HomeMy WebLinkAboutContract 52634-CO1 FORT WORTH City of Fort Worth
Change Order Request CSC No.52634-COI
Project Namel Trffic Signal Mods and Upgrades at Various Location throughout the City City Sec# 52634
Client Project#(s)l 101729
Project Description Traffic Signal Modification and Upgrades contrac for varoios construction projects
Contractorl Siemens Mobility,Inc. Change Order ft 1 Date 11/23/2020
City Project Mgr.1 Yang Jin City Inspectorl Cedric Dorsey
Dept. TPW Contract Time
Totals CD
Original Contract Amount $7,10"00.00 5750,000.00 365
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date 5750.DD0.00 S760 000.00 365
Amount of Pro osed Change Order $0.00
Revised ContractAmounl $750,000.00 S750,000.D0 365
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO S0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) S937.500.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Additional bid items that were not included in the original contract are needed in order to construct proposed improvements.The additional bid items will not increase the total
contract amount.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money)for all costs arising out of,or incidental to,the above Change Order.The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract,including ens in all performance and reporting requirements.
Contractor's Company Name Contraaor Name Contra nature Date
Siemens William Tucker.Jr f 2�7•ZO
Transporlationand Public Works Date Transportation and Public Works Date
Yano Jin vans iin
Ra nish Gupta
.�,.P ,, Date Transportation
Transportation and Public Works and Public Works Date
c Y 1J n0.
Tanya Brooks `�
��- „ William
City of Fort Worth L I Date CMO Date
Doug Black Dana Burghdoffl-0.1-11,
,._,,..
Data
Date Date
Coundl Acton i(raquir4
M&C Number NIA M&C Date Approved NIA
/ATTTTESTQ: OR
.�/��
ba44��ngp
Mary J.Kayser,City Secretary �01oo-0--.4k&
c'.° 'add
_moo
Pvo oo=A
Pp 00 o o*dd
Oao oIV
a 00000a a
a>Z nEX A5o4p
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
Yang Ji(in, P.E., PTOE
Engineering Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth
Change Order Additions
Project Name I Trffic Signal Mods and Upgrades at Vanous Location throughout the City City Sec M
Client Project# 101729
Convactorl Siemens Mobility,Inc. PMJ Kassem Elkhalil Inspector Cednc Dorsey
Change Order Submittal Date 11
AUUI I IONS
Unit I Unit-c4stotal
umtsry ns �ncn an mch)Condurts,in same ditch
Install video presence detecton device
umis nsta video Presence detection e
Install ish-ye Uelection 5ystem nd bmart.Mic,Vision or similar)
lUb Furnish and InstallInstall is-ye Detection ys em(Und Smart Mio ision
emove etewon FdaUle7PVr-
IIJA o
l'umish/Install calWe cable
Install catoie cable
wap communication device em,
In3t8I1 Radio Communication unit
roue Snooting for communication unit(4U Modem.Radio) �.
roor inters n,con urts and grouncl boxes
lFstall I ype 41 SignalPole .
lblb Install ype 42 bignalPole
Install ype 43 Signale Ipw
Idlu Install ype 44 Signalo
Install ype 45 SignalPole
Install I ype 4b bignalPole
Install traffic sign on mast arm,vertical shaft or post
Install c sign wth post
iWA Remove itgrit nirture o
Remove tremc related sign(other than Metrosign o,
a ice support per omcer our
Install railroad an out sign
I
Jam» .v�J.I:V
Ub Ofa CO210n5 �+i.0 JVJ
Change Order Additions Page 2 of 4
Fn .t. VOR I+ City of Fort Worth
Change Order Deletions
Project Name Trffic S nal Mods and U ades at Various Location throughout the City City Sec: 263a
Client Project- 1 101729
Contractor Siemens Mobility,Inc. PMj Kassem Elkhelil InspectorCedric Dorsey
Charip Order Submidal+ = Dale iIfX020
UhLF I TUNS
unit NI otal
luu umis ns System btand Alone
IN Fumishiln stall Hyloncl e ys m
t-UMISM InSitall A um Sign Mast Arm MountecoSign)
n um Ign nl
283 umis nsta um gn nt 1
294 FsTalf sign(Traffic Sign orSign)
emove Sgn(Traffic Ign or Metro n I.
9 $241.883.00
0 oa eeoons
Change Order Deletions Page3of4
MISBE for this Change Order
iV,/SB Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT �
I�
Total $0.00