Loading...
HomeMy WebLinkAboutContract 52596-CO1 CSC No. 52596-001 FORT WORTH. City of Fort Worth Tw r Change Order Request Project Name I Trffic Signal Mods and Upgrades at Various Location throughout the City City Sec# 52596 Client Project#(s)1 101729 r Project Description Traffic Signal Modification and Upgrades contrac for varoios construction projects Contractor EARTC Change Order# t Date 1112312020 —71 City Project Mgr.1— Yang Jin --] City Inspector Cedric Dorsey J Contract Time Dept TPW Totals (CD) Original Contract Amount $750,000.00 $750,000.00 365 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $750,000.00 $750,000,00 365 Amount of Proposed Change Order $0.00 Revised Contract Amount $750,000.00 $750.000.00 365 Original Funds Available for Change Orders $0,00 Remaining Funds Available for this CO $0.00 Additional Funding(I necessary) CHANGE ORDERS fo OA TE(fNCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00% MAXALLOWABLE CONTRA CT AMOUNT(ORIGINALCONTRACTCOST+25%) $937,500.00 JUSTIFICATION(REASONS)FOR CHANGE ORDER Additional bid items that were not included in the original contract are needed in order to construc proposed improvements. The additional bid items will not increase the total contract amount. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money)for all costs arising out of,or incidental to,the above Change Order, The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name Contractor(Name) Co re IDate EARTC Carlos Reyes Ih- :1 11/24/2020 Transportation and Public Works Date Transportation and Public Works Date Yang Jin Rajnish Gupta Transportation and Public Works Date Transportation and Public Works Date Tanya Brooks William Johnson City of Fort Worth Legal Date CMO Date Doug Black Dana Burghdoff Date Date Date Council Action(if reau ired) M&C Number NIA M&C Date Approved NIA A�:�! p4�11 *oR n� o O Mary J.Kayser,City Secretary p�° °o?.r0 Ov8 g=d P g A a�a o°o. °o*�d albi000000 zxiA o OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Yang Jin, P.E., PTOE Engineering Manager OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX City of Fort Worth Change Order Additions Projed Name I Trffic Siqnal Mods and Upgrades at Various Location throughout the City_ City Sec# 52546 ClientProjKt# 101229 7771 Contraclor EARTC PM Karst rduElklta1ri InspectorE Cedric Dorsey Change Order Submittal# 0 Date 11f23f2020 ADDITIONS l tPI Qty Unit nit Cost total [(A Instal 9-4rich sidewalk curo IIr uu Lr M.00 00,017 276 Install Retaining wall(higher than -inc I eW v v 41R umis nsta 2-inchan -In Conduits In same aitch I Ir r 3uu.uu uuuuu It C7. $b,oVV.W MA Install video presence etecbon mce I i rw p. 51, . u .vu 8A FumtshFnstall video presence detection I FVV 6.v 5, 112A Install Is ye Detection System fund 5mart.Mio Vision or similar) III-WV 3.01i11MN 6,6/U.0 un lFumish arid Install Install Fish-Eye Delection System mart,Mio Vision q I PVV Z.VJAAAJW u, I Remove detection a irVv ti 9 A Fi;mishilristall cat leca le r 3W. u Lr au 1, 1. 11 Install cat5le cable W .uuu uuu u_uu 5577 „ a* p communication device(Modem,P Z) w 4u u uu sb. .0v t 5B ns I Radio Communication unit I w 5.uu uuuu rA a roub a oobng forcommumraUon unn(4 Mo em, as p Ie 000000 ac 1,a IoBA [Proof intersection.conduits an group xes levy .13UUU1300 ,u 1 1A Instal Type 41 Signaloe I W 5.suuuuuuvu EA $2,61M.011 $13'VVQ.u0 1 1Install Type 42 Signal Poie I IYY4 570000005 31 J.u0u.1Ju a nstall Typea3 Signal Pole IIYW SI uuu u I Install Type 44 S Ignal Poe IIPW t,.uuuuuuoo EA S3,0.011 51 ,I 0. I Instaill I ype 45.5ignaO Pole Ir y 1Instal type 46 Signal Pole eW v uuuouu EA yW. A emOve IghtExture TPVY 12MIJUMIJ EA 565.00 31e nstall tia c sign on mast an,verticals an or post IP W 1U. U DO W.00 y[,v nstall trio c sign on mast arm,vertical shaft or post Irvy t .0 ,0 29 emove manic relate sign(other an Metro sign I IM 1 .u uvuuu U 0 0oo 3u Police support per officer(3 hour) I Irry 6.UMAK W HR 546b.0 328 instalf-ra—Iro-aa blackout sign IIrW , Zv. I TPW 5218,601.00 Sub Total Additions ,tivl.OU Change Order Additions Page2&4 F2LrT�+7�Z City of Fort Worth "T Change Order Deletions Project Name [ Trf6o Signal Mods and Upgrades at Various Location througbout the C_ C y Sec# 52596 CIient Project# 19t729 Connector EARTC PM Kos wit Elkhalil nspectc Ced Do sey Change Or4erSubmittalk Date 1 1 12 31202 0 UtLtt1ONS ltM jlzscmpli DEPi aty U-04nitUOU coal 1FumMlnslall BBU System Stand Alone I I PYV S7,222.5C $14,445.Ot1 104 11-unniShAnstail Hyona Uetection a m I ljvv uuu 7, .0 s aa,10.00 2& Fumrs nstallAlum Sign Mast Ann oun[ etro gn uuuuouuu 0zcuu 2 Itnstall Alum Sign MastArm Mount eho gn u.0 zw lFumnshfinstall Alum Sign Px.Pole Mount JTPWV. .uu nsw Sign ra c Sign or MetroSign) ssu.ut u emwe Ssign(Tra c gnat evo gn lipw L,y, 1 WNUULI 1 i TPW 1218.601.00 otal Deletions sz Change Order Deletions Page ll Of 4 M1SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00