Loading...
HomeMy WebLinkAboutContract 54411-CO1 F_ORTWORTH_ , City of Fort Worth Change Order Request CSC N.54411-CO1 Project Name I East 1st Street Bridge Improvements City Sec# 54411 Client Project 4(s) 100575 33005-0800450-5740010-100575-005080-9999 Project East 1st Street Bridge Improvements Description Contractor Fort Worth Civil Constructors,LLC Change Order# 1 Date 121112020 City Project Mgr. Carlos M Gonzalez City Inspector Ryan Garrett Miller Contract Time Dept. PARD Totals CD Original Contract Amount $836,554.59 $836,554.59 180 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $836,554.59 $836,554.59 180 Go to ADD&DEL Tabs to Enter CO Backup $20,642.28 $20,642.28 Revised Contract Amount $857,196.87 $857,196.87 180 Original Funds Available for Change Orders $40,000.00 $40,000.00 Remaining Funds Available for this CO $40,000.00 $40,000,00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.47% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,045,693.24 JUSTIFICATION(REASONS)FOR CHANGE ORDER During construction,the plan calls for the removal of the existing asphalt road at 9"deep to install a new concrete trail at the same location. However,during the removal,it was discovered the abandoned roadway was 13 to 14 inches deep. The contractor was asked to provide a quote to remove the remains of the old road.Upon reviewing the proposed scope and pricing,staff found the fee to be fair and reasonable. The Park&Recreation Department will use the available funds in the project to award this change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. IIIIIIIIIIIIIIIIIIIIIIIII�ontractor's Company Name Contractor Name Contract Signature Fort Worth Civil Constructors,LLC Austin Alumbua h —4"'aa Dec 9,2020 Inspector/inspection Supervisor Date Project Mana erlPro ram ana er Uate Dec 18,2020 (�,�/.�. -��..�/.: �� Dec 18 2020 Rai ld—dav,o.�18 �/ Assistant Director(Dept) Date Director,Contracting Department(Dept) Date NECre k(-21,]@0141 M Dec 21,2020 Rirr. Dec 21,2020 W(oec n,ww v:locsn Assistant City Attorney Date Assistant City Manager Date OEM, Dec 23 2020 Dec 23,2020 awck�o«ulwu lmscsn � ar�e ��¢conlacal,ww laalcsn Council Action if re uire M&C Number NIA M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth Change Order Additions Project Name East 1st Street Bridge Improvements City Sec# 54411 Client Project# 100575 33005-08D0450-574D010-100575-005080-9999 Contractor Fart Worth Civil Constructors,LLC PM Carlos M Gonzalez Inspector Ryan Garrett Miller Change Order Submittal# I—J Date 1 21112 0 2 0 ADDITIONS ITEM DESCRIPTION DEPT ty Unit Unit Cost Total 38 -5Additional Depth pa emova 2,883.00000000 SY 7.6 PARD 72D,642.28 Sub Totar7dUl—tions 20 642.28 Change Order Additions Page 2 of 4 FORT lVORTII City of Fort Worth V--- Change Order Deletions Project Name I East 1st Street Bridge Improvements City Sec# 54411 Client Project 4 1 100575 33905-0800450-5740010-100575-005080-9999 Contractor Fort Worth Civil Constructors,LLC PM Carlos M Gonzalez Inspector Ryan Garrett Miller Change Order Submittal# 1 Date 12111202D DELETIONS ITEM DESCRIPTION DEPT ty Unit Unit Cost Total PARD $0.00 Sub Tot Deetions -0.DO Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 Project: East 1st Street Bridge Improvements Project# 100575 Summary Highway: Additional Depth Asphatl Removal Date: 01 Dec 20 COR Number: 1 Item Description QTY UM Unit Price Amount 1 Additional Depth Aspahtl Removal(4"-5") 2,883,000 SY $ 7.16 $ 20,642.28 Total $ 20,642.28 Page 1 of 1 121112020 11:45 AM Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Carlos M Gonzalez Name of Employee Park Planner Title ❑ This form is N/A as No City Funds are associated with this Contract akj Carlos M Gonzalez � Fo °�Y�"'�" Printed Name Signature 2� bad44�n�� Attested by: U 4101°FORr°����� p °O�o° °00 ° °�o °'=o °° o° o P�a�nEXpSop d OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX