HomeMy WebLinkAboutContract 52596-CO1 CSC No. 52596-001
FORT WORTH. City of Fort Worth
Tw r Change Order Request
Project Name I Trffic Signal Mods and Upgrades at Various Location throughout the City City Sec# 52596
Client Project#(s)1 101729
r
Project Description Traffic Signal Modification and Upgrades contrac for varoios construction projects
Contractor EARTC Change Order# t Date 1112312020
—71
City Project Mgr.1— Yang Jin --] City Inspector Cedric Dorsey
J
Contract Time
Dept TPW Totals (CD)
Original Contract Amount $750,000.00 $750,000.00 365
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $750,000.00 $750,000,00 365
Amount of Proposed Change Order $0.00
Revised Contract Amount $750,000.00 $750.000.00 365
Original Funds Available for Change Orders $0,00
Remaining Funds Available for this CO $0.00
Additional Funding(I necessary)
CHANGE ORDERS fo OA TE(fNCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00%
MAXALLOWABLE CONTRA CT AMOUNT(ORIGINALCONTRACTCOST+25%) $937,500.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Additional bid items that were not included in the original contract are needed in order to construc proposed improvements. The additional bid items will not increase the total
contract amount.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money)for all costs arising out of,or incidental to,the above Change Order, The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor(Name) Co re IDate
EARTC Carlos Reyes Ih- :1 11/24/2020
Transportation and Public Works Date Transportation and Public Works Date
Yang Jin Rajnish Gupta
Transportation and Public Works Date Transportation and Public Works Date
Tanya Brooks William Johnson
City of Fort Worth Legal Date CMO Date
Doug Black Dana Burghdoff
Date
Date Date
Council Action(if reau ired)
M&C Number NIA M&C Date Approved NIA
A�:�! p4�11
*oR n�
o O
Mary J.Kayser,City Secretary p�° °o?.r0
Ov8 g=d
P g A
a�a o°o. °o*�d
albi000000
zxiA o
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
Yang Jin, P.E., PTOE
Engineering Manager
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
City of Fort Worth
Change Order Additions
Projed Name I Trffic Siqnal Mods and Upgrades at Various Location throughout the City_ City Sec# 52546
ClientProjKt# 101229 7771
Contraclor EARTC PM Karst rduElklta1ri InspectorE Cedric Dorsey
Change Order Submittal# 0 Date 11f23f2020
ADDITIONS
l tPI Qty Unit nit Cost total
[(A Instal 9-4rich sidewalk curo IIr uu Lr M.00 00,017
276 Install Retaining wall(higher than -inc I eW v v
41R umis nsta 2-inchan -In Conduits In same aitch I Ir r 3uu.uu uuuuu It C7. $b,oVV.W
MA Install video presence etecbon mce I i rw p. 51, . u .vu
8A FumtshFnstall video presence detection I FVV 6.v 5,
112A Install Is ye Detection System fund 5mart.Mio Vision or similar) III-WV 3.01i11MN 6,6/U.0
un lFumish arid Install Install Fish-Eye Delection System mart,Mio Vision q I PVV Z.VJAAAJW u,
I Remove detection a irVv ti
9 A Fi;mishilristall cat leca le r 3W. u Lr au 1, 1.
11 Install cat5le cable W .uuu uuu u_uu 5577
„ a* p communication device(Modem,P Z) w 4u u uu sb. .0v
t 5B ns I Radio Communication unit I w 5.uu uuuu rA a
roub a oobng forcommumraUon unn(4 Mo em, as p Ie 000000 ac 1,a
IoBA [Proof intersection.conduits an group xes levy .13UUU1300 ,u
1 1A Instal Type 41 Signaloe I W 5.suuuuuuvu EA $2,61M.011 $13'VVQ.u0
1 1Install Type 42 Signal Poie I IYY4 570000005 31 J.u0u.1Ju
a nstall Typea3 Signal Pole IIYW SI uuu u
I Install Type 44 S Ignal Poe IIPW t,.uuuuuuoo EA S3,0.011 51 ,I 0.
I Instaill I ype 45.5ignaO Pole Ir y
1Instal type 46 Signal Pole eW v uuuouu EA yW.
A emOve IghtExture TPVY 12MIJUMIJ EA 565.00 31e
nstall tia c sign on mast an,verticals an or post IP W 1U. U DO W.00 y[,v
nstall trio c sign on mast arm,vertical shaft or post Irvy t .0 ,0
29 emove manic relate sign(other an Metro sign I IM 1 .u uvuuu U 0 0oo
3u Police support per officer(3 hour) I Irry 6.UMAK W HR 546b.0
328 instalf-ra—Iro-aa blackout sign IIrW , Zv.
I
TPW 5218,601.00
Sub Total Additions ,tivl.OU
Change Order Additions Page2&4
F2LrT�+7�Z City of Fort Worth
"T Change Order Deletions
Project Name [ Trf6o Signal Mods and Upgrades at Various Location througbout the C_ C y Sec# 52596
CIient Project# 19t729
Connector EARTC PM Kos wit Elkhalil nspectc Ced Do sey
Change Or4erSubmittalk Date 1 1 12 31202 0
UtLtt1ONS
ltM jlzscmpli DEPi aty U-04nitUOU coal
1FumMlnslall BBU System Stand Alone I I PYV S7,222.5C $14,445.Ot1
104 11-unniShAnstail Hyona Uetection a m I ljvv uuu 7, .0 s aa,10.00
2& Fumrs nstallAlum Sign Mast Ann oun[ etro gn uuuuouuu 0zcuu
2 Itnstall Alum Sign MastArm Mount eho gn u.0
zw lFumnshfinstall Alum Sign Px.Pole Mount JTPWV. .uu
nsw Sign ra c Sign or MetroSign) ssu.ut u
emwe Ssign(Tra c gnat evo gn lipw L,y, 1 WNUULI
1
i
TPW 1218.601.00
otal Deletions sz
Change Order Deletions Page ll Of 4
M1SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00