irrigation lines that suround the the project area. The lines are owned by the McPherson HOA.Several(Ines were damaged during the construction of the project. The purpose for the oonstruclion allowance is to provide funding for small known unknown risks like irrigation lines. A portion of this allowance will go to the repair of the irrigation lines. The survey for the project was completed a couple years prior to the construction beginning. Since that design survey,vegetation expanded and trees grow from saplings to more established trees. This allowance will cover the cost of additional tree removal. There is an asphalt drive approach at the very edge of the project. Reconstruction of lice drive approach was not originally included in the project because it appeared to fall outside the footprint of the project. In hindsight,the small sliver of asphalt is right at the edge of the project and by not repaving this asphalt section the project does riot look complete. This allowance will cover the cost for reconstructing the asphalt drive approach. It Is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or Incidental to,tite above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Cmdractors Company Na fe Contractor(Name) Contract Signallu Date Nod 4G �Jc �u•u r--- �!VTest r spection Supervisor Date Projecl and Contract Compliance Manager Date 1-14, Dec2020 miKnhn" Dec2,2020 yr� Program Manager Dec2Date Senior.Capital Project Officer Dec Date WW11 4.'rreL�Aceveda�E. Assistant Director(Dept) Date Director,Contracting Department(Dept) Dale L—A';"- Dec 7,2020 -- Dec 7,2020 Assistant City Attorney Date Assistant City Manager Dale Dec 11,2020 m 110 Dec11,2020 mao.w,o.oun 4,d.64VUn�� _ _ a FoeT a ATTEST:yy „, p p1.Fo°°°°°°�o�L����� Q Z P.8 Mary J.Kayser,City Secretary pvo os� PPQ*000 *� aka TEXASo°p ��bd0444 OFFICIAL RECORD Construction Allowance SUMMARY CITY SECRETARY Page 1 of 4 FT.WORTH, TX rOR'1' /01t'l'H: City of Fort Worth Construction Allowance Additions Project Name r I<ELLER-HASLET DRAINAGE IMPROVEMENTS City Sec It 0 Client Project II 1 101697/101492 Contractor MCMAHON CONTRACTING L.P. PM Mike Bennett Inspectorl William Maltegal Construction Allowance Submittal 11 Dale ADDITIONS ITEM DESCRIPTION DEPT Qly Unit Unit Cost Total Drainage uleariumb/Haul ultx ra32 1 rees Asphalt epair on lw—ff—er—Raslet ana utfus nve raga ion Hopair TF 2,a3.Oa Water $0.00 sewer $0.00 Total ons Construction Allowance Additions Page 2 of 4 POR'r WORTII, City of Fort Worth —" Construction Allowance Value Project Name I KE LER-HASLET DRAINAGE IMPROVEMENTS City Sect! CllentProlect# 1 101697/101492 ConUactorl MCMAHON CONTRACTING L.P. I PMj Mike Bennett Inspectorl William Maltegat Con sWclion Allowance Submittal ll © Date CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total 40 Drainage Construction Allowance 0.33 EA $75,000.00 $24,834.98 Construction Allowance Value 3of4 M/SBE for this Construction Allowance Request M/SBE Sub Type of Service Amount for this CAR Total $0.00 Previous Construction Allowance Requests CAR# DATE AMOUNT None Total Construction Allowance MSBE Data Page 1 of 1