Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 55108
CITY SECREIARY FORT WClRTli CONTRACT FOR THE CONSTRUCTION OF Water & Sanitary Sewer Replacement Contract 2019, WSM-B (Lead Services Replacement D2) City Project No. 102169 Betsy Price David Cooke Mayor City Manager Chris Harder, P.E. Water Director William Johnson Director, Transportation and Public Works Department Prepared for The City of Fort Worth WATER DEPARTMENT August 2020 t•" •'Fx�s4�1 GARVER, LLC .Pa��.....sa�......;�H . F-5713i .e•. 121636 10/30/2020 m-YG`� FORT WORTH., City of Fort North Standard Construction Specification Documents Adopted September 2011 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page f of 5 SECTION 00 00 00 Division 00 - General Conditions Last Revised 0005 10 Mayor and Council Communication 07/01/2011 0005 15 Addenda 07/01/2011 0011 13 Invitation to Bidders 03/09/2020 0021 13 Instructions to Bidders 03/09/2020 0032 15 Construction Project Schedule 07/20/2018 0032 15.1 Construction Project Schedule BasseIine Example 07/20/2018 00 32 15.2 Construction Project Schedule Progress Example 07/20/2018 0032 15.3 Construction Project Schedule Progress Narrative 07/20/2018 0032 15.4 Construction Project Schedule Submittal Process 07/20/2018 0035 13 Conflict of Interest Statement 02/24/2020 0041 00 Bid Form 03/09/2020 00 42 43 Proposal Form Unit Price 01/20/2012 0043 13 Bid Bond 09/11/2017 00 43 37 Vendor Compliance to State Law Nonresident Bidder 06/27/2011 0045 11 Bidders Prequalifications 07/01/2011 00 45 12 Prequalification Statement 07/01/2011 0045 13 Bidder Prequalification Application 03/09/2020 00 45 26 Contractor Compliance with Workers' Compensation Law 07/01/2011 00 45 40 Minority Business Enterprise Goal 06/09/2015 00 52 43 Agreement 09/06/2019 0061 13 Performance Bond 07/01/2011 0061 14 Payment Bond 07/01/2011 0061 19 Maintenance Bond 07/01/2011 0061 25 Certificate of insurance 07/01/2011 00 72 00 General Conditions 03/09/2020 00 73 00 Supplementary Conditions 03/09/2020 Division 01 - General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 2500 Substitution Procedures 07/01/2011 01 31 19 Preconstruction Meeting 08/17/2012 0131 20 Project Meetings 07/01/2011 01 32 16 Construction Progress Schedule 07/01/2011 01 3233 Preconstruction Video 07/01/2011 01 33 00 Submittals 12/20/2012 01 35 13 Special Project Procedures 12/20/2012 01 4523 Testing and inspection Services 03/09/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 58 13 Temporary Project Signage 07/01/2011 01 6000 Product Requirements 03/09/2020 CITY OF FORT WORTH WATER AND SANITARYSEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) Revised March 9, 2020 City Project No. 102169 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 5 01 6600 Product Storage and Handling Requirements 07/01/2011 01 7000 Mobilization and Remobilization 11/22/2016 01 71 23 Construction Staking and Survey 02/14/2018 01 7423 Cleaning 07/01/2011 01 77 19 Closeout Requirements 07/01/2011 01 78 23 Operation and Maintenance Data 12/20/2012 01 7839 Project Record Documents 07/01/2011 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Date Division 02 - Existing Conditions Modified 0241 14 1 Utility Removal/Abandonment Division 03 - Concrete None Division 26 - Electrical None Division 31 - Earthwork None Division 32 - Exterior improvements None Division 33 - Utilities 33 12 10 1 Water Services I -inch to 2-inch Division 34 - Transportation 34 71 13.01 1 Traffic Control — Neiahborhood Street Proiects CFW Utility Construction Policy — 2019 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httn:l/fortworthtexas. guv/t=/contractors/ or h s.., awns.fortworthtexas.E!ov/ProiectResourcesl Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 12/20/2012 0241 14 Utility Removal/Abandonment 12/20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/2012012 0334 13 Controlled Low Strength Material (CLSM) 12/20/2012 0334 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical None CITY OF FORT WORTH WATLR AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATTON DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-13(LEAD SL'RVICES REPLACEMENT 132) Revised Mani) 9, 2020 Cily PrajecT No. 102169 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 5 Division 31 - Earthwork 31 1000 Site Clearing 12/20/2012 31 23 16 Unclassified Excavation 01/29/2013 31 2500 Erosion and Sediment Control 12/20/2012 Division 32 - Exterior Improvements 3201 17 Permanent Asphalt Paving Repair 1212012012 3201 18 Temporary Asphalt Paving Repair 12/20/2012 3201 29 Concrete Paving Repair 12/20/2012 32 11 23 Flexible Base Courses 12/20/2012 32 12 16 Asphalt Paving 12/20/2012 32 13 13 Concrete Paving 12/20/2012 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Rams 06/05/2018 32 1373 Concrete Paving Joint Sealants 12/20/2012 32 16 13 Concrete Curb and Gutters and Valley Gutters 10/05/2016 32 1723 Pavement Markings 11 /22/2013 32 1725 Curb Address Painting 11/04/2013 3231 13 Chain Fences and Gates 12/20/2012 32 31 26 Wire Fences and Gates 12/20/2012 32 31 29 Wood Fences and Gates 12/20/2012 3291 19 Topsoil Placement and Finishing of Parkways 12/20/2012 32 92 13 Hydro -Mulching, Seeding, and Sodding 12/20/2012 32 93 43 J. Trees and Shrubs 12/20/2012 Division 33 - Utilities 3301 30 Sewer and Manhole Testing 12/20/2012 3301 31 Closed Circuit Television CCTV Inspection 03/03/2016 33 03 10 Bypass Pumping of Existing Sewer Systems 12/20/2012 33 04 30 Temporary Water Services 0710112011 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Sewer Mains 12/20/2012 33 05 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 3305 12 Water Line Lowering 12/20/2012 3305 13 Frame, Cover and Grade Rings — Cast Iron 01/22/2016 33 05 13.10 Frame, Cover and Grade Rings Composite 01/22/2016 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Strictures to Grade 12/20/2012 33 05 17 Concrete Collars 12/20/2012 33 05 22 Steel Casing Pie 12/20/2012 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 06/19/2013 33 05 26 Utility Markers/Locators 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 1105 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pie 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride PVC Pressure Pie l 1/16/2018 33 1210 Water Services 1-inch to 2-inch 02/14/2017 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) Revised March 9, 2020 City Project No. 102169 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 5 33 1220 Resilient Seated Gate Valve 12/20/2012 33 1225 Connection to Existing Water Mains 02/06/2013 33 1240 Fire Hydrants 01/03/2014 33 1250 Water Sample Stations 12/20/2012 33 3120 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06119/2013 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 3339 10 Cast -in -Place Concrete Manholes 12/20/2012 33 39 20 Precast Concrete Manholes 12/20/2012 33 39 60 Epoxy Liners for Sanitary Sewer Structures 12/20/2012 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 07/01 /2011 33 49 20 Curb and Drop Tnlets 12/20/2012 Division 34 - Transportation 3471 13 1 Traffic Control 11/22/2013 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTR[1C LION SPECIFICATION DOCUMENTS REPLACEMENT CONTRAUF 2019, WSM-B (LEAD SERVICES RLPLACL'ML•NT D2) Revised March 9, 2020 City Proicci No. 102169 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 5 APPENDIX GC-4.01 Availability of Lands: None GC-4.02 Subsurface and Physical Conditions: Exploratory Excavation ,Sheets, Street Coring Report GC-4.04 Underground Facilities: None GC-4,06 Hazardous Environmental Condition at Site: None GC-6.06.13 Minority and Women Owned Business Enterprise Compliance: MBE Special Instructions for Offerors MBE Subcontractors/Suppliers Utilization Form MBE Prime Contractor Waiver Form MBE Good Faith Effort Form MBE Joint Venture EIigibility Form GC-6,07 Wage Rates: Wage Rate Table GC-6.09 Permits and Utilities: None GC-6.24 Nondiscrimination: None GR-01 60 00 Product Requirements: Standard Product List END OF SECTION CITY OF FORT WORTH WATER AND SANITARYSFWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTR-ACT 2019, WSM-6 (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Project No. 102169 City ®f Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, October 27, 2020 REFERENCE NO.: **M&C 20-0803 LOG NAME: 602019WSMB-GRATEX SUBJECT: (CD 9) Authorize Execution of a Contract with Gra-Tex Utilities, Inc., in the Amount of $4,933,473.30, for the 2019 Water Line and Sanitary Sewer Replacement, Water and Sewer Maintenance-B Project in Southwest Fort Worth, Adopt Appropriation Ordinances, and Amend the FY2021-2025 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a contract with Gra-Tex Utilities, Inc., in the amount of $4,933,473.30, for the 2019 Water Line and Sanitary Sewer Replacement, Water and Sewer Maintenance-B (City Project No. 102169); 2. Adopt the attached Appropriation Ordinance increasing receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $4,049,931.00, transferred from available funds within the Water and Sewer Fund, for the 2019 Water Line and Sanitary Sewer Replacement, Water and Sewer Maintenance-B project; and 3. Adopt the attached Appropriation Ordinance adjusting receipts and appropriations in the General Capital Projects Fund by decreasing receipts and appropriations in the Contract Street Maintenance programmable project (City Project No. P00020) in the amount of $1,675,131.00 and increasing receipts and appropriations in the 2019 Water Line and Sanitary Sewer Replacement, Water and Sewer Maintenance-B project by the same amount; and 4. Amend the FY2021-2025 Capital Improvement Program. DISCUSSION: This Mayor and Council Communication (M&C) is to authorize a construction contract for the replacement of deteriorated water and/or sanitary sewer mains as indicated on the following streets located south of Interstate Highway (IH) 30 and west of IH 35W in the Las Familias de Rosemont, Shaw Clarke and Worth Heights neighborhood areas: Street From To Scope of Work Wayside Avenue W. Butler Street W Dickson Street 11 Water Townsend Drive W. Devitt ]EWBiddison Street Street Water Woodland Street College Avenue S. Henderson Street Water 5th Avenue St Butler JFW- Street Dickson Street Water W. Drew Street Hemphill Street 6th Avenue Water Malta Avenue College Avenue Union Pacific Railroad Right-of-way Water College IlUnion Pacific Railroad In conjunction with replacement of the water and sewer mains, all connecting lead services will be removed and replaced. There are a total of 91 lead services that have been identified that will need to be replaced as part of this contract. Additionally, asphalt pavement rehabilitation will be conducted on all streets subsequent to the water and sanitary sewer main replacement. The Transportation & Public Works Department's share of this contract is $1,402,515.40 and the Water Department's share of the contract is $3,530,957.90. The project was advertised for bids on August 26, 2020, and September 3, 2020, in the Fort Worth Star - Telegram. On September 24, 2020, the following bids were received: Bidder Amount Time of Completion Gra-Tex Utilities, Inc. 11 $4,933,473.30 430 Calendar Days Woody Contractors, Inc. $5,108,270.25 FNH Construction, LLC $5,747,673.50 Belt Construction, Inc. $5,775,703.001 Jackson Construction, Ltd. $6,094,564.00 Omega Contracting, Inc. $6,102,479.20 In addition to the contract amount, $607,839.00 (Water: $384,797.00; Sewer: $20,553.00; Paving: $202,489.00) is required for project management, material testing and inspection, and $183,749.70 (Water: $102,632.80; Sewer: $10,990.30; Paving: $70,126.60) is provided for project contingencies. The sanitary sewer component of this project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. This project will have no impact on the Transportation & Public Works' or the Water Department's operating budgets when completed. Construction is expected to start in January 2021 and be completed by April 2022. The General Capital funding was included in the 2021-2025 Capital Improvement Program for project P00020. In order to administratively track the spending of all funding sources in one project, appropriation ordinances are needed to move appropriations from the programmable project to the jointly funded static project. This action will amend the 2021-2025 Capital Improvement Program as approved in connection with Ordinance 24446-09-2020. Appropriations for the 2019 Water Line & Sanitary Sewer Replacement, Water and Sewer Maintenance-B (WSM-t3) project are as depicted below: Fund Existing Appropriations Additional Appropriations Project Total* Water & Sewer Capital Projects $434,317.00 $4,049,931.00 $4,484,248.00 Fund 56002 General Capital Projects Fund $0.00 $1,675,131.00 $1,675,131.00 30100 Project Total $434,317.00 0011 *Numbers rounded for presentation purposes. MIWBE OFFICE: Gra-Tex Utilities, Inc., is in compliance with the City's BDE Ordinance by committing to 23 percent MBE participation on this project. The City's MBE goal on this project is 13 percent. The project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION 1 CERTIFICATION: The Director of Finance certifies that funds are available in the current operating budget of the Water & Sewer Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in these W&S Capital Projects Fund and the General Capital Projects Fund 2019 WSM-B project. Prior to any expenditure being incurred, the Water and Transportation & Public Works Departments have the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs): TO Fund Department ID FROM FundJ Department ID _.. — CERTIFICATIONS: project Programctivityl Budget Reference # mou ID II Year I (Chartfield 2) n Project Program �r-tivity Budget Reference # moun ID Year (Chartfield 2) Submitted for City Manager's Office by'. Dana Burghdoff (8018) Originatinq Department Head: Chris Harder (5020) Additional Information Contact: Pratima Poudyal (6149) ATTACHMENTS 1. 602019WSMB-GRATEX Compliance Memo.pdf (CFW Internal) 2. 602019WSMB-GRATEX FID Table (WCF 10.07.20) V2.xlsx (CFW Internal) N N N N N H 1-1 N W W N N N N W W W W N N N hi Ln U'i Cn U-1 Ln Ln Ln Ln Ln W W Ln Ln Ln Ln W W W W Ln Ul Ln m m m m m m m m O O m m m m O O O O m m m Ol O O O O O O O O 1-' Y O O O O - Y Y Y �-' O O 0 0 O N O N 0 N 0 N O N O N O N O hi 0 0 0 0 0 N 0 H q !.! O Y O 0 0 0 0 0 0 0 O N O N 0 N 0 N w r � O CD CD CD CD O O CD 0 0 0 0 0 O CD O CD O 0 0 0 0 m m m (n m O) m m N N V V m m 1.1 N N N V V Ol m O 0 0 O 0 0 0 00 0 0 0 CD CD 40 00 O CD 0 CD A O A O A O A O A O A O A O A 0 4A 0 .P O A lD O 0 A LO O 0 A 0 A 0 A 0 A Q A O A 0 0 A W W W W W W W W W W W N W N W W W W W W W W 00 0 O O O CD A H Y 0 0 O O Ln 1-` W H H 0 0 0 Cl io u) Ln Ln W W in A A A Ln A A A A A W W W Ln V V H LD LD LD L0 LD LO LO LO LD LO LD H H W A A A H Ln Y Y [n ut Ln Ui I--� Ln Ln CD Y O W O Ln CD Y CD a CD O O m O CD O m O m O Ln O m O 0 Y 0 Y m O m O if m 0 0 Y Y 0 0 O CD O CD CD 0 0 CD O O CDH O CDH Y CD CD H Y Y Y Y 0 Y 0 1--� Y H Y Y Y H W W H Y H Y Y H I Y 1--� q 0 O CD CD CDO O 0 0 O O 0 0 0 0 CD 0 0 0 N N h1 Pi N N N N O N N N O N CD N N Ili I- Y H H Y Y Y Y Y O Y Y Y O Y O Y Y H Y m m m m m m m m m N Cl) m m N m N m m m m LD D W LO LO 1D LD LD LO O LD to LD 0 LO CD ID 10 10 LD w O CD O O O O CD CD v 'n O O CD Y O H O Y O Y O O C.O O O O V V V V V V V V A n V V m m m w 0a W W bo co W W Ln A A C. O O O CDO LD r- O O N LO lD LD L0 m LO m LO L0 LO LO N N Ni 1J N N N LD LO W LO LD LO LO LD LO LO W LO W LO LO LD LD LD LO LO LD LO LD LE) O N O N 0 N 0 N O N O N O N O N W LD LD LD LO LO L0 LO • W LO LO LD Y Y Y H Y Y Y Y ■• 0 • 'A 46 N iA V V> O N iA V LO CDA Y �-' LD d w 0 Y A Y A LO 0 LD 0 m O m N Y O W 1 co 00 H Y 06 OO A? O M o A A A A �A I �P A A A pF N V O W m V 00 A A DD w A A 0v co r+ 03 :P o N A A ¢ O O p 0 N w O - O 0 0 Q CDC7 O d CD CD 0 0 0 0 0 0 .. 0 0 o O Y N N N I-+ Y N N W In (n ui win (n Ln O CD d O O CD O O O N O N O N CD N O N d N C7 N ON OV CD J V V V V O O O O O d d d W W W W W W W W F- d O O O O O O Ln V W W W V V F, W d O O O O O O G) O W W (n O O Y O Y O (n d (n d O 0 F-A 0 F-` O O Y O F> d 0 0 0 CD O d CD d N N N N N N N N Y Ql lD of (D w Ol lO Cl)Q7 lD l0 W l0 Ql lD Ql lD CD d0 dd O OO 4 O 4 -A V V V V V V V 00 00 00 00 00 00 00 00 O In .A 4p O O O O (D (D to w W W W W (0 (D (D (D (D (D to (D (D (D (D w w w (D w ifT 41 00 N l O CD A N -P ? 00 w w w A Ln m Y W W O W A Y W 00 p d W Fn V LnCDO CD CD --AW 0 'A CD O CD O CD CDCD Home Legislation Details Reports File #: Type: File created: On agenda: Title: Attachments: Calendar City Council Departments Sian In A © 0 Share I RSS , v ?"10005 M&C 20-0803 Version: 1 Name: Award of Contract Consent Status: Passed 10/22/2020 In control: CITY COUNCIL 10/27/2020 Final action: 10/27/2020 (CD 9) Authorize Execution of a Contract with Gra Tex Utilities, Inc., in the Amount of $4,933,473.30, for the 2019 Water Line and Sanitary Sewer Replacement, Water and Sewer Maintenance-B Project in Southwest Fort Worth, Adopt Appropriation Ordinances, and Amend the FY2021-2025 Capital Improvement Program 1. M&C 20-0803, 2. M & C Map - 60WSSC19WSMB=GRATEX.pdf, 3. M & C Mag - 60WSSC19WSMB-GRATEX(2Jpdf, 4. M & C Map - 60WSSC19WSMB-GRATEX(3).pdf, 5. M & C Map - 6QWSSCI9WSMB-GRATEX(44).pdf,, 6. 602019WSMB- GRATEX 56002 A021(R2)pdf, 7. 602019WSMB-GRATEX 30100 A021(R3).pdf History (1) Text 1 record Group Export Date Ver. Action By 10/27/2020 1 CITY COUNCIL Action Result Action Details Meeting Details Video Approved Action details Meeting details Not available 000510-1 MAYOR AND COUNCIL COMMUNICATION (M&C) Page 1 of 1 I SECTION 00 05 10 2 MAYOR AND COUNCIL COMMUNICATION (M&C) 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 END OF SECTION CITY OF FORT WORT14 WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT D2) Revised July 1, 2011 City Project No. 102169 CITY OF FORT WORTH WATER DEPARTMENT DATER AND SANITARY SEVER REPLACEMENT CONTRACT 2019, VSM-R City Project NO. 102169 ADDENDUM NO. a Unit 1. o Water Unit 2 o Sanitary Sewer Unit 3 — Paving Improvement Addendum No 1 issued: September 14, 2020 Bid Receipt Date: September 24, 2020 This Addendum forms part of the Specifications and Contract Documents and modifies the original Specifications and Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided below and acknowledge receipt on the outer envelope in your bid. Failure to acknowledge receipt of this addendum could subject the bidder to disqualification. The Specifications and Contract Documents for City Project No. 102169 are hereby revised by this Addendum No. 1 as follows: 1. Specifications Section 00 42 43 — PROPOSAL FORD to be REPLACED in its entirety with attached revised PROPOSAL FORM. This Addendum No. 1 forms part of the Specifications and Contract Documents for the above referenced project and modifies the original Project Manual & Contract documents of same. Acknowledge your receipt of Addendum No. 1 by completing the requested information at the following locations: (1) in the space provided in Section 00 4100, Bid Form, Page 3 of 3, and (2) indicate in upper case letters on the outside of your sealed bid envelope "RECEIVED AND ACKNOWLEDGED ADDENDUM NO. 7" Include a signed copy of Addendum No. 1 in the sealed bid envelope at the time of bid submittal. Failure to acknowledge receipt of Addendum No. 1 below could cause the subject bidder to be considered "NONRESPONSIVE", resulting in disqualification. A-1 Addendum No. 1 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) CPN 102695 Addendum No. 1 Christopher Harder, P.E. RECEIPT ACK 0 LEDGED: Director, Water D�e'p7rt7 n By: _10 A rl , ef Com�Porn ��Tony ant Die P.E. y: � �Gi G'>C i � � j ('- Assistant Director, Water Department A--1 Addendum No. 1 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM--B (LEAD SERVICES REPLACEMENT D2) CPN 102695 CITY OF FORT WORTH WATER DEPARTMENT WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-13 City Project No. 102169 ADDENDUM NO.2 Unit 1 — Water Unit 2 — Sanitary Sewer Unit 3 — Paving Improvement Addendum No I issued: September 14, 2020 Addendum No 2 issued: September 21, 2020 Bid Receipt Date: September 24, 2020 This Addendum forms part of the Specifications and Contract Documents and modifies the original Specifications and Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided below and acknowledge receipt on the outer envelope in your bid. Failure to acknowledge receipt of this addendum could subject the bidder to disqualification. The Specifications and Contract Documents for City Project No. 102169 are hereby revised by this Addendum No. 2 as follows: 1. Specifications: a. 00 4100 — BID FORM to be REPLACED in its entirety with attached revised BID FORM. b. 00 42 43 — PROPOSAL FORM UNIT PRICE to be REPLACED in its entirety with attached revised PROPOSAL FORM UNIT PRICE. c. 00 52 43 — AGREEMENT to be REPLACED in its entirety with attached revised AGREEMENT. 2. Drawings: a. SHEET 2 of 50 — INDEX to be REPLACED in its entirety with attached revised SHEET 2 of 50 --- INDEX b. SHEET 39 of 50 — 8" S.S. PLAN & PROFILE STA.10+00 TO 12+00 to be REPLACED in its entirety with attached revised SHEET 39 of 50 -- 8" S.S. PLAN & PROFILE STA. 10+00 TO 12+00 c. SHEET 4A — PAVEMENT IMPROVEMENT PLAN to be ADDED to the drawing set. d. Add "Last Streets to Construct" as a construction note on the following sheets: SHEET 23 of 50 PROP. 8" WATER REPLACEMENT PLAN STA. 10+00 TO 24+00 Addendum No. 2 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) CPN 1021169 ii. SHEET 24 of 60 PROP. 8" WATER REPLACEMENT PLAN STA. 24+00 TO 26+60 iii. SHEET 28 of 60 PROP. 8" WATER REPLACEMENT PLAN STA. 10+00 TO 22+00 iv. SHEET 29 of 60 PROP. 8" WATER REPLACEMENT PLAN STA. 22+00 TO 27+43 Addendum No. 2 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) CPN 102169 This Addendum No. 2 forms part of the Specifications and Contract Documents for the above referenced project and modifies the original Project Manual & Contract documents of same. Acknowledge your receipt of Addendum No. 2 by completing the requested information at the following locations. (1) in the space provided in Section 00 4100, Bid Form, Page 3 of 3, and (2) indicate in upper case letters on the outside of your sealed bid envelope "RECEIVED AND ACKNOWLEDGED ADDENDUM NO. 2" Include a signed copy of Addendum No. 2 in the sealed bid envelope at the time of bid submittal. Failure to acknowledge receipt of Addendum No. 2 below could cause the subject bidder to be considered "NONRESPONSIVE", resulting in disqualification. Addendum No. 2 RECEIPT ACKNOWLEDGED: By: �( (-� Compa y; (cam i !' I1t Christopher Harder, P.E. Director, Water Dep . m L nt f�- By: f d�4 v 4 Tony Sholola, P.E. Assistant Director, Water Department Addendum No. 2 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-8 (LEAD SERVICE5 REPLACEMENT D2) CPN 102169 00 11 13 INVITATION TO BIDDERS Page 1 of 3 SECTION 00 11 13 INVITATION TO BIDDERS RECEIPT OF BIDS Due to the COVIDI9 Emergency declared by the City of Fort Worth and until the emergency declaration, as amended, is rescinded, sealed bids for the construction of Water and Sanitary Sewer Replacements Contract 2019, WSM-B, CPN 102169 ("Project") will be received by the City of Fort Worth Purchasing Office until 1:30 P.M. CST, Thursday, September 241', 2020 as further described below: City of Fort Worth Purchasing Division 200 Texas Street Fort Worth, Texas 76102 Bids will be accepted by: 1. US Mail at the address above, 2. By courier, FedEx or hand delivery from 8:30-1:30 on Thursdays only at the South End Lobby of City Hall located at 200 Texas Street, Fort Worth, Texas 76102. A Purchasing Department staff person will be available to accept the bid and provide a time stamped receipt; or 3. If the bidder desires to submit the bid on a day or time other than the designated Thursday, the bidder must contact the Purchasing Department during normal working hours at 817-392-2462 to make an appointment to meet a Purchasing Department employee at the South End Lobby of City Hall located at 200 Texas Street, Fort Worth, Texas 76102, where the bid(s) will be received and time/date stamped as above. Bids will be opened publicly and read aloud at 2:00 PM CST in the City Council Chambers and broadcast through live stream and CFW public television which can be accessed at http:.I/fortworthtexas.gov/fwtv,. The general public will not be allowed in the City Council Chambers. In addition, in Iieu of delivering completed MBE forms for the project to the Purchasing Office, bidders shall e-mail the completed MBE forms to the City Project Manager no later than 2:00 p.m. on the second City business day after the bid opening date, exclusive of the bid opening date. GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: The necessary labor, materials, equipment, supervision to construct The Water and Sanitary Sewer Replacements Contract 2019, WSM-B, including but not limited to Water: 201 LF 6-inch Water Replacement by Open Cut 9,661 LF 8-inch Water Replacement by Open Cut 224 LF 12-inch Water Replacement by Open Cut 17 EA Fire Hydrant CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-13 (LEAD SERVICES REPLACEMENT D2) Temporarily Revised March 25, 2020 due to COVID 19 EmeTaency City Project No. 102169 00 11 13 INVITATION TO BIDDERS Page 2 of 3 Sewer: 200 LF 8-inch Sanitary Sewer Replacement by Open Cut Pavement: 8,344 LF 7-inch Curb and 18-inch Gutter 29,160 SF of 4-inch Concrete Sidewalk 39,555 SF of 6-inch Concrete Driveway 33,012 SY of 2-inch Asphalt Pavement 13,586 SY of 10-inch Pavement Pulverization PREQUALIFICATION The improvements included in this project must be performed by a contractor who is pre - qualified by the City at the time of bid opening. The procedures for qualification and pre - qualification are outlined in the Section 00 21 13 INSTRUCTIONS TO BIDDERS. DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained on-line by visiting the City of Fort Worth's Purchasing Division website at h__Ut .,"/www.fortworthtexas.goy/purchasing" and clicking on the link below to the advertised project folders on the City's electronic document management and collaboration system site. The Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. Bid Documents Folder hqps:,/d,ocs.b360.autodesk.com/ shares/ee56el 2a-096b-49ef-956f-d45327f517da Addenda https:,-/docs.b360.autodesk. com,shares/5a649dda-50aa-42dd-84cO-e9. 6115a20e72 Copies of the Bidding and Contract Documents may be purchased from Graver, LLC 500 W 7t1, Street, Ste. 1729 Fort Worth, TX 76102 817-740-9575 Call a minimum of 24 hours in advance to schedule pick up. The cost of Bidding and Contract Documents is: Set of Bidding and Contract Documents with full size drawings: $100.00 Set of Bidding and Contract Documents with half size (if available) drawings: $75.00 PREBID CONFERENCE A prebid conference may be held as discussed in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following date, and time via a web conferencing application: DATE: September 15t", 2020 TIME: 10:OOAM CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPFCFFICATFON DOCUMENT REPLACEMENT CONTRACF 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Temporariiy Revised March 25, 2020 due to COVID 19 Emergency City Project No. 102169 00 11 13 INVITATION TO BIDDERS Page 3 of 3 If a prebid conference will be held online via a web conferencing application, invitations will be distributed directly to those who have submitted Expressions of Interest in the project to the City Project Manager and/or the Design Engineer. The presentation given at the prebid conference and any questions and answers provided at the prebid conference will be issued as an Addendum to the call for bids. CITY'S RIGHT TO ACCEPT OR REJECT SIDS City reserves the right to waive irregularities and to accept or reject bids. AWARD City will award a contract to the Bidder presenting the lowest price, qualifications and competencies considered. INQUIRIES All inquiries relative to thisprocurementshould be addressed to the following: Attn: Pratima Poudyal, PE, City of Fort Worth Email: Pratima.poudyal@fortworthtexas.gov Phone: 917-392-6149 AND/OR Attn: Paul Banschbach, PE, Garver, LLC Email: PMBanschbach@GarverUSA.com Phone: 817-740-9575 EXPRESSION OF INTEREST To ensure bidders are kept up to date of any new information pertinent to this project or the COVIDI9 emergency declaration, as amended, as it may relate to this project, bidders are requested to email Expressions of Interest in this procurement to the City Project Manager and the Design Engineer. The email should include the bidder's company name, contact person, that individuals email address and phone number. All Addenda will be distributed directly to those who have expressed an interest in the procurement and will also be posted in the City of Fort Worth's purchasing website at itttp:,/fortworthtexas.gov;purchasing PLAN HOLDERS To ensure you are kept up to date of any new information pertinent to this project such as when an addenda is issued, download the Plan Holder Registration form to your computer, complete and email it to the City Project Manager or the Design Engineer. The City Project Manager and Design Engineer are responsible to upload the Plans Holder Registration form to the Plan Holders folder in BIM360. Mail your completed Plan Holder Registration form to those listed in INQUIRIES above. ADVERTISEMENT DATES August 27i1', 2020 September 3rd, 2020 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Temporarily Revised March 25, 2020 due to COVID 19 Emergency City Project No. 102169 SECTION 00 21 13 112MY38I" M[� F-10lei :1U71MXIM 1. Defined Terms 00 21 13 INSTRUCTIONS TO BIDDERS Page 1 of 10 l L Terms used in these INSTRUCTIONS TO BIDDERS, which are defined in Section 00 72 00 - GENERAL CONDITIONS. 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof. 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents. 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City (on the basis of City's evaluation as hereinafter provided) makes an award. 2. Copies of Bidding Documents 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 2.2. City and Engineer in making copies of Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use. 3. Prequafification of Bidders (Prime Contractors and Subcontractors) 3.1. All Bidders and their subcontractors are required to be prequalified for the work types requiring prequalification at the time of bidding. Bids received from contractors who are not prequalified (even if inadvertently opened) shall not be considered. Prequalification requirement work types and documentation are available by accessing all required files through the City's website at: https://apps.fortworthtexas.govfPro'ectResources/' 3.1.1. Paving — Requirements document located at; 02-Construction Documents/Contractor Prequalifcation/TPW Paving Contractor Prequalification Program 3.1.2. Roadway and Pedestrian Lighting — Requirements document located at; 02-Construction Documents/Contractor Prequalification/TPW Roadway and Pedestrian Lighting Prequalification Program CITY of FORT WORTN WATER AND SANITARY SEWER STANDARD CoNSTRUCTTON SPECIFTCATTON DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Project No. 102169 0021 13 INSTRUCTIONS TO BIDDERS Page 2 of 10 3.1.3. Water and Sanitary Sewer — Requirements document located at; 02-Construction Documents/Contractor Pre qualification/Water and Sanitary Sewer Contractor Prequ ali fi cation Program 3.2. Each Bidder unless currently prequalified, must be prepared to submit to City within seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 45 11, BIDDERS PREQUALIFICATIONS. 3.2.1. Submission of and/or questions related to prequalification should be addressed to the City contact as provided in Paragraph 6.1. 3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low bidder(s) for a project to submit such additional information as the City, in its sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information, if requested, maybe grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. 3.4.Tn addition to prequalification, additional requirements for qualification may be required within various sections of the Contract Documents. 3.5. None. 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 4.1. Before submitting a Bid, each Bidder shall: 4.1. L Examine and carefully study the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to in Paragraph 4.2. below). No information given by City or any representative of the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work. 4.1.3. Consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work. 4.1.4. None CITY OF FORT WORTI1 WATER AND SANITARY SEWER STANDARD CUNSTRUCTTON SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-IS (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Pmject No. 102169 0021 13 INSTRUCTIONS TO BIDDERS Pape 3 of 10 4.1.5. Study ail: (i) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in the Contract Documents as containing reliable "technical data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in the Contract Documents as containing reliable "technical data." 4.1.6. Be advised that the Contract Documents on file with the City shall constitute all of the information which the City will furnish. All additional information and data which the City will supply after promulgation of the formal Contract Documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.7. Perform independent research, investigations, tests, borings, and such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. On request, City may provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies. 4.1.8. Determine the difficulties of the Work and all attending circumstances affecting the cost of doing the Work, time required for its completion, and obtain all information required to make a proposal. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal is prima -facie evidence that the Bidder has made the investigation, examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. 4.1.9. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related documents. The Contractor shall not take advantage of any gross error or omission in the Contract Documents, and the City shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. 4.2. Reference is made to Section 00 73 00 SUPPLEMENTARY CONDITIONS for identification of. 4.2.1. Those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by City in preparation of the Contract Documents. The logs of Soil Borings, if any, on the plans are for general information only. Neither the City nor the Engineer guarantee that the data shown is representative of conditions which actually exist. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B {LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Project No. 102169 OD 21 13 INSTRUCTIONS TO BIDDERS Page 4 of 10 4.2.2. Those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by City in preparation of the Contract Documents. 4.2.3. Copies of such reports and drawings will be made available by City to any Bidder on request. Those reports and drawings may not be part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02. of the General Conditions has been identified and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any "technical data" or any other data, interpretations, opinions or information. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder (i) that Bidder has complied with every requirement of this Paragraph 4, (ii) that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (iii) that Bidder has given City written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by City as described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work, 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract Documents. 5. Availability of Lands for Work, Etc. 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by City unless otherwise provided in the Contract Documents. 5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- of-way, easements, and/or pen -nits are not obtained, the City reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project. CITY OF FORT WORTH WATER AND SANITARY SF.WFR STANDARD CONSTRUCTION SPECIFICATION DOCUMENT RFPI-ACF.MFNT CONTRACT 2019, WSM-13 (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Project No. 102169 0021 13 INSTRUCTIONS TO BIDDERS Page 5 of 10 5.3. The Bidder shall be prepared to commence construction without all executed right-of- way, easements, and/or permits, and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits and/or easements. 6. interpretations and Addenda 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions received after this day may not be responded to. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda delivered to all parties recorded by City as having received the Bidding Documents. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Address questions to: City of Fort Worth 200 Texas Street Fort Worth, TX 76102 Attn: Pratima PoudyaI, P.E., City of Fort Worth Email: Pratima.PoudyaI@fortworthtexas.gov Phone. 817-392-6149 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. 6.3. Addenda or clarifications may be posted via the City's electronic document management and collaboration system at http://does.6360.autodesk.com/sharesl5a649dda-50aa-42dd-84c.0-e96115a2Oe72 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or INVITATION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. 7. Bid Security 7.1. Each Bid must be accompanied by Bid Bond made payable to City in an amount of five (5) percent of Bidder's maximum Bid price on form attached, issued by a surety meeting the requirements of Paragraphs 5.01 of the General Conditions. CITY of FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Project No. 102169 0021 13 INSTRUCTIONS TO BIDDERS Page 6 of 10 7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and deliver the complete Agreement within 10 days after the Notice of Award, City may consider Bidder to be in default, rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited. Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all other Bidders whom City believes to have a reasonable chance of receiving the award will be retained by City until final contract execution. 8. Contract Times The number of days within which, or the dates by which, Milestones are to be achieved in accordance with the General Requirements and the Work is to be completed and ready for Final Acceptance is set forth in the Agreement or incorporated therein by reference to the attached Bid Form, 9. Liquidated Damages Provisions for liquidated damages are set forth in the Agreement. 10. Substitute and "Or -Equal" Items The Contract, if awarded, will be on the basis of materials and equipment described in the Bidding Documents without consideration of possible substitute or "or -equal" items. Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or - equal" item of material or equipment may be furnished or used by Contractor if acceptable to City, application for such acceptance will not be considered by City until after the Effective Date of the Agreement. The procedure for submission of any such application by Contractor and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General Conditions and is supplemented in Section 01 25 00 of the General Requirements. 11. Subcontractors, Suppliers and Others 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 12-2011 (as amended), the City has goals for the participation of minority business and/or smal l business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The Bidder shall submit the MBE and SBE Utilization Form, Subcontractor/Supplier Utilization Form, Prime Contractor Waiver Form and/or Good Faith Effort Form with documentation and/or Joint Venture Form as appropriate. The Forms including documentation must be received by the City no later than 2:00 P.M. CST, on the second business day after the bid opening date. The Bidder shall obtain a receipt from the City as evidence the documentation was received. Failure to comply shall render the bid as non- responsive. 41.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor has reasonable objection. 12. Bid Form 12.1. The Bid Form is included with the Bidding Documents; additional copies may be obtained from the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPF.CIFTCAT10N DOCUMENT RF.PLACF,MENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 Cily Project No. 102169 0021 13 INSTRUCTIONS TO BIDDERS Page 7 of 10 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No Bid," "No Change," or "Not Applicable" may be entered. Bidder shall state the prices, written in ink in both words and numerals, for which the Bidder proposes to do the work contemplated or furnish materials required. All prices shall be written legibly. In case of discrepancy between price in written words and the price in written numerals, the price in written words shall govern. 123. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. Bids by individuals shall show the Bidder's name and official address. 12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated on the Bid Form. The official address of the joint venture shall be shown. 12.8. All names shall be typed or printed in ink below the signature, 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 12.10. Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance with Section 00 43 37 — VENDOR COMPLIANCE to State Law Non Resident Bidder. 13. Submission of Bids Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed envelope, marked with the City Project Number, Project title, the name and address of Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCI FKF.NT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Reviud March 9, 2020 Cily Prajeel No. 102169 0021 13 INSTRUCTIONS TO BIDDERS Pap; 8 ur 10 14. Modification and Withdrawal of Bids 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office cannot be withdrawn prior to the time set for bid opening. A request for withdrawal must be made in writing by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. After all Bids not requested for withdrawal are opened and publicly read aloud, the Bids for which a withdrawal request has been properly filed may, at the option of the City, be returned unopened. 14.2. Bidders may modify their Bid by electronic communication at any time prior to the time set for the closing of Bid receipt. 15. Opening of Bids Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids. 16. Bids to Remain Subject to Acceptance All Bids will remain subject to acceptance for the time period specified for Notice of Award and execution and delivery of a complete Agreement by Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid security prior to that date. 17. Evaluation of Bids and Award of Contract 17.1. City reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by City. City also reserves the right to waive informalities not involving price, contract time or changes in the Work with the Successful Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists among the Bidders, Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCFfON SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 20t9, WSM-H (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Project No. 102169 0021 13 INSTRUCTIONS TO BIDDERS Pagc 9 of 10 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.3. City may conduct such investigations as City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and fiirnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. 17.4. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. 17.5. if the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 17.7. A contract is not awarded until formal City Council authorization. If the Contract is to be awarded, City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by the City. 17.7.1. The contractor is required to fill out and sign the Certificate of Interested Parties Form 1295 and the form must be submitted to the Project Manager before the contract will be presented to the City Council. The form can be obtained at httus:,'iwww.ethics.state.tx,us/data/forms/1295/1295.ndf ITS. Failure or refusal to comply with the requirements may result in rejection of Bid. 18. Signing of Agreement 18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement. Within 14 days thereafter Contractor shall sign and deliver the required number of counterparts of the Agreement to City with the required Bonds, Certificates of Insurance, and all other required documentation. 18.2. Failure to execute a duly awarded contact may subject the Contractor to penalties. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Praject No. 102169 0021 13 INSTRUCTIONS TO BIDDERS Pagc l0 01`10 18.3. City shall thereafter deliver one fully signed counterpart to Contractor. END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Pmccl No. 102169 0032 15 - 0 CONSTRUCTION PROJECT SCHEDULE SECTION 00 32 15 CONSTRUCTION PROJECT SCHEDULE PART1- GENERAL 1.1 SUMMARY Page I of 10 A. Section Includes: 1. General requirements for the preparation, submittal, updating, status reporting and management of the Construction Project Schedule B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — General Conditions 2. Division 1 — General Requirements D. Purpose The City of Fort Worth (City) is committed to delivering quality, cost-effective infrastructure to its citizens in a timely manner. A key tool to achieve this purpose is a properly structured schedule with accurate updates. This supports effective monitoring of progress and is input to critical decision making by the project manager throughout the life of the project. Data from the updated project schedule is utilized in status reporting to various levels of the City organization and the citizenry. This Document complements the City's Standard Agreement to guide the construction contractor (Contractor) in preparing and submitting acceptable schedules for use by the City in project delivery. The expectation is the performance of the work follows the accepted schedule and adhere to the contractual timeline. The Contractor will designate a qualified representative (Project Scheduler) responsible for developing and updating the schedule and preparing status reporting as required by the City. 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 2. Non-compliance with this specification is grounds for City to withhold payment of the Contractor's invoices until Contractor achieves said compliance. 1.3 REFERENCES A. Project Schedules Each project is represented by City's master project schedule that encompasses the entire scope of activities envisioned by the City to properly deliver the work. When the City contracts with a Contractor to perform construction of the Work, the Contractor CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIPICATIDN DOCUMEN"I- RevisM July 20, 201 S WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Pmjccl No. 102169 003215-0 CONSTRUCTION PROJECT SCHEDULE Page 2 of] 0 will develop and maintain a schedule for their scope of work in alignment with the City's standard schedule requirements as defined herein. The data and information of each such schedule will be leveraged and become integral in the master project schedule as deemed appropriate by the City's Project Control Specialist and approved by the City's Project Manager, Master Project Schedule The master project schedule is a holistic representation of the scheduled activities and milestones for the total project and be Critical Path Method (CPM) based. The City's Project Manager is accountable for oversight of the development and maintaining a master project schedule for each project. When the City contracts for the design and/or construction of the project, the master project schedule will incorporate elements of the Design and Construction schedules as deemed appropriate by the City's Project Control Specialist. The assigned City Project Control Specialist creates and maintains the master project schedule in P6 (City's scheduling software). 2, Construction Schedule The Contractor is responsible for developing and maintaining a schedule for the scope of the Contractor's contractual requirements. The Contractor will issue an initial schedule for review and acceptance by the City's Project Control Specialist and the City's Project Manager as a baseline schedule for Contractor's scope of work. Contractor will issue current, accurate updates of their schedule (Progress Schedule) to the City at the end of each month throughout the Iife of theirwork. B. Schedule Tiers The City has a portfolio of projects that vary widely in size, complexity and content requiring different scheduling to effectively deliver each project. The City uses a "tiered" approach to align the proper schedule with the criteria for each project. The City's Project Manager determines the appropriate schedule tier for each project, and includes that designation and the associated requirements in the Contractor's scope of work. The following is a summary of the "tiers". 1. Tier 1: Small Size and Short Duration Project (design notrequired) The City develops and maintains a Master Project Schedule for the project. No schedule submittal is required from Contractor. City's Project Control Specialist acquires any necessary schedule status data or information through discussions with the respective party on an as -needed basis. 2. Tier 2: Small Size and Short to Medium Duration Project The City develops and maintains a Master Project Schedule for the project. The Contractor identifies "start" and "finish" milestone dates on key elements of their work as agreed with the City's Project Manager at the kickoff of their work effort. The Contractor issues to the City, updates to the "start" and "finish" dates for such milestones at the end of each month throughout the life of their work on theproject. 3. Tier 3: Medium and Large Size and/or Complex Projects Regardless of Duration The City develops and maintains a Master Project Schedule for the project. The Contractor develops a Baseline Schedule and maintains the schedule of their respective scope of work on the project at a level of detail (generally Level 3) andin CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 201R WATER AND SANITARY SEWER REPLACEMENT CONTRACT 200, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 003215-0 CONSTRUCTION PROJFCT SCHEDULE Page 3 of 10 alignment with the WBS structure in Section 1.4.H as agreed by the Project Manager. The Contractor issues to the City, updates of their respective schedule (Progress Schedule) at the end of each month throughout the life of their work on theproject. C. Schedule Types Project delivery for the City utilizes two types of schedules as noted below. The City develops and maintains a Master Project Schedule as a "baseline" schedule and issue monthly updates to the City Project Manager (end of each month) as a "progress" schedule. The Contractor prepares and submits each schedule type to fulfill their contractual requirements. Baseline Schedule The Contractor develops and submits to the City, an initial schedule for their scope of work in alignment with this specification. Once reviewed and accepted by the City, it becomes the `Baseline" schedule and is the basis against which all progress is measured. The baseline schedule will be updated when there is a change or addition to the scope of work impacting the duration of the work, and only after receipt of a duly authorized change order issued by the City. In the event progress is significantly behind schedule, the City's Project Manager may authorize an update to the baseline schedule to facilitate a more practical evaluation of progress. An example of a Baseline Schedule is provided in Specification 00 32 15.1 CONSTRUCTION PROJECT SCHEDULE BASELINE EXAMPLE. 2. Progress Schedule The Contractor updates their schedule at the end of each month to represent the progress achieved in the work which includes any impact from authorized changes in the work. The updated schedule must accurately reflect the current status of the work at that point in time and is referred to as the "Progress Schedule". The City's Project Manager and Project Control Specialist reviews and accepts each progress schedule. In the event a progress schedule is deemed not acceptable, the unacceptable issues are identified by the City within 5 working days and the Contractor must provide an acceptable progress schedule within 5 working days after receipt of non -acceptance notification. An example of a Progress Schedule is provided in Specification 00 32 15.2 CONSTRUCTION PROJECT SCHEDULE PROGRESS EXAMPLE. 1.4 CITY STANDARD SCHEDULE REQUIREMENTS The following is an overview of the methodology for developing and maintaining a schedule for delivery of aproject. A. Schedule Framework The schedule will be based on the defined scope of work and follow the (Critical Path Methodology) CPM method. The Contractor's schedule will align with the requirements of this specification and will be cost loaded to reflect their plan for execution. Overall schedule duration will align with the contractual requirements for the respective scope of work and be reflected in City's Master Project Schedule. The Project Number and Name of the Project is required on each schedule and must match the City's projectdata. B. Schedule File Name CITY OF FORT WORT14 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 2019 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) City Project No. 102169 003215-0 CONSTRUCTION PROJFCT SCHEDULE Page 4 of 10 All schedules submitted to the City for a project will have a file name that begins with the City's project number followed by the name of'the project followed by baseline (if a baseline schedule) or the year and month (if a progress schedule), as shownbelow. • Baseline Schedule File Name Format: City Project Number _Project Name —Baseline Example: 101376 North Montgomery Street HMAC Baseline Progress Schedule File Name Format: City Project Number Project Name YYYY-MM Example: 101376 North Montgomery StreetHMAC-201801 • Project Schedule Progress Narrative File Name Format: City Project Number _Project Name PN YYYY-MM Example: 101376_North Montgomery Street MMAC_PN_2018_01 C. Schedule Templates The Contractor wiI I utilize the relevant sections from the City's templates provided in the City's document management system as the basis for creating their respective project schedule. Specifically, the Contractor's schedule will align with the layout of the Construction section. The templates are identified by type of project as noted below. • Arterials • Aviation • Neighborhood Streets • Sidewalks (later) • Quiet Zones (later) • Street Lights (later) • Intersection Improvements (later) • Parks • Storm water • Street Maintenance • Traffic • Water D. Schedule Calendar The City's standard calendar for schedule development purposes is based on a 5-day workweek and accounts for the City's eight standard holidays (New Years, Martin Luther King, Memorial, Independence, Labor, Thanksgiving, day after Thanksgiving, Christmas). The Contractor will establish a schedule calendar as part of the schedule development process and provide to the Project Control Specialist as part of the basis for their schedule. Variations between the City's calendar and the Contractor's calendar must be resolved prior to the City's acceptance of their Baseline project schedule. E. WBS & Milestone Standards for Schedule Development The scope of work to be accomplished by the Contractor is represented in the schedule in the form of a Work Breakdown Structure (WBS). The WBS is the basis for the development of the schedule activities and shall be imbedded and depicted in the schedule. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 2018 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-A (LEAD SERVICES REPLACEMENT D2) City Project No, 102159 003215-0 CONSTRUCTION PROJECT SCHEDULE Page 5 of 10 The following is a summary of the standards to be followed in preparing and maintaining a schedule for project delivery. Contractor is required to utilize the City's WBS structure and respective project type template for "Construction" as shown in Section 1.4.1-1 below. Additional activities may be added to Levels 1 - 4 to accommodate the needs of the organization executing the work. Specifically the Contractor will add activities under WBS XXXXXX.80.83 "Construction Execution" that delineates the activities associated with the various components of the work. 2. Contractor is required to adhere to the City's Standard Milestones as shown in Section 1.4.I below. Contractor will include additional milestones representing intermediate deliverables as required to accurately reflect their scope ofwork. F. Schedule Activities Activities are the discrete elements of work that make up the schedule. They will be organized under the umbrella of the WBS. Activity descriptions should adequately describe the activity, and in some cases the extent of the activity. All activities are logically tied with a predecessor and a successor. The only exception to this rule is for "Project start" and "project finish" milestones. The activity duration is based on the physical amount of work to be performed for the stated activity, with a maximum duration of 20 working days. If the work for any one activity exceeds 20 days, break that activity down incrementally to achieve this duration constraint. Any exception to this requires review and acceptance by the City's Project Control Specialist. G. Change Orders When a Change Order is issued by the City, the impact is incorporated into the previously accepted baseline schedule as an update, to clearly show impact to the project timeline. The Contractor submits this updated baseline schedule to the City for review and acceptance as described in Section 1.5 below. Updated baseline schedules adhere to the following: 1. Time extensions associated with approved contract modifications are limited to the actual amount of time the project activities are anticipated to be delayed, unless otherwise approved by the Program Manager. 2. The re-baselined schedule is submitted by the Contractor within ten workdays after the date of receipt of the approved Change Order. The changes in logic or durations approved by the City are used to analyze the impact of the change and is included in the Change Order. The coding for a new activity(s) added to the schedule for the Change Order includes the Change Order number in the Activity ID. Use as many activities as needed to accurately show the work of the Change Order. Revisions to the baseline schedule are not effective until accepted by the City. H. City's Work Breakdown Structure CITY OF FoRT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-13 (LEAD SERVICES REPLACEMENT D2) Revised July 20, 2018 City Project No. 102169 003215-0 CONSTRUCTION PROJECT SCHEDULE Page 6 of 10 WBS Code WBS Name XXXXXX Project Name XXXXXX.30 Design XXXXXX.30.10 Design Contractor Agreement XXXXXX.30.20 Conceptual Design (30%) XXXXXX.30.30 Preliminary Design (60%) XXXXXX.30.40 Final Design XXXXXX.30.50 Environmental XXXXXX.30.60 Permits XXXXXX.30.60.10 Permits - Identification XXXXXX.30.60.20 Permits - Review/Approve XXXXXX.40 ROW & Easements XXXXXX.40.10 ROW Negotiations XXXXXX.40.20 Condemnation XXXXXX.70 Utility Relocation XXXXXX.70.10 Utility Relocation Co-ordination XXXXXX.80 Construction XXXXXX.80.81 Bid and Award XXXXXX.80.83 Construction Execution LX.80.85 Inspection LX.80.86 Landscaping XXXXXX.90 Closeout XXXXXX.90.10 Construction Contract Close-out XXXXXX.90.40 Design Contract Closure I. City's Standard Milestones The following milestone activities (i.e., important events on a project that markcritical points in time) are of particular interest to the City and must be reflected in the project schedule for all phases of work. Activit_v ID Activity Name Design 3020 Award Design Agreement 3040 issue Notice To Proceed - Design Engineer 3100 Design Kick-off Meeting 3120 Submit Conceptual Plans to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3150 Peer Review Meeting/Design Review meeting (technical) 3160 Conduct Design Public Meeting #1 (required) 3170 Conceptual Design Complete 3220 Submit Preliminary Plans and Specifications to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3250 Conduct Design Public Meeting #2 (required) 3260 Preliminary Design Complete CITY OF FORT WORTIT WATER AND SANITARY SEWER STANDARD CUNsnucTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July 20, 2018 City Project No. 102169 003215-0 CONSTRUCTION PROJECT SCHEDULE Page 7 of 10 3310 Submit Final Design to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3330 Conduct Design Public Meeting #3 (if required) 3360 Final Design Complete ROW & Easements 4000 Right of Way Start 4230 Right of Way Complete Utility Relocation 7000 Utilities Start 7120 Utilities Cleared/Complete Construction Bid and Award 8110 Start Advertisement 8150 Conduct Bid Opening 8240 Award Construction Contract Construction Execution 8330 Conduct Construction Public Meeting #4 Pre -Construction 8350 Construction Start 8370 Substantial Completion 8540 Construction Completion 9130 Notice of Completion/Green Sheet 9150 Construction Contract Closed 9420 Design Contract Closed 1.5 SUBMITTALS A. Schedule Submittal & Review The City's Project Manager is responsible for reviews and acceptance of the Contractor's schedule. The City's Project Control Specialist is responsible for ensuring alignment of the Contractor's baseline and progress schedules with the Master Project Schedule as support to the City's Project Manager. The City reviews and accepts or rejects the schedule within ten workdays of Contractor's submittal. Schedule Format The Contractor will submit each schedule in two electronic forms, one in native file format (.xer, .xm1, .mpx) and the second in a pdf format, in the City's document management system in the location dedicated for this purpose and identified by the Project Manager. In the event the Contractor does not use Primavera P6 or MS Project for scheduling purposes, the schedule information must be submitted in .xlsor .xlsx format in compliance with the sample layout (See Specification 00 32 15.1 Construction Project Schedule Baseline Example), including activity predecessors, successors and total float. 2. Initial & Baseline Schedule The Contractor will develop their schedule for their scope of work and submit their initial schedule in electronic form (in the file formats noted above), in the City's document management system in the location dedicated for this purpose within ten workdays of the Notice ofA ward. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July 20, 2018 City Project No. 102169 003215-0 CONSTRUCTION PROJECT 5CIJE.DULE Pages of 10 The City's Project Manager and Project Control Specialist review this initial schedule to determine alignment with the City's Master Project Schedule, including format & WBS structure. Following the City's review, feedback is provided to the Contractor for their use in finalizing their initial schedule and issuing (within five workdays) their Baseline Schedule for final review and acceptance by the City. 3. Progress Schedule The Contractor will update and issue their project schedule (Progress Schedule) by the last day of each month throughout the life of their work on the project. The Progress Schedule is submitted in electronic form as noted above, in the City's document management system in the location dedicated for this purpose. The City's Project Control team reviews each Progress Schedule for data and information that support the assessment of the update to the schedule. In the event data or information is missing or incomplete, the Project Controls Specialist communicates directly with the Contractor's scheduler for providing same. The Contractor re -submits the corrected Progress Schedule within 5 workdays, following the submittal process noted above. The City's Project Manager and Project Control Specialist review the Contractor's progress schedule for acceptance and to monitor performance and progress. The following list of items are required to ensure proper status information is contained in the Progress Schedule. • Baseline Start date • Baseline Finish Date • % Complete • Float • Activity Logic (dependencies) • Critical Path • Activities added or deleted • Expected Baseline Finish date • Variance to the Baseline Finish Date B. Monthly Construction Status Report The Contractor submits a written status report (referred to as a progress narrative) at the end of each month to accompany the Progress Schedule submittal, using the standard format provided in Specification 00 32 15.3 CONSTRUCTION PROGRESS SCHEDULE NARRATIVE. The content of the CONSTRUCTION PROGRESS SCHEDULE NARRATIVE should be concise and complete to: • Reflect the current status of the work for the reporting period (including actual activities started and/or completed during the reporting period) • Explain variances from the baseline on critical path activities • Explain any potential schedule conflicts or delays • Describe recovery plans where appropriate • Provide a summary forecast of the work to be achieved in the next reporting period. C. Submittal Process CC€'Y OP €70RT WORTH STANDARD CONSTRUCTION SPECYRCATTON DOCUMENT Revised July 20, 2019 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-R (LEAD SL'.RWCES REPLACEMENT D2) City Project No. 102169 0032 15 - 0 CONSTRUCTION PROJECT SCHEDULE Page 9 of 10 • Schedules and Monthly Construction Status Reports are submitted in Buzzsaw following the steps outlined in Specification 00 32 15.4 CONSTRUCTION PROJECT SCHEDULE SUBMITTAL PROCESS. • Once the project has been completed and Final Acceptance has been issued by the City, no further progress schedules or construction status reports are required from the Contractor. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. The person preparing and revising the Contractor's Project Schedule shall be experienced in the preparation of schedules of similar complexity. B. Schedule and supporting documents addressed in this Specification shall be prepared, updated and revised to accurately reflect the performance of the Contractor's scope of work. C. The Contractor is responsible for the quality of all submittals in this section meeting the standard of care for the construction industry for similarprojects. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] 1.13 ATTACHMENTS Spec 00 32 15.1 Construction Project Schedule Baseline Example Spec 00 32 15.2 Construction Project Schedule Progress Example Spec 00 32 15.3 Constriction Project Schedule Progress Narrative Spec 00 32 15.4 Constriction Project Schedule Submittal Process PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CrTY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 2018 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LL'AD SERVICES REPLACEMENT D2) City Pmjec[ Nu. 102169 0032 15 - 0 CONSTRUCTION PROJECT SCHEDULE Revision Log DATE NAME SUMMARY OF CHANGE July 20, 201 S M. Jaffell Initial Issue Page 10 of 10 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 2018 WATER AND SANITARY SEWER REPLACEMENT CONTRAGI 2019, WSM-H (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 0032 15.1 - 0 CONSTRUCTION PROJECT SCHEDULE —BASELINE EXAMPLE Page 1 ors SECTION 00 32 15.1 CONSTRUCTION PROJECT SCHEDULE — BASELINE EXAMPLE PART1- GENERAL The following is an example of a Contractor's project schedule that illustrates the data and expectation for schedule content depicting the baseline for the project. This version of the schedule is referred to as a "baseline" schedule. This example is intended to provide guidance for the Contractor when developing and submitting a baseline schedule. See CFW Specification 00 32 15 CONSTRUCTION PROJECT SCHEDULE for details and requirements regarding the Contractor's project schedule. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 2018 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES RFPLACEMENT 132) City Project No. 102169 00 32 15.1 - 0 CONSTRUCTION PROJFCT SCHEDULE — BASELINEEXAMPLE Page 2 of5 .,_......... F........ . ------- ------------ F---------- +---------- {---------- {---------- F---------- ;....__-_._{----------- ---------- {---------- {--- ai} i i i i i • i --------- _.�.._..._-,,...,,.,.._. - ,,,— — —� --1 YR • iT j ii'+} Q. i .{ O mil iY Q iF it .4• nin �.1 i- 14 I� Lp kmo, �yy M' � w � YY M F it r* E I' 4 .• rl to u a! u u u 4�•.�. 11 iid s 9 ii .J .6 to Y IJ CI dl M T R5 •l f1 Y �I �1 iF iM1 A A ^5 M I• �} p` �•i YS �} iM1 r'Y A �� G��l W .ii Y � n• 4• n. y! n � Y� y �I � o w � � � �_ �,, � � M p�� 4 O {u.{ o W u � o u {p /�� Cl .. w` .. n.I Y.1 w �• n ryo- w r< n .I +r r_" _ ppp0 4 Y. .i Ya d +W �+ o a 4 U f N N A AI {� "�+��JI y� •ll F�jj �7�7CCyypyy{•{,, "f•$�j �Y r r� /w Y+ r4 LY i1 CAI ! T ®1 y..• •yy J y p M yy - Q _ r r "i',{ { M •r u it m •n N r� ice+ O # ; r r n n" In .1 Y T :4.i!p - a La +' ,• �, �1 m Y •• .� �1 4i *1 ii _� �i "} g # • a" .ii 0Y N• 4i • ■�y�v' s"d W 4 {5 •.,�y t..i v _g �Y Q C � t3 y T +1 wgi L O 2i k rg� �■`�■ Lr T•] Ln �e e w & fi i5 ip w d TJ" �• S O4 IAL II g a CI W 4 Lq �• yy�� r !j�� j� !L�+ rI }r �} .{yk{1 �r a� C } / '/ '+ Lip y LF .y � iL it , 1 lY .i I� rA YL Ll R iYL � Is { �1yJ�� ri'!5t � r..il� (qy+ ,�pyr qO tl �xW C4 {w r{J�+ •� { ♦1 � 3 � W fh q� '+ FiF � i1 Zr •I i i^t Y�j ryi IF Q y l Cr ry rJT+ /J U � I CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 20i 8 WATER. AND SANITARY Si" W FR REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMFNT D2) City Project No. 1U2169 0032 15.1 -0 CONSTRUCTION PROJECT SCHEDULE — BASELINE EXAMPLE Page of y: --.....1---------- .1.-•---- ....1---------- a ........... I- ----------- F-.........I---------- ....... t......... i.......... y.......... t--------- a .......... •' I i i i' i • i i i I I • I - + i t------- - _ 1 I I -, - r I I � s a • . : i : i I ------------ - ^I ���.I� j'�..A1 � � J d � - f. 1Tj- �I- 4`.af d ; s� LI v Ir �r IP •J I.� [, k� .� iJ O s/I;CS K5 S±'b 'r�,�a II i'I Q [t 39 M M •1 IF / � 1 .4.I 9 rxx1!. t Icy •=R � vryryl � � Y1`V� p `,ll���� "4` rOryy 5 r�rp?7 2 ,9ery 2-2:2R 0 aF� ti :':,' C:'.42 „12.1g2n �214gAA 2 2n •! i0 " ?. a Z�•[y-�1i tr� �y? /a■' - ++--i'II { NN mqi _�.. * -I^ 6 r1pt IM �VWm`iE :��G F �� L.i •1 R 14 Q 1rl 0 %'1 �I 41 0 0 H M O 0 E- I V'A - 8; 1•F R VI 'JI . I I r1'{� r IIF •i, r; til I i.rR �' CiI. YY '� N ri r`y i♦ r, 'L M h� x= YI el J Ipt¢ _ � S-J iJ a 1 ~- 1W, yy}ypp: Lam, 4 G'I {1��yI T k +tl Fr - � .}.. 0 11-0 n •CL 1gs ��y 1�. 4 {a0� •` tp7G ♦rrRR! r,•il'iI F Y o00. h + i ro Yq1 Rrr 7,p ^ j KI LJ-ry ru CL . a'hi vY n4 n4 itl CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 2018 WATER AND SANITARY SEINER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Pmject No. 102169 0032 15,1 -0 CONSTRUCTION PROJECT SCHEDULE — BASELINE EXAMPLE Page 4 of CITY DF FORT WORTR WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECSFICATTON DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES RFPLACEMLNT D21 Revised July 10, M 8 City Pr,,j—t No 102169 0032 15.1 - 0 CONSTRUCTION PROJECT SCHEDULE• — BASELINE EXAMPLE Page 5 of5 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 2U18 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019. WSM-B (LEAD SERVICES REPLACEMENT D2) City Projccl No. 102169 0032 15.2 - 0 CONSTRUCTION PROJECT SCHEDULE— PROGRESS EXAMPLE Page 1 of4 SECTION 00 32 15.2 CONSTRUCTION PROJECT SCHEDULE — PROGRESS EXAMPLE PARTI- GENERAL The following is an example of a Contractor's project schedule that illustrates the data and expectation for schedule content depicting the progress for the project. This version of the schedule is referred to as a "progress" schedule. This example is intended to provide guidance for the Contractor when developing and submitting a progress schedule. See CFW Specification 00 32 15 CONSTRUCTION PROJECT SCHEDULE for details and requirements regarding the Contractor's project schedule. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 2018 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 00 32 15.2 - 0 CONSTRUCTION PROJECT SCHEDULE — PROGRESS EXAMPLF. Page 2 of4 co1 -�-------;--------------------€------------------- i------------ ---------- --¢............................... ----- .._.,............................................ .........._.....-F -------`----- --- Fivn +M LIP L& — -- CL +j M. !{ O O:O-a O 4 JF Y{ Cy r+ {, {I rl r,l MWJ." fI:f1 ji 91 M R{ f.4 •hj fi *.'4f N if it i{'rl •1 #■ !i 51 II f V O �y I +] $ �..1 ..1 b:n {� p �.+! — I'� 1` A !i iY rl /i 1L! 1't �tl F I- 1- �. i. [Y a r! 1� al ii�.i �} "� w! r� � o � �1•.� � to r +4 r a YF a x1 � �i � � � �"1 ��x 1� 1� y ice+ oE k d 4 'S a 2 rl � {1 '! w:� ■1 � w •. y'I ri �r w�, m � � 1 rtl 4 u� IR o •i m I!!1 ?:.;�a 4 _ w 4i rt4 _ r..5... ! m ak+r.IJ..r r 4+ n_ I I fj I eF ri fl si b O {� II n� �F saaWV V V T ,,,{ r t l! 1.�4 r�j V1,6w:3..aw{ �•. IF i a •' i'! 4 h w :1 y — y `fix +I• el A fC !! L L 4.1sn yna flrigg .g 904 5/@ H 4# .1 +f 1# +1 � �}#yy'�! M kl it � � ! � r` � r � T w.nl ry � in �i Y� YqqI � s � � •! � ,'.{! ��.yy +� i'a 4 � r � •Y pp y�� ��I � �i a '� 4.M." +f hF h ,�,� /1 � III ' � LFI � 1i! Mi N! 11 '� ii! w! .. YI � r! •� y Y w, �I Ld q fo 9 ' Y p 3 ry p 3.FL 41+F{'fR IIII In Iy q Ir, e s {} q Icy 5y� �y� +I g igr1l M U CITY OF FORT WORTH STANDARD CONSTROCTION SPECIFICATION DOCUMENT Revised July 20, 2018 WATER AND SANITARY SEWER REPLACFMFNT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Cily Picjccl No. 102169 0032 15.2 - 0 CONSTRUCTTON PROJECT SCHEDULE -- PROGRESS EXAMPLE Page 3 of 4 I 1 I I -----------------T-------- - JGil ------- -------- _--•--- _ -_i____.-_-- '-••-••-•'-•--•----T---------1--•------�---•------1--------- �._'•..--- '-----•- ------ -•-------- J _ 0 ._..._1._.........1...._.._..1_________.1--------- J---------- l___;____J__ ___ _ y _ _ _ ___L_______ �J____ __1_.___.___J.__ fl , ... f - -_ _ ________ _ - - _ -___-_ _-_._ __-___ -____-______ f1..1 C: rJ'/,( f1 PI,Fi fi C1,Fr {r -4 •.V ^. ,:'N'Vi M 14 !r -i -i :N C`a,Cl NzCl CQ N,i{ M N1N V4 r11r1 M .•ram� s n w n �F til :o ,� a x` x, �r a .x r .x �,� ,�� .n 4� ,w do ', 0. d. r .�� !!•' ! CI {{ rA r4 A A,+a ry O #A 4 0— iEi! 7J!y; f - 7 -2 . 0 C,ML .n yi N MS 1 � 9 - 1: .I '2 c 12 s , W +n +h K .n T u T V R ..ii w • w .e -ii 'A rN�.II q {qy{}{ o i3 r{ � 8 ��4 C. d 04 �, L 47 — �} r1 li, Fi � Y F' / p w jl /, it � ii �' r +�.,� �j r rl 51 s1 v � it CI i•5 !�F M lil �' I A ►1 � O � �F�^�II 2+ a a FAD „ fie" a 'C Fry�ferf_!j1' fi' 25 }�l���j. n a 'ss 2 p INr 3n a gl CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July 20, 201 S City Project No. 102169 00 32 15.2 - 0 CONSTRUCTION PROJECT SCHEDULE: — PROGRESS EXAMPLE END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue Page 4 of CITY OF FORT WORTFl STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 201 S WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Pngm( Nn. 102169 00 32 15.3 - 0 — PROGRESS NARRATIVE Page 1 of 1 SECTION 00 32 15.3 CONSTRUCTION PROJECT SCHEDULE PROGRESS NARRATIVE Reporting Period: Date Issued: Project Name: Company Name: City Project No: Engineer's Project No: City Project Manager: Engineer's Project Manager: A. List of activities accomplished in the reporting period. 1. (insert text here) 2. (insert text here) 3. (insert text here) 4. (insert text here) 5. (insert text here) 6. (insert text here) B. List of activities to be accomplished in the next reporting period 1. (insert text here) 2. (insert text here) 3. (insert text here) 4. (insert text here) 5. (insert text here) 6. (insert text here) C. List any potential delays and provide mitigation actions 1. (insert text here) 2. (insert text here) 3. (insert text here) D. List any actual delays and provide recovery actions 1. (insert text here) 2. (insert text here) 3. (insert text here) City of Fort Worth, Texas Construction Project Schedule Narrative Report for CFW Projects TPW Official Release Date: 7.20.2018 Page 1 of 1 00 32 15.4 - 0 CONSTRUCTION PROJECT SCHEDULE — SUBMITTAL PROCESS Page 1 of 7 SECTION 00 3215.4 CONSTRUCTION PROJECT SCHEDULE SUBMITTAL PROCESS PART1- GENERAL The following information provides the process steps for the Contractor to follow for submitting a project baseline or progress schedule for a capital project to the City of Fort Worth. See CFW Specification 00 32 15 CONSTRUCTION PROJECT SCHEDULE for details and requirements regarding the Contractor's project schedule. If you are not a registered CFW Buzzsaw user, please email or contact: Fred Griffin, Buzzsaw Administrator City of Fort Worth Fred. Griffin@fortworthgov. org 817-392-8868 Using your registered username and password log into the City's Buzzsaw Site https://projectt)oint.buzzsaw.com/client/fortworthgov MEOW- e.1 a a Navigate to your Project Folder. Verify that your Project ID and Project Name are consistent with Project FolderName. Navigate to the Schedule Directory under your Project Folder. The 00701-Flaxseed Drainage Improvements project is used for illustration. CITY OF FORT WORTH STANDARD CONSTRUCTION SPCCIFICATTON DOCUMENT Revised July 20, 2018 WATER AND SANITARY SEWER REPIACF.MF.NT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 02) City Project No. 102169 0032 15.4 - 0 CONSTRUCTION PROJECT SCHEDULE - SURMITTAI. PROCESS Page 2 of 7 iTM ice* 7W CIA * - Fdar■ . i 7�2 NfF+ j°/]hE4.i�L hak �. r. +rcl ram- Lk iN Nanun � � treaeylnses F ,_} taruE�p6Jn P. ruwe Ww inraamd�axe .� GwaA Co�ba[r CKl,tili�a r'o x + Lj Rbk W�ww usam r 07m• LItr. >vCrto�a� r crams urbn lllgesci *wUali.' r * W?% Ldr 1w4+SE QWW M1 r . o7rll %am 1� Rrtrk I"& Saris Wg)ft"#R4CW PFF 1 4 10A 4N7M .LNM-0�41 �n s. r�� 9. F.. fu.. 'J >n a �a4 Rhlwr+F J I. .o+m. 1 Un 7 Two files will be uploaded for each submittal. A native schedule file format either Primavera ,xcr or MS Project .mpp and a PDF version of the schedule will beuploaded Verify that the file name contains the 5-digit Project ID, Project Name, and Submittal Date and follows the standard naming convention. Initial schedule submittal will be labeled as `Baseline' for example: 00701-FlaxseedDrainagelmprovements-Baseline Schedule submittal updates will be labeled with Schedule Submittal Date `YYYY_MM' for example: 00701-Flax see dDrainageTmprovements-2009 01 Expand or select the Schedules folder and add both the native file and PDF file to the directory. From the Toolbar Select Add Document CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTTON SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2D19, WSM-H (LEAD SERVICES REPLACEMENT D2) Revised July 20, 2018 City Project No. 102169 .Frle EAL V*w Fouls Hlb *7 Lira 4 0032 15.4 - 0 CONSTRUCTION PROJECT SCHEDULE — SUBMITTAL PROCESS Page 3 of ]]141-J�sr3eedtkbnd(rJmp6'r'cm��A N 4 ) i5u! PpM�^r�_��� Im M1ex- g Cnn:;:.fir LJ ca+eaonrryra tames} Cwooq 6ec mwds aid 4peo t: ; Ptq- Ora" ' rl Mh,& Q:ndex.� c 0 limb" U: 0o71ss uebanxURSC-lwar" s 1. wX3 Lrwn :li Ka rur�r� al iw 'd .1 oom - urLer. VA.¢c Sir k'#selc Cery-Ah QOM -LAtm'rwo es5E 6xrer Neur 4-:95 41 Q ODM-Si p51ngr Rekkc-xowt re Y I1OM-6rla Aoid-FrFmr', i4b YfS a. 00775 -Ldmm O a09W +w754 - swn r rA, S S;� sch�I „ s C. LWh8a.A F*e7filRn M.3:14 WrtO ll rapm Select Browse and go to the location of the files on your desktop. Select Olen —1 �jiekakOvr7.v+anWu�dtl4urkrd'�i�i�baksl'i�won�Yradtii�Lk�n+`.�:°�,yw�fU�rr�fiJ ooasun+nFs _ �4Lt#{�fyrk i�1.� �.�!��! ,f-'=x'I-• !lib luukri 7m CORKM t 4 E? tn. � �"r C�ur5i1�111 Cao�le. r+rr�TTI�-p.r �n1 44 �an��Ce I�FM{�1 �"i *+�n}1#Ir4k nrb p3 :.art-e n4�etr r ± -.� Lj 3rn1�}J4� �aLep�Xr �cle.r�rueh.r,p :'M'.ca VIS+Iti,p.4un 0"Ilpa�drdcr.r [IICQW1.eP Wt.re5n1 L r r �I ,�' cryeoisR�oord � - �fi[!F 4r.Lel �odLq�ElOela�.wii HFina�tr �°�r¢� Da.G4igier+'.* M76s11�fi�®e AP Prae Sara Rerade '� i9#�19n C+Nhr Prr�.q�r'9.�KrM4rr.�ry ,�+r�rCw4�[t Lsuduu5tx�rt+ 66qoKft%M.WW21 V01l613,,k*3DA +tlWei+yl i ' 401� Wv FW* papRss,r * 1A+Pt. f, The file will appear in the Buzzsaw Add to Project — SeIect Documents window SeIect Next. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July 20, 2018 City Project No. 102169 00 32 15.4 - 0 CONSTRUCTION PROJECT SCiiFDULE— SUBMITTAL PROCESS Page 4 of 7 Do not select Finish at this time. if U 4r4atTWawrTW?M wWbm"ingg uffbiilr..rauranoft wlil1r.0P--Olw{oph3k9). Oseket I @pone. F nMEUDLES" Mnmrf,fouh�u�l riel rile_ F&L.0.1- M.W... J n, C07dk �r vi�xar.ls Jsl.lnr �loagn�nGEwr�,,. #filz., J4-?%n sm4 F. n� PItl�A[lllon f i 1, I Fndi exr o FNAP I You will be placed into the Attach Comment window to enter a record into theProject Schedule Submittal Log. Enter the Project ID -Project Name -Submittal in the Subject Line. Type Submittal and Company Name into the Comment window along with Contact Name and Contact Phone Number. Select Next. Qeele A «Ir ■rk kick Rti warm dejJKm" Ilrlk dwzpwn dwi Fw Firs ki q ad*-d. J l�waPha� Wm 5eleck rlrr��m�rsts � ddd m�aeriR 9io reaa �eern swakal m scrbul.�c s� fi,lm x;rm�ranr Rom'Company Name fnr work perfo med lip to January 31, 20D9 ti @htCF yet . I P.-W, C4-"l F�p CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-H (LEADSERVICES REPLACEMENT D2) Revised July 20, 2018 City Pmjeer No 102169 003215.4-0 CONSTRUCTION PROJECT SCHEDULE — SUBMITTAL PROCESS Page 5 of 7 You will be placed into the Send Email Notification window. Select To and the Select Recipients window will appear with a list of Project Contacts. Select the Project Manager as the To Recipient and the Project Controls Group as the Copy Recipient. r,—d qr 6 � Gu'Cui r9e,. •'.1n m±- C7;-1 .•r.mrrt vti+.•—*-4—Wr m4— yr „•.I•—•r. -.l A tL+J J l ,.� l• [ au .rr. 1 71 ; F.44 I ^ r.=J _ t h� K n.. w Yt �v Vra it Vl��,yr Z Z r vetli Ter3i R F � ■ i Ir r. rx 4f • t# Fr �s •y F r C P. ti. P•o.. �# R �1i +sr r+a. u rr cT. e rl fia. .1., Select the Paste Comment button to copy the Comment into the body of the email Select Finish. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 2018 WATER. AND SANITARY SEWER REPLACEMENT CONTRACT 2011), WSM-13 (LEAD SERVICE-S REPLACEMENT D2) City Prujed No. 102169 0032 15.4 - 0 CONSTRUCTION PROJECT SCHEDULE -- SUT3MITTAL PROCESS Pade 6 of 7 � I Q 51-Ni Blida I0 #Uti+ ITUIeli hle-dL s 4blJFyfV 8 Wil UI the rwl LN uoclaLLd des lha xLY �PFt Y�(+$911ef115 SE�dElmll tv.,, I FledCIFIFM+ • J I14r — — t�, IftrFemCMWPIFTcmm 15tii� �dlJeilJ Is7Q7Q1�Irasee�rYltepGL�rbr�aerI: �K:eirrt — —�� SOLeh}E ` ' " kw C8 0aw Flame' rvtw P�n-r Wwddle5da1f 11 b01n1eo W17-NblU' W UW6PnlfrrNdiLo I&.Wefflr Si, M09 �; re The schedule file is uploaded to the directory. An emai[ is sent to the City's Project Manager and Project Control Specialist. b ixm1 ` J a-a"'rts wF l'r K, A� LB Fi 1m.'Ap 4 V J r«t ' � .re'a[u'rrl�i�rnsosoo-= ,� GIYd O]S3 Uhw~<Egrw VI wh. f O&M LriR=!KXLsMr.4• i1G:w Uw `yP:�!E lk 'Ln 1i + fl075S 5a5er. 11d, �[yLr ka f /l}15i I'w"kY�11#h1dLCP 4r 11G� i 36.W.. Llw2il� r g1.IF Upload the PDF file using the same guideline. END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPRCIFICATION DOCUMENT REPLACEMENT CONTRACT 20I9, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July 20, 2016 CiLy Project No. 102169 0032 1 s.4 - 0 CONSTRUCTION PROJECT SCHEDULE— SUBMITTAL PROCESS Revision Log DATE NAME SUMMARY OF CHANGE July 20, 201 & M. Jarrell Initial Issue Page 7 of7 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 20, 2019 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT V21 City Pnojecl No. 102169 UU 3:3 -13 BID FORM Page 1 of 1 SECTION 00 35 13 CONFLICT OF INTEREST AFFIDAVIT Each bidder, offeror, or respondent (hereinafter also referred to as "you") to a City of Fort Worth (also referred to as "City") procurement are required to complete Conflict of Interest Quiastionnaire (the attached CIQ Form) and Local Government Officer Conflicts Disclosure Statement (the attached CIS Form) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work. The referenced forms may also be downloaded from the website links provided below. hftp://www.ethics.state.tx.us/forms/C[Q.pdf http://Www.ethics.state.tx.us/forms/ClS.pdf CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary CIS Form is on File with City Secretary ❑ CIS Form is being provided to the City Secretary BIDDER: Company Name Here N Cn"' CY UT �s S2S� l(. By: Address Here N � - fox wo Signature: Address Here or Space Add ` -an /T-x thobq City, State Zip Code Here Title: END OF SECTION - a(gmfs armf Printed Name Here Title Here 1tX4j',br CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 Bit! Proposal Workbook 004100 BID FORM Page 1 of 3 SECTION 00 4100 BID FORM TO: The Purchasing Manager c/o: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B FOR: (Lead Services Replacement D2) Multiple Locations in Southwest Fort Worth Area City Project No.: 102169 Units/Sections: UNIT 1: WATER IMPROVEMENTS UNIT 2: SANITARY SEWER IMPROVEMENTS UNIT 3: PAVING IMPROVEMENTS 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS (LEAD SERVICES REPLACEMENT D2) Form Revised March 9, 2020 00 41 00 BID FORM Page 2 of 3 d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Preq ualifi cation The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Asphalt Paving Construction/Reconstruction (Greater than 15,000 square yards) b. Water Distribution, Urban and Renewal, 12-inch diameter and smaller c. Sewer Collection System, Development, 8-inches and smaller d. NIA 4. Time of Completion 4A. The Work will be complete for Final Acceptance within 430 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2_ Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones} within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 4100 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequali#fcation Statement, Section 00 45 12 g. Conflict of Interest Section 00 35 13 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS (LEAD SERVICES REPLACEMENT D2) Form Revised March 9, 2020 0041 00 BID FORM Page 3 of 3 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. Total Bid 7. Sid Submittal This Bid is submitted on September 24th, 2020 by the entity named below. Respectfully subm" ted, By: (Signature) James Brent (Printed name) Title: Estimator Company: Gra-Tex Utilities, Inc. Address: P.O. Box 700 Arlinton, Texas 76004 State of Incorporation: Email: 9ra1axfabggloba).net Texas Phone: 817-276-5800 or 225-301-5462 END OF SECTION Receipt is acknowledged of the following Addenda: Initial Addendum No. 1: JEB Addendum No. 2: JEB Addemdwm Corporate Seal: CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS (LEAD SERVICES REPLACEMENT D2) Form Revised March 9, 2020 Cit(r of fort Worth Water and Sanitary Sewer Replacement Contract 2010, WSM-8 Mead Services Replacement D2) CPN No. 102169 UNIT 1: WATI=R PAY ITEM BID LIST ITEM NO. SPEC. NO, DESCRIPTION OF ITEMS BID QTY UNIT OF MEASURE UNIT PRICE TOTAL AMOUNT 1 3311.0,161 33 11 12 12" PVC Waler Pipe (DR-14) 224 LF $ 90.02 $ 20,160.00 2 3311.0261 33 11 12 B" PVC Water Pipe 9.775 LF $ 69.0n S 6/4,475.00 3 3305 2002 33 05 24 8" DIP Water Pipe 40 LF $ 250.00 S 10.000.00 4 3311.0161 331112 6"PVCWater Pipa 201 LF $ 56,00 $ 11,055.00 5 1 3312.3402 331220 6"Gale Valve 17 EA $ 925.00 S 15,725A0 6 3312.3003 331220 8" Gate Valve 34 FA S 1.300.00 S 44,200.00 7 3312.3005 33 12 20 12" Gate Valve 6 EA $ 2.350.00 $ 14,10DA0 8 3311.0001 33 11 11 Ductile Iron Water Fittings w1 Restraint 11 TON $ 100.00 $ 1.100.00 9 241.E 118 02 41 14 4"-12" Pressure Plug 1 1=A $ 4,200.00 $ 4,2W.00 10 241.1218 02 41 14 4"42' Waler Ahandonmont Plug i EA S 1,000.00 S 1,000.00 11 3312.0001 33 12 40 Fire Hydrant 17 EA $ 3.750.00 S 63.750.00 12 241.151 024114 Salvage Fire Hydrant 17 EA S 380.00 S 6,120,D0 13 3312.20D1 331210 1" Water Service, MeterReconnectipn 296 EA S 280.0D 5 82,800.00 14 331Z20D3 331210 11"Water Service 320 EA $ 1,450,00 S 464,000.00 15 3312,2004 331210 1" Pdvale Water Service Relocation 160 LF S 10.00 S 7,800.00 16 3312.0117 331225 Connection to Existing 4"-12" Water Main 22 EA $ 3,550.00 $ 78,100.00 17 3312.0106 331226 Connection to Existing 16" Water Main 1 EA $ 18,500.00 S 18.600.00 15 331225 16' Ring Connection 1 FA $ 7,750.00 S 7,75D.00 19 3305.0202 33 0510 Imported EmbedmentfBackfill, CGS 10 CY S 80.00 $ 800.00 20 3305.0203 1 330510 Imparted EmbedmentlBackfiti,CLSM 10 CY $ 1t5.00 5 1,150AD 21 3305.0206 33 0510 Imported EmbadmentlBackfili, Select Fll 10 CY $ 24.00 $ 240.00 22 99%A999 Remove and Replace Dead End Barricade (Firm St.) 1 EA $ 3,500.o0 $ 3,500.00 23 320.1.0112 320117 5'WtdeAsphall PvmtRepair, Residential 595E LF $ 61A0 $ 363,436_00 24 3261.0261 32.01 17 Asphalt Pvmt Repair Beyond Defined Width, Residential 4W SY $ 94.00 S 37,600.00 25 3201.0122 32 01 17 5' Wide Asphalt Pvmt Repair, Arterial 385 LF $ 100.00 S 36,500,00 28 3201.0202 32 01 17 Asphalt Pvmt Repair Beyond Defined Width, Artedal 50 SY S 187.00 3 9,350.00 27 3201.0151 320117 jAsphattPvmtRep&,Water Service 2,790 LF $ 31.50 S 87,885A0 28 3201.04 3201 18 ITemporary Asphalt Paving Repair (2' HMAC on 8' Flex Base) 5.907 LF $ 22.50 $ 132.907.50 29 3217.0001 321123 4" SLU Pvmt Marking HAS (W) 170 LF 3 3.50 S 59500 3D 3217.0002 32 17 23 4" SLD Pvmt Marking HAS (Y) 170 LF S 3,50 $ 505.00 31 3201.01314 320129 Cone PvmtRepair, ResideRGal 101 SY 5 155.00 S 15,655.00 32 3216.0301 32 16 13 9" Conc Valley Gulter, Residential (60160) 10 SY $ 154.0D 5 1,540.00 33 2411001 024114 WatedlneGrouting 1 CY S 2,300.0D $ 2,300,00 34 3305.0109 330510 Trench Safety 1000 Li` $ 5.0D S 5,00aao 35 3305.0003 330512 6" Watedtne Lowertng 5 EA $ 10.500.00 S 52,500,00 36 3305.0103 33 05 30 Exploratory Excavation of Existing Utilities 5 €=A $ 2,860.00 5 14,400.00 37 241.13 02 41 15 Remove ConCreta Curb & Gultor(60150) 3785 LF S 3.05 S 14,572.25 38 32f6.0102 321613 7-inch Concrete Curb and 18-Inch Culler (match existing) (50150) 3860 LF $ 33.00 S 127,380.00 39 241.0401 02 41 13 Remove Concrete Driveway (60160) 19715 SF $ 3.30 S 65.059,50 40 3213.0401 32 13 20 0-inch Concrete Drivaway (60160) 19715 SF S 9.10 S 179,40&50 41 321&0301 321643 7-inch Concrete Valley Gulter (50160) 156 SY S f w7 60 $ 21,450.00 42 241,1506 02 41 15 2-incur Surface Milling (50160) 9545 SY S 2.65 $ 25,294.25 43 241.16 024115 Butt MilSng(601601 110 LF $ 28.35 S 3,118.50 44 3124.0101 312400 Asphalt Pavement Erase Repair (So150) 30 CY S 362.00 $ 10,860.00 45 3212.06 32 12 16 Asphalt Pavement Level -Up (50150) 58 TN $ 135.00 $ 7,830.00 46 3212.0302 321216 2-inch Asphalt Pavement Type "D" (60150) 15906 SY S 11,50 S 183,839.00 47 3306A111 330514 Water Valve Box Adjust wlCollar (60160) 7 EA $ 710.00 S 4,970.00 48 330&0108 33 05 14 Miscehaneous Adjustments - Water Meter Box (50150) 13 EA $ 55-00 S 716,00 49 3305 0107 33 05 14 Manhole Adjust, Minorwl Cellar (501601 1 FA $ 1.320,00 S 1,320.00 50 3217.5001 321725 Curb AddressPainting (501501 92 EA $ 80,00 5 7,360.00 51 9999.9999 321725 Curb Address, CeramicTife(S0150) 6 EA $ 850.00 $ 5,100.00 52 3291.01 32 91 19 Topsoil (60)60) 143 CY $ 27.50 $ 3.932.50 53 3292.01 32 92 13 Block Sod Replacament(60160) 1313 SY S 6.00 $ 7,878.00 54 3123.0101 32 23 16 Unclassified Excavation (60160) 1226 CY $ 25.00 15 30,650.00 55 3211 b1i 24 32 It 23 10-€rich Hex Base, Type A, GR-2 (501501 114 SY $ 26,40 $ 3,009.60 56 241.17 02 41 15 104nch Pavement Pulverization (60150) 6273 SY 5 8.20 S 51,438.60 57 3125.0f01 312500 SWPPP=> 1 acre 1 LS $ 6,600.00 S 6.500.00 58 3304.0101 33 D4 30 Temporary Wafer Servioes 1 LS $ 248.000.00 $ 248,00W30 59 171,0101 01 71 23 Conslruciion Staking 1 LS S 8,25D.00 $ 6,25D.00 6D 171.0102 0171 23 As -Built Survey (Red Line Survey) 1 I LS $ 3.850.00 S 3,650,00 61 3471.0wi 34 71 13 Traffic Control B MO S 800.00 S 6,400.00 62 9999.0003 Water ConstruelionAHcrwance. 1 LS S 100,000.00 S 100.000.00 UNIT SUB -TOTAL= $ 3,421,054.20 UNIT 2: SANITEf,RY SEWER PAY ITEM BID LIST ITEM NO. SPEC. NO. DESCRIPTION OF ITEMS BID QTY UNIT OF MEASURE UNIT PRICE TOTAL AMOUNT 1 3331.4115 33 31 20 B" Sewer Pipe 2DO LF S 100.00 S 20,000,00 2 3339,1001 33 39 10 4' Manhale 1 EA $ 5,75o.0o $ 5,750.00 3 3339.1003 333910 4' Extra Depth Manhole 5 VF $ 390.00 S 1,950.OD 4 3339.1062 39 10,33 3 4' Drop Manhole i EA S 14,50o.0o S 14.500.00 5 3305.0112 330517 ConcreteCallar 1 EA S 1,220,00 $ 1,220.00 6 3331.3101 333150 14" Sower Service 4 EA S 2,000.00 S 8,000.00 7 3305.0103 33 05 30 Exploratory Excavation of ExislIng Utilities 1 EA S 3,75D.00 S 3,750.OD 8 3305.0202 34 0510 Imported EmbedmentlBackfill, CLSM 3 CY $ 115.00 $ 345.00 9 3301.0002 330131 Post -CCTV Inspection 200 LF S 3.00 S 600A0 10 3305.0109 330510 Trench Safety 200 LF S moo S 2,000.00 11 339.0001 33 39 60 Epoxy Manhole Liner(Warren or Chesterton) 10 VF $ 400.00 S 4,000.00 12 3471.0001 34 71 13 Traffic Control 4 MO 5 260.00 S 250.00 13 3201.04 32 01 18 Temporary Asphalt Paving Repair(2' HMAC on IV Flex Base 260 LF $ 26.00 S 6,760.00 14 3216.0102 32 16 13 7-Inch Concrete Curb and 18-inch Guitar (match existing) (59160) 312 LF $ 33.00 S 10,296.00 15 241.0461 02 41 13 Remove Concrete Driveway (00150) 63 SF $ 3,30 $ 20T90 16 3213.0401 32 13 20 6-inch Concrete Driveway (50160) 63 SF $ 9.10 $ 573,30 17 3212.0302 32 12 V 2-inch Asphalt Pavement Type "U" {SOlSD) 520 SY $ 11.50 S 5,9130.00 18 3305.0108 330514 Miscellaneous Adjustments -Water Meter Box (0150) 1 EA S 55.00 S 55.00 19 3305A107 330514 Manhole Adjust, Minor wlCollar (50150) 2 EA S 1,32D.00 $ 2,640.00 20 3217.5001 32 17 25 Curb Address Painting (50180) 1 EA S 80.00 $ 80.00 21 3291.01 32 91 19 Topsoil (80150) 3 CY S 27,50 $ 82.50 22 3292,01 320213 Block Sod Replacement (50150) 50 SY $ 6.00 S 300.00 23 3123.01101 322316 Unclassified Excava9an (50150) 3 CY S 25.00 S 75.00 24 241-17 02 41 15 10-inch Pavement Pulverization (SOISO) 520 SY $ 0.20 S 4.264.00 25 3125.0101 31 25 00 SWPPP = > 1 acre 1 LS S 275.00 $ 275.00 26 171.0101 017123 Construction Staking 1 LS $ 550.00 S 550.00 27 171,0102 01 71 23 As -Built Survey (Red Line Survey) i LS S 400.0a S 400.00 28 1 9909,9909 Sevier Construction Allowance 1 LS $ 15,000.00 is 15,000.00 UNIT 2SUa-TOTAL= S 109,903.70 UNIT 3: PAVING) IMPROVEMENT PAY ITEM BID LIST ITEM NO. SPEC. NO. DESCRIPTION OF ITEMS BID QTY UNIT OF MEASURE UNIT PRICE TOTAL AMOUNT 1 241,01 024113 Remove Sidewalk 11320 SF S 1.95 $ 22,074.D0 2 3213.0301 321320 4-inch Concrete Sidewalk 29160 SF $ 6.85 S 199.746,00 3 3232.01 322313 4-inch Concrete Sidewalk with Retaining Wall 1320 SF S 27.50 $ 36,300.00 4 241-03 02 41 13 Remove ADA Ramp 16 EA $ 275.00 $ 4,400.A0 5 999-0002 32 13 20 ADA Ramp 57 EA S 2,2%00 $ 128,250.00 6 241.13 02 41 15 Remove Concrete Curb & Cutter (50150) 3785 LF 3 3.85 $ 14,672.25 7 3216,0102 321613 7-inch Concrete Curb and 18-inch Gutter (match existing) (60150) 4172 LF $ 33.00 $ 137.676.00 6 241.0401 02 41 13 Remove Concrete Driveway (60150) 19778 Sr $ 3.30 S 65,267.40 9 3213,0401 32 13 20 6-inch Concrete Driveway (50140) 19778 SF S 9-10 $ 179.979.80 10 3216.0301 3216 f3 7-inch Concrete Valley Gutter (50150) 156 SY S 137.50 $ 21,450A0 11 3216 0301 321613 9' Conc Valley Gutter, Res-tdentiat (50160) 10 SY S 164.00 S 1.540.00 12 241.1506 024115 2-Inch Surface Milling (50150) 9545 SY $ 2.65 S 25,294.25 13 241,16 024115 100 Milling (50190) 110 LF S 28.35 $ 3.118.50 14 3124.0101 W 24 00 Asphalt Pavement Base Repair (50150) 30 CY S 362.00 S 113.860.00 15 3212.06 32 12 16 Asphalt Pavement Level -Up (50/60) 58 TN $ 135.o0 S 7,830.00 18 3212.0302 32 12 16 2-Inch Asphalt Pavement Type"D" (60150) 16506 SY S 11.50 S 189,819Ao 17 3305.0111 330514 Wafer Valve Box Adjust wl Collar (50150) a £A S 710.00 S 5.680.00 18 33305.0108 330514 Miscellaneous Adjustments - Water Meter BoX (50160) 14 EA $ faw $ 770.00 19 3305.0107 33 0514 Manhole Adjust, Mirtorwl Collar (50150) 3 EA S 1,320.00 S 3,960-00 20 3217.5001 321725 Curb Address Painting(60160) 93 EA $ flue $ 7,440.00 21 9999.9999 321725 Curb Address, Ceramic Tile (50150) 6 EA $ 850.00 S 511WOO 22 . 3291.01 32 91 19 Topsoil (50160) 146 CY S 27.50 S 4.015.00 23 3202.01 329213 Gluck Sad Replacement(90150) 1363 SY ' S 6A0 S 8,178.00 24 3123.0101 322316 Unclassified Excavation (50160) 1229 CY S 25.00 $ 30,725.00 25 3211.0124 321123 10-inch Flex Base, Type A, GR-2 (50150) 114 SY S 26,40 $ 3,009.60 26 24f A 7 02 41 15 10 inchPavement Pulverization (60160) 6793 SY S 8.20 S 55,702.60 27 3211.06 32 11 33 Cem-Lime Stabilization /Cement Modification, 261bs-1sy. 191 TN $ 220.00 S 42,020.00 28 3305.0108 323213 Miscellaneous Adjustments, spdnlder systems 1 LS S 10,00o.0O S 10,000.00 29 3110.0104 311000 244nch and larger, Tree Removal 4 EA S 2,750,00 S 11,000.00 30 3217.0305 321723 Pavement Markings, Slop Bar 299 LF S 12.00 S 3,568.00 31 3471,0001 347113 TraffrcConlral 8 MO S 800.00Is $ 6;400.00 32 3125.0101 312500 SWPPP=> 1 acre 1 LS S 1.750.00S 1,750.00 33 9999.0005 Pavement Construction Allowance i LS $ 155,00000S 155,000.00 UNIT 3 SUBJOTAL= 4,402,540.14 TOTAL (UNIT 1+UNIT 2+UNIT 3)= $ 4,933,473.30 THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A310 Bid Bond KNOW ALL MEN BY THESE PRESENTS, that we Gra-Tex Utilities, Inc. as Principal, hereinafter called the Principal, and Hartford Fire Insurance Company a corporation duly organized under the laws of the State of Texas as Surety, hereinafter called the Surety, are held and firmly bound unto CItV,af Ep 4Var11, as Obligee, hereinafter Called the Obligee, in the sum of Five Percent of the Greatest Amount Bid- - - - - - - - - Dollars ($ 5% GAB ); for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid forWateT and Sanitary Sewer Repleopmanrs Contract 2019. WSM.B,GPN 10 M, NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 23rd day of September. 2020 Gra-Tex Utilities, Inc. (Principal) (Seal) By jaN 0 AJ I (Title) President Hartford Fire Insurance Company (SQ ety) (Seal) y 1 Rhonda Wells (Title) Attorney -in -Fact AIA DOCUMENT A31019 BID BOND 31 AIA ® B FEBRUARY 1970 ED 0 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D.C. 20006 j Direct Inquiries/Claims to; P0WEj"1-k1-OF THE HARTFORD BOND, T-12 ATTOR EY HartfOne ad, Conatiu06155 Bond.Claimsfathehartford.com tail: 888-266-3488 orfax: 860-757-s83s KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: INSURICA INS MANAGEMENT NETWORK A ency Code: 46-51.0067 = Hartford Fire insurance Company, a corporation duty organized under the laws of the State of Connecticut 0 Hartford Casualty Insurance Company, a corporation duty organized under the laws of the State of Indiana Hartford Accident and indemnity Company, a corporation duty organized under the laws of the State of Connecticut 0 Hartford Underwriters Insurance Company, a corporation duty organized under the laws of the State of Connecticut 0 Twin City Fire insurance Company, a corporation duty organized under the laws of the State of Indiana 0 Hartford insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois 0 Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter up fo the amountof Unlimited as JIM BARR, ROGER REDDEN, RHONDA WELLS, RUSSELL BOARD of ARLINGTON, Texas make, constitute and appoint, their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(tes) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. r�tvyf:I�D �U�°4rt „ _ .. t%US L o dA7�f'41"�!�• sn ;K/•r:Re,risi: a �Q� in � �e %� �¢.9.Q� . �X97ff��.f� It i! „_� �,asc� jiA'e L=�* • � r quFgR' '4•,•µ� �a. John Gray, Assistant Secretary M. Ross Fisher, Senior Vice President STATE OF CONNECCTICUT ss, Hartford COUNTY OF HARTFORD On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say; that he resides In the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. -0 KathleenT. Maynard Notary Public CER77FICATE My Commission &pins July 31, 2021 1, the undersigned, Assistant Vice President of the Companies, 00 HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said ameanies, which is soli in foil force effective as Signed and st the City of Hartford �' "` � pf LDE7 � � r ram: � s3=� r �•:� F � Kevtln Heckman, Assistant Vice President PPA 1019 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. B. The principal place of business o our company or our parent company or majority owner is in the State of Texas. BIDDER: Gra-Tex Utilities, Inc. By: James Brent P.O. Box 700 Arlinton, Texas 76004 (Signature) Title: Estimator Date: t �� END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-13 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS (LEAD SERVICES REPLACEMENT D2) Form Revised 20110627 004511-1 BIDDERS PREQUALIFICATIONS Page 1 of 3 SECTION 00 45 11 BIDDERS PREQUALIFICATIONS 1. Summary. All contractors are required to be prequalified by the City prior to submitting bids. To be eligible to bid the contractor must submit Section 00 45 12, PREQUALIFICATION STATEMENT for the work type(s) listed with their Bid. Any contractor or subcontractor who is not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder Prequalification Application in accordance with the requirements below. The prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. The information must be submitted seven (7) days prior to the date of the opening of bids. For example, a contractor wishing to submit bids on projects to be opened on the 7th of April must file the information by the 31 st day of March in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's Prequalification Application, the following must accompany thesubmission. a. A complete set of audited or reviewed financial statements. (1) Classified Balance Sheet (2) Income Statement (3) Statement of Cash Flows (4) Statement of Retained Earnings (5) Notes to the Financial Statements, if any b. A certified copy of the firm's organizational documents (Corporate Charter, Articles of Incorporation, Articles of Organization, Certificate of Formation, LLC Regulations, Certificate of Limited Partnership Agreement). c. A completed Bidder Prequalification Application. (1) The firm's Texas Taxpayer Identification Number as issued by the Texas Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification number visit the Texas Comptroller of Public Accounts online at the following web address www.window.state.tx.us/tamermit/ and fill out the application to apply for your Texas tax ID. (2) The firm's e-mail address and fax number. (3) The firm's DUNS number as issued by Dun & Bradstreet. This number is used by the City for required reporting on Federal Aid projects. The DUNS number may be obtained at www.dnb.com. d. Resumes reflecting the construction experience of the principles of the firm for firms submitting their initial prequalification. These resumes should include the size and scope of the work performed. e. Other information as requested by the City. 2. Prequalification Requirements a. Financial Statements. Financial statement submission must be provided in accordance with the following: (1) The City requires that the original Financial Statement or a certified copy be submitted for consideration. CITY Of PORT WORTH WATER. AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-13 (LEAD SERVICES REPLACEMENT 1]2) Rcvised July 1, 2011 City Project Nu. 102169 0045 11 -2 BIDDERS PREQUALIFICATIONS Page 2 of 3 (2) To be satisfactory, the financial statements must be audited or reviewed by an independent, certified public accounting firm registered and in good standing in any state. Current Texas statues also require that accounting firms performing audits or reviews on business entities within the State of Texas be properly licensed or registered with the Texas State Board of Public Accountancy. (3) The accounting firm should state in the audit report or review whether the contractor is an individual, corporation, or limited liability company. (4) Financial Statements must be presented in U.S. dollars at the current rate of exchange of the Balance Sheet date. (5) The City will not recognize any certified public accountant as independent who is not, in fact, independent. (6) The accountant's opinion on the financial statements of the contracting company should state that the audit or review has been conducted in accordance with auditing standards generally accepted in the United States of America. This must be stated in the accounting firm's opinion. It should: (1) express an unqualified opinion, or (2) express a qualified opinion on the statements taken as a whole. (7) The City reserves the right to require a new statement at anytime. (8) The financial statement must be prepared as of the last day of any month, not more than one year old and must be on file with the City 16 months thereafter, in accordance with Paragraph 1. (9) The City wilt determine a contractor's bidding capacity for the purposes of awarding contracts. Bidding capacity is determined by multiplyingthe positive net working capital (working capital — current assets — current liabilities) by a factor of 10. Only those statements reflecting a positive net working capital position will be considered satisfactory for prequalification purposes. (10) In the case that a bidding date falls within the time a new financial statement is being prepared, the previous statement shall be updated with proper verification. b. Bidder Prequalification Application. A Bidder Prequalification Application must be submitted along with audited or reviewed financial statements by firms wishing to be eligible to bid on all classes of construction and maintenance projects. Incomplete Applications will be rejected. (4) In those schedules where there is nothing to report, the notation of "None" or "N/A" should be inserted. (2) A minimum of five (5) references of related work must be provided. (3) Submission of an equipment schedule which indicates equipment under the control of the Contractor and which is related to the type of work for which the Contactor is seeking prequalification. The schedule must include the manufacturer, model and general common description of each piece of equipment. Abbreviations or means of describing equipment other than provided above will not be accepted. 3. Eligibility to Bid a. The City shall be the sole judge as to a contractor's prequalification. b. The City may reject, suspend, or modify any prequalification for failure by the contractor to demonstrate acceptable financial ability orperformance. c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WOR'n i WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-S (LEAD SERVICES REPLACEMENT D2) Revised July 1, 2011 City Project No. 102169 0045 11 - 3 BIDDERS PREQUALIFICATIONS Page of d. if a contractor has a valid prequalification letter, the contractor will be eligible to bid the prequalified work types until the expiration date stated in the letter. END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECTFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July I, 2011 City Project Na_ 102169 00 45 12 8JD FORM Page 1 of 1 SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Asphalt Paving Construction/Reconstruction Advanced Paving Company 9/1/2020 (Greater than 15,000 square yards) Water Distribution, Urban and Renewal, 12-inch diameter and Gra-Tex Utilities, Inc. 10/31/2020 smaller Sewer Collection System, Development, 8-inches and Gra-Tex Utilities, Inc. 10/31/2020 smaller N/A The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Gra-Tex Utilities, Inc. By: Jaynes Brent P.O. Box 700 _ lla- L---- - -- Arlinton, Texas 76004 7 (Signature) Title: Estimator Date: END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS (LEAD SERVICES REPLACEMENT D2) Form Revised 20120120 FORTWORTH September 6, 2018 Advanced Paving Company 2257 Joe Field Road Dallas, TX 75229 Attn: Sam Garrett RE: PREQUALIFICATION FOR PAVING PROJECTS City of Fort Worth APPROVAL EFFECTIVE DATE — Se ntetnber 1, 2018 ASPHALT PAVEMENT HEAVY MAINTENANCE — ISO LIMIT Dear Mr. Garnett: The City of Fort Worth Department of Transportation and Public Works has reviewed the materials you have submitted for prequalifrcation RENEWAL to perform street paving in the City of Fort Worth. This letter is to advise you that you have been deemed qualified to bid upon and perform the types of street paving indicated above, up to the limits specified. This notice serves only to advise you of that prequalification as future project specifications may require and does not otherwise affect any other provisions of those same project specifications. This prequalif cation will remain in effect for two (2) years as long as you remain in good standing with the City of Fort Worth. Prior to the end of the two years you are required to submit anew financial statement for consideration. In the interim, if you have any questions or comments, please do not hesitate to contact me. Sincerely, -�� Dennis I -I. Sallis C.P.M. Development Project Coordinator Infrastructure Design and Construction Services Transportation and Public Works City of Fort Worth TRANSPORTATION AND PUBLIC WORKS DEPARTMENT INFRASTRUCTURE PLAN REVIEW CENTER THE CITY oF, FORT WORTH * 1000 THROCKMORTON STREET * FORT WoRTFI, TEXAS 76102 817-392-8363 * FAx 817-392-2483 Co Printed on recycled pnper SECTION 00 45 13 BIDDER PREQUALIFICATION APPLICATION Date of Balance Sheet Name under which you wisli to qualify Post Office Box Street Address (required) Telephone Mark only one: City City Fax Individual Limited Partnership General Partnership Corporation Limited Liability Company State State Em ai l Texas Taxpayer Identification No. Federal Employers Identification No. DUNS No. (if applicable) Zip Code Zip Code MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO: CITY OF FORT WORTH TEXAS 200 TEXAS STREET FORT WORTH, TEXAS 76102-6311 AND MARK THE ENVELOPE: `BIDDER PREQUALIFICATIONAPPLICATION" 0045 13 - 2 BIDDER PREQUAI,TFICATIONAPPLICATION Page 2 o f 8 BUSINESS CLASSIFICATION The following should be completed in order that we may properly classify yourfrm: (Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 and/or Block 2 is checked) 171 Has fewer than 100 employees and/or Has less than $6,000,000.00 in annual gross receipts OR Does not meet the criteria for being designated a small business as provided in Section 2006.001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in determining eligibility to become prequalified. MAJOR WORK CATEGORIES Water Department Augur Boring - 24-inch diameter casing and less Augur Boring - Greater than 24-inch diameter casing and greater Tunneling 36-Inches 60 inches, and 350 LF or less Tunneling - 36-Inches 60 inches, and greater than 350 LF Tunneling — 66" and greater, 350 LF and greater Tunneling — 66" and greater, 350 LF or Less Cathodic Protection Water Distribution, Development, 8-inch diameter and smaller Water Distribution, Urban and Renewal, 8-inch diameter and smaller Water Distribution, Development, 12-inch diameter and smaller Water Distribution, Urban and Renewal, 12-inch diameter and smaller Water Transmission, Development, 24-inches and smaller Water Transmission, Urban/Renewal, 24-inches and smaller Water Transmission, Development, 42-inches and smaller Water Transmission, Urban/Renewal, 42-inches and smaller Water Transmission, Development, All Sizes Water Transmission, Urban/Renewal, All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches 36-inches Sewer Bypass Pumping 42-inches and larger CCTV, 8-inches and smaller CCTV, 12-inches and smaller CCTV, 18-inches and smaller CCTV, 24-inches and smaller CCTV, 42-inches and smaller CCTV, 48-inches and smaller CITY OF FORT WORTH STANDARD CONSTRUCTION SPECTFTCATION DOCUMENT Revised March 9, 202U WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-R (T_FAT) SERVICES REPLACEMENT D2) City Projxt No. 102169 004513-3 BIDDER PREQUALIFICATION APPLICATION Page 3 o f 8 MAJOR WORK CATEGORIES, CONTINUED Sewer CIPP, 12-inches and smaller Sewer CIPP, 24-inches and smaller Sewer CIPP, 42-inches and smaller Sewer CIPP, All Sizes Sewer Collection System, Development, 8-inches and smaller Sewer Collection System, Urban/Renewal, 8-inches and smaller Sewer Collection System, Development, 12-inches and smaller Sewer Collection System, Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal, 24-inches and smaller Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal, 42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller Sewer interceptors, Urban/Renewal, 48-inches and smaller Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement, All Sizes Sewer Cleaning, 24-inches and smaller Sewer Cleaning, 42-inches and smaller Sewer Cleaning, All Sizes Sewer Cleaning, 8-inches and smaller Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less Sewer Siphons All Sizes Transportation Public Works Asphalt Paving Constriction/Reconstruction (LESS THAN 15,000 squareyards) Asphalt Paving Construction/Reconstruction (15,000 square yards and GREATER) Asphalt Paving Heavy Maintenance (UNDER$1,000,000) Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) Concrete Paving Construction/Reconstruction (LESS THAN 15,000 squareyards) Concrete Paving Constriction/Reconstruction (15,000 square yards and GREATER) Roadway and Pedestrian Lighting CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) Revised March 9, 2020 City Project No. 102169 UD 45 ] 3 - 4 BMER PREQUALIFICATION APPLICATION Page 4 or$ 1. List equipment you do not own but which is available by renting DESCRIPTION OF EQUIPMENT I NAME AND DETAILED ADDRESS OF OWNER 2. How many years has your organization been in business as a general contractor under your present name? List previous business names: 3. How many years of experience in construction work has your organization had: (a) As a General Contractor: (b) As a Sub -Contractor: 4. *What projects has your organization completed in Texas and elsewhere? CONTRACT AMOUNT CLASS OF WORK DATE COMPLETED LOCATION CITY -COUNTY- STATE NAME AND DETAILED ADDRESS OF OFFICIAL TO WHOM YOU REFER *If requalifying only show work performed since laststatement. 5.Have you ever failed to complete any work awarded to you?_ If so, where and why? 6.Has any officer or owner of your organization ever been an officer of another organization that failed to complete a contract? If so, state the name of the individual, other organization and reason 7.Has any officer or owner of your organization ever failed to complete a contract executed in his/her name?If so, state the name of the individual, name of owner and reason. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATTON DOCUMENT Revised Mash 9,1020 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 004513-5 BIDDER PREQUALIFICATION APPLICATION Page 5 of $ 8. In what other lines of business are you financially interested?. 9 Have you ever performed any work for the City? If so, when and to whom do you refer? 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. I NAME OF FIRM OR COMPANY i DETAILED ADDRESS I 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12, What is the construction experience of the principal individuals in your organization? NAME PRESENT POSITION OR OFFICE YEARS OF EXPERIENCE I MAGNITUDE AND TYPE OF WORK IN WHAT CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee, please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those relatedby adoption or marriage. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECTFTCATTON DOCUMENT Revised March 9, 2020 WATER AND SANITARY SEIVER REPLACEMENT CONTRACT 2019, WSM-I3 (LEAD SERVICES REPLACEMENT D2) City Piojcct No. 102169 004513-6 BIDDER PREQUALIFICATION APPI.ICATION Page 6 of 8 CORPORATION BLOCK PARTNERSHIP BLOCK If a corporation: Date of incorporation Charter/File No. President Vice Presidents If a partnership: State of Organization Date of organization Is partnership general, limited, or registered limited liability partnership? File No. (if Limited Partnership) General Partners/Officers Secretary Treasurer Limited Partners (if applicable) LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Officers or Managers (with titles, if any) individuals authorized to sign for Partnership Except for limited partners, the individuals listed in the blocks above are presumed to have full signature authority for your firm unless otherwise advised. Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement, power of attorney or other legal documentation which grants this authority. CITY OF FORT WORTH STANDARD CONSTRUCTION $PF.C1FiCAT10N DOCI_tivIF.NT Revised March 9, 2020 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, 4VSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 14. Equipment 004513-7 BIDDER PRFQUALIFICATION APPLICATION Page 7 of 8 TOTAL ITEM QUANTITY ITEM DESCRIPTION BALANCESHEET VALUE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Various - TOTAL Similar types of equipment may be lumped together. if your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as "various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all yourequipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include, the manufacturer, model, and general common description of each. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised March 9, 2020 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT 02) City Project No. 102169 004513-8 BIDDER PR EQUALIFICATION APPLICATION Page 8 of 8 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information, while this statement is in force, necessary to verify said statement. , being duly sworn, deposes and says that he/she is the of , the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalificatian Application are correct and true as of the date of this affidavit. Firm Name: Signature: Sworn to before me this day of , Notary Public Notary Public must not be an officer, director, or stockholder or relative thereof. CITY OF FORT WORTH STANDARD CONSTRUCTION SPFCIFICATiON DOCUMENT Revised March 9,202U WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page I of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. 102169 Contractor further certifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. S 9 CONTRACTOR: 10 11rG- ! C)c l�[.� i 6 r'1 I:5 1/`tC= By: gIC&4i Wasel?Afx ors 12 Company (Please Print) 13 14 � 760 Signature: � 15 Address 16 r i ✓� n f�0� / Title: + 1S City/Scat ip (Please Print) 19 20 21 THE STATE OF TEXAS § 22 23 COUNTY OF TARR-ANT § 24 25 BEFO�YE ME, th undersigned authority, on this day personally appeared 26 �►1CiL�dn �nbaoM , known to me to be the person whose name is 27 subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as 28 the act and deed of %rc,' )ex UI�i �tPS, Tay6 for the purposes and 29 consideration therein expressed and in the capacity therein stated. 30 31 32 33 34 35 36 GTVEN UNDER MY HAND AND SEAL OF OFFICE this 2&. u to 61ic d for the StAe of Texas V _day of 37 38 END OF SECTION ��Y {;,: GREG HUGOAH , SR. _•: �= My notary 10 21281609M 39 a°i'op s . Expim February 1, 2022 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 1, 2011 WATER AND SANITARY SEWER RF.PLACEMF.NT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT 62) City Project No. 102169 004540- 1 Minority Business Enterprise Specifications Page I of 2 61 Orel UA[IIIiW,if TEMPORARY REVISION 4/6/2020 (COVID-191 Minority Business Enterprise Specifications APPLICATION OF POLICY If the total dollar value of the contract is greater than $50,000, then a MBE subcontracting goal is applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance apply to thisbid. MBE PROJECT GOALS The City's MBE goal on this project is l 3%0 of the total bid value of the contract (Base bid applies to Parks and Community Services). Note. If both MBE and SBE subcontracting goals are established for this project, then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. COMPLIANCE TO BID SPECIFICATIONS On City contracts $50,000 or more where a MBE subcontracting goal is applied, Offerors are required to comply with the intent of the City's Business Diversity Enterprise Ordinance by one ofthefollowing: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or 3. Good Faith Effort documentation, or; 4. Prime Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the assigned City of Fort Worth Project Manager or Department Designee, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall EMAIL the MBE documentation to the assigned City of Fort Worth Project Manager or Department Designee. A faxed copy will not be accepted. 1, Sul1cr111tractcsr LJtill atioll F+}rm, il+ received no later' Ihnn 2:00 p,m- oii the seeorid City business goal is niei or exceeded: day after the bid opening date, exclusive of the hid uponing 2. Good Faith EITDrt and Subcontractor Utflization Form. if b�rticiltiatiork i-s-IQss Ilan sla� led pal. 3. Good Faith Ef&rt and Su1)canIractor (Jtilization Forin, if no MBE narticination: 4. Prime Contractor Wsriver Form, ifyQ1I will pieFor113 :ill con Irlctinglsupplier work: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised June 9, 2015 ruceivad no lutrr than. 2:110 p.m, on the second City busiuess play afl;et sloe bid opening. datii, exclusive of IEE; bid opening date, received no Inter Ihan 2:W p.m., on -the -seeon d 0ty bus inc , clay aficr the bi4 opening elate, exclusive or the 1)1d opCumg date, eceivcd at) infer than 2,00 p.m., od Ilse second City businetis day aver the bid opcning dale, exclusive of the bid 1}nelking chltc. WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2 City Project No. 102169 004540-2 Minority Business Enterprise Specifications Page 2 of 2 5: Joint Veinrnre Form. if goat is met re!QeiY. Cd Fill later [Flat] 2:00 p.m., III the second City business or oxceeded. day niter the bid openFng date, exclusive of the bid opcntng date, FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE WILL RESULT IN THE BID BEING CONSIDERED NON-RESONSIVE TO SPECIFICATIONS. FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE. A SECOND FAILURE WILL RESULT IN THE OFFEROR BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR. THREE FAILURES IN A FIVE YEAR PERIOD WILL RESULT IN A DISQUALIFICAITON PERIOD OF THREE YEARS. Any Questions, Please Contact the BDE Office at (817) 392-2674. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised June 9, 2015 END OF SECTION WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 005243-1 Agreement Page I of 5 SECTION 00 52 43 A GREPMENT TMS AGREEM ENT, authorized on 10/27/.20 is made by and between the City of Forth Worth, a Texas home rule municipality, acting by and through its duty authorized City Manager, ("City"), and Gra-Tex Utilities, Inc., authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor"). City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Water & Sanitary Sewer Rglacement Contract 2019, WSH 8 (Lead Serpices RgPlacement D2) City Proiect No. 102169 Article 3. CONTRACT PRICE City agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount, in current funds, of Four Million, Nine Hundred Thi -three, Thousand, Four Hundred Seventy-three Dollars and 30 cents Dollars ($4,933,473.30). Article 4. CONTRACT TIME 4.1 Final Acceptance. The Work will be complete for Final Acceptance within 430 days after the date when the Contract Time commences to run, as provided in Paragraph 2.03 of the General Conditions, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. 4.2 Liquidated Dainages Contractor recognizes that tune is of the essence for completion of Milestones, if any, and to achieve Final Acceptance of the Work and City will suffer financial Ioss if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also recognizes the delays,, expense and difficulties involved in proving in a Iegal proceeding, the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Six Hundred Thirty Dollars ($630.00 for each day that expires after the time specified in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH Water & Sanitary Sewer Replacement Contract 2019, WSM-H (Lead Services Replacement D2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102169 Revised 09/06/2019 005243-2 Agreement Page 2 of 5 Article S. CONTRACT DOCUMENTS 5.1 CONTENTS: A. The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: I. This Agreement. 2, Attachments to this Agreement: a. Bid Form 1) ProposaI Form 2) Vendor Compliance to State Law Non -Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specific) b. Current Prevailing Wage Rate Table c. Insurance ACORD Form(s) d. Payment Bond e. Performance Bond f. Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MBE and/or SBE Utilization Form 3. General Conditions. 4. Supplementaq Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the .Prof ect's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders, c. Change Orders. d. Letter of Final Acceptance. Article 6. INDEMNIFICATION 6.1. Contractor covenants and agrees to indemnify, hold harmless and defend, at its oven expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages beinLz sought were caused, in whole or in part, by any act, omission or negligence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. CITY OF FORT WORTH Water & Saaiiary Server Replacement Contract 2019, WSM-g (Lead Services Replacement D2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102169 Revised 09/06/2019 005243-3 Agreement Page 3 of 5 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the worIc and sex -vices to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is aIIeaed or proven that all or some of the damages being sought were caused, in lyhole or in -part by any act, omission or nealiyence of the city. Article 7. MISCELLANE, OUS 7.1 Terms. Terms used in this Agreement which are defined in Article I of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors and Assigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability. Any provision or part of the unenforceable by a court of remaining provisions shall CONTRACTOR. 7.5 Governing Law and Venue. Contract Documents held to be unconstitutional, void or competent jurisdiction shall be deemed stricken, and all continue to be valid and binding upon CITY and This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern. District of Texas, Fort Worth Division, 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement if signed by someone other than the duly authorized signatory of the Contractor. 7.7 Prohibition On Contracts With Companies Boycotting Israel. Contractor acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. CITY OF FORT WORTH Witter & Sanitary Sewer Replacement Contract 2019, WSM-13 (Lead Services Replacement D2j STANDARD CONSTRUCTION SPEC71CA`iION DOCUMENTS City Project No. 102169 Revised 09/06/2019 005243-4 Agreement Page 4 of 5 The terms "boycott Isracl" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing tJiis contract, Contractor• certifies Mal Contractor's signature provicles Ivritten verification to the City that Conttactol•: (1) does not boycott Israel, and (2) Ivill not boycottlsrael during the term of the contract. 7.8 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to aII Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNMY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE, TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S ]EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for violations of this provision by Contractor. 7.9 No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Contractor and there are no third -party beneficiaries. 7.10 No Cause of Action Against Engincor. Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their sureties, shall maintain no direct action against the Engineer, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the City will be. the beneficiary of any undertaking by the Engineer. The presence or duties of the Engineer's personnel at a construction site, whether as on -site representatives or otherwise, do not make the Engineer or its personnel in any way responsible for those duties that belong to the City and/or the City's construction contractors or other entities, and do not rclievc the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The Engineer and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. SIGNATURE PAGE TO FOLLOW CITY OF FORT WORTH Water & Sanitary Sewer Replacement Contract 2019, WSM B (Lead Services Replaceineat D2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102169 Revised 09/06/2019 00 52 43 - 5 Agreement Page 5 of 5 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor•: CJ) Ct- "r4ex Ufi J Hi CS ,_TrkC . By: Signature A�-: L) 8A ale^ (Printed Name) W. Title �)d Address / 4 adion o City/Stat ip — - - Date City of Fort Worth By: Z�wg &�L� Dana P—ghd- f (Dc 23, 202 1 :25 CST) ,Dana Burglidoff Assistant City Manager Dec 23, 2020 Date 1 _ 1�Itte t'� ° O Xp ty Secretary (Seal) ' M&.C: 20-0803 Date: 10/27/2020 Form 1295 No.: 2020-676649 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. fo A ✓ 0 ' Pratima Poudyal, P.E. Project Manager Approved as to Form and Legality: OBI-k (Dec 23, 202014.53 CST) Douglas W. Black Sr. Assistant City Attorney APPROVAL RECOMMENDED: 2 ,ZLIT Christopher Hard (Dec 23, 202011:59 CST) Chris Harder, P.E., Director Water Department OFFOCRAL RECORD CITY OF FORT WORTH Water & Sanitary Sewer Replacernard Contract 2019, WSM- {L ti;i STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS it rfyjgc�:yl� Revised 09/06/2019 AWORTNy Th 0061 19 - 1 MAINTENANCE BOND Pagel of 3 1 SECTION 00 6119 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we Gra-Tex Utilities Inc. , known as 8 "Principal" herein and Hartford Fire Insurance Company , a corporate surety 9 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a I 1 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, Four Million Nine Hundred Thirty Three Thousand Four Hundred 12 in the SUM Of seventy Three Dollars and /30 cents Dollars 13 ($ 4,933,473.30 ), lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its 15 successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 16 and severally, firmly by these presents. 17 18 WHEREAS, the Principal has entered into a certain written contract with the City awarded 19 the day of , 20__, which Contract is hereby 20 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 21 materials, equipment labor and other accessories as defined by law, in the prosecution of the 22 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 23 the "Work") as provided for in said contract and designated as WATER AND SANITARY 24 SEWER REPLACEMENT CONTRACT WSM-B (Lead Services Renlacement D21 Citv 25 Project No. 102169 26 27 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 28 accordance with the plans, specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two (2) years 30 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 31 32 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 33 upon receiving notice from the City of the need therefor at any time within the Maintenance 34 Period. 35 CITY OF FORT WORTH WATER ANDSANrrARYSEWER STANDARD CONSTRUCnONSPECIFiCATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-E (LEAD SERVICES REPLACEWNr D21 Revised duly 1. 2011 City Proj4a No. 102169 46ECSHP4387 0061 19-2 MAINTENANCE BOND Page 2 o€3 1 NOW THEREFORE, the condition of this obligation is such that if Principal shall 2 remedy any defective Work, for which timely'notice was, provided by City, to a completion 3 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 4 fulI force and effect. 5 6 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 7 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 8 be repaired and/or recoristructed with all associated costs thereof being home by the Principal and 9 the .Surety under this Maintenance bond, a11d 10 11 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 12 Tarrant County; Texas or the United States District Court fbr'the Northern District of Texas, Fort 13 Worth Division; and 14 15 PROVIDED FURTHER, that this obligation shall be continuous in nature and 16 successive recoveries may be had hereon for successive breaches. 17 ; 1$ 19 CITY OF FORT WORTH WA9"Elt AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT' REPLACEMENT CONTRACI2919, WSNf B (LEAD SERVICES REPLACEMENT 02) Revised July 1, 2011 City Project No. 10210 006119-3 MAINTENANCE BOND Page 3 of I IN WITNESS WHEREOF, the Principal and the Surety have each, SIGNED and SEALED this 2 insti urnent by duly authorized agents and officers on this the 18th day of November 3 , 20 20 5 6 7 8 9 ld 11 12 13 14 I5 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 �1[ i I (Principal) Secretary tness as to Principal ATTEST: (M)sL Witness as to Oety PRINC AL;�-� � 1/ �� r (0.69 ' ! CSC 1,of "ac. e4ea-ba4to, tell, Name and Title Address: Ab,z Red SURETY: Hartford Fire Insurance Company BY: on a eJo�nar- Signature Name and Title Address: 700 Highlander Blvd # 340 Arlington, TX 76015 Telephone Number: 817-226-3710 37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY Of FORT WORTH WATER AND SANPFARY SE WER STANDARD CONSTRUCTION SPECIFiCAVON DOCUMENT REPLACEMENT CONTRACT 2019, WSW R (LEAD SERVICES REPLACEMENT D2) Revised July I, 2011 City Project No. 102169 Direct inquirieslClaims to: THE HARTFORD POWER "F ATTORNEYBONnecti 2 One Hartford Plaza Hartford, Connecticut 06155 Bond.Claims0thehartford.com call:888-266-3488 orfax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: INSURICA INS MANAGEMENT NETWORK Agency Code: 46•-510067 0 Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut 0 Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana 0 Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of Unlimited JIM BARR, ROGER REDDEN, RHONDA WELLS, RUSSELL BOARD of ARLINGTON, Texas their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. Q �Ri►�o � .{.c��.le.rfsl � s ��� 5r' � _ �' °o�;�'� �'- 3 i LOR7 It e • o%.`c "3+t a pti ' 8 a. „�a � °jne rA"J� ��atenl► 1074lSs X;r, 1ti 7aJe 3Fig 'D (6-" _ilow' 'fix sip .*`L•�1} i„a�q�nois+'' 'i'~4...'.Ni'/'* f John Gray, Assistant Secretary M. Ross Fisher, Senior Vice President STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORO ) On this 5th day of January, 2018, before me personally came M, Ross Fisher, to me known, who being by me duly swom, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. 0Kathleen T. Maynard NotaryPublic CERTIFICATE My Commission Expires July 31, 2021 1, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of jW41 Af 101 e- 0 6-71� lemma Signed and sealed at the City of Hartford. ��>� � e m � LE.S7{ G s' ��1�i9 r9.•� i=�'a�° ;c",�;�L .� ,3 r RcF+� ' i�$ '�Vaver,ev�f ��atahta• icy: X970/C_B a�x 1D7Sg 29T9 rr. . m * �."'t9i> �.'eQxeaa yik 'T`La�] ► �� h,ge � VnaN' 1...,. Kevin Heckman, Assistant Vice President FOA 2018 006113-1 PERFORMANCE BOND Page 1 of 2 1 SECTION 00 6113 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Ora -Tex Utilities, Inc. known as 8 "Principal" herein and Haratford Fire Insurance Company , a corporate 9 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort North, a 11 municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal Four Million Nine hundred thirty three thousand dollars 12 SUM Of, Four Hundred Seventy Three Dollars .30 cents _ Dollars 13 ($ 1,933,473.30 ), lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas for the payment of which sum well and truly to be made, we bind 15 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 16 - firmly by these presents. 17 WHEREAS, the Principal has entered into a certain written contract with the City 18 awarded the day of , 20____, which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 20 labor and other accessories defined by law, in the prosecution of the Work, including any Change 21 Orders, as provided for in said Contract designated as WATER AND SANITARY SEWER 22 REPLACEMENT CONTRACT WSM-B (Lead Services Replacement D2) Citv Project No. 23 - 102169 24 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 25 shall faithfully perform it obligations under the Contract and shall in all respects duly and 26 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 27 specifications, and contract documents therein referred to, and as well during any period of 28 extension of the Contract that may be granted on the part of the.City, then this obligation shall be 29 and become null and void, otherwise to remain in full force and effect. 30 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 31 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 32 Worth Division. CITY OP FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECTFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM B (LEAD SERVICES REPLACEMENT 132) Revised July 1. 7011 Cily Projec XA. 102169 46BCSHP4387 0061 13 - 2 PERFORMANCE BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities ori'tlus bond shall be determined in 3 accordance with the provisions of said statuc. 4 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 181h day of November 6 , 20 20 7 PRINCIPAL: $ ara-3 Utilities, Inc. 9 10 11 12 Signature 13 ATTE�J, 14 15 � , /i/6wel J, LeaLX7 (,ma's 16 (Principal) Secretary Name and Title 17 1$ Address:�� 19 20 AM7 Io 21 22 WrIess as to Principal 23 SURETY: 24 Hanford Fire Insurance Company 25 26 27 BY: 2$ IIltllie Rhonda, Wells, Attorney In Fact 29 30 31 Name and Title 32 33 Address: 700 Highlander Blvd 4340 34 Arlington, TX 7601-5 35 .. 36 37 Witness as to S ty Telephone Number: 817-226-3710 3$ 39 40 41 *Note: If signed by an officer of the Surety Company, there trust be on file a certified extract 42 from the by-Iaws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address, both must be provided. 44 The date of the bond shalt not be prior to the date the Contract is awarded. 45 CITY OF FORT WORTH WATER AND SANrrARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CQNTRACr 2019, WSM-8 (LEAD SERVICES REPLACEMENT D2) Revised July 1, 20P 1 City PmjectNu.142I69 Direct Inquiries/Claims to: W q THE HARTFORD �0E OF ATT(D BONtiectic One Hartford Plaza Hartford, Connecticut 06155 Sond.ClaimsCa thehartford.com call., 880-266-3488 orfar: 860-7575838 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: INSURICA INS MANAGEMENT NETWORK Agency Code: 46-510067 Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut -- 1 Hartford Casualty Insurance Company, a corporation duly organized under the Iaws of the State of Indiana 0 Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut 0 Hartford Underwriters Insurance Company, a corporation duty organized under the laws of the State of Connecticut 0 Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford insurance Company of Illinois, a corporation duly organized under the taws of the State of Illinois 0 Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana 0 Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, uptotheamountof Unlimited J'IM BARR, ROGER REDDEN, RHONDA WELLS, RUSSELL BOARD of ARLINGTON, Texas their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. Ty osslrgrr `1 4P,$ � r y'[ 9,r!� ►c�e.ie.rti f a®�i" Jar�ca1art.��+:'- ti I•rr � {v i,1 °nr nlr !ti �•alay¢ ��Y •197 4 fo t :+, er41<• 'aax,�1r �yrp s'kr•J�+ ► zl l-i11] s+'' `+�nu•'� ' .wrf� • //Pl- ?i John Gray, Assistant Secretary STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD M. Ross Fisher, Senior Vice President On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. SfiNr•� � � f/ .y �t5>r' * Kathleen T. Maynard Notary Public CERTIFICATE My Commission Expires July 31, 2021 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of �d f/%r flJau� 01,40 e ; "414)c20 Signed and sealed at the City of Hartford. 7Yl »r>�yr t,,trs -., ew,y !1 �Yf�-•--•:+`ram • � � v;`.•a•rnl,r4i� m ���'� om �1 tOs7 : 'do -:- a .:? „ 4err:n�r•ff • is$1�pp i aL !9'r 4 "l 't•.t 1D � 9 - .8 D �� ,� '�y�•. . �ta� +� �,'�;'�•....•�` 1/—� Kevin Heckman, Assistant Vice President POA2018 00 61 14 - I 46BCSHP4387 PAYMENTBOND Page 1 of2 I SECTION 00 61 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF'TARRANT § 7 That we, Gra-Tex Utilities, Inc. known as 9 "Principal" herein, and Hartaford Fire Insurance Company . a 9 corporate surety (sureties), duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 11 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, Four Million Nine Hundred Thirty Three Thousand Four 12 in the penal sum of Hundred Seventy Three Dollars Dollars 13 ($ , lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves, 15 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these 16 presents: 17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 18 day of , ZO , which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, 20 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 21 said Contract and designated as WATER AND SANITARY SEWER REPLACEMENT 22 CONTRACT WSM-B (Lead Services Replacement D2) City Project No. 102169 23 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 24 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 25 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 26 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 27 force and effect. 28 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 29 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 30 accordance with the provisions of said statute. 31 CrN OF FORT WORTH WATER AND SANCfARYSEIVER STANDARD CONSTRUCTION SPECFHCATiON DOCUMENT REPLACEMENT CONTRACT 2019. WSM-B (LEAD SERVICES REPLACEMENT D2) Revised Su[y t, 2011 cityProimtNu. 102169 F 0061 14 - 2 PAYMENT BOND Page 2 of 1 M WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the I8th� day of 3 November 20 20 s 4 ATTEST: (Principal) as to Principal ATTEST: PRINCIPAL: Gra-Tex Utilities, Inc. BY:AZ,C 2 . J� Signature Name Ti ye Address:. C �� 1U1 .an X �U SURETY: Hartford Fire Insurance Company BY: Signature Rhonda We11s,Attorney In Fact (Surety) Secretary Name and Title Address: 700 Highlander Blvd # 390 , Arlington, TX 76015 Witness as t0 urety Telephone Number: 817-226-3710 5 6 Note: ' If signed by an officer of the Surety, there must be on file a certified extract from the 7 bylaws showing that this person has authority - to sign such obligation. If Surety's physical 8 address is different from its mailing address, both must be provided. 9 10 The date of the bored shall not be prior to the date the Contract is awarded. 11 END OF SECTION 12 CITY OF FORT WORTH WATER AND SANTTAFySEWER STANDARD CONSTRUMON SPECiFTCATrON DOCUMENT REPLACEMENT CON1RACTION, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July 1, 2011 City PeulectNo. t02169 Direct Inquiries/Claims to: BOND, T-12 THE HARTFORD POWEIROF ATP(I"IRNEY Hartford, Conne ticut06155 Bond.ClaimsAtheha rtford.com call.888-266-3488 ortax. 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: INSURICA INS MANAGEMENT NETWORK Agency Code: 46-510067 0 Hartford Fire insurance Company, a corporation duly organized under the laws of the State of Connecticut 0 Hartford Casualty insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duty organized under the laws of the State of Connccticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws ofthe State of Connecticut 0 Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana 0 Hartford insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois 0 Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint up to the amount of Unlimited : JIM BARR, ROGER REDDEN, RHONDA WELLS, RUSSELL BOARD of ARLINGTON, Texas their true and lawful Attarney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(les) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. ?ram V. 0.- 10&7 John Gray, Assistant Secretary M. Ross Fisher, Senior Vice President STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD On this 5th day of January, 2018, before me personalty came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. 0 Kathleen T. Maynard Notary Public C6RTIFIGATE My Commission Expires July 3I, 2021 1, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of /,fl 106 Ue yl-1 b ,-V( Signed and sealed at the City of Hartford. 6 y� Trt t#W �4,w e+ 'xftiu t t�s..`+ice a cow+► I SIT) O r.4Y� s Kevin Heckman, Assistant Vice President POA 2019 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT 007200 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mmeli9,2020 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article l Definitions and Terminology................................................................................ .... l 1.01 Defined Terms...............................................................................................................................1 1.02 Terminology..................................................................................................................................6 Article 2 — Preliminary Matters........................................................ 2.01 Copies of Documents ................................................... 2.02 Commencement of Contract Time; Notice to Proceed 2.03 Starting the Work ......................................................... 2 04 Before Startin Construction ............................................................. 7 ............................................................. 7 g....................................................... I..--- 2.05 Preconstruction Conference............................................................... 2.06 Public Meeting................................................................................... 2.07 Initial Acceptance of Schedules......................................................... ....................................... 7 ....................................... 8 ....................................... 8 ....................................... 8 ................................... 8 Q Article 3 — Contract Documents: Intent, Amending, Reuse............................................................................ 8 3.01 Intent.............•----..-----------....-----...................................................................................................... 8 3.02 Reference Standards............................................................................................................... .....9 3.03 Reporting and Resolving Discrepancies....................................................................................... 9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data ........................................................ ................11 Article 4 — Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points...........................................................................................................11 4.01 Availability of Lands................................................................................................ 4.02 Subsurface and Physical Conditions .................................. ...12 4.03 Differing Subsurface or Physical Conditions.............................................................................12 4.04 Underground Facilities.................................................................. 4.05 Reference Points.........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article 5 — Bonds and Insurance ............................................................ 5.01 Licensed Sureties and Insurers .......................................... 5.02 Performance, Payment, and Maintenance Bonds .............. 5.03 Certificates of Insurance .................................................... 5.04 Contractor's Insurance....................................................... 5.05 Acceptance of Bonds and Insurance; Option to Replace.. Article 6 Contractor's Responsibilities ............... 6.01 Supervision and Superintendence...... CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revisiun: Mauch9,2020 ....................................................16 ....................................................16 ....................................................16 •...................................................16 ....................................................1. 8 ....................................................19 ............19 ............19 6.02 Labor; Working Hours................................................................................................................20 6.03 Services, Materials, and Equipment .......................................... ...................20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and "Or-Equals"................................•----.................................................................21 6.06 Concerning Subcontractors, Suppliers, and Others ....................................................................24 6.07 Wage Rates........................................................................................ ..........................25 6.08 Patent Fees and Royalties........................................................................................................... 26 6.09 Permits and Utilities....................................................................................................................27 6.10 Laws and Regulations.................................................................................................................27 6.11 Taxes...........................................................................................................................................28 6.12 Use of Site and Other Areas....................................................................................................... 28 6.13 Record Documents......................................................................................................................29 6.14 Safety and Protection.................................................................................................................. 29 6.15 Safety Representative..................................................................................................................30 6.16 Hazard Communication Programs.............................................................................................30 6.17 Emergencies and/or Rectification............................................................................................... 30 6.18 Submittals....................................................................................................................................31 6,19 Continuing the Work ................. :................................................................................................. 32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indemnification.........................................................................................................................33 6.22 Delegation of Professional Design Services..............................................................................34 6.23 Right to Audit..............................................................................................................................34 6.24 Nondiscrimination.......................................................................................................................35 Article 7 - Other Work at the Site................................................................................................................... 35 7.01 Related Work at Site...................................................................................................................35 7.02 Coordination ---------------------------------------------- .............................36 Article 8 - City's Responsibilities................................................. 8.01 Communications to Contractor................................................................................................... 36 8.02 Furnish Data................................................................................................................................36 8.03 Pay When Due............................................................................................................................36 8.04 Lands and Easements; Reports and Tests...................................................................................36 8.05 Change Orders.............................................................................................................................36 8.06 Inspections, Tests, and Approvals.............................................................................................. 36 8.07 Limitations on City's Responsibilities ....................................................................................... 37 8.08 Undisclosed Hazardous Environmental Condition.................................................................... 37 8.09 Compliance with Safety Program...............................................................................................37 Article 9 - City's Observation Status During Construction........................................................................... 37 9.01 City's Project Manager............................................................................................................37 9.02 Visits to Site................................................................................................................................ 37 9.03 Authorized Variations in Work..................................................................................................38 9.04 Rejecting Defective Work..........................................................................................................38 9.05 Determinations for Work Performed..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work.....................38 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March9,2020 Article 10 - Changes in the Work; Claims; Extra Work................................................................................ 38 10.01 Authorized Changes in the Work............................................................................................... 38 10.02 Unauthorized Changes in the Work........................................................................................... 39 10.03 Execution of Change Orders........................•..............................................................................39 10.04 Extra Work.................................................................................................................................. 39 10.05 Notification to Surety..................................................................................................................39 10.06 Contract Claims Process.............................................................................................................40 Article 11 - Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement ......................41 11.01 Cost ofthe Work.........................................................................................................................41 11.02 Allowances............................................................................................................... 11.03 Unit Price Work..........................................................................................................................44 11.04 Plans Quantity Measurement......................................................................................................45 Article 12 -- Change of Contract Price; Change of Contract Time.................................................................46 12.01 Change of Contract Price............................................................................................................46 12.02 Change of Contract Time............................................................................................................47 12.03 Delays..........................................................................................................................................47 Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ......................48 13.01 Notice of Defects........................................................................................................................48 13.02 Access to Work.....................................................................................................48 13.03 Tests and Inspections..................................................................................................................49 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work.............................................................................................................49 13.06 Correction or Removal of Defective Work................................................................................50 13.07 Correction Period........................................................................................................................ 50 13.08 Acceptance of Defective Work......................................................•-----.......---------..---------............51 13.09 City May Correct Defective Work............................................................................................. 51. Article 14 - Payments to Contractor and Completion................................................................... ....... 52 14.01 Schedule of Values...................................................................................................................... 52 14.02 Progress Payments......................................................................................................................52 14.03 Contractor's Warranty of Title...................................................................................................54 14.04 Partial Utilization................................................................................................---------...55 14.05 Final Inspection ...........................................................................................................................55 14.06 Final Acceptance.........................................................................................................................55 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release........................................................ 56 14.09 Waiver of Claims........................................................................................................................57 Article 15 - Suspension of Work and Termination............................................................. ..57 ......................... 15.01 City May Suspend Work................................................................... ........................ 57 15.02 City May Terminate for Cause................................................................................................... 58 15.03 City May Terminate For Convenience............................................................. .. 60 Article 16 Dispute Resolution......................................................................................................................61 16.01 Methods and Procedures.............................................................................................................61 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 Article 17 —Miscellaneous .............................................................................................. 17.01 Giving Notice.............................................................................................. 17.02 Computation of Times................................................................................ 17.03 Cumulative Remedies.............................................................................. 17.04 Survival of Obligations............................................................................... 17.05 Headings.................................................................................................. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Man h 9, 2020 ............................... 62 ............................... 62 ............................... 62 ............................... 62 ............................... 63 .............................. 63 007200-1 GENFRAL CONDITIONS Page 1 of 63 ARTICLE 1 — DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement —The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. S. Award — Authorization by the City Council for the City to enter into an Agreement. 6. Bid —The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder —The individual or entity who submits a Bid directly to City. S. Bidding Documents The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements —The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision; Madi9,2020 007200-1 GENERAL CONDITIONS Page 2 of 63 12. Change Order —A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 13. City— The City of Fort Worth, Texas, a home -rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work .is to be performed. 14, City Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 15. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 16. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 17. Contract Claim A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 18. Contract —The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 19. Contract Documents —Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 20. Contract Price The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 21, Contract Time The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 22. Contractor The individual or entity with whom City has entered into the Agreement. 23. Cost of the Work —See Paragraph l 1.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March9,2020 007200-I GENERAL CONDITIONS Page 3 of 63 24. Damage Claims — A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 25. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 26. Director of Aviation The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 27. Director of'Parks and Community Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Planning and Development The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Water Department The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 32. Effective Date of the Agreement The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 33. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 34. Extra Work --- Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 35. Field Order— A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 36. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mamh 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 4 of 63 37. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 38. General Requirements —Sections of Division 1 of the Contract Documents. 39. Hazardous Environmental Condition —The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 40. Hazardous Waste —Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 41. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 42. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 43. Major Item — An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 44. Milestone ---A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 45. Notice of Award —The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 46. Notice to Proceed —A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 47. PCBs —Polychlorinated biphenyls. 48. Petroleum Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 49. Plans See definition of Drawings. CrrY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision; March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 5 of 63 50. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 51. Project The Work to be performed under the Contract Documents. 52. Project Manager —The authorized representative of the City who will be assigned to the Site. 53. Public Meeting An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 54. Radioactive Material Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 55. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 56. Samples —Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 57. Schedule of Submittals A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 58. Schedule of Values —A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 59. Site —Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 60. Specifications That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 61. Subcontractor An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mardi 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 6 of 63 62. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 63. Successful Bidder The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 64. Superintendent The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 65. Supplementary Conditions That part of the Contract Documents which amends or supplements these General Conditions. 66. Supplier A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 67. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69 Unit Brice Work —See Paragraph 11.03 of these General Conditions for definition. 69. Weekend Working Hours -- Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 70. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 71. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Match 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 7 of 63 The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 -- PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given no earlier than 14 days after the Effective Date of the Agreement, unless agreed to by both parties in writing. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mamh9,2020 007200-1 GENERAL CONDITIONS Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3 — CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 _ I GENERAL CONDITIONS Page 9 of63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Contractor's Review of'Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation , (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Maieh 9,2020 00 72 00 - 1 GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1, have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Maecli9,2020 00 72 00 - 1 GENERAL CONDITIONS Page 1 I of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's on-line electronic document management and collaboration system site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4 — AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mareh9,2020 00 72 00 - 1 GENERAL CONDITIONS Page 12 oi'63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mach 9, 2020 00 72 OU - 1 GENERAL CONDITIONS Page 13 of63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated.• The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Maoh 9, 2D26 00 72 00 - 1 GENERA], CONDITIONS Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% wilI be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March9,2020 00 72 00 - 1 GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City,s own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone, for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDA RD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9,2020 00 72 00 - 1 GENERAL CONDITIONS Page 16 of 63 ARTICLE 5 — BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (other evidence of insurance requested by City or any other additional insured) in at least the minimum amount as specified in the Supplementary Conditions which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 - I GENERAL CONDITIONS Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as Iisted in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VIT in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Man;li9,2020 00 72 00 -- 1 GENERAL CONDITIONS Page IS of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14, City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mmuh 9, 2020 007200- 1 GENERAL CONDITIONS Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto', defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the ,Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mareh 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shal I notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 007200- 1 GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 01 32 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 - i GENERAL CONDITIONS Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. S. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March9,2020 007200-I GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions, No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions, D. Minority Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is required to comply with the intent of the City's MBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 25 of63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2, shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents, B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mard19,2020 00 72 00 - 1 GENERAL CONDITIONS Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 Ith day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Match 9, 2020 007200-1 GENERAL CONDITIONS Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B. City shall pay a]I charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Arrny Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mash 9, 2020 007200- 1 GENERAL CONDITIONS Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time ofperformance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Tees A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subehapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin, TX 78711; or 2. tlttp:.,`,rv°ww.yindorw.state.tx.us/taxinfo;taxtormsr43-torrns.html 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 - I GENERAL CONDITIONS Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the ,Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall C= OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 007200-1 GENERAL CONDITIONS Page 30 of63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: l , all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision. Mareli9,2020 00 72 00 - 1 GENERAL CONDITIONS Page31 of63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof, if City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.1 S.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Man:h 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents, 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mmc i 9, 2020 00 72 00 -1 GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2, recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR 121 PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revisi on: Mardi 9, 2020 007200-1 GENERAL CONDITIONS Page 34 of 63 SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IN ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE _CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 6,22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Maidi9,2020 00 72 00 - 1 GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title Vl, Civil Rights Act of 1964 as amended Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7 --- OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Msmli 9,2020 007200-1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions. 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8 — CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements; Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8,06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDMONS Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific, applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Manager City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City's Project Manager during construction are set forth in the Contract Documents. The City's Project Manager for this Contract is identified in the Supplementary Conditions. 9.02 Visits to Site A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Manager's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents, B. City's Project Manager's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mach 9, 2020 00 72 00 - i GENERAL CONDITIONS Page 38 of 63 9.03 Authorized Variations in Work City's Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Manager will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Minch 9, 2020 00 72 00 - i GENERAL CONDITIONS Page 39 or63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (h) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sure or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March9,2020 007200-1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02, 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mairh9,2020 00 72 00 - 1 GENERAL CONDITIONS Page 44 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11— COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.013, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.013, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2C20 007200-1 GENERAL CONDITIONS Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Matt-1i9,2020 00 72 00 - 1 GENERAL CONDITIONS Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B: Costs Excluded: The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.01.A.1 or specifically covered by Paragraph 11.01.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 1 LOLA and 11.01.13, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre -bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mmuh9,2020 00 72 00 - 1 GENERAL CONDITIONS Page 44 of 63 a. the pre -bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre -bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2, there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH STANDARD CONSTRUCTION SPFCIFICATION DOCUMENTS Revision; March 9, 2020 007200-I GENERAL CONDITIONS Page 46 of 63 E. For callout work or non -site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2, where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.01.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3, where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.01.13.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.01.C). C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.01.A.1, 11.01.A.2. and 11.01.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.01.A.4 and 11.0l.A.5, the Contractor's fee shall be five percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.0l.C.2.a and 12.01.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision; March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.01.A.1 and 11.01.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs l 1.01.A.6, and 11.01.13; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made tberefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 4, 2020 00 72 00 - ] GENERAL CONDITIONS Page 48 of 63 ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13, 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing Iaboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mawh 9, 2020 00 72 00 - I GENERAL CONDITIONS Page 49 or63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.09 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Match 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: l . repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other ]and or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. AI] claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and a]I court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Man:h 9, 2020 00 72 00 - I GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. F. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision; March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 52 of63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the'basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mardi 9, 2020 00 72 00 - I GENERAL CONDITIONS Page 53 of 63 B. Review of Applications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor, or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors, requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Match 9, 2020 007200- I GENERAL CONDITIONS Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts Iess than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment: 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld,.or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mare 9, 2020 00 72 00 - ] GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification of the City and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Mardi9,2020 007200-1 GENERAL CONDITIONS Page 56 of 63 14.07 Final Payment A. Application for Payment: 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.09 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under, the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 58 of63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not Iimited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or S. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH STANDARD CONSTRUCTION SPFCIFICATION DOCUMENTS Revision: March 9, 2MO 007200- 1 GENERAL CONDITIONS Page 59 oF63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.13, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March9,2020 00 72 00 - i GENERAL CONDITIONS Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 — DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.13 shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March9,2020 00 72 00 - 1 GENERAL CONDITIONS Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 —MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if. 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: March 9, 2020 00 72 00 - 1 GENERAL CONDITIONS Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: %09,2020 00 73 00 SUPPLEMENTARY CONDITIONS SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO GENERAL CONDITIONS Supplementary Conditions Page I of 6 These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modifications and Supplements The following are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, "Resolving Discrepancies" Plans govern over Specifications. SC-4.01A Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SC-4.01A.1., "Availability of Lands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of [May 22, 2020]: None Outstanding Right -Of -Way, and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION None The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the representations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. SC-4.01A.2, "Availability of Lands" Utilities or obstructions to be removed, adjusted, and/or relocated CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 1)2j Revised March 9, 2020 City Project No. 102169 00 73 00 SUPPLEMENTARY CONDITIONS Page 2 of 6 The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of [May 22, 2020]: None EXPECTED UTILITY AND LOCATION OWNER None TARGET DATE OF ADJUSTMENT The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., "Subsurface and Physical Conditions" The following are reports of explorations and tests of subsurface conditions at the site of the Work: None SC-4.06A., "Hazardous Environmental Conditions at Site" The following arc reports and drawings of existing hazardous environmental conditions known to the City: None SC-5.03A., "Certificates of Insurance" The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: None (3) Other: None SC-5.04A., "Contractor's Insurance" The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regulations: 5.04A. Workers' Compensation, under Paragraph GC-5.04A. Statutory limits Employer's liability $100, 000 each accident/occurrence $100, 000 Disease - each employee $500,000 Disease -policy limit SC-5.04B., "Contractor's insurance" 5.04B. Commercial General Liability, under Paragraph GC-5.0413. Contractor's Liability Insurance under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with minimum limits of: $1,000,000 each occurrence $2, 000, 000 aggregate limit CITY OF FORT WORT11 WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019. WSM-8 (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Project No. 102169 00 73 00 SUPPLEMENTARY CONDITIONS Page 3 of 6 The policy must have an endorsement (Amendment Aggregate Limits of insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5.04C., "Contractor's Insurance" 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability insurance under Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: $250,000 Bodily Injury per person / $500, 000 Bodily Injury per accident / $100,000 Property Damage SG5.04D., "Contractor's Insurance" The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks None The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: (1) General Aggregate: (2) Each Occurrence: — Required for this Contract $Confirm Limits with Railroad $Confirm Limits with Railroad X Not required for this Contract With respect to the above outlined insurance requirements, the following shall govern: 1. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) Revised March 9, 2020 City Project No. 102169 00 73 00 SUPPLEMENTARY CONDITIONS Page 4 of 6 2. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of -way, the Contractor may be required to provide separate insurance policies in the name of each railroad company, 3. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at - grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. 4. If no grade separation is involved but other work is proposed on a railroad company's right-of- way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. SC-6.04-, "Project Schedule" Project schedule shall be tier 3 for the project. SC-6.07., "Wage Rates" The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: CFW Horizontal Wage Rate Table A copy of the table is also available by accessing the City's website at: https:/Iapps.fortworthtexas.gov/ProjectResources/ You can access the file by following the directory path: 02-Construction Documents/Specifications/Div00 General Conditions SC-6.09., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: SC-6.09I3. "City obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the City: None SC-6,09C. "Outstanding permits and licenses" The following is a list of known outstanding permits and/or licenses to be acquired, if any as of [May 22, 20201: None CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPE.CIEICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SLRVICL'S REPLACEMENT D2) Revised March 9, 2020 City Project Nu. 102469 00 73 00 SUPPLEMENTARY CONDITIONS Page 5 of 6 Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION None SC-6.24B., "Title VI, Civil Rights Act of 1964 as amended" During the performance of this Contract, the Contractor, for itself, its assignees and successors in interest (hereinafter referred to as the "Contractor") agrees as follows: 1. Compliance with Regulations: The Contractor shall comply with the Regulation relative to nondiscrimination in Federally -assisted programs of the Department of Transportation (hereinafter, "DOT") Title 49, Code of Federal Regulations, Part 21, as they maybe amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract. 2. Nondiscrimination: The Contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, or national origin, in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The Contractor shall not participate either directly or indirectly in the discrimination prohibited by 49 CFR, section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations. 3. Solicitations for Subcontractors, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontactor or supplier shall be notified by the Contractor of the Contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin. 4. Information and Reports: The Contractor shall provide all information and reports required by the Regulations or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information and its facilities as may be determined by City or the Texas Department of Transportation to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information the contractor shall so certify to the City, or the Texas Department of Transportation, as appropriate, and shall set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of the Contractor's noncompliance with the nondiscrimination provisions of this Contract, City shall impose such contract sanctions as it or the Texas Department of Transportation may determine to be appropriate, including, but not limited to: a. withholding of payments to the Contractor under the Contract until the Contractor complies, and/or b. cancellation, termination or suspension of the Contract, in whole or in part. 6. incorporation of Provisions: The Contractor shall include the provisions of paragraphs (1) through (6) in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The Contractor shall take such action with respect to any subcontract or procurement as City or the Texas Department of Transportation may direct as a means of enforcing such provisions including sanctions for non-compliance: Provided, however, that, in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request City to enter into CITY OF FORT NORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Pmjocs No. 1112169 00 73 00 SUPPLEMENTARY CONDITIONS Page 6 of 6 such litigation to protect the interests of City, and, in addition, the contractor may request the United States to enter into such litigation to protect the interests of the United States. Additional Title VI requirements can be found in the Appendix. SC-7.02., "Coordination" The individuals or entities listed below have contracts with the City for the performance of other work at the Site: None Vendor Scope of Work Coordination Authority SC-8.01, "Communications to Contractor" None SC-9.01., "City's Project Manager" The City's Project Manager for this Contract is Pratima Poudyal, P.E., or his/her successor pursuant to written notification from the Director of Water Department. SC-13.03C., "Tests and Inspections" None SC-16.01C.1, "Methods and Procedures" None END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F. Griffin SC-9.01., "City's Project Representative" wording changed to City's Project Manager_ 3/9/2020 D.V. Magana SC-6.07, Updated the link such that files can be accessed via the City's website_ CITY OF FORT WORT" WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-E (LEAD SERVICES REPLACEMENT D2) Revised Mamh 9, 2020 City Project No. 102169 SECTION 01 11 00 SUMMARY OF WORK PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 11 00- 1 SUMMARY OF WORT{ Page 1 of 3 1. Summary of Work to be performed in accordance with the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limitedto: 1. Division 0 -Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division I - General Requirements 1.2. PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Work Covered by Contract Documents Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises I . Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the constriction operations. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised Deceinber 20, 2012 City Project No. 102169 01 11 00 - 2 SUMMARY OF WORK Pagc 2 of3 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. if the street is occupied by railroad tracks, the Work shall be carried on in such manner as not to interfere with the operation of the railroad. 1) All Work shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. D. Work within Easements l . Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 2. Do not store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the City. 3. Unless specifically provided otherwise, clear all rights -of -way or easements of obstructions which must be removed to make possible proper prosecution of the Work as a part of the project construction operations. 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public orprivate lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in theproposal. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-R (€,£AD SERVICES REPLACEMENT D2) Revised December 20, 2012 City Projeer No 102169 011100-3 SUMMARY OF WORK Page 3 or3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Lag DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMLNT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) Revised December 20, 2012 Ciry Prgra No, 107169 SECTION 0125 00 SUBSTITUTION PROCEDURES PARTI- GENERAL 1.1 SUMMARY A. Section Includes: 012.500-1 SUBSTITUTION PROCEDURES Page 1 ofa The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteriaor defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals", B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 General Conditions 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in placeof those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, 1 TTY OF FORT ZVORTFI WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATTON DOL13W..NT REPLACEMENT CONTRACT 2019, WSM-S (LEAD SERVICES REPLACEMENT D2) Revised July 1, 2011 City Project No. 102169 01 25 00 - 2 SUBSTITUTION PROCEDURES Page 2 Df 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) EXHIBIT A B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a, Documentation I ) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance ofproposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection I . Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, the resulting cost and/or time reduction will be documented by Change Order in accordance with the General Conditions. �D-Y OF FORT WORTH WATER AND SANITARY SF.WF.R STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July 1, 2011 City Project No. 102169 01 25 00 - 3 SUBSTITUTION PROCEDURES Page 3 of4 4. No additional contract time will be given for substitution. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the City's opinion, acceptance will require substantial revision of the original design d. In the City's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.1 D DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY INOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE ,CITY OP FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July 1, 20I I City Project No. 102169 01 25 00 - 4 SUBSTITUTION PROCEDURES EXHIBIT A REQUEST FOR SUBSTITUTION FORM: 101 Page 4 of4 PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on othertrades? C. Differences between proposed substitution and specifueditem? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone For Use by City: Approved City Recommended Recommended Not recommended Received late By Date Remarks Rejected Date I :FTY OF FORT WOR"fH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July 1, 7011 City Project No. 102169 SECTION 01 31 19 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 31 19 - 1 PRECONSTRUCTION MEETING Page I of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division a —General Conditions 2. Division I General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attendingmectings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the execution of the Agreement and before Work is started. a. The meeting will be scheduled and administered by the City, 2, The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Project Representative b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH WATLR AND SANITARY SEWER STANDARD CONSTRUCPiON SPECIFICATION DOCUMENT REPLACEMENT CONTRAC-I' 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised August 17, 2012 City Project No. 102169 01 31 19 - 2 PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Construction Schedule a. Prepare baseline construction schedule in accordance with Section 01 32 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. 5. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings f£ Temporary construction facilities gg. M/WBE or MBE/SBE procedures hh. Final Acceptance ii. Final Payment jj. Questions or Comments CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECTFTCATTON DOCUMENT REPLACEMENT CONT RACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised Aug st 17, 2012 City Project No. 102169 01 31 19 - 3 PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS INOT USED] 1.12 WARRANTY INOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE ^� CPTY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B ILEAD SERVICE'S REPLACEMENT D2) Revised August I T, 2012 City PRject No. 102169 SECTION 01 3120 PROJECT MEETINGS PARTI- GENERAL 1.1 SUMMARY 01 31 20 - 1 PROJECT MEETINGS Pagel of 3 A. Section Includes: 1. Provisions for project meetings throughout the constriction period to enable orderly review of the progress of the Work and to provide for systematic discussion of potential problems B. Deviations this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — General Conditions 2. Division 1 General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Schedule, attend and administer as specified, periodic progress meetings, and specially called meetings throughout progress of the Work. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity eachrepresents. 3. Meetings administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. 4. Meetings, in addition to those specified in this Section, may be held whenrequested by the City, Engineer or Contractor. B. Pre -Construction Neighborhood Meeting I . After the execution of the Agreement, but before construction is allowed to begin, attend I Public Meeting with affected residents to: a. Present projected schedule, including construction start date b. Answer any construction related questions 2. Meeting Location a. Location of meeting to be determined by the City. 3. Attendees CI"IY Of PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIVICATION DOCLIMFNT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) Revised July I, 2011 City Project No. 102169 01 31 20-2 PROJECT MEETINGS Page 2 of 3 a. Contractor b. Project Representative c. Other City representatives 4. Meeting Schedule a. in general, the neighborhood meeting will occur within the 2 weeks following the pre -construction conference. b. in no case will construction be allowed to begin until this meeting is held. C. Progress Meetings 1. Formal project coordination meetings will be held periodically. Meetings will be scheduled and administered by Project Representative. 2. Additional progress meetings to discuss specific topics will be conducted on an as - needed basis. Such additional meetings shall include, but not be limited to: a. Coordinating shutdowns b. installation of piping and equipment c. Coordination between other construction projects d. Resolution of construction issues e. Equipment approval 3. The Project Representative will preside at progress meetings, prepare the notes of the meeting and distribute copies of the same to all participants who so request by fully completing the attendance form to be circulated at the beginning of each meeting. 4. Attendance shall include: a. Contractor's project manager b. Contractor's superintendent c. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request d. Engineer's representatives e. City's representatives f. Others, as requested by the Proj ect Representative Preliminary Agenda may include: a. Review of Work progress since previous meeting b. Field observations, problems, conflicts c. items which impede construction schedule d. Review of off -site fabrication, delivery schedules e. Review of construction interfacing and sequencing requirements with other construction contracts f. Corrective measures and procedures to regain projected schedule g. Revisions to construction schedule h. Progress, schedule, during succeeding Work period i. Coordination of schedules j. Review submittal schedules k. Maintenance of quality standards 1. Pending changes and substitutions m. Review proposed changes for: 1) Effect on construction schedule and on completion date 2) Effect on other contracts of the Project n. Review Record Documents o. Review monthly pay request CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOC UMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July I, 2011 City Projwt No. 102169 01 31 20 - 3 PROJECT MEETINGS Page 3 oP3 p. Review status of Requests for Information 6. Meeting Schedule a. Progress meetings will be held periodically as determined by the Project Representative. 1) Additional meetings may be held at the request of the: a) City b) Engineer c) Contractor 7. Meeting Location a. The City will establish a meeting location. 1) To the extent practicable, meetings will be held at the Site. LS SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOTUSED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTIT WATER AND SANITARY SF.WF.R REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 02I STANDARD CONSTRUC'"ON SPECIFICATION DOCUMENT City Project No. 102169 Revised July I, 2011 01 32 16 - 1 CONSTRUCTION PROGRESS SCHEDULE Page] of 5 SECTION 0132 16 CONSTRUCTION PROGRESS SCHEDULE PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. General requirements for the preparation, submittal, updating, status reporting and management of the Construction Progress Schedule 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance Document B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — General Conditions 2. Division I General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Definitions 1. Schedule Tiers a. Tier 1 - No schedule submittal required by contract. Small, brief duration projects b. Tier 2 - No schedule submittal required by contract, but will require some milestone dates. Small, brief duration projects c. Tier 3 - Schedule submittal required by contract as described in the Specification and herein. Majority of City projects, including all bond program projects d. Tier 4 - Schedule submittal required by contract as described in the Specification and herein. Large and/or complex projects with long durations 1) Examples: large water pump station project and associated pipeline with interconnection to another governmental entity e. Tier S - Schedule submittal required by contract as described in the Specification and herein. Large and/or very complex projects with long durations, high public visibility 1) Examples might include a water or wastewater treatment plant 2. BaseIine Schedule - Initial schedule submitted before work begins that will serve as the baseline for measuring progress and departures from the schedule. 3. Progress Schedule - Monthly submittal of a progress schedule documenting progress on the project and any changes anticipated. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUC `I'ION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-S (LEAD SERVICES REPLACEMENT 132) Revised July I, 2011 City Project No. 102169 013216-2 CONSTRUCTION PROGRESS SCHEDULE Page 2 oC5 4. Schedule Narrative - Concise narrative of the schedule including schedule changes, expected delays, key schedule issues, critical path items, etc B. Reference Standards 1. City of Fort Worth Schedule Guidance Document 1.4 ADMINISTRATIVE REQUIREMENTS A. Baseline Schedule 1. General a. Prepare a cost -loaded baseline Schedule using approved software and the Critical Path Method (CPM) as required in the City of Fort Worth Schedule Guidance Document. b. Review the draft cost -loaded baseline Schedule with the City to demonstrate understanding of the work to be performed and known issues and constraints related to the schedule. c. Designate an authorized representative (Project Scheduler) responsible for developing and updating the schedule and preparing reports. B. Progress Schedule 1. Update the progress Schedule monthly as required in the City of Fort Worth Schedule Guidance Document. 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 3. Change Orders a. Incorporate approved change orders, resulting in a change of contract time, in the baseline Schedule in accordance with City of Fort Worth Schedule Guidance Document. C. Responsibility for Schedule Compliance 1. Whenever it becomes apparent from the current progress Schedule and CPM Status Report that delays to the critical path have resulted and the Contract completion date will not be met, or when so directed by the City, make some or all of the following actions at no additional cost to the City a. Submit a Recovery Plan to the City for approval revised baseline Schedule outlining: 1) A written statement of the steps intended to take to remove or arrest the delay to the critical path in the approved schedule 2) Increase construction manpower in such quantities and crafts as will substantially eliminate the backlog of work and return current Schedule to meet projected baseline completion dates 3) Increase the number of working hours per shift, shifts per day, working days per week, the amount of construction equipment, or any combination of the foregoing, sufficiently to substantially eliminate the backlog ofwork 4) Reschedule activities to achieve maximum practical concurreney of accomplishment of activities, and comply with the revisedschedule 2. If no written statement of the steps intended to take is submitted when so requested by the City, the City may direct the Contractor to increase the level of effort in manpower (trades), equipment and work schedule (overtime, weekend and holiday work, etc.) to be employed by the Contractor in order to remove or arrest the delay to the critical path in the approved schedule. a. No additional cost for such work will be considered. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) STANDARD CONSTRT3CTTUN SPECIFICATION DOCUMENT Project No. 102169 Revised July 1, 2V1 I 0] 32 16-3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of D. The Contract completion time will be adjusted only for causes specified inthis Contract. a. Requests for an extension of any Contract completion date must be supplemented with the following: 1) Furnish justification and supporting evidence as the City may deem necessary to determine whether the requested extension of time is entitled under the provisions of this Contract. a) The City will, after receipt of such justification and supporting evidence, make findings of fact and will advise the Contractor, in writing thereof. 2) If the City finds that the requested extension of time is entitled, the City's detennination as to the total number of days allowed for the extensions shall be based upon the approved total baseline schedule and on all data relevant to the extension. a) Such data shall be included in the next updating of the Progress schedule. b) Actual delays in activities which, according to the Baseline schedule, do not affect any Contract completion date shown by the critical path in the network will not be the basis for a change therein. I . Submit each request for change in Contract completion date to the City within 30 days after the beginning of the delay for which a time extension is requested but before the date of final payment under this Contract. a. No time extension will be granted for requests which are not submittedwithin the foregoing time limit. b. From time to time, it may be necessary for the Contract schedule or completion time to be adjusted by the City to reflect the effects of job conditions, weather, technical difficulties, strikes, unavoidable delays on the part of the City or its representatives, and other unforeseeable conditions which may indicate schedule adjustments or completion time extensions. 1) Under such conditions, the City will direct the Contractor to reschedule the work or Contract completion time to reflect the changed conditions and the Contractor shall revise his schedule accordingly. a) No additional compensation will be made to the Contractor for such schedule changes except for unavoidable overall contract time extensions beyond the actual completion of unaffected work, in which case the Contractor shall take al possible action to minimize anytime extension and any additional cost to the City. b) Available float time in the Baseline schedule may be used by the City as well as by the Contractor. 2. Float or slack time is defined as the amount of time between the earliest start date and the latest start date or between the earliest finish date and the latest finish date of a chain of activities on the Baseline Schedule. a. Float or slack time is not for the exclusive use or benefit of citherthe Contractor or the City. b. Proceed with work according to early start dates, and the City shall have the right to reserve and apportion float time according to the needs of theproject. CITY OF FORT NORTH WAMR AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SMVICLS REPLACEMENT D2) Revised July I, 2011 City Project No. 102169 01 32 16 - 4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 c. Acknowledge and agree that actual delays, affecting paths of activities containing float tirne, will not have any effect upon contract completion times, providing that the actual delay does not exceed the float time associated with those activities. F. Coordinating Schedule with Other Contract Schedules 1. Where work is to be performed under this Contract concurrently with orcontingent upon work performed on the same facilities or area under other contracts, the Baseline Schedule shall be coordinated with the schedules of the othercontracts. a. Obtain the schedules of the other appropriate contracts from the City for the preparation and updating of Baseline schedule and make the required changes in his schedule when indicated by changes in corresponding schedules. 2. In case of interference between the operations of different contractors, the City will determine the work priority of each contractor and the sequence of work necessary to expedite the completion of the entire Project. a. In such cases, the decision of the City shall be accepted as final. b. The temporary delay of any work due to such circumstances shall not be considered as justification for claims for additional compensation. 1.5 SUBMITTALS A. Baseline Schedule 1. Submit Schedule in native file format and pdf format as required in the City of Fort Worth Schedule Guidance Document. a. Native file format includes: 1) Primavera (P6 or Primavera Contractor) 2. Submit draft baseline Schedule to City prior to the pre -construction meeting and bring in hard copy to the meeting for review and discussion. B. Progress Schedule 1. Submit progress Schedule in native file format and pdf format as required in the City of Fort Worth Schedule Guidance Document. 2. Submit progress Schedule monthly no later than the last day of the month. C. Schedule Narrative 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth Schedule Guidance Document. 2. Submit schedule narrative monthly no later than the last day of the month. D. Submittal Process 1. The City administers and manages schedules through Buzzsaw. 2. Contractor shall submit documents as required in the City of Fort Worth Schedule Guidance Document. 3. Once the project has been completed and Final Acceptance has been issued by the City, no further progress schedules are required. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) STANDARD CONSTRUCTION SPECIFICATION DOCIJMFNT City Projeel No. 102169 Revised July I, 2011 01 32 16 - 5 CONSTRUCTION PROGRESS SCHEDULF. Page 5 of 5 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. The person preparing and revising the construction Progress Schedule shall be experienced in the preparation of schedules of similar complexity. B. Schedule and supporting documents addressed in this Specification shall be prepared, updated and revised to accurately reflect the performance of the construction. C. Contractor is responsible for the quality of all submittals in this section meetingthe standard of care for the construction industry for similarprojects. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-6 (LEAD SERVICES REPLACEMENT D2) Revised July I, 2011 City Project No. 102169 013233-1 PRECONSTRUCTION VIDEO Page ] of 2 SECTION 01 32 33 PRECONSTRUCTION VIDEO PARTI- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort North Standard Specification 1. None. G Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — General Conditions 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL ,SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-R (LEAF) SERVICES RFPI-ACEMF,NT DZj Revised July I, 2011 City Project No. 102169 013233-2 PRECONSTRUCTION VIDEO PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CETY OF FORT WORTH STANDARD CONSTRUCTION SPECIPICA'140N DOCUMENT Revised July I, 2011 Page 2 of 2 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-H (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 SECTION 01 33 00 SUBMITTALS PARTI- GENERAL 1.1 SUMMARY A. Section Includes: 01 3300- 1 SUBMITTALS Page I of8 General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1, None. C. Related Specification Sections include, but are not necessarily limitedto: 1. Division 0 — General Conditions 2. Division i General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADM.INISTRATIVE REQUIREMENTS A. Coordination l . Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-I3 (LEAD SERVICESREPLACEMENTD2) Revised December 20, 2012 City Project No. 102169 01 33 DD - 2 SUBMITTALS Page 2 of S d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering 1, When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the satne drawing (i.e. A=2nd submission, 13=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, 1 hereby represent that f have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and 1 have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 1/2 inches x 11 inches to 8 1/2, inches x 1 finches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions C3TY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised Decem6cr 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-13 (LEAD SERVICES REPLACEMENT D2) CiryProject Na. 1 D2169 013300-3 SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph (s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work ormaterials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings As specified in individual Work Sections includes, but is not necessarily limitedto: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g, Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data l . For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limitedto: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTiT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) City P-j-1 Nm 102169 01 33 00 - 4 SUBMITTALS Pape 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Suzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-S (LEAD SERVICES REPLACEMENT D2) Revised December 20, 2012 City Pmjecr No. 102169 01 33 00 - 5 SUBMITTALS Page 5 of S a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) if Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Rcvis d December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Pnject No. 102169 013300-6 SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for manufacture. CITY OF FORTWORTH STANDARD CONSTRUCTION SPFCTFICATTON DOCUMENT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, W SM-B (LEAD SERVICES REPLACEMENT 132) City Project No. 102169 013300-7 SUBKOTTALS Page 7 of 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Use the Request for Information (RFI) form provided by the City. 3. Numbering of RFI a. Prefix with "RFI" followed by series number, "-xxx", beginning with "01" and increasing sequentially with each additional transmittal. 4. Sufficient information shall be attached to permit a written response without fiirther information. 5. The City will log each request and will review the request. a. If review of the project information request indicates that a change to the Contract Documents is required, the City will issue a Field Order or Change Order, as appropriate. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUGTIDN SPFCIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised December 20, 2012 City Project No. 102169 01 33 00 - 8 SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to CalendarDays CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Proj ecl ND. 102169 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 1I 12 13 14 15 16 17 Is 19 20 21 22 23 01 35 13-1 SPECIAL PROJECT PROCEDURES Page 1 of 8 SECTION 0135 13 SPECIAL PROJECT PROCEDURES A. Section Includes: 1. The procedures for special project circumstances that includes, but is not limited to: a. Coordination with the Texas Department of Transportation b. Work near High Voltage Lines c. Confined Space Entry Program d. Air Pollution Watch Days e. Use of Explosives, Drop Weight, Etc. f. Water Department Notification g. Public Notification Prior to Beginning Construction h. Coordination with United States Army Corps of Engineers i. Coordination within Railroad permits areas j. Dust Control k. Employee Parking B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — General Conditions 2. Division 1 -- General Requirements 3. Section 33 12 25 Connection to Existing Water Mains 24 1.2 PRICE AND PAYMENT PROCEDURES 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 A. Measurement and Payment 1. Coordination within Railroad permit areas a. Measurement 1) Measurement for this item will be by lump sum. b. Payment 1) The work performed and materials furnished in accordance with this item will be paid for at the lump sum price bid for Railroad Coordination. c. The price bid shall include: 1) Mobilization 2) Inspection 3) Safety training 4) Additional insurance 5) Insurance Certificates 6) Other requirements associated with general coordination with Railroad, including additional employees required to protect the right-of-way and property of the Railroad from damage arising out of and/or from the construction of the Project. 2. Railroad Flagmen CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019. WSM-B (LEAD SERVICES REPLACEMENT D2) Revised December 20, 2012 Ciry Projmr Nu. 102169 013513-2 SPECIAL PROJECT PROCEDURES Page 2 of S 1 a. Measurement 2 1) Measurement for this Item will be per working day. 3 b. Payment 4 1) The work performed and materials furnished in accordance with this Item 5 will be paid for each working day that Railroad Flagmen are present at the 6 Site. 7 c. The price bid shall include: 8 1) Coordination for scheduling flagmen 9 2) Flagmen 10 3) Other requirements associated with Railroad 11 3. All other items 12 a. Work associated with these Items is considered subsidiary to the various items 13 bid. No separate payment will be allowed for this Item. 14 1.3 REFERENCES 15 A. Reference Standards 16 1. Reference standards cited in this Specification refer to the current reference 17 standard published at the time of the latest revision date logged at the end of this 18 Specification, unless a date is specifically cited. 19 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 20 High Voltage Overhead Lines. 21 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 22 Specification 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Coordination with the Texas Department of Transportation 25 1. When work in the right-of-way which is under the jurisdiction of the Texas 26 Department of Transportation (TxDOT): 27 a. Notify the Texas Department of Transportation prior to commencing any work 28 therein in accordance with the provisions of the permit 29 b. All work performed in the TxDOT right-of-way shall be performed in 30 compliance with and subject to approval from the Texas Department of 31 Transportation 32 B. Work near High Voltage Lines 33 1. Regulatory Requirements 34 a. All Work near High Voltage Lines (more than 600 volts measured between 35 conductors or between a conductor and the ground) shall be in accordance with 36 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 37 2. Warning sign 38 a. Provide sign of sufficient size meeting all OSHA requirements. 39 3. Equipment operating within 10 feet of high voltage lines will require the following 40 safety features 41 a. Insulating cage -type of guard about the boom or arm 42 b. Insulator links on the lift hook connections for back hoes or dippers 43 c. Equipment must meet the safety requirements as set forth by OSHA and the 44 safety requirements of the owner of the high voltage lines 45 4. Work within 6 feet of high voltage electric lines CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-8 (LEAD SERVICES REPLACEMENT D2) Revised December 20, 2012 City Project No. 102169 01 35 13-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 1 a. Notification shall be given to: 2 1) The power company (example: ONCOR) 3 a) Maintain an accurate log of all such calls to power company and record 4 action taken in each case. 5 b. Coordination with power company 6 1) After notification coordinate with the power company to.- 7 a) Erect temporary mechanical barriers, de -energize the Iines, or raise or 8 lower the lines 9 c. No personnel may work within 6 feet of a high voltage line before the above 10 requirements have been met. 1 1 C. Confined Space Entry Program 12 1. Provide and follow approved Confined Space Entry Program in accordance with 13 OSHA requirements. 14 2. Confined Spaces include: 15 a. Manholes 16 b. All other confined spaces in accordance with OSHA's Permit Required for 17 Confined Spaces 18 D. Air Pollution Watch Days 19 1. General 20 a. Observe the following guidelines relating to working on City construction sites 21 on days designated as "AIR POLLUTION WATCH DAYS". 22 b. Typical Ozone Season 23 1) May I through October 31. 24 c. Critical Emission Time 25 1) 6:00 a.m. to 10:00 a.m. 26 2. Watch Days 27 a. The Texas Commission on Environmental Quality (TCEQ), in coordination 28 with the National Weather Service, will issue the Air Pollution Watch by 3:00 29 p.m. on the afternoon prior to the WATCH day. 30 b. Requirements 31 1) Begin work after 10:00 a.m. whenever construction phasing requires the 32 use of motorized equipment for periods in excess of 1 hour. 33 2) However, the Contractor may begin work prior to 10:00 a.m. if 34 a) Use of motorized equipment is less than 1 hour, or 35 b) If equipment is new and certified by EPA as "Low Emitting", or 36 equipment burns UItra Low Sulfur Diesel (ULSD), diesel emulsions, or 37 alternative fuels such as CNG. 38 E. TCEQ Air Permit 39 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 40 F. Use of Explosives, Drop Weight, Etc. 41 1. When Contract Documents permit on the project the following will apply: 42 a. Public Notification 43 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 44 prior to commencing. 45 2) Minimum 24 hour public notification in accordance with Section 01 31 13 46 G. Water Department Coordination CITY OF FORT WORTH WATER AND SANITARY SEIVER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-6 (LEAD SERVICES REPLACEMENT D2) Revised December 20, 2012 City Pmjcct No. 102169 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 0135 13 - 4 SPECIAL PROJECT PROCFDURHS Page 4 of 8 l . During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. 2. Coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. a. Coordination shall be in accordance with Section 33 12 25. b. If needed, obtain a hydrant water meter from the Water Department for use during the life of named project. c. In the event that a water valve on an existing live system be turned off and on to accommodate the construction of the project is required, coordinate this activity through the appropriate City representative. 1) Do not operate water line valves of existing water system. a) Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. b) In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. H. Public Notification Prior to Beginning Construction 1. Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer 7 days prior to beginning any construction activity on each block in the project area, 1) Prepare flyer on the Contractor's letterhead and include the following information: a) Name of Project b) City Project No (CPN) c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number f) Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre -construction notification' flyer is attached as Exhibit A. 3) Submit schedule showing the construction start and finish time for each block of the project to the inspector. 4) Deliver flyer to the City Inspector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer is delivered to all residents of the block. 1. Public Notification of Temporary Water Service Interruption during Construction I, In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 1021r9 01 35 13 - 5 SPECIAL PROJECT PROCEDURES Page 5 of S 1 b. Prepare flyer on the contractor's letterhead and include the following 2 information: 3 1) Name of the project 4 2) City Project Number 5 3) Date of the interruption of service 6 4) Period the interruption will take place 7 5) Name of the contractor's foreman and phone number 8 6) Name of the City's inspector and phone number 9 c. A sample of the temporary water service interruption notification is attached as 10 Exhibit B. 11 d. Deliver a copy of the temporary interruption notification to the City inspector 12 for review prior to being distributed. 13 e. No interruption of water service can occur until the flyer has been delivered to 14 all affected residents and businesses. 15 f. Electronic versions of the sample flyers can be obtained from the Project 16 Construction Inspector. 17 J. Coordination with United States Anny Corps of Engineers (USACE) 18 1. At locations in the Project where construction activities occur in areas where 19 USACE permits are required, meet all requirements set forth in each designated 20 permit. 21 K. Coordination within Railroad Pen -nit Areas 22 1. At locations in the project where construction activities occur in areas where 23 railroad permits are required, meet all requirements set forth in each designated 24 railroad permit. This includes, but is not limited to, provisions for: 25 a. Flagmen 26 b. Inspectors 27 c. Safety training 28 d. Additional insurance 29 e. Insurance certificates 30 f. Other employees required to protect the right-of-way and property of the 31 Railroad Company from damage arising out of and/or from the construction of 32 the project. Proper utility clearance procedures shall be used in accordance 33 with the permit guidelines. 34 2. Obtain any supplemental information needed to comply with the railroad's 35 requirements. 36 3. Railroad flagmen 37 a. Submit receipts to City for verification of working days that railroad flagmen 38 were present on Site. 39 L. Dust Control 40 1. Use acceptable measures to control dust at the Site. 41 a. If water is used to control dust, capture and properly dispose of waste water. 42 b. If wet saw cutting is performed, capture and properly dispose of slurry. 43 M. Employee Parking 44 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT D2) Revised December 20, 2012 City Project No. 102169 013513-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31 /2012 D. Johnson 1 AM — Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E — Added Contractor responsibility for obtaining a TCEQ Air Permit CITY OF FORT NORTH WATER ANT) SANITARY SEWER STANDARD CONSTRUCTION SPFCIFICATTON DOCUMENT REPLACEMENT CONTRACT 2019, WSM-H (T.F,AD SERVICES REPLACEMENT D2) Reviwd December 20, 2012 City Project No. 102169 01 35 13 - 7 SPECIAL PROJECT PROCEDURES Page 7 of S 1 EXHIBIT A 2 (To be printed on Contractor's Letterhead) 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: 10 Mapsco Location: 11 Limits of Construction: 12 13 14 ■1 w 'W ® ® = = ® = = = w W w w ' w 15 16 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THIS CITY OF PORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> 29 30 OR 31 32 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 37 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATTON DOCUMENT REPLACEMENT CONTRACT 2019, WSM-8 (LEAD SERVICES REPLACEMENT D2) Revised December 20, 2012 City Project Nu. 102169 1 EXHIBIT B 2 3 4 FORTWORTH Pam: 013513-5 SPECIAL PROJECT PROCEDURES Page S of S DOE NO. Si di ft"Is" : HOTICE OF TEMPORARY WATER SERVICE INTERRUPTIOM DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL; MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. (CITY INSPECTOR) AT (TELEPHONE NUMBER) THIS INCONVENIENCE WILL HE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT b2) Revised December 20, 2012 City Project No. 102169 01 45 23 TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL i Rmin u hi r I'M A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — General Conditions 2. Division 1 — General Requirements 1.2 , PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another external FTP site approved by the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised March 9, 2020 City Project No. 102169 01 4523 TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents, 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 3/9/2020 D.V. Magana Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-13 {LEAD SERVICES REPLACEMENT D2 Revised March 9, 2020 City Project No. 102165 01 50 00 - 1 TEMPORARY FACILITIES AND CONTROLS Pagel of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limitedto: 1. Division 0 — General Conditions 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Maize arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies orauthorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July I, 2011 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT 1)2) City Project No. 102169 01 50 00 - 2 TEMPORARY FACILITIES ANb CONTROLS Page 2 nf4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working eon ditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4, Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUME Revised July I, 2011 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 1121 City Project No. I OZ 169 01 50 00 - 3 TEMPORARY FACILITIES AND CONTROLS Page 3 of4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] /[RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 39 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTTI WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-H (LEAD SERVICES REPLACEMENT D2) Revised July I, 2011 City Project No. 102169 01 5000-4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED[ 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July I, 201 1 WATER AND SANITARY SEWER RLPL.ACLMENT CONTRACT 2019, WSM-B (L.EA➢ SF,RVTCFS REPLACEMENT D2) City Project No. 102169 D 155 26 - 1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page I of3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limitedto: 1. Division 0 General Conditions 2. Division I General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 7113 TRAFFIC CONTROL. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 TRAFFIC CONTROL and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit isrequired. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTR WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July I, 2011 City Project No. 102169 01 55 26 - 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13 TRAFFIC CONTROL. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign, F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsawwebsite. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOTUSEDI 1.11 FIELD [SITE1 CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUC'TTON SPECIFTCATION DOCUMENT Revised July I, 201 I WATER AND SANTTARY SEWER REP7-ACEMF,NT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACHMENT D2) City Prujcel No, 1021 59 01 55 26 - 3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Revision Log DATE NAME SUMMARY OF CHANGE Page 3 of 3 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 1, 2011 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-S (LEAD SERVICES REI'IACEMFNT D2) City Projcci No. 102169 015713-1 STORM WATER POLLIUTTONPREVENTTON Pagel of 3 SECTION 01 5713 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limitedto: 1. Division 0 — General Conditions 2. Division I General Requirements 3. Section 31 25 00 —Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this item. 2. Construction Activities resulting in greater than I acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pol lution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality. TCEQ 5. Notice of Change: NOC A. Reference Standards i. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan, CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July 1, 201 1 City Project No. 102169 01 57 13-2 STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 31 25 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 31 25 00 EROSION AND SEDIMENT CONTROL b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates >ro NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 EROSION AND SEDIMENT CONTROL b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP Submit in accordance with Section 01 33 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division forreview CITY OF FORT WORTH STANDARD CONSTRUCTION SPFCIFICATION 1)0[.TiMFNT Revised July 1, 2011 WATER AND SANITARY SEWER REPLACEMEN'r CONTRACT 2o19, WSM-u (LEAD smvICEs REPLACEMENT D2) Cily Pmjw No. 102169 OI 57 13 - 3 STORM WATER POLLUTION PREVENTION Page 3 of B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 01 33 00 SUBMITTALS. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 7019, WSM-B (LEAD SERVICES REPLACEMENT 133) Revised July 1, 2011 City Project No. 102169 SECTION 01 58 13 TEMPORARY PROJECT SIGNAGE PART1- GENERAL 11 SUMMARY 01 58 13- 1 TEMPORARY PROJECT SIGNAGE Pagel of 3 A. Section Includes: 1. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limitedto: 1. Division 0 General Conditions 2. Division 1 General Requirements I.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USEDI 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS INOT USEDI 1.7 CLOSEOUT SUBMITTALS [NOT USEDI 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Design Criteria 1. Provide free standing Project Designation Sign in accordance with City's Standard Details for project signs. CITY OF FORT WORTH WATER AND SANITARY SEINER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LSAD SERVICES REPLACEMENT D2) Revised July 1, 2011 City Pmject No. 102169 01 58 13 -2 TEMPORARY PROJECT SICYNAGE Page 2 of 3 B. Materials 1. Sign a. Constructed of 3/4-inch fir plywood, grade A-C (exterior) or better 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General L Provide vertical installation at extents of project. 2. Relocate sign as needed, upon request of the City. B. Mounting options a. Skids b. Posts c. Barricade 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD loR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION (NOT USED] 3.13 MAINTENANCE A. General 1. Maintenance will include painting and repairs as needed or directed by the City. 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-8 (LEAD SERVICES REPLACEMENT 1)2) ReWged July I, 2011 City Projecl No. 102169 01 58 13 - 3 TEMPORARY PROJECT SIGNAGE Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July 1, 2011 Page 3 of 3 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES RL"PLACEMENT D2) City Pmjecl No. 102169 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY of Uooa-1 PRODUCT REQUIREMENTS Page 1 of Z A. Section includes: 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 General Conditions 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES ]NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. A list of City approved products for use is located on Buzzsaw as follows: 1. Resources102 - Construction Documents\Standard Products List B. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. C. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. D. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. E. See Section 01 33 00 SUBMITTALS for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 19 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPFCIFICATION DOCUMENT REPLACEMENT CONTRACT 2D14, WSM-B (LEAD SERVICE'S REPLACEMENT D2) Reviud December 20, 2012 City Project No. I02164 01 60 00 - 2 PRODUCT REQUIREMENTS Page 2 of2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS INOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 . D. Johnson Modified Location of City's Standard Product List CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019. WSM-B (LEAD SERVICES REPLACEMENT 132) Revised December 20, 2012 Cily Proicct No. 102169 016000-1 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — General Conditions 2. Division 1 General Requirements 1.2 PRIC.E AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements I . ScheduIe delivery of products or equipment as required to allow timelyinstallation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CTTY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July t, 2011 City Pmjcd No. 102169 016600-2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fatly mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage area for materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in Iocations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide oft -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control ofpremises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH STANDARD CONSTRUCTION SPFCIFICATION DOCITW.NT Revised July I, 2011 WATER AND SANITARY SF.WF.R REPLACEMENT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT D2) City Pmjcd No. )92169 016600-3 PRODUCT STORAGE AND HANDLTNG REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY ]NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS ]NOT USED] 31 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION (NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD 10R] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH WATFR AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-S (LEAD SERVICES REPLACEMENT D2) Revised Illy 1, 2011 City Project No. 102169 01 66 00 - 4 PRODUCT STORAGE AND HANDI-INGREQUIREMENTS Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised hly I, 2911 Page 4 of4 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Pmjod Nu_ 102169 01 70 00 - 1 MOBILIZATION AND REMOBILIZATION Page 1 of 5 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Mobilization and Demobilization 7 a. Mobilization 8 1) Transportation of Contractor's personnel, equipment, and operating supplies 9 to the Site 10 2) Establishment of necessary general facilities for the Contractor's operation 11 at the Site 12 3) Premiums paid for performance and payment bonds 13 4) Transportation of Contractor's personnel, equipment, and operating supplies 14 to another location within the designated Site 15 5) Relocation of necessary general facilities for the Contractor's operation 16 from 1 location to another location on the Site. 17 b. Demobilization 18 1) Transportation of Contractor's personnel, equipment, and operating supplies 19 away from the Site including disassembly 20 2) Site Clean-up 21 3) Removal of all buildings and/or other facilities assembled at the Site for this 22 Contract 23 c. Mobilization and Demobilization do not include activities for specific items of 24 work that are for which payment is provided elsewhere in the contract. 25 2. Remobilization 26 a. Remobilization for Suspension of Work specifically required in the Contract 27 Documents or as required by City includes: 28 1) Demobilization 29 a) Transportation of Contractor's personnel, equipment, and operating 30 supplies from the Site including disassembly or temporarily securing 31 equipment, supplies, and other facilities as designated by the Contract 32 Documents necessary to suspend the Work. 33 b) Site Clean-up as designated in the Contract Documents 34 2) Remobilization 35 a) Transportation of Contractor's personnel, equipment, and operating 36 supplies to the Site necessary to resume the Work. 37 b) Establishment of necessary general facilities for the Contractor's 38 operation at the Site necessary to resume the Work. 39 3) No Payments will be made for: 40 a) Mobilization and Demobilization from one location to another on the 41 Site in the normal progress of performing the Work. 42 b) Stand-by or idle time 43 c) Lost profits CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised September 16, 2019 City Project No. 102169 017000-2 MOBILIZATION AND REMOBILIZATION Page 2 of 5 1 3. Mobilizations and Demobilization for Miscellaneous Projects 2 a. Mobilization and Demobilization 3 1) Mobilization shall consist of the activities and cost on a Work Order basis 4 necessary for: 5 a) Transportation of Contractor's personnel, equipment, and operating 6 supplies to the Site for the issued Work Order. 7 b) Establishment of necessary general facilities for the Contractor's 8 operation at the Site for the issued Work Order 9 2) Demobilization shall consist of the activities and cost necessary for: 10 a) Transportation of Contractor's personnel, equipment, and operating 11 supplies from the Site including disassembly for each issued Work 12 Order 13 b) Site Clean-up for each issued Work Order 14 c) Removal of all buildings or other facilities assembled at the Site for 15 each Work Oder 16 b. Mobilization and Demobilization do not include activities for specific items of 17 work for which payment is provided elsewhere in the contract. 18 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 19 a. A Mobilization for Miscellaneous Projects when directed by the City and the 20 mobilization occurs within 24 hours of the issuance of the Work Order. 21 B. Deviations from this City of Fort Worth Standard Specification 22 1. None. 23 C. Related Specification Sections include, but are not necessarily limited to: 24 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 25 2. Division 1 General Requirements 26 1.2 PRICE AND PAYMENT PROCEDURES 27 A. Measurement and Payment [Consult City Department/Division for direction on if 28 Mobilization pay item to be included or the item should be subsidiary. Include the 29 appropriate Section 1.2 A. 1.] 30 1. Mobilization and Demobilization 31 a. Measure 32 l) This Item will be measured by the lump sum or each as the work 33 progresses. Mobilization is calculated on the base bid only and will not be 34 paid for separately on any additive alternate items added to the Contract. 35 2) Demobilization shall be considered subsidiary to the various bid items. 36 b. Payment 37 1) For this Item, the adjusted Contract amount will be calculated as the total 38 Contract amount less the lump sum for mobilization. Mobilization shall be 39 made in partial payments as follows: 40 a) When 1 % of the adjusted Contract amount for construction Items is 41 earned, 50% of the mobilization lump sure bid or 2.5% of the total 42 Contract amount, whichever is less, will be paid. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised September 16, 2019 City Project No. 102169 01 7000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 5 1 b) When 5% of the adjusted Contract amount for construction Items is 2 earned, 75% of the mobilization lump sum bid or 3.55% of the total 3 Contract amount, whichever is less, will be paid. Previous payments under 4 the Item will be deducted from this amount: 5 c) When 10% of the adjusted Contract amount for construction Items is 6 earned, 100% of the mobilization lump sum bid or 5% of the total Contract 7 amount, whichever is less, will be paid. Previous payments under the Item 8 will be deducted from this amount. 9 d) A bid containing a total for "Mobilization" in excess of S % of total 10 contract shall be considered unbalanced and a cause for consideration 11 of rejection. 12 e) The Lump Sum bid for "Mobilization — Paving/Drainage" shall NOT 13 include any cost or sum for mobilization items associated with 14 water/sewer items. Those costs shall be included in the various 15 water/sewer bid Items. Otherwise the bid Items shall be considered 16 unbalanced and a cause for consideration of rejection. 17 f) The Lump Sum bid for "Mobilization — Paving" shall NOT include 18 any cost or sum for mobilization items associated with drainage items. 19 Those costs shall be included in the "Mobilization — Drainage" Lump 20 Sum bid Item. Otherwise the bid Items shall be considered unbalanced 21 and a cause for consideration of rejection. 22 g) The Lump Sum bid for "Mobilization — Drainage" shall NOT 23 include any cost or sum for mobilization items associated with paving 24 items. Those costs shall be included in the "Mobilization — Paving" 25 Lump Sum bid item. Otherwise the bid items shall be considered 26 unbalanced and a cause for consideration of rejection. 27 2) The work performed and materials furnished for demobilization in 28 accordance with this Item are subsidiary to the various Items bid and no other 29 compensation will be allowed. 30 2. Remobilization for suspension of Work as specifically required in the Contract 31 Documents 32 a. Measurement 33 1) Measurement for this Item shall be per each remobilization performed. 34 b. Payment 35 1) The work performed and materials fiunished in accordance with this Item 36 and measured as provided under "Measurement" will be paid for at the unit 37 price per each "Specified Remobilization" in accordance with Contract 38 Documents. 39 c. The price shalt include: 40 1) Demobilization as described in Section 1.1.A.2.a.1) 41 2) Remobilization as described in Section 1.1.A.2.a.2) 42 d. No payments will be made for standby, idle time, or lost profits associated this 43 Item. 44 3. Remobilization for suspension of Work as required by City 45 a. Measurement and Payment 46 1) This shall be submitted as a Contract Claim in accordance with Article 10 47 of Section 00 72 00. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-S (LEAD SERVICES REPLACEMENT D2) Revised September 16, 2019 City Project No. 102169 01 70 00 - 4 MOBILIZATION AND REMOBiLIZATION Page 4 of 5 1 2) No payments will be made for standby, idle time, or lost profits associated 2 with this Item. 3 4. Mobilizations and Demobilizations for Miscellaneous Projects 4 a. Measurement 5 1) Measurement for this Item shall be for each Mobilization and 6 Demobilization required by the Contract Documents 7 b. Payment 8 1) The Work performed and materials furnished in accordance with this Item 9 and measured as provided under "Measurement" will be paid for at the unit 10 price per each "Work Order Mobilization" in accordance with Contract 11 Documents. Demobilization shall be considered subsidiary to mobilization 12 and shall not be paid for separately. 13 e. The price shall include: 14 1) Mobilization as described in Section 1.1.A.3.a.1) 15 2) Demobilization as described in Section 1.1.A.3.a2) 16 d. No payments will be made for standby, idle time, or lost profits associated this 17 Item. 18 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 19 a. Measurement 20 1) Measurement for this Item shall be for each Mobilization and 21 Demobilization required by the Contract Documents 22 b. Payment 23 1) The Work performed and materials furnished in accordance with this Item 24 and measured as provided under "Measurement" will be paid for at the unit 25 price per each "Work Order Emergency Mobilization" in accordance with 26 Contract Documents. Demobilization shall be considered subsidiary to 27 mobilization and shall not be paid for separately. 28 c. The price shall include 29 1) Mobilization as described in Section l.l.A.4.a) 30 2) Demobilization as described in Section 1.1.A.3.a.2) 31 d. No payments will be made for standby, idle time, or last profits associated this 32 Item. 33 1.3 REFERENCES [NOT USED] 34 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 35 1.5 SUBMITTALS [NOT USED] 36 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 37 1.7 CLOSEOUT SUBMITTALS [NOT USED] 38 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 39 1.9 QUALITY ASSURANCE [NOT USED] 40 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 41 1.11 FIELD [SITE] CONDITIONS [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised September 16, 2019 WATER AND SANITARY SEWER RFPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Prajtut No, 102169 01 7000-5 MOBILIZATION AND REMOBILIZATION Page 5 of 5 1 1.12 WARRANTY [NOT USED] 2 PART 2 - PRODUCTS [NOT USED] 3 PART 3 - EXECUTION [NOT USED] 4 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 11/22/16 Michael Owen 1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised September 16, 2019 Of7123-1 CONSTRUCTION STAKING AND SURVEY Page] of 8 SECTION 017123 CONSTRUCTION STAKING AND SURVEY PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — General Conditions 2. Division I — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "Construction Staking". 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following: 1) Verification of control data provided by City. 2) Placement, maintenance and replacement of required stakes and markings in the field. 3) Preparation and submittal of construction staking documentation in the form of "cut sheets" using the City's standard template. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "As -Built Survey". CITY OE PORT WORTH WATER AND SANITARY SEWLR STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-8 (LEAD SERVICES REPLACEMENT D2) Revised Febneary 14, 2018 City Project No. 102169 Ot7123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following:: 1) Field measurements and survey shots to identify location of completed facilities. 2) Documentation and submittal of as -built survey data onto contractor redline plans and digital survey files. 1.3 REFERENCES A. Definitions 1. Construction Survey - The survey measurements made prior to or while construction is in progress to control elevation, horizontal position, dimensions and configuration of structures/improvements included in the Project Drawings. 2. As -built Survey —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Staking --- The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans.\ 4. Survey "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References I . City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) -- 01 71 23.16.01 Attachment A Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latestrevision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice forLand Surveying in the State of Texas, Category 5 1.4 ADMINISTRATIVE REQUIREMENTS A. The Contractor's selection of a surveyor must comply with Texas Government Code 2254 (qualifications based selection) for this project. 1.5 SUBMITTALS A. Submittals, if required, shall be in accordance with Section 01 33 00 SUBMITTALS. B. All submittals shall be received and reviewed by the City prior to delivery ofwork, 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Field Quality Control Submittals CITY OF FORT WORTH STANDARD CONSTRUCTION SPFCIFICATION DOCUMENT Revised February 14, 2018 WAPL'RAND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-E (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 01 71 23 - 3 CONSTRUCTION STAKING AND SURVEY Page.3 OrB 1. Documentation verifying accuracy of field engineering work, including coordinate conversions if plans do not indicate grid or ground coordinates. 2. Submit "Cut -Sheets" conforming to the standard template provided by the City (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 1.7 CLOSEOUT SUBMITTALS B. As -built Redline Drawing Submittal I . Submit As -Built Survey Redline Drawings documenting the locations/elevations of constructed improvements signed and sealed by Registered Professional Land Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment — Survey Staking Standards) . 2. Contractor shall submit the proposed as -built and completed redline drawing submittal one (1) week prior to scheduling the project final inspection for City review and comment. Revisions, if necessary, shall be made to the as -built redline drawings and resubmitted to the City prior to scheduling the construction final inspection. 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Construction Staking 1. Construction staking will be performed by the Contractor. 2. Coordination a. Contact City's Project Representative at least one week in advance notifying the City of when Construction Staking is scheduled. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes. If City surveyors are required to re -stake for any reason, the Contractor will be responsible for costs to perform staking. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed disturbed or omitted that the contracted Work cannot take place then the Contractor will be required to stake or re -stake the deficient areas. B. Construction Survey 1. Construction Survey will be performed by the Contractor. 2. Coordination a. Contractor to verify that horizontal and vertical control data established in the design survey and required for construction survey is available and inplace. 3. General a. Construction survey will be performed in order to construct the work shown on the Construction Drawings and specified in the Contract Documents. b. For construction methods other than open cut, the Contractor shall perform construction survey and verify control data including, but not limited to, the following: 1) Verification that established benchmarks and control are accurate. CITY OF FORT WORTIT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised February 14, 2018 WATER AND SANITARY SEWER RFPLACEMFNT CONTRACT 2019, WSM-6 (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 01 71 23 -4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 2) Use of Benchmarks to furnish and maintain all reference lines and grades for tunneling. 3) Use of line and grades to establish the location of the pipe. 4) Submit to the City copies of field notesused to establish all lines and grades, if requested, and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City, if requested, to verify the guidance system and the line and grade of the carrier pipe. 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) if the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. it is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) 5tormwater—Not Applicable CITY OF FORT WORTIi STANDARD CONSTRUCTION SPEC]HCATION DOCUMENT Revised February 14, 2W R WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-8 (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 01 71 23 - 5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) f) Air Release valves (Manhole rim and vent pipe) g) Blow off valves (Manhole rim and valve lid) h) Pressure plane valves i) Underground Vaults (1) Rim and flowline elevations and coordinates for each Underground Vault. 3) Sanitary Sewer a) Cleanouts (1) Rim and flowline elevations and coordinates foreach b) Manholes and Junction Structures (1) Rim and flowline elevations and coordinates for each manhole and junction structure. 4) Stormwater Not Applicable 1.10 DELIVERY, STORAGE, AND HANDLING [NOTUSED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY PART 2 - PRODUCTS A. A construction survey will produce, but will not be limitedto: 1. Recovery of relevant control points, points of curvature and points ofintersection. 2. Establish temporary horizontal and vertical control elevations (benclunarks) sufficiently permanent and located in a manner to be used throughout construction. 3. The location of planned facilities, easements and improvements. a. Establishing final line and grade stakes for piers, floors, grade beams, parking areas, utilities, streets, highways, tunnels, and other construction. b. A record of revisions or corrections noted in an orderly manner forreference. c. A drawing, when required by the client, indicating the horizontal and vertical location of facilities, easements and improvements, as built. 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all construction staking projects. These cut sheets shall be on the standard citytemplate which can be obtained from the Survey Superintendent (817-392-7925). 5. Digital survey files in the following formats shall be acceptable: a. AutoCAD (.dwg) b. ESRI Shapefile (.shp) CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-8 (LEAD SERVICES REPLACEMENT 132) Revised February 14,201 & City Projcc[ No. 102169 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of S c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use standard templates, if available) 6. Survey files shall include vertical and horizontal data tied to original project control and benchmarks, and shall include feature descriptions PART 3 - EXECUTION 3.1 INSTALLERS A.Tolerances: The staked location of any improvement or facility should be as accurate as practical and necessary. The degree of precision required is dependent on many factors all of which must remain judgmental. The tolerances listed hereafter are based on generalities and, under certain circumstances, shall yield to specific requirements. The surveyor shall assess any situation by review of the overall plans and through consultation with responsible parties as to the need for specific tolerances. a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical tolerance. Horizontal alignment for earthwork and rough cut should not exceed 1.0 ft. tolerance. b. Horizontal alignment on a structure shall be within .0.lfttolerance. c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and walkways shall be located within the confines of the site boundaries -and, occasionally, along a boundary or any other restrictive line. Away from any restrictive line, these facilities should be staked with an accuracy producing no more than 0.05ft. tolerance from their specified locations. d. Underground and overhead utilities, such as sewers, gas, water, telephone and electric lines, shall be located horizontally within their prescribed areas or easements. Within assigned areas, these utilities should be staked with an accuracy producing no more than 0.1 ft tolerance from a specified location. e. The accuracy required for the vertical location of utilities varies widely. Many underground utilities require only a minimum cover and a tolerance of 0.1 ft. should be maintained. Underground and overhead utilities on planned profile, but not depending on gravity flow for performance, should not exceed 0.1 ft. tolerance. B. Surveying instruments shall be kept in close adjustment according to manufacturer's specifications or in compliance to standards. The City reserves the right to request a calibration report at any time and recommends regular maintenance schedule be performed by a certified technician every 6 months. 1. Field measurements of angles and distances shall be done in such fashion as to satisfy the closures and tolerances expressed in Part 3.1.A. 2. Vertical locations shall be established from a pre -established benchmark and checked by closing to a different bench mark on the same datum. 3. Construction survey field work shall correspond to the client's plans. irregularities or conflicts found shall be reported promptly to the City. 4. Revisions, corrections and other pertinent data shall be logged for fiiturereference. CITY OF FORT WORTH WATER AND SANITARY SF.WF.R STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised February 14, 20I8 City Projcct No. 102169 01 71 23 - 7 CONSTRUCTION STAKING AND SURVEY Page 7 Or8 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION A. If the Contractor's work damages or destroys one or more of the control monuments/points set by the City, the monuments shall be adequately referenced for expedient restoration. 1. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. a. Contractor shall perform replacements and/or restorations. b. The City may require at any time a survey "Field Check" of any monument or benchmarks that are set be verified by the City surveyors before further associated work can move forward. 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A.It is the Contractor's responsibility to maintain all stakes and control data placed by the City in accordance with this Specification. This includes easements and right of way, if noted on the plans. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP A. Survey Checks 1. The City reserves the right to perform a Survey Check at anytime deemed necessary. 2. Checks by City personnel or 3r'Iparty contracted surveyor are not intended to relieve the contractor of his/her responsibility foraccuracy. 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTIT WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 1)2) Revised February 14, 2018 City Project No. 102169 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/20I2 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "glue text'; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey fileformat CITY OF FORT WORTH STANDARD CONSTRUCTION SPECTFICATTON DOCUMENT Revised February 14, 2018 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-R (LEAD 3ERVTCF.S REPLACEMENT D2) City Project No. 102169 FORT WORTH, Section 01 71 23.01- Attachment A Survey Staking Standards February 2017 O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 1 of 22 These procedures are intended to provide a standard method for construction staking services associated with the City of Fort Worth projects. These are not to be considered all inclusive, but only as a general guideline. Far projects on TXDOT right-of-way or through joint TXDOT participation, adherence to the TXDOT Survey Manual shall be followed and if a discrepancy arises, the TXDOT manual shall prevail.(http://onlinemanuals.txdot.gov/txdotmanualsless/ess.pdf) If you have a unique circumstance, please consult with the project manager, inspector, or survey department at 817-392-7925. Table of Contents 1. City of Fort Worth Contact Information II. Construction Colors III. Standard Staking Supplies IV. Survey Equipment, Control, and Datum Standards V. Water Staking VI. Sanitary Sewer Staking VII. Storm Staking VIII. Curb and Gutter Staking IX. Cut Sheets X. As -built Survey O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01WAttachment A_Survey Staking Standards.docx Page 2 of 22 I. Survey Department Contact Information Physical and mailing address: 8851 Camp Bowie West Boulevard Suite 300 Fort Worth, Texas 76116 Office: (817) 392-7925 Survey Superintendent, direct line: (817) 392-8971 II. Construction Colors The following colors shall be used for staking or identifying features in the field. This includes flagging, paint of laths/stakes, paint of hubs, and any identification such as pin flags if necessary. Utility Color PROPOSED EXCAVATION WHITE ALL ELECTRIC AND CONDUITS i POTABLE WATER - GAS OR OIL YEI.€ ow TELEPHONE/FIBER OPTIC ORANGE SURVEY CONTROL POINTS, BENCHMARKS, PROPERTY CORNERS, RIGHT-OF-WAYS, AND ALL PAVING INCLUDING CURB, SIDEWALK, BUILDING CORNERS PINK SANITARY SEWER IRRIGATION AND RECLAIMED WATER III. Standard Staking Supplies Item Minimum size Lath/Stake 36" tall Wooden Hub (2"x2" min. square preferred) 6" tall Pin Flags (2.5" x 3.5" preferred) 21" long Guard Stakes Not required PK or Mag nails 1" long Iron Rods (1/2" or greater diameter) 18" long Survey Marking Paint Water -based Flagging 1" wide Marking Whiskers (feathers) 6" long Tacks (for marking hulas) 3/4" long O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 3 of 22 IV. Survey Equipment, Control, and Datum Standards A. City Benchmarks All city benchmarks can be found here: ipttp_//fortwortiitexas.gov/itsolutions/GIS/ Look for 'Zoning Maps'. Under 'Layers' , expand 'Basemap Layers', and check on 'Benchmarks'. B. Conventional or Robotic Total Station Equipment I. A minimum of a 10 arc -second instrument is required. II. A copy of the latest calibration report may be requested by the City at any time. it is recommended that an instrument be calibrated by certified technician at least 1 occurrence every 6 months. C. Network/V.R.S. and static GPS Equipment I. It is critical that the surveyor verify the correct horizontal and vertical datum prior commencing work. A site calibration may be required and shall consist of at least 4 control points spaced evenly apart and in varying quadrants. Additional field checks of the horizontal and vertical accuracies shall be completed and the City may ask for a copy of the calibration report at any time. IL Network GPS such as the Western Data Systems or SmartNet systems may be used for staking of property/R.O.W, forced -main water lines, and rough -grade only. No GPS staking for concrete sanitary sewer, storm drain final grade or anything that needs vertical grading with a tolerance of 0.25' or less is allowed. — D. Control Points Set I. All control points set shall be accompanied by a lath with the appropriate Northing, Easting, and Elevation (if applicable) of the point set. Control points can be set rebar, 'X' in concrete, or any other appropriate item with a stable base and of a semi -permanent nature. A rebar cap is optional, but preferred if the cap is marked 'control point' or similar wording. 11. Datasheets are required for all control points set. Datasheet should include: A. Horizontal and Vertical Datum used, Example: N.A.D.83, North Central Zone 4202, NAVD 88 Elevations B. Grid or ground distance. — If ground, provide scale factor used and base point coordinate, Example: C.S.F.=0.999125, Base point=North: 0, East=O C. Geoid model used, Example: GEOID12A O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 4 of 22 E. Preferred Grid Datum Although many plan sets can be in surface coordinates, the City's preferred grid datum is listed below. Careful consideration must be taken to verify what datum each project is in prior to beginning work. It is essential the surveyor be familiar with coordinate transformations and how a grid/surface/assumed coordinate system affect a project. Projected Coordinate System: NAD_1983_StatePlane_Texas_North_Centra[—FIPS_4202_Feet Projection: Lambert _ Conformal _Conic Fa Ise_Easti ng: 1968500.00000000 False —Northing: 6561666.66666667 Central Meridian:-98.S0000000 Standard Parallel 1: 32.13333333 Standard Parallel 2: 33,96666667 Latitude —Of —origin: 31.66666667 Linear Unit: Foot —US Geographic Coordinate System: GCS_North_American_1983 Datum: D North American 1983 Prime Meridian: Greenwich Angular Unit: Degree Note: Regardless of what datum each particular project is in, deliverables to the City must be converted/translated into this preferred grid datum. 1 copy of the deliverable should be in the project datum (whatever it may be) and 1 copy should be in the NAD83, TX North Central 4202 zone. See Preferred File Naminq Convention below F. Preferred Deliverable Format .txt csv dwg job G. Preferred Data Format P,N,E,Z,D,N Point Number, Northing, Easting, Elevation, Description, Notes (if applicable) H. Preferred File Naming Convention This is the preferred format: City Project Number Description_Datum.csv Example for a project that has surface coordinates which must be translated: File 1: C1234 As -built of Water on Main Street Grid NAD83 TXSP 4202.csv O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A Survey Staking Standards.docx Page 5 of 22 File z: C1234_As-built of Water on Main Street —Project Specific Datum.csv Example Control Stakes O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16,01_Attachment A_Survey Staking Standards.docx Page 6 of 22 V D- d LLJ m d I V) p LL! F- W O_ a W EL. = 100. a0° 11 y -1 I ( W (_ 7I I- LLI t d_ J t C/) Lij ED O C] U a CP #1 N=5000.00 a � W 0�• U LL 00 1 I— CO Ld CD I , < z J LL- W a 0 _ Q < T U m W IY 0 E=5000.00--- 3 V. Water Staking Standards O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 7 of 22 A. Centerline Staking —Straight Line Tangents I. Offset lath/stakes every 200' on even stations 11. Painted blue lath/stake only, no hub is required III. Grade is to top of pipe (T/P) for 12" diameter pipes or smaller IV. Grade to flow line (F/L) for 16" and larger diameter pipes V. Grade should be 3.50' below the proposed top of curb line for 10" and smaller diameter pipes V1. Grade should be 4.00' below the proposed top of curb line for 12" and larger diameter pipes VII. Cut Sheets are required on all staking and a copy can be received from the survey superintendent Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking - Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Same grading guidelines as above III. Staking of radius points of greater than 100' may be omitted C. Water Meter Boxes I. 7.0' perpendicular offset is preferred to the center of the box II. Center of the meter should be 3.0' behind the proposed face of curb Ill. Meter should be staked a minimum of 4.5' away from the edge of a driveway IV. Grade is to top of box and should be +0.06' nigher than the proposed top of curb unless shown otherwise on the plans D. Fire Hydrants 1. Center of Hydrant should be 3.0' behind proposed face of curb II. Survey offset stake should be 7.0' from the center and perpendicular to the curb line or water main III. Grade of hydrants should be +0.30 higher than the adjacent top of curb E. Water Valves & Vaults [. Offsets should be perpendicular to the proposed water main [I. RIM grades should only be provided if on plans Example Water Stakes O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachrnent A_Survey Staking Standards.docx Page 8 of 22 v N to Z e[ f/i G 1'7' w/L CLLI � F z,L, w _ > m?LjLa LO 4 lJ W Wrd {{ 7' O/S W/Llgal STA=1+72_81 F C-3A1 Ld t� < 1017 EL.— 191.16, mL Ld D V F r LL 2 O � O � � Y J R (ry W g I \ �~ V Y Lam ? r w w {!7 � 4 r�k O ?� Z yA W '� d O z— 4T IC Q L.. C m z irl p 77 C� Ld 0/S tN/Lr=o+aa a-�.s In-- < � � F v O a � l0 x VI. Sanitary Sewer Stakinl =o& m Y O J Q M U3 lsl Q O W d Ld =i Z O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01—Attachment A —Survey Staking Standards.docx Page 9 of 22 A. Centerline Staking — Straight Line Tangents I. Inverts shall be field verified and compared against the plans before staking II. Painted green lath/stake WITH hub and tack or marker dot, no flagging required Ill. 1 offset stake between manholes if manholes are 400' or less apart IV. Offset stakes should be located at even distances and perpendicular to the centerline V. Grades will be per plan and the date of the plans used should be noted VI. If multiple lines are at one manhole, each line shall have a cut/fill and direction noted VII. Stakes at every grade break Vlll. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D soil or hub set with a whisker B. Centerline Staking — Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Sanitary Sewer Manholes I. 2 offset stakes per manhole for the purpose of providing alignment to the contractor II. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 10 of 22 �J Y 1.0i Example Sanitary Sewer Stales f a' J � to jj 3: ��CFfS SS STA=i+�1'a c-a- C-4- A c'_pra H Ut Fy l f {aoa l j STA.3+7P ti, c-ate z -� z C�°- - - w a¢- L't Ce 1 e, 9 _ W 4 4 _tW �` Ld1 F N W g�`f I CILJ�� r Q�'1y 7' ( h-1t7w S? 44 W J p V7 If (Ai u EL Ld IL A LL i ti Z W F F _ O U w 7 S, Vl w 3-6 CO rs r J Il 5 n x F F F� Fr u JJJ 7 4_ 7 F +I r L` 0 'L $s = 4J ` ii. C.FAw0 oc c s Qeti m e Y H O Y U Fe u W aF t}l� LLil# l J �,s ss LOLL4115 Iy u I? # F- C 4 r r LL ME a? LL 1 -a c7 O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 11 of 22 1/11. Storm Sewer & Inlet Staking A. Centerline Staking -- Straight Line Tangents I. 1 offset stake every 200' on even stations il. Grades are to flowline of pipe unless otherwise shown on plans III. Stakes at every grade break IV. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval IL Staking of radius points of greater than 100' may be omitted C. Storm Drain Inlets [. Staking distances should be measured from end of wing lI. Standard 10' Inlet = 16.00' total length Ill. Recessed 10' Inlet = 20.00' total length IV. Standard double 10' inlet = 26.67' total length V. Recessed double 10' inlet = 30.67' total length D. Storm Drain Manholes 1. 2 offset stakes per manhole for the purpose of providing alignment to the contractor [I. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachrnent A_Survey Staking Standards.docx Page 12 of 22 BACK (g[1E FAWC H.RW.) Example Storm Inlet Stakes FRONT (SIDE FACING 8 NQ FLA,QQiN'C= REQUfR.ED IN LIEU OF PINK- PAINTED LATP IDENTIFIES MICH END OF THE WND BEING STAKED ]1 INLET STATION t (IF NOTED ON PLANS) IDENTIFIES GRADE rfC TO TOP OF CURB -F O rV IDENTIFIES CRAPE TO FLJ}41IJNE BACK {511E FAD= HAXW_) CUNT 0 i Q' HV9 ELIE 110N n nI FRONT (SIDE FACING Q DISTANCES FOR INLETS STANDARD ID' — 15' RECESSED 11Y — W STANDARD DOUBLE 10' — E6.67' HUED WIrH TACK I I 1 9ACK OF INLET i w `4 �rl • k RIF,{ T I BACK aF (I€C -WING FLOALINE FACE Of INLET FACE OFINLET EDGE OF PAVEMENT EDGE OF PAVEMENT O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 13 of 22 IDENTIFIES WHICH END OF THE YANG BEING STAKED BSX OF CURB EDGE OF PAVEMENT VIII. Curb and Gutter Stakin A. Centerline Staking —Straight Line Tangents V. 1 offset stake every 50' on even stations VI. Grades are to top of curb unless otherwise shown on plans VII. Stakes at every grade break VIII. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves III. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval IV. Staking of radius points of greater than 100' may be omitted O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 14 of 22 Example Curb & Gutter Stakes FRONT (SIDE FACING CL) 4 !, a FRONT FRONT\ O N T �SDE FADING ¢ ^ F a/c FRONT a (SIDE FACING %) 1OENZILIE9START ec SIDE FACING ¢ P4NT GF WRYATURE L e U a n C g 1 PT 13ACK IDENTIFIES OFFSET 18 fO (SIDE FACING RO.W,) 8" Cr cuae OR IF/in r�G u FCR FACE OF CURD `3 t7 POINT 4 g/O I f I I III IOENTFREE GRADE IS II T%1 TO-rQP OF UUFB I NO GRADE OR III I HUB ELEVATION � RADIUS POINTS �- O i4 � 0 I`jQ �.E�GIflG f?�f1lJ1F+E! I ti I '�•�.w � 1 f i I TOP OF CUR£i � I BACK OF CI_IRB FACE OF CURB �I �— �- ---� "" FLOWLI NE EDGE OF PAVEMENT Example Curb & Gutter Stakes at Intersection O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 15 of 22 � -2, � @ n E — LU § § § 0( pE Ole — — v/2V) § z ` , ( 2 f;k LP [ IE -st; GZ �\ ES \{ f -inr m ». w |& ®� gun) s AJYB .§qr� LLJ kg;§m k §CL - \ C _,a _e ® & »® - 9(A� » t ƒ ] § 2\f § CS»�{ N& 10 , l5 I^ O: c a+ Governance P@2a\TempoeRSpec Files\CapitalDeIs %\CaPDelivery Div 011171 2I16 J1-m@ch me@ A Su&e Staking aandags.d«x Page of 22 IX. Cut Sheets Date: A. Date of field work B. Staking Method (GPS, total station) C. Project Name D. City Project Number (Example: C01234) E. Location (Address, cross streets, GPS coordinate) F. Survey company name G. Crew chief name H. A blank template can be obtained from the survey superintendent (see item I above) Standard City+ Cut Sheet City Project Number: Project Name: ❑ TOTAL Staking Method: ❑ GPS STATION ❑ OTHER LOCATION: CONSULTANTICONTRACTOR SURVEY CREW INITIALS ALL GRADES ARE TO FLOWLINE OR TOP OF CURB UNLESS OTHERWISE NOTED. PT # STATION OFFSET DESCRIPTION PROP. STAKED _ CUT + FILL -LT/+RT GRADE ELEV. O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 17 of 22 X. As -built Survey A. Definition and Purpose The purpose of an as -built survey is to verify the asset was installed in the proper location and grade. Furthermore, the information gathered will be used to supplement the City's GIS data and must be in the proper format when submitted. See section IV. As -built survey should include the following (additional items may be requested): Manholes Top of pipe elevations every 250 feet Horizontal and vertical points of inflection, curvature, etc. (All Fittings) Cathodic protection test stations Sampling stations Meter boxes/vaults (A1l sizes) Fire lines Fire hydrants Gate valves (rim and top of nut) Plugs, stub -outs, dead-end lines Air Release valves (Manhole rim and vent pipe) Blow off valves (Manhole rim and valve lid) Pressure plane valves Cleaning wyes Clean outs Casing pipe (each end) Inverts of pipes Turbo Meters 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.15.01_Attachment A Survey Staking Standards.docx Page 18 of 22 B. Example Deliverable A hand written red line by the field surveyor is acceptable in most cases. This should be a copy of the plans with the point number noted by each asset. If the asset is missing, then the surveyor should write "NOT FOUND" to notify the City. O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 19 of 22 FF O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A Survey Staking Standards.docx Page 20 of 22 OW NAM &ETD O*kbtjrl!m A AA ze MrAffi ,17 11 SEE SHM VAN". Pwq aF iF &.- &ww& twe M 5a O:\Spocs-StdyGovernance Pnoc000\TempomrySpec Fi|eo\Cupitu|De|ivery\CupDelivery Div O1\017I 23.16.01_Attachmant/�_ unxeyStaNngStan6ards.docx Page 21of22 ILO d �nl 23.16.01—Attachment A_Survey Staking Standards.docx Page 22 of 22 Obviously the .csv or .txt file cannot be signed/sealed by a surveyor in the format requested. This is just an example and all this information should be noted when delivered to the City so it is clear to what coordinate system the data is in. POINT NO. NORTHING LASTING CLEV- DESCRIPTION 1 6946257.189 2296079,165 726.09 SSMH RIM AID" 2 6946760.893 2296052,141 725,668 GV RIM i 694630,399 2296038.306 726.85 GV RIM C +ta• b1%.+ I ' ; 4 69416770,582 411961311.025 123.3,11 SSMH RIM 5 E, "6195.23 229fil1IL5116 T22-1.1 3 GV RIM 6 rmifi19d.52R 2296Q2.721. 72.2.32.5 Fli A 0 0) 7 6691116136.012' 229'i?'12..115 719.449 WM RIM 8 694(M2167 ?ZWI19.133 a11.331 WM: RIM TX C L 9 694U*1.0% 2'295933.418 71.3.652 CO RIM2-Qr 42-c,�*z 10 fi945914 677 2295880.52 711.562 SSMH RIM 11 6945986.473 2295869.892 110.046 WM RIM 12 bAliN50'17 229586a1.962 707.72WWIRIM 13 6945996.591 2295862.188 708.2135 WVM RIM V f A L-_. 14 6945934.286 2295EIA 1-925 WN! F11M 15 4445e,{ti i27 229583OA41 710.084 CO RIM C'1- kv.-41 F- ; -L S t6 6945915 t0a 2AW99.107 707.774 SSMH RIM 17 69451417 488 2295827.011 708.392 SSMH RIM 18 6945759 776 o ; ,15758.643 711.218 5STA 11 RIM I) R 19 6945169.563 229577BA24 - MA.D86 GV RIM , 20 Nf 5743 318 279578h1 192 7111.631 6V RIM 21 +i44571J'.219 22957Si 394 : 1,,449 Cis/ RIM 22 W 15(. 211 22957A.I.22 716`686 Wm AIM 23 6%5671 902 2295664.471 72,3.76 WIN RIM 24 h14Sm 5.407 2295216-03 11,1,317 CO RIM. # (AP4 25 6�145571 059 2295655.195 727.5 M SSMH RIM 14 L t 26 15g S5 vo.498 224555 t.803 77"1.123 WM} RIM 'f l 27 1694551LIAM 22Q1.6 r.9.49 732.689 WM RIM 28 64AM17.879 1295580.27 )4u521 VLMRIM 29 459di :1S6.5.57 ]7-1 .i-A-4A45 736.451 CO RIM s 30 6945387.35.6 2295597-IUI 740.756 GV RIM 31 6945370.688 2295606.793 740.976 GV RIM 32 6946383.53 2295610.559 740.448 FII 33 6945321.226 27415551J0S 746.34 WM RIM 34 6945319 365 2295539.728 746.777 CQ RIM 35 6945242.289 2'295574.715 748.A54 WNT RIM 36 NW5233624 2295544.b26 149,°+4SSMH RIM _ `' ' 37 65IA5206.40.1 224y524 MIS 753 43i8 WM RIM G � • } 38 w)45J42.n15 YrUIi3 WM RIM 39 40 fi445i13445 f,945EMgfjI 2295510.335 2295S,17 1AS 75LIN71 WM RIM 752.W SSMH RIM 41 6LA504► U24 229555/675 7'11.19 W&i RIM 42 15945938-878 2795551147 75 I " WM RIM 43 6CUU136.397 21955%AA5 74eaLSWH}RIM �#�} 44 0449,"-783 #29557Q,G3S 75� Wil WM RIM 45 CW941,432 2.295556-479 156WIVIRIM 46 k%448611.416 2295934.397 752 986 I5 M--f RIM O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 24 of 24 C. Other preferred as -built deliverable Some vendors have indicated that it is easier to deliver this information in a different format. Below is an example spreadsheet that is also acceptable and can be obtained by request from the survey superintendent. 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01 Attachment A_Survey Staking Standards.docx Page 25 of 25 I W u F x° ZE F $ E3 r. II■ r yd~ IO y I 1 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 26 of 26 SECTION 0174 23 CLEANING 171:71 li�ll_�I►1.�i:7�11 1.1 SUMMARY 01 74 23 - 1 CLEANING Page 1 oP4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limitedto: 1. Division 0 — General Conditions 2. Division 1 — General Requirements 3. Section 32 92 13 Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES ]NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fal I on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS ]NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2014, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July I, 2011 City Project No. 102169 01 74 23 - 2 CLEANING Page 2 of 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS 2.1 OWNER -FURNISHED 1t7R] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3A INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED 3.6 RE -INSTALLATION INOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUML'NT REPLACEMENT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT 132) Revised July I, 2011 City Project No. 102 t69 01 74 23 - 3 CLEANING Page 3 of 6. Handle materials in a controlled manner with as few handlings aspossible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically locatedcontainer(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Interior Final Cleaning 1. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels andother foreign materials from sight -exposed surfaces. 2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 3. Wash and shine glazing and mirrors. 4. Polish glossy surfaces to a clear shine. 5. Ventilating systems a. Clean permanent filters and replace disposable filters if units were operated during construction. b. Clean ducts, blowers and coils if units were operated without filters during construction. 6. Replace all burned out lamps. 7. Broom clean process area floors. 8. Mop office and control room floors. D. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July I, 2011 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 01 7423 -4 CLEANING Page 4 of 4 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES INOT USED] 3.13. PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTTI STANDARD CONsTRUC: LION SPECIFICATION DOCUMEN'r Revised July I, 701 1 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2014, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 01 77 19- 1 CLOSEOUT REQUIREMENTS Page] of 3 SECTION 01 77 19 CLOSEOUT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 General Conditions 2. Division 1 General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this item. 1.3 REFERENCES [NOT USEDI 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH WATL'R AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July 1, 2011 City Project No. 102169 01 77 19 - 2 CLOSEOUT REQUIREMENTS Page 2 of 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 01 78 39 PROJECT RECORD DOCUMENT 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limitedto: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORT14 WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised July I, 2011 City Project No. 102169 01 7719--3 CLOSEOUT REQUIREMENTS Page of 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request forpayment. 3.5 REPAIR/ RESTORATION [NOT USED] 3.6 RE4NSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTFT WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-13 (LEAD SERVICES REPLACEMENT DZ) Revised July I, 2011 City Pruke t Na. 102169 017823-1 OPERATION AND MAINTENANCE DATA Page I of 5 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limitedto: a. Traffic Controllers b. irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limitedto: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form I . Prepare data in form of an instructional manual for use by City personnel. I Format a. Size: 8 '/z inches x 1 I inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAb SFRVICES REPLACEMENT D2) Revised December 20, 2012 City Project No. 102169 o! 78 23 - 2 OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephonenumber b. A list of each product required to be included, indexed to content of thevolume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particularinstallation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH sTANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 1 U2I69 01 78 23 - 3 OPERATION AND MAINTENANCE DATA Page 3 of5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving fall information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information onproducts 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures l) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Rcvis d December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2919, WSM-B (LEAD SERVICES REPLACEMENT 02) City Pmjccl No. 102169 017823-4 OPERATION AND MAINTENANCE DATA Page 4 of i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories ofpanelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1, Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTIT STANDARD CONSTRUCTION SPECIFICATION DOCumENC Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) City Project No. 102169 017823-5 OPERATION AND MAINTENANCE DATA Page 5 of 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 —title of section removed CITY OF FORT WORTH WATER ANT) SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2D19, WSM-B (LEAD SERVICES RETLACI]MENT D2) Revised December 20, 2012 City Pmjctt No. I D2169 SECTION 0178 39 PROJECT RECORD DOCUMENTS PARTI- GENERAL 1.1 SUMMARY 01 78 39 - 1 PROJECT RECORD DOCUMENTS Page 1 of A. Section includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 --- General Conditions 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records I . Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORT" WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT D2) Revised Jelly 1, 2011 City Project No. 102169 01 78 39 - 2 PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. in such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [oR] OWNER -SUPPLIED PRODUCTS ]NOTUSED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising theContract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS ]NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES RE.PLACEMF.NT D2) Revised July 1, 2011 City Project No. I U2169 01 7939 - 3 PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site ofwork. 3. Coordination with Construction Survey a. At a minimum, in accordance with the intervals set forth in Section 01 71 23, clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describethe change by graphic line and note as required. c, Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. l) Final physical arrangement is determined by the Contractor, subject tothe City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within ] inch, the centerline of each run of items. l) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical Iocation of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may berelated reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised July I, 20t I WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 01 78 39 - 4 PROJECT RECORD DOCUMENTS Page 4 of 4 c. Call attention to each entry by drawing a "cloud" around the area or areas affected. d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USEDI 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] M2 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SL'WER STANDARD CONSTRucrioN SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-$ (LEAD SERVICES REPLACEMENT D2) Revised July 1, 2011 City Pmject No. 102169 0241 14 - 1 UTn.1TYREMOVAUABANDONMENT Page t of 1 G SECTION 02 41 14 UTILITY REMOVAL/ABANDONMENT PART1- GENERAL 1.1 SUMMARY A. Section Includes: Direction for the removal, abandonment or salvaging of the following utilities: a. Cathodic Protection Test Stations b. Water Lines c. Gate Valves d. Water Valves e. Fire Hydrants f. Water Meters and Meter Box g. Water Sampling Station h. Concrete Water Vaults i. Sanitary Sewer Lines j. Sanitary Sewer Manholes k. Sanitary Sewer Junction Boxes 1. Storm Sewer Lines m. Storm Sewer Manhole Risers n. Storm Sewer Jun cti on Boxes o. Storm Sewer inlets p. Box Culverts q. Headwalls and Safety End Treatments r. Trench Drains B. Deviations from this City of Fort Worth Standard Specification Removal of Existing Lead Services — The Work for removal and disposal of the existing lead water services to be replaced shall be considered subsidiary to the bid price for the appropriate water service. The lead service lines shall be disposed of at a certified metal recycling center with receipts of said recycling and submitted for verification to the City of Fort Worth Water Department. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — General Conditions 2. Division l — General Requirements 3. Section 03 34 13 — Controlled Low Strength Material(CLSM) 4. Section 33 05 10 — Utility Trench Excavation, Embedment andBackfill 5. Section 33 05 24 --- Installation of Carrier Pipe in Casing or Tunnel LinerPlate 6. Section 33 11 11 Ductile Iron Fittings 7. Section 33 11 13 — Concrete Pressure Pipe, Bar -wrapped, Steel Cylinder Type 8. Section 33 11 14 — Buried Steel Pipe andFittings 9. Section 33 12 25 — Connection to Existing WaterMains 1.2 PRICE AND PAYMENT PROCEDURES A. Utility Lines 1. Abandonment of Utility Line by Grouting a. Measurement CITY OF FORT WORTI I WATER AND SANITARY SEWER STANDARD CONSTRUCTIONSPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) Revised O.cc7nM-r 2o, ^IIi2 City Project No. 102169 0241 14-2 UTILITY REMOVAL/ABANDONMENT Page 2 of 16 1) Measurement for this Item shall be per cubic yard of existing utility line to be grouted. Measure by tickets showing cubic yards of grout applied. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price per cubic yard of "Line Grouting" for: a) Various types of utility line c. The price bid shall include: 1) Low density cellular grout or CLSM 2) Water 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction ofbackfill 8) Clean-up 2. Utility Line Removal, Separate Trench a. Measurement 1) Measurement for this Item shall be per linear foot of existing utility line to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per linear foot of "Remove Line" for: a) Various types of existing utility line b) Various sizes c. The price bid shall include: 1) RemovaI and disposal of existing utility pipe 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction ofbackfill 7) Clean -tip Utility Line Removal, Same Trench a. Measurement 1) This Item is considered subsidiary the proposed utility line being installed. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the installation of proposed utility pipe and shall be subsidiary to the unit price bid per linear foot of pipe complete in place, and no other compensation will be allowed. THIS ALSO INCLUDES REMOVAL OF VALVES 4. Manhole Abandonment a. Measurement l) Measurement for this Item will be per each manhole to be abandoned. b. Payment 1) The work performed and materials finished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Abandon Manhole" for: CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised December 2% 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACF.MFNT D2) City Project No. 1 U2169 0241 14-3 UTILITY REMOVAL/ABANDONMENT Page 3 of 16 a) Various diameters b) Various types c. The price bid shall include: 1) Removal and disposal of manhole cone 2) Removal, salvage and delivery of frame and cover to City, ifapplicable 3) Cutting and plugging of existing sewer lines 4) Concrete 5) Acceptable material for backfrlling manhole void 6) Pavement removal 7) Excavation 8) Hauling 9) Disposal of excess materials 10) Furnishing, placement and compaction ofbackfill l I) Surface restoration 12) Clean-up 5. Cathodic Test Station Abandonment a. Measurement 1) Measurement for this Item will be per each cathodic test station to be abandoned. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Abandon Cathodic Test Station". The price bid shall include: 1) Abandon cathodic test station 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction ofbackfill 8) Clean-up B. Water Lines and Appurtenances Installation of a Water Line Pressure Plug a. Measurement 1) Measurement for this Item shall be per each pressure plug to be installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Pressure Plug" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing pressure plug 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess material 6) Gaskets 7) Bolts and Nuts CTTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-13 (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 0241 14 - 4 UTUATY REMOVAL/ABANDONMENT Page 4 of] 6 8) Furnishing, placement and compaction of embedment 9) Furnishing, placement and compaction ofbackfill 10) Disinfection 11) Testing 12) Clean-up 2. Abandonment of Water Line by Cut and installation of Abandonment Plug a, Measurement 1) Measurement for this Item shall be per each cut and abandonment plug installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Water Abandonment Plug" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction ofbackfill 8) Clean-up 3. Water Valve Removal a. Measurement 1) Measurement for this Item will be per each water valve to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Water Valve" for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of valve 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction ofbackfill 8) Clean-up 4. Water Valve Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water valve to be removed and salvaged. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Water Valve" for: a) Various sizes CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMFNT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B [LEAD SERVICES REPLACEMENT D2) City Pmjecl No, 1021 69 0241 14 - 5 UTILITY REMOVAL/ABANDONMENT Page 5 Of 16 c. The price bid shall include: 1) Removal and Salvage of valve 2) CLSM 3) Delivery to City 4) Pavement removal 5) Excavation 6) Hauling 7) Disposal of excess materials 8) Furnishing, placement and compaction of backfill 9) Clean-up 5. Water Valve Abandonment a. Measurement 1) Measurement for this Item will be per each water valve to be abandoned. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Abandon Water Valve" for: a) Various Sizes The price bid shall include: 1) Abandonment of valve 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction ofbackfill 8) Clean-up 6. Fire Hydrant Removal and Salvage a. Measurement 1) Measurement for this Item will be per each fire hydrant to be removed. b. Payment 1) The work performed and materials furnished in accordance with this item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Fire Hydrant". c. The price bid shall include: 1) Removal and salvage of fire hydrant 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction ofbackfill 8) Clean-up 7. Water Meter Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water meter to be removed and salvaged. b. Payment CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) Revised December 20, 2012 City Project No. 102169 0241 14 - 6 UTILITY REMOVAL/ABANDONMENT Page 6 of 16 1) The work performed and materials famished in accordance with this item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Water Meter" for: a) Various sizes 2) If a "Water Meter Service Relocate" is performed in accordance with Section 33 12 10, removal and salvage or disposal of the existing (2-inch or smaller) water meter shall be subsidiary to the cost of the "Water Meter Service Relocate", no other compensation will be allowed. The price bid shall include: 1) Removal and salvage of water meter 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction ofbackfill 8) Clean-up 8. Water Sampling Station Removal and Salvage a. Measurement 1) Measurement for this item will be per each water sampling station to be removed. b. Payment 1) The work performed and materials furnished in accordance with this item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Water Sampling Station". c. The price bid shall include: 1) Removal and salvage of water sampling station 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction ofbackfill 8) Clean-up 9. Concrete Water Vault Removal a. Measurement 1) Measurement for this Item will be per each concrete water vault to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Concrete Water Vault". c. The price bid shall include: 1) Removal and disposal of concrete water vault 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Removal, salvage and delivery of any valves to City, if applicable 4) Removal, salvage and delivery of any water meters to City, if applicable 5) Pavement removal 6) Excavation CITY OF FORT WORTII STANDARD CONsTRUCTION SPECIFICATION DOCUMENT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-II {LEAD SERVICES REPLACEMENT D2) City Project No. 102169 0241 14-7 UTILITY REMOVAL/ABANDONMENT Page 7 of 16 7) Hauling 8) Disposal of excess materials 9) Furnishing, placement and compaction ofbackfill 10) Clean-up C. Sanitary Sewer Lines and Appurtenances Abandonment of Sanitary Sewer Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug installed. b, Payment 1) The work performed and materials furnished in accordance with this Item - and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Sewer Abandonment Plug" for: a) Various sizes The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction ofbackfill 8) Clean-up 2. Sanitary Sewer Manhole Removal a. Measurement 1) Measurement for this item will be per each sanitary sewer manhole to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Sewer Manhole" for: a) Various diameters c. The price bid shall include: 1) RemovaI and disposal of manhole 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Cutting and plugging of existing sewer lines 4) Pavement removal 5) Excavation 6) Hauling 7) Disposal of excess materials 8) Furnishing, placement and compaction ofbackfill 9) Clean-up 3. Sanitary Sewer Junction Structure Removal a. Measurement 1) Measurement for this Item will be per each sanitary sewer junction structure being removed. b. Payment CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised DeCember 20,2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No_ 101169 0241 14-8 UTILITY REMOVAL/ABANDONMENT Padc 8 of] 6 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the lump sum bid per each "Remove Sewer Junction Box" location. c. The price bid shall include: 1) Removal and disposal of junction box 2) Removal, salvage and delivery of frame and cover to City. 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction ofbackfill 8) Clean-up D. Storm Sewer Lines and Appurtenances Abandonment of Storm Sewer Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug to be installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Storm Abandonment Plug" installed for: a) Various sizes c. The price bid shall include: I ) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction ofbackfill 8) Clean-up 2. Storm Sewer Manhole Removal a. Measurement 1) Measurement for this Item will be per each storm sewer manhole to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Manhole Riser" for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of manhole 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction ofbackfill 8) Clean-up WATER AND SANITARY SEWER CITY OP FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised December 20, 2012 REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPI.ACFM. ENT D2) City Project No. 102169 0241 14-9 UTILITY REMOVAL/ABANDONMENT Page 9 of 16 3. Storm Sewer Junction Box Removal a. Measurement 1) Measurement for this Item will be per each storm sewer junction structure to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Storm Junction Box" for: a) Various sizes c, The price bid shall include: 1) Removal and disposal of junction box 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction ofbackfill 8) Clean-up 4. Storm Sewer Junction Structure Removal a. Measurement 1) Measurement for this Item will be per each storm sewer junction structure being removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the lump sum bid per each "Remove Storm Junction Structure" location. c. The price bid shall include: I ) Removal and disposal of junction structure 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction ofbackfill 8) Clean-up 5. Storm Sewer Inlet Removal a. Measurement 1) Measurement for this Item will be per each storm sewer inlet to be removed. b, Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Storm Inlet" for: a) Various types b) Various sizes c. The price bid shall include: 1) Removal and disposal of inlet 2) Pavement removal 3) Excavation CITY OF FORT WORTTI STANDARD CONSTRUCTION SPECfFICATION DOCUMENT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMLNT D2) City Project No. 102169 0241 14 - 10 UTILITY REMOVAL/ABANDONMENT Page 10 of 16 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 6. Storm Sewer Junction Box Removal a. Measurement 1) Measurement for this Item shall be per linear foot of existing storm sewer box to be removed. b. Payment 1) The work performed and materials furnished in accordance with this item and measured as provided under "Measurement" shall be paid for at the unit price bid per linear foot of "Remove Storm Junction Box" for all sizes. c. The price bid shall include: I) Removal and disposal of Storm Sewer Box 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 7. Headwall/SET Removal a. Measurement 1) Measurement for this item will be per each headwall or safety end treatment (SET) to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove .Headwall/SET". c. The price bid shall include: l ) Removal and disposal of Headwall/SET 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction ofbackfill 7) Clean-up 8. Trench Drain Removal a. Measurement l) Measurement for this Item shall be per linear foot of storm sewer trench drain to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per linear foot of "Remove Trench Drain" for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of storm sewer line 2) Pavement removal 3) Excavation CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 024114-11 UTILITY REMOVAL/ABANDONMENT Page 11 of 16 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Contact Inspector and the Water Department Field Operation Storage Yard for coordination of salvage material return. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Protect and salvage all materials such that no damage occurs during delivery to the City. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PUM 71 &_� 91T1]_11I"I 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS ]NOT USED] 2.2 MATERIALS 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 REMOVAL, SALVAGE, AND ABANDONMENT A. General CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised December 20, 2012 City Pmjcet No. 102169 0241 14 - 12 UTILITY REMOVAL/ABANDONMENT Page 12 of 16 1. Manhole Abandonment a. All manholes that are to be taken out of service are to be rem oved un I ess specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Remove and salvage manhole frame and cover as coordinated with City. d. Deliver salvaged material to the City. c. Cut and plug sewer lines to be abandoned. f. Backfill manhole void in accordance with City Standard Details. B. Water Lines and Appurtenances 1. Water Line Pressure Plugs a. Ductile Iron Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug with an MJ Plug with mechanical restraint and blocking in accordance with Section 33 11 11. 3) Perform Cut and Plug in accordance with Section 33 12 25. b. PVC C900 and C905 Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug with an MJ Plug with mechanical restraint and blocking in accordance with Section 33 11 11. 3) Perform Cut and Plug in accordance with Section 33 12 25. c. Concrete Pressure Pipe, Bar Wrapped, Steel Cylinder Type Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10 2) Plug using: a) A fabricated plug restrained by welding or by a Snap Ring in accordance with Section 33 11 13; or b) A blind flange in accordance with Section 33 11 13 3) Perform Cut and Plug in accordance with Section 33 12 25. d. Buried Steel Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug using: a) A fabricated plug restrained by welding in accordance with Section 33 11 14; or b) A blind flange in accordance with Section 33 11 14 3) Perform Cut and Plug in accordance with Section 33 12 25. 2, Water Line Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Plug with CLSM in accordance with Section 03 34 13. 3. Water Line Abandonment by Grouting a. Excavate and backfill. in accordance with Section 33 05 10. b. Dewater from existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 4. Water Line Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipeline and properly dispose as approved by City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSlvl-H (I. F.AD SERVICES REPLACEMENT D2) Revised December 20, 2012 Ciry Pmjecr No. 102169 0241 14 - 13 UTILITY REMOVAL/ABANDONMENT Page 13 of 16 5. Water Valve Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and dispose of valve bonnet, wedge and stem. c. Fill valve body with CLSM in accordance with Section 03 34 13. 6. Water Valve Removal and Salvage a. Excavate and backfill in accordance with Section 33 05 10. b. Remove valve bonnet, wedge and stem. c. Deliver salvaged material to the Water Department Field Operation Storage Yard. d. Protect salvaged materials from damage. e. Fill valve body with CLSM in accordance with Section 03 34 13. 7. Water Valve Abandonment a. Excavate and backfill in accordance with Section 33 05 10. b. Remove the top 2 feet of the valve stack and any valve extensions. c. Fill the remaining valve stack with CLSM in accordance with Section 03 3413. 8. Fire Hydrant Removal and Salvage a. Excavate and backfill in accordance with Section 33 05 10. b. Remove Fire Hydrant. c. Place abandonment plug on fire hydrant lead line. d. Deliver salvaged fire hydrant to the Water Department Field Operation Storage Yard. e. Protect salvaged materials from damage. 9. Water Meter Removal and Salvage a. Remove and salvage water meter. b. Return salvaged meter to Project Representative. c. City will provide replacement meter for installation. d. Meter Box and Lid 1) Remove and salvage cast iron meter box lid. 2) Remove and dispose of any non -cast iron meter box lid. 3) Return salvaged material to the Water Department Field Operation Storage Yard. 4) Remove and dispose of meter box. 10. Water Sample Station Removal and Salvage a. Remove and salvage existing water sample station. b. Deliver salvaged material to the Water Department Field Operation Storage Yard. 11. Concrete Water Vault Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and salvage vault lid. c. Remove and salvage valves. d. Remove and salvage meters. e. Deliver salvaged material to the Water Department Field Operation Storage Yard. f. Remove and dispose of any piping or other appurtenances. g. Demolish and remove entire concrete vault. h. Dispose of all excess materials. 12. Cathodic Test Station Abandonment a. Excavate and backfill in accordance with Section 33 05 10 CITY OF FORT WORTH STANDARD CONSTRDCTION SPECIFICATION DOCUMENT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT 132) City Project No. 102169 0241 14- 14 UTILITY RFMOVAL/ABANDONMENT Page 14 of 16 b. Remove the top 2 feet of the cathodic test station stack and contents. c. Fill any remaining voids with CLSM in accordance with Section 03 3413. C. Sanitary Sewer Lines and Appurtenances 1. Sanitary Sewer Line Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and dispose of any sewage. c. Plug with CLSM in accordance with Section 03 34 13. 2. Sanitary Sewer Line Abandonment by Grouting a. Excavate and backfill in accordance with Section 33 05 10. b, Dewater and dispose of any sewage from the existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 3. Sanitary Sewer Line Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipeline and properly dispose as approved by City. 4. Sanitary Sewer Manholes Removal a. All sanitary sewer manholes that are to be taken out of service are to be removed unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Remove and salvage manhole frame and cover. d. Deliver salvaged material to the Water Department Field Operation Storage. e. Demolish and remove entire concrete manhole. f. Cut and plug sewer lines to be abandoned. 5. Sanitary Sewer Junction Structure Removal a. Excavate and backfil l in accordance with Section 33 05 10. b. Remove and salvage manhole frame and cover. c. Deliver salvaged material to the Water Department Field Operation Storage. d. Demolish and remove entire concrete manhole. e. Cut and plug sewer lines to be abandoned. D. Storm Sewer Lines and Appurtenances l . Storrn Sewer Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater line. c. Plug with CLSM in accordance with Section 03 34 13. 2. Storm Sewer Line Abandonment by Grouting a. Excavate and backfill in accordance with Section 33 05 10, b. Dewater the existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 3. Storm Sewer Line Removal a. Excavate and backfill in accordance with Section 33 05 10, b. Remove existing pipeline and properly dispose as approved by City. 4, Storm S ewer Manh o I e R em oval CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 0241 14- 15 UTILITY REMOVAL/ABANDONMENT Page 15 of 16 a. All storm sewer manholes that are to be taken out of service are to beremoved unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Demolish and remove entire concrete manhole. d. Cut and plug storm sewer lines to be abandoned. 5. Storm Sewer Junction Sox and/or Junction Structure Removal a. Excavate and backfill in accordance with Section 33 05 10, b. Demolish and remove entire concrete structure. c. Cut and plug storm sewer lines to be abandoned. 6. Storm Sewer Inlet Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Demolish and remove entire concrete inlet. c. Cut and plug storm sewer lines to be abandoned. 7. Storm Sewer Box Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipeline and properly dispose as approved by City. 8. Headwall/SET Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Demolish and remove entire concrete inlet. c. Cut and plug storm sewer lines to be abandoned. 9. Storm Sewer Trench Drain Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove existing pipeline and dispose as approved by City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD lop] SITE QUALITY CONTROL 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIYITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised December 20, 2012 City Project No. 102169 0241 14 - 16 UTILITY REMOVAIJARANDONMENT Page 16 of 16 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/12 D. Johnson 1.2.C.3.e. — Include Frame and Cover in Payment description Throughout — added abandonment of storm and sewer manholes when requested and/or approved by City CITY OF FORT NORTH STANDARD CONSTRUCTION SPECIRCAT10N DOCUMENT Revised December 20, 2012 WATER ANTI SANITARY SEWER RF.PLACEWNT CONTRACT 2019, WSM-n (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 U12t0-1 WATER SERVICES I -INCH TO 2-INCH SECTION 33 12 10 WATER SERVICES 1-INCH TO 2-INCH PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 17 Lead-free 1-inch to 2-inch water service lines from the water main to the right-of- way, fittings and water meter boxes complete in place, as shown on the Drawings, directed by the Engineer, and specified herein for: a. New Water Service b. New Water Service (Bored) c. Water Meter Service Relocate d. Private Water Service B. Deviations from this City of Fort Worth Standard Specification 1. Part 3 — EXECUTION 3.4 INSTALLATION 2. E. Removal of Existing Lead Service Lines 1. All lead service lines encountered by the Contractor either discovered during construction or as indicated on the drawings shall be removed from the water main to the meter. 2. The Contractor shall notify the Project Manager and Inspector of any lead service lines encountered that are not indicated on the drawings. 3. All lead service lines shall be disposed of at a certified metal recycling center as specified in the deviations of the Utility Removal/Abandonment Specification (02 41 14). 4. Lead Service Line removal shall be considered subsidiary to the installation of the new water service and/or service reconnection. No additional payment will be made. 3. F. Installation and Repairment of Sidewalks and Driveways 1. The work associated with the installation of new sidewalks and/or driveways shall be considered subsidiary with the removal and installation of water meters and public or private water services. C. Products Installed but not Furnished Under this Section 1. Water meters for various sizes D. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 -- Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 General Requirements 3. Section 33 04 40 — Cleaning and Acceptance Testing of Water Mains 4. Section 33 05 10 — Utility Trench Excavation, Embedment and Backfill 5. Section 33 12 25 — Connection to Existing Water Mains CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2D 19, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised February 14, 2017 City Project No. 102169 33 12 10-2 WATFR SERVICES l-INCH TO 2-INCH Page 2 of 17 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment New Water Service a. Measurement 1) Measurement for this Item shall be per each new "Water Service" complete in place from the tap of the main to the installation of the meter box and associated appurtenances where the service line is installed by open cut construction. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per each "Water Service" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing New Service Line as specified by the Drawings 2) Submitting product data 3) Tapping saddle 4) Corporation stop 5) Curb stop 6) Fittings 7) Service line installed by open cut 8) Connection to meter 9) Meter Box and Lid 10) Pavement removal 11) Excavation 12) Hauling 13) Disposal of excess material 14) Surface Restoration associated with Meter Box installation and connection, excluding grass (seeding, sodding or hydro -mulch paid separately) 15) Clean-up 16) Disinfection 17) Testing 2. New Bored Water Service a. Measurement 1) Measurement for this Item shall be per each new Water Service complete in place from the tap of the main to the installation of the meter box and associated appurtenances where the service line is installed by trenchless method. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per each "Bored Water Service" installed for: a) Various sizes c. The price bid shall include: 1) Submitting product data 2) Tapping saddle 3) Corporation stop 4) Curb stop 5) Fittings CITY OF FORT WORTTi WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-8 (T.FAD SERVICES REPLACEMENT 132) Revised February 14, 2011 City Project No. 102169 33 12 10 - 3 WATER SERVICES 1-INCH TO 2-TNCH Page 3 of 17 6) Service line installed by trenchless method 7) Connection to meter 8) Meter Box and Lid 9) Pavement removal 10) Excavation 11) Hauling 12) Disposal of excess material 13) Surface restoration associated with Meter Box installation and connection, excluding grass (seeding, sodding or hydro -mulch paid separately) 14) Clean-up 15) Disinfection 16) Testing 3. Water Meter Service Reconnect a. Measurement 1) Measurement for this Item shall be per each Water Meter Service Reconnect complete in place from public service line connection to private service line connection. b. Payment 1) The work performed in conjunction with relocation of the meter, associated private service line, fittings and meter box 5 feet or less in any direction from centerline of existing meter location and the materials furnished in accordance with this item will be paid for at the unit price bid per each "Water Meter Service, Reconnection" installed for: a) Various size of services c. The price bid shall include: 1) Private service line 2) Fittings 3) Private connection to water meter 4) Connection to existing private service line 5) Cut and crimp of existing service 6) Removal and Disposal or Salvage of existing 2-inch or smaller water meter, as directed by City 7) Pavement removal 8) Excavation 9) Hauling 10) Disposal of excess material 11) Surface restoration for area disturbed for installation of meter box, excluding grass (seeding, sodding or hydro -mulch paid separately) 12) Clean-up 13) Cleaning 14) Disinfection 15) Testing 4. Private Water Service Relocation a. Measurement 1) Measurement for this Item shall be per linear foot of Private Service relocation complete in place from the meter box to a connection to the existing service line on private property. b. Payment CITY OF FORT }NORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTTON SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised February 14, 2017 City Project No. 102169 33 12 10 - 4 WATER SERVICES 1-INCH TO 2-INCH Page 4 of 17 1) The work performed in conjunction with Private Service Line installation where the meter and meter boxes are moved more than 5 feet in any direction from centerline of existing meter location and materials furnished in accordance with the Item and measured as provided under "Measurement" will be paid for at the unit price bid per linear foot of "Private Water Service" performed for: a) Various service sizes The price bid shall include: 1) Obtaining appropriate permit 2) Obtaining Right of Entry 3) Submitting product data 4) Private service line 5) Fittings 6) Backflow preventer, check valve, and isolation valve relocation, if applicable 7) Connection to existing private service line 8) Pavement removal and replacement 9) Excavation 10) Hauling 1 1) Disposal of excess material 12) Surface restoration, excluding grass (seeding, sodding or hydro -mulch paid separately) 13) Clean-up 14) Cleaning 15) Disinfection 16) Testing 1.3 REFERENCES A. Definitions 1. New Service a. Installation of new 1-inch to 2-inch Water Service Line by open cut construction from the water main to the right-of-way, including corporation stop, curb stop, fittings and water meter boxes complete in place, as shown on the Drawings. 2. New Service (Bored) a. installation of new 1-inch to 2-inch Water Service Line by trenchless construction method from the water main to the right-of-way, including corporation stop, curb stop, fittings and water meter boxes complete in place, as shown on the Drawings. 3. Meter Service Reconnection a. Relocation and reconnection of the private service line from an existing meter to be abandoned and a new meter installed that lies within 5 feet of the existing meter. 4. Private Service Relocation a. Relocation and reconnection of private service line behind the water meter where the existing meter to be abandoned and the new meter installed is greater than 5 feet of the existing meter. A licensed plumber is required to relocate the private service. 5. Lead-free CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2919, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised Febmary 14, 2017 City Prajcct No. 102169 33 12 10-5 WATER SERVICES E-INCH TO 2-INCH Page 5 of 17 a. Lead-free pipes and plumbing fittings and fixtures shall contain less than 0.25 percent lead in accordance with the reduction of Lead in Drinking Water Act (P.L. 111-380). B. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. ASTM International (ASTM): a. A48, Standard Specification for Gray Iron Castings. b. A536, Standard Specification for Ductile iron Castings. c. B88, Standard Specification for Seamless Copper Water Tube. d. B98, Standard Specification for Copper -Silicon Alloy Rod, Bar and Shapes. e. C131, Standard Specification for Resistance to Degradation of Small -Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. f. C150, Standard Specification for Portland Cement. g. C330, Standard Specification for Lightweight Aggregates for Structural Concrete. h. C857 (RL), Standard Practice for Minimum Structural Design Loading for Underground Precast Concrete Utility Structures i. D883, Standard Terminology Relating to Plastics. j. D 1693, Standard Test Method for Environmental Stress -Cracking of Ethylene Plastics 3. American Water Works Association (AWWA): a. C700, Cold -Water Meters - Displacement Type, Bronze Main Case. b. C800, Underground Service Line Valves and Fittings. 4. NSF International (NSF): a. 61, Drinking Water System Components - Health Effects. 5. Reduction of Lead in Drinking Water Act a. Public Law 111-380 (P.L. 111-380) 6- General Services Administration (GSA): a. RR-F-621E, Frames, Covers, Gratings, Steps, Sump and Catch Basin, Manhole 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Provide advance notice for service interruptions and meet requirements of Division 0 and Division 1. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to delivery. L6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS A. Product Data, if applicable: 1. Tapping Saddle 2. Corporation stop 3. Curb Stop CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-8 (LEAD SERVICES REPLACEMENT D2) Revised February 14, 2017 City Project No. 102169 33 12 10-6 WATER SERVICES 1-INCH TO 2-INCH Page, 6 of 17 4. Service Line 5. Meter Box 6. Meter Box Lid B. Certificates and Test Reports 1. Prior to shipment of any Water Service components, the manufacturer shall submit the following: a. A Certificate of Adequacy of Design stating that the components to be furnished comply with all regulatory requirements identified in this Section including: 1) The Reduction of Lead in Drinking Water Act (P.L. 111-380) 2) AWWA C800 3) NSF 61 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Qualifications 1. Manufacturers a. Water Services shall meet or exceed the latest revisions of AWWA C800, NSF 61, the Reduction of Lead in Drinking Water Act and shall meet or exceed the requirements of this Specification. 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Protect all parts such that no damage or deterioration will occur during a prolonged delay from the time of shipment until installation is completed and the units and equipment are ready for operation. 2. Protect all equipment and parts against any damage during a prolonged period at the site. 3. Prevent plastic and similar brittle items from being directly exposed to sunlight or extremes in temperature. 4. Secure and maintain a location to store the material in accordance with Section 01 6600. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED PRODUCTS A. Water meters for various sizes 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Manufacturers CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-$ (LEAD SERVICES REPLACEMENT D21 Revi,ced Febmv y 14, 2017 City Project No. i 92169 33 12 10 - 7 WATER SERVICES 1-INCH TO 2-TNCI T Page 7 of 17 l . Only the manufacturers as listed on the City's Standard Products List will be considered as shown in Section 01 60 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 01 25 00. 3. The Water Services and appurtenances shall be new and the product of a manufacturer regularly engaged in the manufacturing of Water Services and appurtenances having similar service and size. B. Description 1. Regulatory Requirements a. All materials shall conform to the Reduction of Lead in Drinking Water Act (P.L. 111-380). This Act defines "Lead-free" for pipes and other appurtenances to be less than 0.25 percent lead. b, Water Services shall meet or exceed the latest revisions of AWWA C800 and shall meet or exceed the requirements of this Specification. c. All Water Services components in contact with potable water shall conform to the requirements of NSF 61. C. Materials/Design Criteria I . Service Lines a. Provide Type K Copper Tubing per ASTM B88. b. Furnish in the annealed conditions, unless otherwise specified in the Contract Documents. 2. Service Couplings a. Fitting Ends 1) Flared Copper Tubing with thread dimensions per AWWA C800 2) Provide coupling nuts with a machined bearing skirt of a length equal to the tubing outer diameter (O.D.). b. Provide with hexagonal wrench grip compatible with the coupling size. c. Provide lead-free service couplings in accordance with the Reduction of Lead in Drinking Water Act. 3. Corporation stops a. Provide brass castings per AWWA C800 for: 1) Bodies 2) Plugs 3) D washers 4) Bottom nuts b. Machining and Finishing of Surfaces I ) Provide 1 3/a inch per foot or 0.1458 inch per inch f 0,007 inch per inch taper of the seating surfaces for the key and body. 2) Reduce large end of the tapered surface of the key in diameter by chamfer or turning for a distance that will bring the largest end of the seating surface of the key into the largest diameter of the seating surface of the body. 3) Relieve taper seat in the body on the small end. 4) Extend small end of the key there -through to prevent the wearing of a shoulder and facilitate proper seating of key. 5) Design key, key nut and washer such that if the key nut is tightened to failure point, the stem end of the key shall not fracture. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, W SM-B (LEAD SERVICES REPLACEMENT D2) Revised February 14, 2017 City Preijed Nn- 102169 33 12 10-8 WATER SERVICES 1-INCH TO 2-TNCH Page 8 of 17 6) Design nut and stem to withstand a turning force on the nut of at least 3 times the necessary effort to properly seat the key without failure in any manner. 7) Port through corporation stop shall be full size to eliminate turbulence in the flow way. 8) Design stop for rotation about the axis of the flow passageway inside the following minimum circles in order to properly clear the tapping machine: a) Two 7/8-inch for 1-inch corporation stops b) Four 15/16-ineh for 1 1/2 -inch and 2-inch corporation stops c. Provide lead-free corporation stops in accordance with the Reduction of Lead in Drinking Water Act. 4. Curb Stops a. Provide brass castings per AWWA C804. b. Valve plugs shall be: 1) Cylinder type 2) Plug type, or 3) BalI type c. Incorporate full flow porting. d. Provide for full 360 degree plug rotation clockwise or counter -clockwise. e. Overall Length l) 3-5/I6 inch + 1/8 inch for I -inch diameter 2) 4-1 /32 inch + 9.32 for I -inch diameter f. Cylindrical Plug Type 1) Provide 0-ring sea] at top and bottom. a) O-ring at top only is acceptable if bottom of curb stop body is closed. 2) Seals shall be Buna N. 3) 1 O-ring seal shall surround the outlet port of the curb stop and act to effectively seal in the closed position. 4) The port in the plug shall provide a straight through, full size flow way, so shaped as to eliminate turbulence. 5) All waterways shall be smooth and free of burrs or rough areas. 6) Design the curb stop to provide ease and accuracy of operation and positive shut-off of water. g. Tapered Plug Type I ) Provide O-ring seal at top and bottom. 2) The tapered plug and cylindrical recess in the valve body shall be machined to match within approved manufacturing tolerances. 3) inlet and outlet ports shall be scaled by O-rings or combination Teflon U- shaped seal rings backed with O-rings. 4) The port in the plug shall provide a straight through, full size flow way, so shaped as to eliminate turbulence. 5) Al l waterways shall be smooth and free of burrs or rough areas. 6) Design the curb stop to provide ease and accuracy of operation and positive shut-off of water. h. Ball Plug Type 1) Provide double 0-ring seals on the stem. 2) The ball shall seal against rubber rings mounted in the valve body at the inlet and outlet ports. 3) The ball shall be bronze with a smooth Teflon coating. CITY OP FORT WORTH WATER AND SANITARY SEWLR STANDARD CONSTRUCTION SPE('.TFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-$ (LEAD SERVICES REPLACF.MFNT 1)2) Revised February Id, 2017 City Project No. 102169 33 1210-9 WATER SERVICES I-TNCII TO 2-INCH Page 9 of 17 4) The port in the plug shall provide a straight through, full size flow way, so shaped as to eliminate turbulence. 5) All waterways shall be smooth and free of burrs or rough areas. i. Provide lead-free curb stops in accordance with the Reduction of Lead in Drinking Water Act. 5. Straight Adapters a. Brass castings and threads per AWWA C800 b. Provide lead-free straight adapters in accordance with the Reduction of Lead in Drinking Water Act. 6. Three Part Copper Unions a. Brass castings and threads per AWWA C800 b. Provide lead-free Three Part Copper Unions in accordance with the Reduction of Lead in Drinking Water Act. 7. Straight Meter Couplings a. Brass castings per AWWA C800 b. Threads per AWWA C700 c. Tailpiece with outside iron pipe thread d. Chamfer corners on threaded end of meter nut. e. Machine inside and outside of tailpiece. f. Provide lead-free Straight Meter Couplings in accordance with the Reduction of Lead in Drinking Water Act. 8. Branch Connections a. Brass castings per AWWA C800 b. Inlet and outlet connections per AWWA C800 c. Provide lead-free branch connections in accordance with the Reduction of Lead in Drinking Water Act. 9. Service Saddles a. Castings 1) Brass or Nylon coated ductile iron castings per AWWA C800 2) Free of porosity with sharp edges removed 3) Saddle a) Form to fit firmly against side of maximum diameter of water main with approximately 180 degrees wrap around. 4) Outlet a) Design outlet boss for no thread distortion by bending moments. b) Tapped for taper threaded corporation stop conforming to AWWA C800. b. Straps 1) Conform to ASTM B98. 2) Form flat to fit uniformly against the wall of the water main. 3) Shall be double straps 4) Rod diameter not less than 5/8 inch flattened to 1 inch on one side. 5) Straps shall be threaded 5/8 inch (11-NC-2A) for a distance such that'/z inch remains after clamp is fully tightened on the pipe. 6) Chamfer strap ends to protect the starting threads. 7) The threads shall be full and free from shear. 8) 4-inch and larger pipe shall be in accordance with Section 33 12 25. c. Nuts 1) Bronze material CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT D2) Revised February 14, 2017 City Project No. 102169 331210-10 WATER SERVICES 1-INCH TO 2-INCH Page 10 of 17 a) Same material as straps 2) Dimensions equal to or larger than heavy hexagon nuts 3) Tapped 5/8 inch (I 1-NC-2B) d. Gaskets 1) Neoprene rubber material 2) Cemented to saddle and positioned to facilitate installation 10. Brass Flanged Angle Valve a. For 1 1/2-inch and 2-inch services b. Brass castings per AWWA C800 c. Valve Body with integral outlet flange and inlet wrenching flat d. Fit together key and body by turning key and reaming body 1) Key with 0-ring seal seat at the upper end 2) Lap key and body seat are to conform to corporation stop requirements of this Specification. 3) The outlet flange shall contain an 0-ring seat or a uniform flat drop -in flange gasket surface. 4) Drop -in flange gasket surface shall contain gasket retaining grooves milled circular about the axis of the flange. 5) The size of the outlet flange and the diameter and spacing of the bolt holes shall conform to AWWA C700. 6) The flange on 2-inch angle valves shall be double drilled to permit connection to 1 1/2 -inch meters. 7) The inlet port of the valve shall be tapered to conform to AWWA C800 taper pipe thread. 8) The key cap shall include a wrenching tee marked with a raised or recessed arrow to show whether the valve is open or closed. 9) Valve Assembly (main body, key, key cap) a) Brass material per AWWA C800 b) 0-ring seal on the top of the key between the key and body seat c) Key cap shall complete the assembly by attaching to the key by means of a strong bronze pin with phosphor bronze spring washer(s) depressed between the key cap and the top of the valve main body. d) Provide with padlock wings for locking the valve in the closed position. e) There shall be a uniform application of cold water valve grease between the body and the key. f) The valve shall be capable of being easily opened and stopping lugs. g) The waterway through the valve steal I be smooth and rounded for minimum pressure loss, and shall be free of burrs or fins. h) The valve shall be strong, well designed, neat in appearance, water- tight and entirely adequate for the intended purpose. i) Provide with either a high quality rubber drop -in gasket or an 0-ring seal depending on the manufacturer's flange seal surface design choice. e. Provide lead-free brass flanged angle valves in accordance with the Reduction of Lead in Drinking Water Act. 11. Meter Boxes shall: a. Be constructed of- t) Polymer, black polyethylene material as defined in ASTM D883. a) Minimum wall thickness of 3/8-inch throughout with no blowing agents or foaming plastics CITY OF FORT WORTH WATER AND SANITARY SLWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS RrPLACEMENT CONTRACr 2019, WSM-B (LEAD SERVICES REPLACEMENT ➢2) Revised February 14, 2017 City Project No. 102169 33 12 10 - 11 WATER SERVICES 1-INCH TO 2-INCH Page 1 I of 17 b) Body shall be black throughout, blended at the time of manufacture, and shall have a molded recycled emblem with a minimum of 35 percent Post Industrial/ Pre Consumer Recycled Content- verified with a Leed Product Documentation. c) Have a tensile strength greater than 1700 pounds per square inch (psi). d) Smooth edges and corners and be free from sharp edges so the unit can be handled safely without gloves. e) Exterior free from seams or parting lines. f) Have crush resistant ribbing along the outside of the box. g) Have a flange around the lid opening to help prevent settling and aide in adjustment to grade. h) Not to be installed in roadway — designed to withstand loading in non - deliberate and incidental traffic only. 2) Concrete a) Frame of No. 6 gauge wire welded closed b) Type I or Type II Portland cement, in accordance with ASTM C150, portioned with lightweight aggregate, in accordance with ASTM C330 (1) Percentage of wear not to exceed 40 per ASTM C131 (2) Minimum 28 day compressive strength of3,000 psi b. Be able to withstand a minimum 15,000 pounds vertical load c. Withstand a minimum 400 pounds sidewall load. d. Have pipe holes measuring a minimum of 2-1/2" x 3-1/4". e. 1-inch Standard Meter Box (Class A) 1) For use with services utilizing 5/8-ineh x 3/4-inch, 3/4-inch or 1-inch meter Single or Dual service meter. 2) Polymer a) Size: working of not less than 10 inches x 16 inches, 12 inches high 3) Concrete a) Size: working area not less than 10-inches x 16-inches, 12 inches high f. 2-inch Standard Meter Box (Class C) 1) For use with services utilizing 1-1/2-inch or 2-inch Single service meter. 2) Polymer a) Size: working area not Iess than 14-inches x 28-inches, 12 inches high 3) Concrete a) Size: working area not less than 15-inches x 26-1 /2-inches, 12 inches high g. Bullhead Standard Meter Box (Class B) 1) For use with services utilizing two 5/8-inch x %-inch or 3/-inch or 1-inch Single service meter. 2) Polymer a) Size: working area not less than 15-inches x 18-inches, 12 inches high 3) Concrete a) Size: working area not less than 15-inches x 18-inches, 12 inches high 12. Meter Box Lid a. Meter Box Lids Shall: 1) Be solid throughout with reinforcing ribs. 2) Have City of Fort Worth `Molly' logo molded into the lid. 3) Bear the Manufacturer's IS (name or logo) and Country of Origin. 4) Be designed both with and without AMl receptacles 5) Have a molded tread -plate CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-S (LEAD SERVICES REPLACEMENT D2) Revived Febmary 14, 2017 City Project No. 102169 33 12 10-12 WATER SERVICES l-iNCH TO 2-INCH Page 12 of 17 6) Seat securely and evenly inside the meter box and shall not overlap the top edge of the meter box. 7) Have a molded pick bar for use by meter reading tool. 8) Have Automated Meter Infrastructure (AMI) snap locking slide mounts for number of meters/endpoints associated with meter box 9) Have an opening to accept the AMI end -point. Opening shall accommodate an endpoint with a 1-7/8 inches diameter. 10) Have recessed AMI end point area, to alleviate a trip hazard, centered over AMI slide mount. Recess area should be 4-1/2 inches in diameter and 3/8" deep. 11) Have built-in anti -flotation devices. b. Cast Iron or Ductile Iron 1) Lids for Concrete Meter Boxes shall be constructed out of a cast iron and meet RRF-621 specification. 2) Shall withstand a minimum vertical load of 15,000 pounds 3) Coat castings with a bituminous emulsified asphalt unless otherwise specified in the Contract Documents, ground smooth, and cleaned with shot blasting, to get a uniform quality free from strength defects and distortions, 4) Dimensions shall be within industry standards of+1 /16 inch per foot. 5) Shall have a plug inserted in to the AMI receptacle to avoid water entering through opening until the AMI receptacle is used 6) Be a minimum of 1-3/4 inches thick at reinforcing ribs. 7) Casting weights may vary f5 percent from drawing weight per industry standards. PIUsti c(Colnposite) 1) The lid shall : a) Constructed of Engineered Plastic as defined in ASTM D883 (1) Have a molded recycled emblem with a minimum of 50 percent Post Consumer Recycled and 50 percent Post Industrial/ Pre Consumer Recycled Content- verified with a Leed Product Documentation. (2) Be designed to fit a concrete box/cast iron box in retrofit installations. (3) Have a tensile strength greater than 1700 psi. (4) Have a `knock -out" plug to accept the AMI end- point. Knock -out diameter shall be 1-7/8 inch diameter. A removable plug may be substituted for the knock -out plug. (5) Be constructed out of a composite material blend for maximum durability and corrosion resistance. (6) Be black throughout with no blowing agents or foaming plastics (7) Smooth edges and corners and be free from sharp edges so the unit can be handled safely without gloves. (8) Exterior free from seams or parting lines. (9) Have a molded tread -pattern- tread dimensions shall be .188-inch x .938-irich x .150-inch deep. (10) Have "City of Fort Worth" molded into the lid. (11) Have "Water Meter" molded into the lid- Font shall be standard Fadal CNC font with 1-inch characters x .1 50-inch deep. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2UU, WSM-H (LEAD SERVICES REPLACEMENT D2) Revised February I A, 2017 City Project No. 102169 33 12 10 - 13 WATER SERVICES 1-INCH TO 2-QNCH Page 13 of 17 (12) Have a molded pick hole pocket- dimensions shall be 3-inch x 9/16-inch x Thru Hole with 3/16-inch 304 stainless steel rod. (13) Have 2 pieces of 1/2-inch rebar located in lid pockets for locatability as shown in Drawings. (14) Have location capability using metal detector. b) Domestic Manufacture Only -Made in USA molded on Lid. c) Not to be installed in roadway or parking area d) Be designed to withstand H-10 loading for non -deliberate and incidental traffic only as . e) Have ultraviolet protection. 2) 1-inch Standard Plastic Meter Box Lid (Class A) a) For use with services utilizing 5/8-inch x 3/4-inch, %-inch or 1-inch meter Single or Dual service meter. b) Size: 11-7/8-inch x 17-7/8-inch, 1-1/2 inches high c) For use with Class A Standard Meter Box. d) Polymer lid shall seat evenly inside meter box and shall not overlap the top edge of the meter box. 3) 2-inch Standard Plastic Meter Box Lid (Class C) a) For use with services utilizing 1-1/2-inch or 2-inch Single service meter. b) Size 27-inches x 15-1/4-inches, 1-7/8 inches high c) For use with Class C Standard Meter Box. d) Polymer Iid shall seat evenly inside meter box and shall not overlap the top edge of the meter box. 4) Bullhead Standard Plastic Meter Box Lid (Class B) a) For use with services utilizing two 5/8-inch x 3/4-inch or 3/4-inch or f- inch Single service meter: b) Size: 16-5/8-inch x 14 5/8-inch, 1-3/4 inches high c) For use with Class B Standard Meter Box. d) Polymer lid shall seat evenly inside meter box and shall not overlap the top edge of the meter box. I3. Horizontal Check Valve a. Equip 1 %-inch and 2-inch Water Services with a horizontal check valve, with pipe plug, only if specified in the Drawings. b. If an existing backflow preventer is present, the Contractor is to leave it, and is not required to provide an additional horizontal check valve. c. Provide lead-free horizontal check valves in accordance with the Reduction of Lead in Drinking Water Act. 14. Service Marker a. 3 inch wide, 5 mil blue vinyl tape 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL A. Tests and Inspections 1. At the City's option, the manufacturer shall be required to provide certification records showing conformance of materials, design and testing to these Specifications. 2. The test procedures shall conform to AWWA C800. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised February 14, 2017 City Project No. 102169 33 12 10 - 14 WATER SERVICES 1-INCH TO 2-INCH Page 14 of 17 a. In the event that a chosen valve fails the City's hydrostatic test, the cost of the test shall be at the expense of the supplier. b. Proof testing of the remainder of the valves shall be at the cost and responsibility of the supplier. c. These tests will be the basis of acceptance or rejection of the remainder of the shipment by the City. 3. The City reserves the right to select products at random for testing. The failure of materials to conform to the applicable Specification may result in the rejection of the entire shipment. B. Marking Service saddle castings shall be clearly marked by letters and numerals cast thereon showing: a. Manufacturer's name b. Type c. Size of Pipe PART 3 - EXECUTION 3.1 INSTALLERS A. A licensed plumber is required for installations on the outlet side of the service meter. 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION INOT USED] 3.4 INSTALLATION A. General 1. Install Water Services and appurtenances in accordance with AWWA C800. 2. Install Water Service Lines 5 feet north or east of center of lot frontage on lots 75 feet or wider, or where shown on Drawings. 3. Install Water Service .Lines on lot center line on lots less than 75 feet wide, unless otherwise shown on the Drawings. 4. Install services at a minimum depth of 36 inches below final grade/proposed top of curb, unless otherwise specified in the Contract Documents. 5. Perform leak tests in accordance with Section 33 04 40. 6. Replace existing 3/4-inch Service Lines with 1-inch new Service Line, tap, and corporation. 7. Install replaced or relocated services with the service main tap and service line being in line with the service meter, unless otherwise directed by the City. 8. Excavate, embed and backfill trenches in accordance with Section 33 05 10. B. Handling 1. Haul and distribute Service Lines fittings at the project site and handle with care to avoid damage. a. Inspect each segment of Service Line and rejector repair any damaged pipe prior to lowering into the trench. b. Do not handle the pipe in such a way that will damage the pipe. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECTFTCATTON DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised February 14, 2017 City Prnpd No_ 102169 33 t210-15 WATER SERVICES 1-INCH TO 2-INCH Page 15 of 17 2. At the close of each operating day: a. Keep the pipe clean and free of debris, dirt, animals and trash during and after the laying operation. b. Effectively seal the open end of the pipe using a gasketed night cap. C. Service Line Installation Service Taps a. Only ductile iron pipe may be directly tapped. b. Install service taps and/or tap assemblies of the specified size as indicated on the Drawings, or as specified by the Engineer. c. Perform taps on a water system that is either uncharged or under pressure. d. Taps consist of: 1) For Concrete Pressure Pipe or Steel Pipe a) Standard internal pipe threaded holes in the pipe walls (1) Made during pipe fabrication (2) Provide tapered threaded outlet with cc threads for up to 2-inch. (3) Provide flange outlet with flange to thread insulator adaptor kits for 4-inch and larger taps. 2) Other pipe materials a) Bronze service clamp with a sealed, threaded port through which the pipe wall is drilled to complete a service port e. Tap Assemblies 1) Consist of corporation stop with iron to copper connection attached to: a) Copper tubing terminating as shown on the City's Standard Detail b) May be required adjacent to gate valves c) Install as shown on the Drawings, or as directed by the Engineer. d) When required, shall be included in the unit price bid for installing gate valve. 2) Chlorination and testing purposes a) No separate payment will be made for taps required for testing and chlorination. 2. Installation of Water Services a. Install tap and Service Line in accordance with City Details. b. Install meter box in accordance with City Details. 1) Adjustment of the Service Line to proper meter placement height shall be considered as part of the Meter Box installation. 3. Trenching a. Provide a trench width sufficiently wide to allow for 2 inches of granular embedment on either side of the Service Line. 4. Bored Services a. Services shall be bored utilizing a pilot hole having a diameter''/2 inch to inches larger than the Service Line. 5. Arrangement a. Arrange corporation stops, branches, curb stops, meter spuds, meter boxes and other associate appurtenances as shown in the City Detail, and to the approval of the Engineer. 6. Service Marker a. When Meter Box is not installed immediately subsequent to service installation: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPT.,ACFMFNT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised February 14, 2017 City Projcet No. 102169 331210-16 WATER SERVICES 1-INCH TO 24NCH Page 16 of 17 1) Mark Curb Stop with a strip of blue vinyl tape fastened to the end of the service and extending through the backfill approximately 6 inches above ground at the Meter Box location. b. Installation of service taps only: 1) Attach service marker tape to the corporation stop or plug and extend upward and normal to the main through the backfill at the adjacent trench edge to at least 6 inches above ground to flag the tap location. 7. Corporation stops a. Fully open corporation stop prior to backfill. D. Removal of Existing Water Meters 1. Remove, tag and collect existing Water Service meter for pickup by the City for reconditioning or replacement. 2. After installation of the Water Service in the proposed location and receipt of a meter from the City inspector, install the meter. 3. Reset the meter box as necessary to be flush with existing ground or as otherwise directed by the City. 4. All such work on the outlet side of the service meter shall be performed by a licensed plumber. 3.5 REPAIR 1 RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Field Tests and Inspections 1. Check each Water Service installation for leaks and full flow through the curb stop at the time the main is tested in accordance with Section 33 04 40. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY Of' FORT WORTH WATER AND SANITARY SEWER S"I'ANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised February T4, 2017 City Project No. 102169 33 12 10- 17 WATER SERVICES I -INCH TO 2-INCH Page 17 of 17 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson Added Blue Text for clarification 1.2 A. — Revision to items included in price bid Specification modified to be in accordance with the Reduction of Lead in Drinking Water Act — All materials shall be lead free in accordance with this Act. 1.2.A.3 — Water Meter Service Relocate was renamed Water Meter Service Reconnect L6.B. — added certification submittals for compliance with regulatory requirements 2/13/2013 F. Griffin Added the phrase', including grass' to lines; Part I, 1.2.A.1.c.14, Patti, 1.2.A.2.c.13, Part 1, L2.A.2.c.13, Part 1,1.2.A.3.c.11, Partl, 1.2.A.4.c.11 Added the phrase `and replacement' to line Part 1,1.2.A.4.c.7 4/26/2013 F- Griffin Revised lines with `including grass' replacing with `excluding grass (seeding, sodding or hydromulching paid separately)' Included in Part 1, 1.2, A, 1, c, 14; Part 1, L2, A, 2, c, 13; Part 1, L2, A, 3, c, 1 I; Part 1, 1.2, A, 4, 2, 11 6/19/2013 D. Johnson 1.2.A.4.c — Addition of private water service appurtenances relocation to being included in the linear foot price of private water services 11/21/2016 W. Norwood Require meter box suitable for AMI meter. 2.2,C, 1 1 & 2.2,C,12 11/21/2016 W. Norwood Require service saddle with double straps, 2.2,C,9,b 2/14/17 W. Norwood 2.2, C, 9.a.3 Remove table "Fit Contour of pipe..." 2/14/17 W. Norwood 3.4, C, l .d.(2) Remove nylon sleeve inserts, require cc threads. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS RLPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised February 14, 2017 City Project No. 102169 SP347113.01 TWFFICCONTROT_. Page I of4 SPECIAL PROVISION TO STANDARD SPECIFICATION 34 71 13 TRAFFIC CONTROL For this Project, the Standard Specification 34 71 13 for Traffic Control (dated 1 1/22/2013) is amended with respect to the clauses cited below. No other clauses or requirements of this Standard Specification are waived or changed. Delete section 1.1. from Standard Specification 34 71 13 and replace with: 1.1 SUMMARY B. installation of Traffic Control Devices and preparation of Traffic Control Plans, including moving, replacing, maintaining, cleaning and removing upon completion of the work, all temporary or permanent street closure barricades, signs, cones, lights or other devices required to handle traffic in conformance with the current edition of the Texas Manual of Uniform Traffic Control Devices and as indicated on the Drawings or directed by the Engineer or designated City representative. C. Deviations from this City of Fort Worth Standard Specification 1. As outlined in this Special Provision to Standard Specification 34 71 13. D. Related Specifications Sections include, but are not limited to: 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 —General Requirements Delete paragraph 1.2. from Standard Specification 34 71 13 and replace with: 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement andPayment 1. installation of Traffic Control Devices a. Measurement 1) Traffic Control Devices for the project will be measured per month throughout the project duration regardless of the number ofset-ups, locations or streets under construction. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured, as provided under "Measurement," shall be paid for at the unit price bid for "Traffic Control" under each Unit ofWork (Water, Sewer, Paving, etc). No additional compensation is made for materials, equipment or labor required for this Item. CITY OF FORT WORTH WATER AND SANITARY SEWER December 13, 2019 REPLACEMENT CONTRACT 2019, WSM-13 (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 SP 34 71 13.01 TRAFFIC CONTROL Page 2 of 4 SPECIAL PROVISION TO STANDARD SPECIFICATION 34 7113 TRAFFIC CONTROL 2) No more than one month maybe charged during the same 30 day period of a contract. Projects with multiple crews performing concurrent Units of Work (Water, Sewer, Paving, etc) will be paid for 1 (one) month total, under the contractor's selected unit. The selected unit must have had active work during that period. 3) The months for each Unit of Work will be approximated for bidding and can be adjusted during construction as thework progresses according to the Contractor's schedule. The Contractor's schedule shall reflect the project being complete within the project duration set by the contract. c. The work performed under this Item shall include, but not be limited to: 1) Traffic Control implementation 2) Installation 3) Maintenance 4) Adjustments 5) Replacements 6) Removal 7) Police assistance during peak hours d. Traffic Control Plan Changes: 1) Contractor driven changes to the sequencing, resources, or location of traffic control activities do not warrant additional cost for traffic control. 2) City requested changes to the scope or sequencing can be submitted as a change order with supporting documentation for review by the 3) During periods of inactivity the contractor must provide supporting documentation that additional traffic control was required based on current site conditions and was present at the site. 2. Portable Changeable Message Board Signs a. Measurement 1) Portable Changeable Message Board Signs for the project shall be measured per week regardless of the number of set-ups, locations or streets under construction. b. Payment 1) The work performed and materials furnished in accordance to this Item and measured as provided under "Measurement" shall bepaid for at the unit price bid per week for "Portable Message Sign". c. The price bid and work performed under this Item shall include, but not be limited to. 1) Delivery of Portable Message Sign to Site 2) Message updating 3) Sign movement throughout construction 4) Return of the Portable Message Sign post -construction 3. Preparation of Traffic Control Plans or details if not provided on the Drawings and applicable City Standard Traffic Control Detail is available at: CITY OF FORT WORTH WATER AND SANITARY SEWER December 13, 2019 REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) City Project No. 102169 SP 34 71 13.01 TRAFFIC CONTROL Page 3 of SPECIAL PROVISION TO STANDARD SPECIFICATION 34 71 13 TRAFFIC CONTROL http://fortworthtexas.gov/uploadedFiles/Transportation and Public Wor ks/Perm i is/TrafficControlPl ans.pdf a. Measurement 1) Traffic Control Plans for the project shall be measured throughout the contract time period and furnished by the Contractor. b. Payment 1) The work performed and materials furnished in accordance with this Item shall be subsidiary to the unit price bid for "Traffic Control". c. The work performed under this item shall include, but not be limited to: 1) Preparing the Traffic Control Plans 2) Adherence to City and Texas Manual on Uniform Traffic Control Devices (TMUTCD) 3) Obtaining the signature and seal of a licensed Texas Professional Engineer for all Traffic Control Plans submitted to the City. 4) Incorporation of City comments Delete paragraph 1.5.B, D, E and G from Standard Specification 34 71 13 and replace with: 1.5 SUBMITTALS B. Obtain a Street Use Permit from the Street Management Section of the Traffic Engineering Division, 311 W. 10th Street. The Traffic Control Plan (TCP) for the Project shall be as detailed on the Traffic Control Plan sheets of the Drawing set if provided. A copy of the Traffic Control Plan shall be submitted with the Street Use Permit and upon approval uploaded to the City's BIM360 project page as a submittal. D. Contractor shall prepare Traffic Control Plans if required by the Drawings or Specifications. The Contractor will be responsible for having a licensed Texas Professional Engineer sign and seal the Traffic Control Plan sheets. Contractor, at his or her expense, shall prepare and submit for approval Traffic Control Plans where Contractor wishes to deviate from the approved set of Traffic Control plans if provided in the construction documents. E. Lane closures (including moving operations) that require a lane to be closed to through traffic for 24 hours or longer shall require a site -specific traffic control plan. G. Design Engineer will furnish standard details for traffic control. These are guidance and are not sufficient for a site specific traffic control plan for lane closures over 24 hours. Delete paragraph 1.5.G from Standard Specification 34 71 13. Delete paragraph 3.3.K from Standard Specification 34 71 13 and replace with: CITY OF FORT WORTH WATER AND SANITARY SEWER December 13, 2019 REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) City Project No. 102169 SP 34 71 13.01 TRAFFIC CONTROL Page 4 of4 SPECIAL PROVISION TO STANDARD SPECIFICATION 34 71 13 TRAFFIC CONTROL 3.3 INSTALLATION K. Contractor shall make arrangements, at his or her expense, for police assistance to direct traffic iftraffic signal turn-ons, street lightpole installation, orother construction will be done during peak traffic times (AM: 7 am 9 am, PM: 4 pm - 6 pm). CITY OF FORT WORTH WATER AND SANITARY SEWER December 13, 2019 REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT 132) City Project No. 102169 City of Fort Worth Utility Construction Policy- 2019 The following policy shall govern all pavement cuts or excavations within the City of Fort Worth rights of way (ROW) and easements. Purpose The purpose of this policy is to effectively manage street closures, minimize disruptions to traffic flow, minimize damage, and ensure the proper repair to the street pavement while allowing for utility construction and maintenance. A. General The Director of the Transportation and Public Works Department or his/her designated representative ("Director") shall specify methods and materials that are acceptable for utility construction within public rights of ways, and all plans and specifications shall be reviewed and approved by the Director. Any variance to this policy must be approved by the Director. 1. Variance Procedure: The request must include the following: 1) Project/permit number with a description of the work being done. 2) Provide supporting information that justifies the need for the variance. 3) Provide an exhibit depicting the proposed limits of work. Right -of -Way Management staff will review the variance request and forward the initial determination to the Transportation & Public Works Director's office for processing and final review. Once a final determination is made, the ROW user will be notified. The ROW user must not start construction without an approved permit. Reduced restoration limits are not allowed within a driveway approach and restoration should conform to the expansion joint in the curb if one exists. B. Planning and coordination 1. Advanced Planning. Maps and projected schedules for the current city fiscal year for all construction planned or anticipated by each utility including water, sanitary sewer, electric, gas, telecommunications, cable, etc., are to be submitted to the Director each October 1. The City will review and distribute this information, which can be conceptual and tentative, through a monthly coordination meeting with other utilities for purpose of project planning, coordination and/or consolidation of projects. 11Page 2. Permit Requirement: All pre -planned utility construction within public right-of-way, including drainage or other applicable easements, must have a Street Use Permit for Utility Construction ("Permit") prior to construction. A permit may also be required for any work on Texas Department of Transportation ("TxDOT") right-of-way that is located within the Fort Worth city limits. One (1) electronic copy of engineering plans must be received by the Director a minimum of ten (10) working days prior to anticipated construction (excludes emergency work). All plans for service connections must be received by the Director a minimum of five (5) working days prior to anticipated construction. An approved Permit will become void if construction has not begun within 30 calendar days after approval of the permit. If the work cannot begin within the specified time period, the permit holder must request an extension at least three (3) working days prior to expiration. All construction work authorized by the Permit must be completed by the time specified therein. If the work cannot be completed within the specified time period, the permit holder must request an extension at least three (3) working days prior to expiration. A copy of the Permit, including an approved Traffic Control Plan, and approved engineering plans (if applicable) shall be maintained at the construction site at all times. If any provisions of this policy are not followed, the Permit may be revoked. If a permit holder has not complied with the terms and conditions of this utility policy under a prior permit, new permits may be denied. Permit approval will specify the type of surface restoration required. A responsible representative with decision -making authority for the permit holder shall be on site at all times during active construction. 3. Emergency Repairs: Emergency repairs may be undertaken without first obtaining a permit, however, the utility company or contractor must inform the Director and shall apply for a Permit within 24 hours of the onset of the emergency and provide the City with a written detailed description of the emergency and the work performed, whether completed or ongoing, to remedy the situation. An emergency is defined as a situation presenting an imminent or actual hazard to personal or public health, safety or property. 4. Plans: Plans shall provide a cover sheet outlining the full limits and type of proposed work; requested number of working days; project point of contact name, 24-hour phone number, address; table of contents; complete legend; location of all trenches, directional bores, street right-of-way, curbs, driveway approaches, sidewalks, and landscaping. Information regarding irrigation systems, existing utilities, pull boxes, manholes, street light, traffic signal or other poles; and loop detectors including horizontal and vertical alignment of pipe sizes shall be provided to the extent necessary if it is determined that they may conflict with construction operations. Plans should clearly indicate if the utility is overhead or underground. Detailed drawings of the proposed utility installation should be provided, such as pipe size, number of inner -ducts, profile and other utility structures such as switch gear and transformers. The length and depth of all bores and trenches must be clearly indicated. The engineer's or plan preparer's name, license number (if applicable), and date the plans were finalized shall be on all plan sheets. Review copies shall be distributed to the Director of the Transportation and Public Works Department, Water 2 1 P a g e Department, Environmental Quality Division of the Code Compliance Department, and the Park and Recreation Department. Engineering plans shall also show the following: Transportation &t Public Works Department 917-392-1234 Water Department 817-392-4477 Contact numbers should also be shown for the other agencies such as Texas Department of Transportation (TxDOT), railroads and gas pipeline companies, as appropriate. 5. Traffic Plan: One (1) electronic copy of the proposed Traffic Control Plan is required. This should be submitted by the permit requestor to the Director with and follow the same general format of the engineering plans in accordance with the latest edition of the Texas Manual of Uniform Traffic Control Devices (MUTCD)_ 6. Storm Water Pollution Prevention Plans and Grading Permits: Utility construction, including linear projects with a total land disturbance of 1.0 acre or greater or that are part of a common plan of development, must prepare a Storm Water Pollution Prevention Plan (SWPPP), obtain permit authorization under the Texas Commission on Environmental Quality (TCEQ) Construction General Permit, implement appropriate Best Management Practices (BMP) to minimize the discharge of pollutants into the Municipal Separate Storm Sewer System (MS4), and submit copies of the SWPPP & state storm water permit(s) to the Environmental Quality Division of the Code Compliance Department. See Chapter 12.5, Article X of the Fort Worth Code of Ordinances. Any project that disturbs 1.0 acre or greater or that is part of a common plan of development must obtain an approved City of Fort Worth grading permit prior to the disturbance of land. All disturbed areas of the project including construction zone, laydown or staging areas, spoils and stock piles, and parking areas must be considered in the determination of the total land disturbance. Projects that will disturb less than 1.0 acre do not require a SWPPP or grading permit, but are regulated by City Ordinance to minimize the discharge of pollutants into the MS4. See Chapter 12.5, Article IV, Division 1 of the Fort Worth Code of Ordinances. Trash, concrete cut slurry, boring mud and water must be captured and not allowed to enter the MS4. All disturbed areas must obtain final stabilization throughout the project. All temporary sediment and erosion controls shall be removed and the area cleaned after final stabilization has been achieved. 7. Deep Trenches: Any trenches must meet OSHA requirements including OSHA minimum safety systems and programs. 3 1 P a g e 8. Utility Locates: The contractor is responsible for obtaining utility locates under the Texas One -Call or DigTest (or equivalent) programs prior to construction, and for diligently utilizing the locate information during construction. Utility locates for City of Fort Worth owned utilities may be obtained from the following list: Transportation & Public Works Department 817-392-1234 Wafter Department 811 For City water and/or sewer pipes sixteen (16) inches in diameter or greater, field verification (hydro excavation) of the alignment and elevation must be performed prior to digging. Any exceptions to this requirement will require the approval of the Fort Worth Water Department Director or his/her designated representative. 9. Notification: 1. Prior to beginning construction on any block in the project, on a block -by -block basis, prepare and deliver a doorhanger or flier of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post doorhanger or flier 7 days and 1 day prior to beginning any construction activity on each block in the project area. b. Prepare doorhanger or flier with the template. Electronic versions of the sample doorhangers can be obtained from the City of Fort Worth Accela Citizens Access website. c. No construction will be allowed to begin on any block until the doorhanger or flier is delivered to all residents of the block. 2. In the event it becomes necessary to temporarily shut down water or wastewater service to residents or businesses during construction, prepare and deliver a doorhanger or flier of the pending interruption to the front door of each affected resident. a. Post doorhanger or flier 24 hours prior to the temporary interruption on each block in the affected area. b. Prepare doorhanger or flier with the template. Electronic versions of the sample doorhangers can be obtained from the City of Fort Worth Accela Citizens Access website. c. No interruption of water or wastewater service can occur until the doorhanger has been delivered to all affected residents and businesses. In addition, the contractor shall install a project identification sign on each end of the work site 48 hours in advance of the start of construction. The sign shall state the name and phone numbers as shown in FIGURE D019 UTILITY REPAIR DESIGNATION SIGN. 4 1 P a g e 10. Coordination: The City reserves the right to coordinate and manage multiple traffic disruptions, including street and lane closures, and to delay or deny issuance of permits which unduly restrict traffic movement or for other public or private events near which the closure of streets for planned (not emergency) work would disrupt the event or the traffic associated therewith. C. Traffic Management The contractor must plan and execute the utility construction in a manner that minimizes the disruption of traffic and in accordance with the City of Fort Worth Traffic Engineering Manual. A maximum of one (1) lane ONLY may be closed for construction work in the downtown area and along arterials unless otherwise authorized by the Director. Work must be scheduled between the hours of 9:00 AM and 4:00 PM in the downtown and along arterials unless extended hours are authorized by the Director. Normal traffic flow will be maintained at all major intersections during peak hours without restriction. Work must be scheduled on all other streets between 7:00 AM and 6:00 PM unless extended hours are authorized by the Director. Adequate traffic control devices are to be installed and maintained in accordance with the approved Traffic Control Plan. The Director and/or his/her designee may require additional traffic control devices. D. Construction Requirement 1. Horizontal & Vertical Clearances: Where buried under roadway pavement, the facility being constructed must be at least 42 inches below top of pavement and should normally be placed under water, sanitary sewer and stormwater pipes; Within the parkway, a minimum depth of 24 inches from street grade shall be required. a. Stormwater Clearances: A minimum clearance of three (3) feet shall be maintained both horizontally and vertically for pipes and associated manholes and inlets. Where the utility crosses under a stream or other open channel, it shall be constructed a minimum of four (4) feet below the bottom of the streambed or channel, or more if improvements are planned by the City. If the utility passes over a stream or other open channel, it must be at least two (2) feet above the 100-year storm elevation and provide sufficient clearance for the passage of maintenance equipment underneath. The contractor must restore the right-of-way, including all public infrastructure, to equal or better condition than before the disturbance upon completion of the project. The utility shall coordinate with Stormwater Management - Planning to verify whether improvements are planned which might conflict with the utility's plans. Where the minimum clearances cannot be accommodated, less than the minimum clearance may be allowed at the discretion of the Stormwater Staff. b. Water, Wastewater, and Reclaimed Water Infrastructure: Horizontal and vertical clearances shall be in compliance with the City of Fort Worth Installation Policy and 5 1 P a g e Design Criteria for Water (Section 5.6), Wastewater (Section 6.5), and Reclaimed Water Infrastructure (Section 7.4). 2. Boring: Utilities installed longitudinally along the street may be bored or open cut. Utilities installed across the street shall be bored unless otherwise authorized by the Director. 3. Trench Design Standard: Dimensions and materials for open trenches shall conform to the City of Fort Worth Standard Specification Document. Steel plates must be used to cover a trench temporarily. See FIGURE D018 STEEL PLATE PLACEMENT FOR TRENCH REPAIRS. 4. Driveways: It is preferred to bore under all driveways. If open trench methods are used, all areas disturbed must be restored to equal or better condition prior to demobilizing from the site. 5. Trees and Landscaping: All work performed under this policy shall be in accordance with the City of Fort Worth's Code of Ordinances, Chapter 33: Trees, Shrubs, etc. The contractor must restore any damage to trees, shrubs and other landscaping in the right of way or easement. For new construction or total reconstruction of the roadway, manholes must be placed outside of the drip line of a tree or 15 feet from the tree trunk, whichever is greater. Trees that are adjacent to the workspace and within the right of way and parkway will require tree protection fencing at the dripline and all the way around to restrict activity inside, keeping the root zone from being compacted by equipment and reducing the potential for damage to the trunk. Boring, rather than an open trench, must be used within the drip line of a tree. Variations to the tree and landscaping requirements shall be approved by the City Forester. 6. Pavement Surface Restoration: In order to maintain an acceptable riding surface on the street, the utility company, developer, or contractor shall replace the pavement surface according to the age, Pavement Condition Index (PCI) and type of the pavement. Backfill and compaction testing in accordance with the City of Fort Worth Standard Specification 33 05 10 may be followed in lieu of flowable fill. However, flowable fill is required to backfill all trenches in downtown streets. Any damage to the street surface caused by the utility construction project, including damage related to staging operations and material storage, must be properly repaired at the contractor's expense. Replacement of pavement shall adhere to the following guidelines: New Pavement If a utility company, developer, or contractor desires or is required to cut the street within the first two (2) years of construction or reconstruction, the entity must receive approval from the Director. For concrete streets less than two (2) years old, effective June 1, 2019, the entity must replace each whole slab with flowable fill, High Early Strength (HES) concrete according to City Specification 31 13 13 or better, and meet a 12-Moot 6 1 PagF, straightedge requirement with a maximum allowable deviation of '/4 inch. For asphalt streets less than two (2) years old, effective October 1, 2019, the entity must mill and overlay the existing asphalt a minimum of two (2) inches using a paving machine from curb to curb and block to block. Concrete Pavement: Effective June 1, 2019 2 years to 10 years or greater than 85 PCI Entire Panel More than 10 years and less than 85 PCI Entire Panel with some exceptions Partial panel replacement of concrete pavement more than ten (10) years old and less than 85 PCI, may be allowed, if the panel is larger than 20 feet. The partial panel replaced shall be equal to a half panel and the remaining half panel must be intact without any identifiable damage as shown in FIGURE 320129-DO20 PARTIAL PANEL CONCRETE REPLACEMENT. Asphalt Pavement: Effective October 1, 2019 2 to 10 years or greater than 85 PCI More than 10 years and less than 85 PCI Overlay half of pavement, curb to centerline, for 50 feet in length Overlay 1 lane width (approximately 12') for 30 feet in length If a street is scheduled for construction start within 6 months and programmed for total reconstruction under a Capital Improvement Program or resurfacing under a Street Maintenance Program, permanent trench repair is acceptable. 7. Other City Property: The permit holder is responsible for reimbursing the City for the cost of replacing any signal cabinet controllers, light and/or traffic signal poles, wiring or conduit, pavement markings, sprinkler systems, landscaping or any other City property, damaged during construction. 8. Emergency Utility Breaks and New Utility Service (Spot Repairs): Pavement surface restoration for concrete streets must follow guidelines in Item D6 above and applicable city standard specifications. All such repair of asphalt streets shall use the T- aut method to cut back and have a minimum rectangular size of 10 by 10 feet. Irregular shapes shall not be permitted. The four sides of the cut shall be neatly sawed without rough edges. The rectangular area will be extended to the edge of the gutter as needed to avoid a cut surface within five (5) feet of edge of the gutter. Any remaining asphalt pavement between spot repairs must be a minimum of ten (10) feet in all directions, see FIGURE 320117-DO21 PARTIAL ASPHALT REPLACEMENT. All emergency temporary repairs will be constructed to permanent base and pavement repair within 14 calendar 7 1 P a g e days and mill and overlay within 60 calendar days of permit issuance unless otherwise authorized by the Director. 9. Manholes, Vaults, and Valve Boxes: For new construction or total reconstruction of the roadway, manholes and vaults in the street pavement must be located mid -lane between the tire path and be flush with the pavement. Valve boxes must be flush with the pavement. 10. Splice Pits: Construction shall be scheduled in such a manner that all splice pits shall be backfilled within ten (10) working days unless otherwise authorized by the Director. 11. Inspection: All trench repair and pavement restoration must be in accordance with the City of Fork Worth Standard Specification. All work shall be subject to inspection by Transportation and Public Works personnel. E. Project Completion Red -line drawings/field notes must be furnished 30 calendar days after completion of each construction segment. Record ("as -built") Drawings must be provided within 30 calendar days after time of final completion of the project. Submissions shall be provided in portable document format (PDF). F. Drawings FIGURE 320117-D520 TRENCH REPAIR HMAC PAVEMENT FIGURE 320129-D521 TRENCH REPAIR REINFORCED CONCRETE PAVEMENT FIGURE 321416-D522 TYPICAL BRICK SURFACE & REINFORCED CONCRETE BASE FIGURE D018 STEEL PLATE PLACEMENT FOR TRENCH REPAIRS FIGURE D019 UTILITY REPAIR DESIGNATION SIGN FIGURE 320129-DO20 PARTIAL PANEL CONCRETE REPLACEMENT FIGURE 320117-DO21 PARTIAL ASPHALT REPLACEMENT 8 1 P a g e X m 0 O m Z m 0 C> 2 Dmo n 'D C i r- X --I M M n M>o O 1 n � -� w n� = z z n o m y m m z O C z r N p N m � Z w A M cc m C] Gi _ m m m Z m n� N D 0 D A-0 O 4zl y m m z o D cn I D COcn mi a:m i o c � co D m X n (n m u� o X n m m x v r n r m r to Q° cn ➢ G) z �G) cz ;u C; m CAM w •` ti• 0 .•f •y O %': G v ?. K O -r m m r z n O n ua > z n D z r tmn w r o y z _ r z m v o X sv D v X fn •° n O cn -o m O m !i7 A CO CO O m c d z 0 ; m -4 O r w cn cu o r > v D cn z o Gzi m r r rr. D rr- :t ry` .l •rF> • S Y. ;u o m s r 1 QO cz m [) ;uc 00 r► m m n D n O _ m:J r r Ou O p m m z z GO p m wv,n O 9 o (n --I C T z -4 � C� -i y% o oz0pa W T (7 D m= Cl)m .II z;.:: .'....�, zmo �n ¢ U) m o v D N N —n D lit . y •:r. v1 m � z n [� Z r m zr� 0 m o o z •n � � � c • o � '.r. • :;•: m r -A ;u mm urntnao -z ° >rnW0 s: m0m zU)x -n0M iA CO 0CUra on aar m •►": :: z o UlC]D �zr - fn mi" Tm az o �'' .: m > > M: czi .. ti, z D I ZMw rn Z n� m z z �u m w ooCA a -upmC„ mmf7r� m y m`em�cn Oam Ng Ufa iiy= DWowW 0-nm -imW i0a' .� .�• � ,�m 4rM mn -ZEzy�_ rn� 0 rn.� maz �An� m zn-�; �Ww Ngn�n mco°'_ CJr-mo -um rOm 'cf. ��• m; z -A0 Z7 z [�T{ X >iz 0rn D � K z -m�1�_'n0 -I �R U] ('y z i j �: .•, •,`w. ,. Z m 1 U) U7 p� Z mA OOz0� iM F9 c—N mZ`4 ;u 3: c'��DO Dm� U'mmal oz v�> ..• n �j OOOD� C A� cw0 mnz m Xcn UDC) 2 D -rpm 0Z;d `.:. r .•. `•. m m w Iil�� m Om0 �fl��n rz0Om CO_m m m N C ��vx- �'a�i0"� COq mm m— m s .... O m m r- zz 0 mom -< -n za >oc ooDm CD p � WN Dm h2 ��v� mm m � 's • . . O o m n .:- N 1 N � • a [[TTii SM � G Z 70 C m W m n c> n � � r z O 0 o o �Z m 0 � Ci "m5�� DZ MmEvZ- -A m o�,M02 m U) C rn�+-nN oy o� ion z a% -i Iz5 .0 m oo c� �w 17 von =r qw U'D D''' Fz 0 M �X mm �•, m m p m cnmG7 D Q m ow 0-;Uom m:•• n m D to COY onni o �m o�o'.0 C) @ o"� m U al m Aa "' m� 0 :U o 0 z � Z m <. zCl) Z y �m T- o r Z •n r rn •lA ,.a m0 �o 17 ono _II•,; '-� z .. 5m =11 ' n 0 m co —1 s O m � z M TI Z o � :L „ o # COsnm M D m -u 4= = •Zn D o n„ mZ-4¢+ m �J momD m mom [i0 Dp nim�� vA rn�ovx-- o-nmYp ap C7;u r mrnma3 --i mmvl aWm{` D m c7 navy �� o 002 >D W> '• m 0 co mp Dv�z Dry -=Y� zyom ' CI] C%:U zym -i oy �cmn . O C —� -i X- x o r• ..t. 0 7C T7 Z�M + y iiy °'o acmim x ,� r'90 C2 pC no �c�c� F:ca 03 A r>c D ono mnn N m omm -zi �pn �pX C. cu _ m r Xz i S ar R°m N N m G� N o � m ;u m Q O ƒ o=mom 'd2 dam 7 §k���� `20 §jgo ��� x £zm£� \ §m4 )U, m 0 ro w m zmFm ]�®S� yew ;p ((77�/ °I¥m§§ Mm3 > \ �m 0 M §�j m E- �§- . . m / q 7ƒ m � 2 � 2 � ` \2� §b ( �w /} \ C) A �_® I �m - � ƒ �0 m � � o m\ / // � � w � n / J ® >m 2 \ ? $ �k 2 {x��� /� //� � j§ 2 % \ 00 q j \§E \ /\ - - a;u m\ C\ b/ . X m n O m 2' m z a m a 2.25" -u C m� C CD' 1.51.1 `,° to rn M m 1 0 0 0 -- z Z A M M z z > c z K - > m M m m n� o� o cn0 D z D � m a C CO Uf d O 67 O i N O_ f0 w m 0 O M z O m a o z � ° � D M m o < ro —1 m —1 m -0 y � � v y m co n r y Iv in ((D � O -n m f�Tl � m o v z � r z IV ffi G) N Z M m �uzz o zD vn� o �' C) o � z � � 0 0 O �, :M ZMZ z rn M N ;u O s N N tp O •• , o N 0 N 0 APPENDIX GC-4.01 Availability of Lands: None GC-4.02 Subsurface and Physical Conditions: Exploratory Excavation Sheets, Street Coring Report GC-4.04 Underground Facilities: None GC-4.06 Hazardous Environmental Condition at Site: None GC-6.06.D Minority and Women Owned Business Enterprise Compliance: MBE Special Instructions for Offerors MBE Subcontractors/Suppliers Utilization Form MBE Prime Contractor Waiver Form MBE Good Faith Effort Form MBE Joint Venture Eligibility Form GC-6.07 Wage Rates: Wage Rate Table GC-6.09 Permits and Utilities: None GC-6.24 Nondiscrimination: None GR-01 60 00 Product Requirements: Standard Product List CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT ➢2) Revised March 9, 2020 City Project No. 102169 GCa4m02 Subsurface and Physical Conditions THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTTON SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2019, WSM-B (LEAD SERVICES REPLACEMENT D2) Revised May 11, 2020 Cily Project No. 102169 tORT WORTH. '114 - Project: 2019 WSM-B CPN# 102169 Date Tested: 4/28/2020 -- 4/29/2020 Requested by: Pratima Poudyal %-Ity Ui r Uri rr uriii Capital Delivery Division/Soil Lab 8851 Camp Bowie Blvd #300 Fort Worth, TX 76116 Laboratory Test Results for A Street Coring Project 5/11/2020 Phone: 817-392-7920 This report presents the results of a street coring project for 2019 WSM-B. Mr. Stephen Overton performed the cores and subgrade lab tests. Mr. Zelalem Arega reviewed and approved the results. (llemphill to fDt,nd end) HOLE # 1 LOCATION: 517 Malta Ave (S/4) 2.50" HMAC 9.50" Brown Sandy Clay w/Gravel (Cement Treated Base) ATTERBURG LIMITS: HOLE # 2 LOCATION: 120'E of Hemphill St (N/4) 2.25" HMAC 7.50" Brown Sandy Clay w/Gavel (Cement Treated Base) 3.00" Brown Clay 4.00" Brownish Grey Clay w/ Gravel ATTERBURG LIMITS: LL: 42.80 PL: 23.49 PI: 19.80 SHRKG: 10% Flint St 01WIM St to 1)elld end HOLE # 3 LOCATION: 515 Flint St. (N/4) 2.00" HMAC 8.00" Light Brown Sandy Clay w/Gravel (Cement Treated Base) 3.50" Light Brown Clayey Sand w/GraveI 3.00" Brownish Gray Clay w/Gravel ATTERBURG LIMITS: LL: 41.80 PL:16.10 PI: 25.70 SHRKG: 12% Parry 1 n F 2 tORT WORTH. *—ILy 01 rurL vrurt1i Capital Delivery Division/Soil Lab 8851 Camp Bowie Blvd #300 Fort Worth, TX 76116 HOLE #4 LOCATION: 85' E of Hemphill St. (S/4) 2.00" HMAC 8.00" Light Brawn Sandy Clay w/Gravel (Cement Treated Base) 3.00" Brown Sandy Clay w/Gravel 3.00" Brownish Grey Clay Phone: 817-392-7920 Far7P 2 of 2 I�ORT-';,;Offho LILY Ul r Ul-L VV UI LLL TPW — Material & Geotechnical Services Phone: 817-392-7920 8851 Camp Bowie West Blvd Fort Worth, TX 76116 Laboratory Test Results for A Street Coring Project 8/6/19 Project: Wand SS Replacement Contract WSM-B (Lead Services Replacement D2). CPN# 102169 Date Tested: 6/14/19-7/01/19 Requested by: Tony Shohola This report presents the results of a street coring project for (W.and SS Replacement Contract WSM-B (Lead Services Replacement D2). Mr. Uday Bangale performed the cores, and subgrade lab tests. Mr. Zelalem Arega reviewed and approved the results. TOWNSEND DRIVE (Devitt .St to Biddisirrt St North) HOLE #1 LOCATION: 3205 Townsend Dr (E/4) 3.75" HMAC 6.25" Concrete (5024) PSI 6.00" Dark Grayish Brown Clay w/ Gravel ATTERBURG LIMITS: LL: 64.30 PL: 27.40 PI: 36.90 SHRKG: 19% HOLE #2 LOCATION: 3245 Townsend Dr (W/4) 3.50" HMAC 5.75" Concrete (3926) PSI 2.75" Dark Grayish Brown Clay w/Gravel 7.00" Grayish Brown Clay ATTERBURG LIMITS: LL: PL: PI: SHRKG: HOLE #3 LOCATION: 3317 Townsend Dr (E/4) 3.00" HMAC 6,75" Concrete (4837) PSI 6.75" Grayish Brown Clay w/Gravel ATTERBURG LIMITS: LL: 59.30 PL: 25.20 PI: 34.10 SHRKG: 18% PaaeIof7 tORT WORTH* q,* %-Ity Ul r"I-L VV UI LIl TPW —Material & Geotechnical Services 8851 Camp Bowie West Blvd Fort Worth, TX 76116 HOLE #4 LOCATION: 3408 Townsend Dr (W/4) 2.75" HMAC 6.25" Concrete (4596) PSI 6.50" Brownish Gray Clay ATTERBURG LIMITS: LL: PL: PI: SHRKG: HOLE #5 LOCATION: 3433 Townsend Dr (E/4) 3.00" HMAC 6.00" Concrete (4645) PSI 9.50" Brownish Gray Clay ATTERBURG LIMITS: LL: 63.60 PL: 26.90 PI: 36.70 SHRKG: 20% HOLE #6 LOCATION: 3456 Townsend Dr (W14) 2.00" HMAC 5.00" Concrete ( Broken not Testable) 5.00" Dark Grayish Brown Clay w/Gravel 5.00" Dark Grayish Brown Clay ATTERBURG LIMITS: LL: PL: PI: SHRKG: FLINT STRE- ET (Hernphlll St to College Ave) HOLE #7 LOCATION: 825 Flint St (S/4) 1.50" HMAC 5.75" Concrete (4162) PSI 9.25" Brownish Gray Clay ATTERBURG LIMITS: LL: 58.60 PL: 26.30 PI: 32.30 SHRKG: 20% Phone: 817-392-7920 Palle 2 of 7 WRT WORTHe 'k-ily Vl rill-L VYVI-tll TPW — Material & Geotechnical Services Phone: 817-392-7920 8851 Camp Bowie West Blvd Fort Worth, TX 76116 HOLE #8 LOCATION: 800 Flint St (N/4) 2.75" HMAC 5.50" Concrete (4915) PSI 9.75" Brownish Gray Clay ATTERBURG LIMITS: LL: 40.30 PL: 18.20 PI: 22.10 SHRKG: 14% HOLE #9 LOCATION : 70' W of Hemphill St (S/4) 1.00" HMAC 5.75" Concrete (6776) PSI 5.25" Brownish Gray Clay 7.00" Grayish Brown Clay ATTERBURG LIMITS: LL: PL: PI: SHRKG: NIALTA AVENUE ( Iemphill St to College Ave) HOLE #10 LOCATION: Malta Ave (N/4 ) 5.00" HMAC 4.00" Concrete (3633 ) PSI 3.00" Asphalt Core 8.00" Dark Gray Clay ATTERBURG LIMITS: LL: 66.00 PL: 28.30 PI: 37.70 SHRKG: 20% HOLE #11 LOCATION: 801 Malta Ave St (S/4) 2.00" HMAC 5.75" Concrete (3713) PSI 4.75" Pale Yellowish Brown Sandy Clay w/ Gravel 5.50" Pale Brown Clay ATERBURG LIMITS: LL: 33.30 PL: 16.60 PI: 16.70 SHRKG: 8% Pane 3 of 7 T 'NORTH® �.ui r v Ge TPW — & Material Geotechnical Services Phone: 817-392-7920 8851 Camp Bowie West Blvd Fort Worth, TX 76116 HOLE #12 LOCATION: 900 Malta Ave (N/4) 10.50" HMAC 10.00" Brownish Gray Clay w/ Gravel ATERBURG LIMITS: LL: PL: PI: SHRKG: 5 Tfl AVENUE ( W. Nutler 'SI to W, Dickson St) HOLE #13 LOCATION: 55' N of Dickson St (E/4) 7.50" HMAC 4.25" Loose Gravel ATTERBURG LIMITS: LL: PL: PI: SHRKG: HOLE #14 LOCATION: 3700 5ThAve (W/4) 7.50" HMAC 4.50" Grayish Brown Sandy Clay w/ Gravel 8.00" Brownish Gray Clay w/ Gravel & Stone ATTERBURG LIMITS: LL: 46.90 PL: 21.70 PI: 25.20 SHRKG: 15% WOODLAND AVENUE ( College Ave to S. Henderson ;fit � HOLE #15 LOCATION: 1.002 Woodland Ave (N/4) 2.25" HMAC 4.25" Concrete (Broken not testable) 5.00" Dark Brownish Gray Clay w/ Gravel 7.50" Brownish Gray Clay ATTERBURG LIMITS: LL: 63.80 PL: 24,60 PI: 39.20 SHRKG: 19% Paae 4 of 7 roar WORTHO. Pity ui rui t vvur to TPW — Material & Geotechnical Services Phone: 917-392-7920 8851 Camp Bowie West Blvd Fort Worth, TX 76116 HOLE #16 LOCATION: 1105 Woodland Ave (S/4) 2.25" HMAC 5.50" Concrete (5239) PSI 11.75" Brownish Gray Clay ATTERBURG LIMITS: LL: PL: PI: SHRKG: WAYSIDE AVENUE (W. Butler S1 lip W. i)ickon SI) HOLE #17 LOCATION: 3710 Wayside Ave (W/4) 0.50" HMAC 9.50" Brownish Gray sandy Clay wl Gravel 5.50" Brownish Gray Clay w/ Gravel & Stone ATTERBURG LIMITS: LL: PL: PI: SHRKG: HOLE #18 LOCATION: 3729 Wayside Ave (E/4) 0.50" HMAC 8.00" Gravel w/ Brown Sandy Clay & Stone 7.50" Brownish Gray Clay w/ Gravel & Stone ATTERBURG LIMITS: LL: 40.50 PL: 18.50 PI: 22.00 SHRKG: 12% W. DREW STREET Hemphill St to 6I'll Ave HOLE #19 LOCATION: 707 W. Drew St (N/4) 3.00" HMAC 6.00" Brown Sandy Clay w/ Gravel & Stone 9.00" Brownish Gray Clay w/ Gravel ATTERBURG LIMITS. LL: 57.80 PL: 25.10 PI: 32.70 SHRKG: 20% Paize 5 of 7 tORT WORTHt TPW —Material & Geotechnical Services Phone: $17-392-7920 8851 Camp Bowie West Blvd Fort Worth, TX 76116 HOLE 420 LOCATION: 805 W. Drew St (S/4) 1.75" HMAC 5.75" Concrete (5798 ) PSI 2.00" Brownish Gray Clay 7.00" Pale Brown Clay ATTERBURG LIMITS: LL: PL: PI: SHRKG: HOLE #21 LOCATION: 900 W. Drew St (N/4) 2.50" HMAC 6.00" Concrete (5326) PSI 8.00" Brownish Gray Clay w/ Gravel ATTERBURG LIMITS: LL: 44.10 PL: 17.60 PI: 26.50 SHRKG: 14% HOLE 422 LOCATION: 1017 W. Drew St (S/4) 2.00" HMAC 5.75" Concrete (4139) PSI 4.25" Brownish Gray Clay w/ Stone 8.50" Pale Brown Clay ATTERBURG LIMITS: LL: PL: PI: SHRKG: HOLE 423 LOCATION: 1112 W. Drew St (N/4) 1.50" HMAC 1.00" Loose Gravel w/ Pale Brown Sand 5.75" Concrete (6199) PSI 4.75" Dark Brownish Gray Clay 6.00" Brownish Gray Clay ATTERBURG LIMIT • LL: PL: PI: SHRKG: HOLE #24 _ LOCATION: 1205 W. Drew St (S/4) 2.50" HMAC 5.00" Concrete (6705) PSI 5.50" Brownish Gray Clay 6.50" Gray Clay ATTERBURG LIMITS: LL- 65.90 PLO 26.20 PU2.7.0__SHRKG: 22% Page 6of7 t J� WORTH_ @ TP - rt t l ultll W —Material & Geotechnical Services Phone: 817-392-7920 8851 Camp Bowie West Blvd Fort Worth, TX 76116 HOLE #25 LOCATION: 1220 W. Drew St (N/4) 2.50" HMAC 5.00" Concrete (5655) PSI 2.00" Grayish Brown Clay 7.50" Brownish Gray Clay ATTERBURG LIMITS: LL: PL: PI: SHRKG: HOLE # 26 LOCATION: 1321 W. Drew St (S/4) 2.25" HMAC 6.00" Concrete (5775) PSI 2.75" Grayish Brown Clay 6.00" Pale Brown Clay ATTERBURG LIMITS: LL: 49.90 PL. 19.80 PI: 30.10 SHRKG: 17% Paize 7 of 7 %'ffC-6.06®D Minority and Women Owned Business Enterprise Compliance THIS PAGE FEET INTENTIONALILY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS RFPI.ACF.MFNT CONTRACT 200, WSM-D (LEAD SERVICE REPLACEMENT 62) City Pmjea Na. t02169 FORT O IRT Ht TEMPORARY REVISION 4/6/2020 (COVIII-19) - - City Of Fort forth Minority Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR OFFERORS APPLICATION OF POLICY If the total dollar value of the contract is $50,000.01 or more, then a MBE subcontracting goal is applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance applies to this bid. The City's MBE goal on this project is 133 MBE PROJECT COALS % of the base bid value of the contract. Note: If both MBE and SBE subcontracting goals are established for this project, then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. COMPLIANCE TO BID SPECIFICATIONS On City contracts $50,000.01 or more where a MBE subcontracting goal is applied, Offerors are required to comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the following: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or; 3. Good Faith Effort documentation, or; 4. Prime Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the by the assigned City of Fort Worth Project Manager or Department Designee, within the following times allocated, in order for the entire bid to be considered responsive to the sperlFicadofls, The Oiiero: shall EMAIL the MBE dcr.urnerilatirin 141 the asslgriati City of For Worth Piajecl M1Manaper or Departrrkent DosJgnoe_ A faxed copy will not be accepted. 1. Subcontractor Utilization Form, if goal is received no later than 2:00 p.m., on the second City business day met or exceeded: after the bid opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received no later than 2:00 p.m., on the second City business day Utilization Form, if participation is less than after the bid opening date, exclusive of the bid opening date. statedgoal: 3. Good Faith Effort and Subcontractor received no later than 2:00 p.m., on the second City business day Utilization Form, if no MBE participation: after the bid opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received no later than 2:00 p.m., on the second City business day perform all subcontracting/supplier work: after the bid opening date, exclusive of the bid opening date. 5. Joint Venture Form, if goal is met or received no later than 2:00 p.m., on the second City business day exceeded: after the bid opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISF ORDINANCE. WILL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE TO SPECIFICATIONS. FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE. A SECOND FAILURE WILL RESULT IN THE OFFEROR BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR. THREE FAILURES IN A FIVE YEAR PERIOD WILL RESULT IN A DISQUALIFICATION PERIOD OF THREE YEARS. Any questions, please contact the Office of Business Diversity at (317) 392-2674. Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Rev.4/6/2020 Phone: (817) 392-2674 ATTACHMENT 1A Page 1 of 4 City of Fort forth Office of Business Diversity MBE Subcontractors/Suppliers Utilization Form OFFEROR COMPANY NAME: Check applicable box to describe Offeroes Certification NON-MNVIDBE. PROJECT NAME: ry p Water and Sanitary Sewer Replacement Contract 2019, WSM-B (Lead Services Replacement De' BID DATE City's MBE Project Goal: 13 % Offeror' s MBE Project Commitment: % PROJECT NUMBER Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Purchasing Division ro later than :tag p.m. on the second City business day after l;ld opening, exclusive of bid opening date, yvill result in the bid being considered non-responsK-e to Ud specifications. The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) listed in this utilization schedule, conditioned upon execution of a ro tract with the City of Fork Worth. The intentional and/or knowing -presentation of facts is grounds for cons idera+; .n of diYpualifrratiYn and will result In the bid being considered non -responsive to bid specifications. MBEs listed toward meeting the project goal must be located in the six (6) county marketplace at the time of bid or the business has a Significant Business Presence in the Marketplace. Marketplace is the geographic area of Tarrant, Dallas, Denton, Johnson, Parker, and Wise counties. Prime contractors must identify by tier level of all subcantractors/suppliers. Tier: means the level of subcontracting below the prime contractor/consultant I.e. a direct payment from the prime n'tractor to a subcontractor is considered I s` tier, a payment by a subcontractor to its supplier is considered 2ncl tier, The prime contractor is responsible to provide proof of payment of all tiered subcontractors ir_i?ntified as a MBE and counting those dollars towards meeiing the contract committed goal. ALL. IVIBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located within the Marketplace, that have been determined to be a bonafide minority business enterprise by the North Central Texas Regional Certification Agency (NCTRCA) and the Dallas/Fort Worth Minority Supplier Development Council (D/FW MSDC). If hauling services are utilized, the Offeror vvlll 'be given credit as long as the !!CBE listed owns and operates at least one fully licensed and operatio^al truck to be used on tfte contract. The MBE may lease trucks frorn another MBE firm, including MBE owner -operated, and receive full MBE credit. The MBE may lease trucks from non -MBEs, Including owner -operated, but will only receive credit for the fees and commissions earned by the MBE as outlined in the lease agreement_ Rev. 2113119 VORTWORTH ATTACHMENT 1A Page 2 of 4 Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., knority and nofl-M13rs. MBE firms are to be listed first, use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal. SUBCONTRACTORISUPPLIER Company Name Address Telephone/Fax Email Contact Person T i e r M B E W B E N o n M $ E Detail Subcontracting Work Detail Supplies Purchased Dollar Amount l� El F-1 1:1 El Rev. 5115/19 Faru�rs� ATTACHMENT 9A Page 3 of 4 Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., l Inarity and non -MBE - MBE firms are to be listed first, use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal. SUBCONTRACTOR/SUPPLIER Company Name Address Telephone/Fax Email Contact Person T i e r M B E W IS E N ° n M B E Detail Subcontracting Work Detail Supplies Purchased DallarAmount 1:1 El El 1:1 El 1:1 Rev. 5115/19 FORT WORTH ATTACHMENT IA Page 4 of 4 Total Dollar Amount of MBE Subcontractors/Suppliers Total Dollar Amount of Non -MBE Subcontractors/Suppliers 1 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORSISUPPLIERS 1 The Offeror will not make additions, deletions, or substitutions to this certified list without the prior approval of the Office of Business Diversity through the submittal of a Request for Approval of OhangelAddition form. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The Offeror shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed MBE goal. If the detail explanation isi not submitted, it will affect the final compliance determination. i By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and any special arrangements with MBEs. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The Offeror agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the MBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of the contract and may result in a determination of an irresponsible Offeror and debarment from participating in City work for a period of time not less than one (1) year. Authorized Signature Title Company Name Address City/State/Zip Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Phone: (817) 392-2674 Printed Signature Contact Name/Title (if different) Telephone and/or Fax E-mail Address Date Rev. 5/15119 ATTACHMENT 1 B Page 1 of 1 City of Fort Worth Minority Business Enterprise Specifications Prime Contractor !Waiver Form OFFEROR COMPANY NAME: Check applicable box to describe Offeror's Certification - PROJECT NAME: Water and Sanitary Sewer Replacement Contract 2019, WSM-B (Lead Services Replacement D2) BID DATE City's MBE Project Goal: Offeror's MBE Project Commitment: % PROJECT NUMBER 102169 If both answers to this form are YES, do not complete ATTACHMENT 1C (Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1 C. This form is only applicable if bAth answers are yes. Failure to complete this form In its entirety and be received by the Purchasing DIVIaion no. later than 2,00 a.m., on the second City business day after bid otkeninili exclusive of the bid opening date, will result in the bid being considered non -(responsive to bid speclfications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an operational profile of your business. NO Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) on this contract, the payment thereof and any proposed changes to the original MBE(s) arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract and may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. Authorized Signature Title Company Name Address Printed Signature Contact Name (if different) Phone Number Fax Number Email Address City/State/Zip Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Phone: (817) 392-2674 Date Rev. 5115119 ATTACHMENT 1C Page 1 of 4 1 QRT NA10.1RTH City ®f Fort Worth Minority Business Enterprise MBE Good Faith Effort Form OFFEROR COMPANY NAME: i Check applicable box to describe Offerors Certification PROJECT NAME: Water and Sanitary Sewer Replacement Contract 2019, WSM-B (Lead Services Replacement D2) BID DATE City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER % I AID If the Offeror did not meet or exceed the ABBE subcontracting goal for this project, the Offeror must complete this form. If the Offeror's method of compliance with the MBE goal is based upon demonstration of a "good faith effort", the Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 11 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Offeror. Failure to complete this form, in its entirety with supporting documentation, and received by the Purchasing Division no later than 2:00 p.m. on the second City is uslness dai after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. mi 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a MBE or non -MBE. (DO NOT LIST NAMES OF FIRMS) On all projects, the Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets, if necessary) I List of Subcontracting Opportunities I List of Supplier Opportunities Rev. 5/15119 ATTACHMENT 1C Page 2 of 4 2.) Obtain a current (not more than two (2) months old from the bid open date) list of MBE subcontractors and/or suppliers from the City's Office of Business Diversity. ❑ Yes Date of Listing ❑ No 3.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? ❑ Yes (If yes, attach MBE mail listing to include name of firm and address and a dated copy of letter mailed.) ❑ No 4.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? ❑ Yes (If yes, attach list to include name of MBE firm, ep rson contacted, phone number and date and time of contact.) ❑ No 5.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by facsimile (fax), exclusive of the day the bids are opened? ❑ Yes (If yes, attach list to include name of MBE firm, fax number and date and time of contact. In addition, if the fax is returned as undeliverable, then that "undeliverable confirmation" received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation andfor "undeliverable confirmation" ❑ NO documentation may render the GFE non -responsive.) 6.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? ❑ Yes (If yes, attach email confirmation to include name of MBE firm, date and time. In addition, if an email is returned as undeliverable, then that "undeliverable message" receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or "undeliverable message" documentation may render the G F E non -responsive.) ❑ No NOTE: The four methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Offeror must document that +either at least two attempts were i::ade using two of the Four rnethods or that at least one successful contact as made using one of the four methods in order to deemed responsive to the Good Faith Effort requirement. NOTE= The Otferor mus! contact Vie entire MSE list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 thru fa. ZP 7.) Did you provide plans and specifications to potential MBEs? ❑ Yes ❑ No 13.) Did you provide the information regarding the location of plans and specifications in order to assist the MBEs? ❑ Yes ❑ No Rev. 5115119 ATTACHMENT 1C Page 3 of 4 9.) Did you prepare a quotation for the MBEs to bid on goods/services specific to their skill set? ❑ Yes (If yes, attach all copies of quotations.) ❑ No 10.) Was the contact information on any of the listings not valid? (If yes, attach the information that was not valid in order for the Office of Business Diversity to address ❑ Yes the corrections needed.) ❑ No 11.)Submit documentation if MBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting documentation the Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Offeror will provide for confidential in -camera access to an inspection of any relevant documentation by City personnel. Please use additional sheets, if necessa , and attach.) Company Name Telephone Contact Person Scope of Work Reason for Rejection ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain MBE participation on this project. The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance shall create a material breach of contract and may result in a determination of an irresponsible Offeror and debarment from participating in City work for a period of time not less than one (1) year. Rev. 5115/19 ATTACHMENT 1C Page 4of4 The undersigned certifies that the information provided and the IVIBE(s) listed was/were contacted in good faith. It is understood that any IVIBE(s) listed in Attachment 'IC will be contacted and the reasons for not using them will be verified by the City's Office of Business Diversity. Authorized Signature Title Company Name Address CitylStatelZip Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Phone: (817) 392-2674 Printed Signature Contact Name and Title (if different) Phone Number Fax Number Email Address Date Rev. 5115/19 Joint Venture Page 1 of 3 FORT WORTH CITY OF FORT WORTH MBE Joint Venture Eligibility Form All questions must be answered, use "NIA "if not appheable. Naive of City project: Water and Sanitary Sewer Replacement Contract 2019, WSM-B (Lead Services Replacement D2) A joint venture form must be completed on each project RF.P/Sid/Project Number: 102169 1. Joint venture information: Joint Venture Name: Joint Venture Address: (If applicable) Telephone: Facsimile: E-mail Cellular: Identify the firms that comprise the joint venture: Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the joint venture MBE firm name: Non -MBE firm name: ~ Business Address: Business Address: City, State, Tip: City, State, Zip: Telephone E-mail Telephone E-mail Cellular Facsimile Cellular Facsimile Certification Status: I Name of Certifying Agency: 2. Scope of work performed by the Joint Venture: Describe the scope of work of the MBE: Describe the scope of work of the non -MBE: Rev. 5115i19 Joint Venture Page 2 of 3 3. What is the percentage of MBE participation on this joint venture that you wish to be counted toward meeting the project goal? 4. Attach a copy of the joint venture agreement. 5. List components of ownership of joint venture: (Do not complete if this information is described in joint venture agree ment) Profit and loss sharing: Capital contributions, including equipment: Other applicable ownership interests: 6. identify by name, race, sex and firm those individuals (with titles) who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating ------------------------------------------------------------- b. Marketing and Sales ------------------------------------------------------------- c. Hiring and Firing of management personnel ------------------------------------------------------------- d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Office of Business Diversity will review your joint venture submission and will have final approval of the MBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's Office of Business Diversity immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's BDE Ordinance. Rev. 5t15119 Joint Venture Page 3 of AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision -making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misre resentation of facts. Name of MBE firm Name of non -MBE firm Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Printed Name of Owner Printed Name of Owner Signature of Owner Signature orowner Title Title Date Date State of Notarization County of On this day of 120 , before me appeared and to me personally known and who, being duty sworn, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public Signature Commission Expires Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Phone: (817) 392-2674 feeat) Rev. 5/15119 GC®6m07 Wage Rates THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT NORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS RRPLACRMF.NT CONTRACT 2019, WSM-R (LEAD SERVICES REPLACEMENT D2) Revised July I, 2011 Cily Pmjecl No. 102169 2013 PREVAILING WAGE RATES (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher, Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 Crane Operator, Hydraulic 80 tons or less $ 18.12 Crane Operator, Lattice Boom 80 Tons or Less $ 17.27 Crane Operator, Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator, 50,000 pounds or less $ 17.19 Excavator Operator, Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter, Structures $ 13.84 Form Setter, Paving & Curb $ 13.16 Foundation Drill Operator, Crawler Mounted $ 17.99 Foundation Drill Operator, Truck Mounted $ 21.07 Front End Loader Operator, 3 CY or Less $ 13.69 Front End Loader Operator, Over 3 CY $ 14.72 Laborer, Common $ 10.72 Laborer, Utility $ 12.32 Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 Motor Grader Operator, Fine Grade $ 17.19 Motor Grader Operator, Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator, Asphalt $ 13.08 Roller Operator, Other $ 11.51 Scraper Operator $ 12.96 Servicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy -Float $ 16.24 Truck Driver Transit -Mix $ 14.14 Truck Driver, Single Axle $ 12.31 Truck Driver, Single or Tandem Axle Dump Truck $ 12.62 Truck Driver, Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis -Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions for the classifications listed are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway, Heavy, Utilities, and Industrial Construction in Texas. Page 1 of 1 GR®®I 60 ®® Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY S E W ER STANDARD CONSTRUCTION SPF,CIFICATION t)OCUMF.NTS REPLACEMENT CONTRACT 2019, WSM-13 (LEAD SERVICES REPLACEMENT D2) Revised April 12, 2019 City Pmjeel No. 102169 o RT WORTH,.. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: April 12, 2019 The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water Department's Standard Products List. Table ®f Content (Click on items to go directly to the page) Items A. Water & Sewer Page 1. Manholes & Bases/Components........................................................... 1 2. Manholes & Bases/Fiberglass............................................................... 2 3. Manholes & Bases/Frames & Covers/Rectangular ............................... 3 4. Manholes & Bases/Frames & Covers/Round....................................... 4 5. Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight .. 5 6. Manholes & Bases/Precast Concrete .................................................... 6 7. Manholes & Bases/Rehab Systems/Cementitious................................ 7 8. Manholes & Bases/Rehab Systems/NonCementitious ......................... 8 9. Manhole Insert (Field Operations Use Only) ........................................ 9 10. Pipe Casing Spacer............................................................................... 10 11. Pipes/Ductile Iron................................................................................. l I 12. Utility Line Marker............................................................................... 12 B. Sewer 13. Coatings/Epoxy..................................................................................... 13 14. Coatings/Polyurethane.......................................................................... 14 15. Combination Air Valves....................................................................... 15 16. Pipes/Concrete...................................................................................... 16 17. Pipe Enlargement System (Method) ..................................................... 17 18. Pipes/Fiberglass Reinforced Pipe ......................................................... 18 19. Pipes/HDPE.......................................................................................... 19 20. Pipes/PVC (Pressure Sewer)................................................................. 20 21. Pipes/PVC*................................................................................•.......... 21 22. Pipes/Rehab/CIPP................................................................................. 22 23. Pipes/Rehab/Fold & Form.................................................................... 23 24. Pipes/Open Profile Large Diameter...................................................... 24 C. Water 25. Appurtenances ................................................................................... 25 26. BoIts, Nuts, and Gaskets....................................................................... 26 27. Combination Air Release Valve........................................................... 27 28. Dry Barrel Fire Hydrants...................................................................... 28 29. Meters................................................................................................... 29 30. Pipes/PVC (Pressure Water)................................................................. 30 31. Pipes/Valves & Fittings/Ductile Iron Fittings ....................................... 31 32. Pipes/Valves & Fittings/Resilient Seated Gate Valve .......................... 32 33. Pipes/Valves & Fittings/Rubber Seated Butterfly Valve ...................... 33 34. Polyethylene Encasement..................................................................... 34 35. Sampling Stations................................................................................. 35 M N MW Im W N W, w p w w •..� w w w w w �� w w �� w w w w ;�j r� Z O C C D O C C C O O O O t5 s n rs � ri an n ° n 0 n 0 n 0 n 0 n 0 n 0 n 0 n 0 n 0 n 0 n 0 n 0 n 0° n n n 0 n 0 n n C y < O G G N < n < n < < C < z C z < z < C 0 < fo C C Z n c 6 IZ' ° n r eS W ws (/1 m m Ln L2 N N N IZG G � � n m � x ° W N 9 � � ONO t°i � � 'T1 � '.� =' �' x � '� G Z iy �] r-" •N� 41 N S ° D d O R n a s a s I v' •-3 '-I '-I y 00 00 g p �a p p as p W W W N Ll W. W. n 0 rn rt C 3 O A S rD N IL O a z m 3 rt § ) § � \ C M \ E k \ \ W �c 4 1� U c R W N a O A N p O n 110 10 �c 0 0 x m c D 7 m m m 0 h 0 m z rt i t r m c r- v 0. O A N O \D F+ V n n 0 z ro .y v �c n F In ;O N iA m W W W W W 1 J O F O O O O O O O G C O O O O O O O y1y `V C< c C C G< C G<<< G C C C C] C] C] C] C] C7 C] C) f] ['1 f i t7 t7 C] f] ro ro ro ro o ro m m m m m m m `D + C � r 'v [ t 4x J i 1 I f J y y w w m 5" -3 5 ^3 G A a a W 3 a W N N � f b G _ IJ � I � J- r a a y � H H Y rt a Y A � a » � � a � O A � lU A A A +• A w x • A x x x A A _ C .- O x ' C 2.1- 21, C T io N N w bq �1 0 0. w 0 P. O N O u N W n n O V T N IJ IJ N O �l �1 N IJ JO w w w o. w w w w w w w w rJ N N N N IJ G IJ O N G N G N G IJ G N O N O [ 1 n n o a a a a a n n n n n n n 0 o d V) w rn rn W to — `-' F rn CA CAD� V� a o 0 o c71, G P m PS �¢p {A i -�'1 y N N tD tD t0 — s�e R rt m a n. C w w w w' 1 i i i 7 C C 'z7 S z z NA Ou � O N n A & Z � .`x a za 4 " za 4 zD a a rC1D! �`a! a bozo c C rc I rn N A C C a N N A ,^,T O O O = O p A A to b �-q 110 ff-� N V O N N W W O W _ W n OL 'm ac ac � ry � m m m io in io OL .rt ly} r r1 � a r o Y i� z z z '� � � � ° N O � � ✓y C z o J N c o C A O � N N 'JAi V 'SC cz x A �^ o a C n N n N n o N n � N n 61 N n N n N n N n N n N r N L: 2 0 a_ w 0 rD rD U) Ls1 10 N in � \ \ \ n \ n \ { § § § ƒ 2 � 2 / \ 45- \ � \ / { ) \ � p Q. _ \ \ R 2�r)2eI /0> § \> ;: ;/ _ _&&none}) Q \ \ n DD ZD v J 'JT N_ O _ InDG ppG A A S_ w ii W W W W iW W W m 6N rn m O m O �^u_ O O 1 j C O 6 O 'O O _ k C C y G L C O O O P C C w ❑ O � O � �` O � O '^'1 � � m rya rho i i 51 a a ' F 'A n" .� m 'a v M pm i } i i 0 o rn R. a. O Lo ? c n g a O io m Cl m m N m z trl ;rl r o fl. o T� 7? o 4 N b b b s_ p o= N b m� r e a �� o n n oo p 6 r9 tlC r—p C a a a a a n >>9aa rt a>aanna a � y y n n_ n n y w w y w w w � N R a re v A w A _ A _ A _ N 'A _ _ a A _ A A _ A A - A N = A N A 0 A r 0? O O O N N O D ' A CT N 0 0 � N � N O a N � = I� � IJ N O N --• ln+ � Oo a a 6 A W O O O a N A o N w O ?- Im a" cr C m Q m w m L] c :] w C C C C C C C � w m w m w m C m C m C m C<< �o m C< C¢ m rn rn w m w m m m m m w w w m C �4 R R R R R (G R f9 f9 C O G'1 w C � Er ° C] c o 0 0 0 0 n ai 0 m n � T � N ^' O •� ^ �' G+ � �. � [n to � A � O C F• N A < a � a a > a a ag z > > > > > `a > > a> a> a a a>> n>> a a p U �h f y Ut U Ut Ln U 0 — N 67 O m A A �P fG A- S� [➢ _ - - V W N M �o W A