Loading...
HomeMy WebLinkAboutContract 45531 (2)DESIGN PROCUREMENT AGREEMENT FOR DESIGN SERVICES BASSWOOD BOULEVARD SECRETAIVI ONTRACT WHEREAS, DR Horton — Texas, Ltd., a Texas limited liability company, ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), each desire to make certain roadway and street improvements to Basswood Boulevard in the City of Fort Worth, Texas, from FM 156 to I-35W including related water, sewer, bridge and drainage improvements (the "Project") as further described on Attachment "A"; and WHEREAS, Developer is a company authorized to do business in Texas and is willing to advance the Project on an earlier schedule than it might otherwise have been implemented; and WHEREAS, Developer and City desire to enter into this Design Procurement Agreement ("Agreement") in order to accomplish the goals of the Parties; and WHEREAS, Developer will retain the services of Peloton Land Solutions, LLLP. ("PLS") to provide for the design of the Project; and WHEREAS, Staff has reviewed both the scope, fee, and schedule for the design of the Project and find there to be fair and reasonable; and WHEREAS, It is understood that this Agreement may be amended from time to time to accommodate expanded scope and cost participation; and WHEREAS, Construction of the Project may be accomplished in phases; and WHEREAS, City and Developer intend to execute a Community Facilities Agreement, or other similar agreement, that provides for the Developer to award and construct the Project and seek reimbursement from the City for construction costs and eligible construction expenses of the Project subject to the availability of funding and based on a public bid process. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. Project will generally consist of certain paving, streetscape, and drainage infrastructure improvements related to the construction of Basswood Boulevard from FM 156 to I-35W as further described on Attachment "B" here to. RECORD ©T SECREIMPOT Fir. WORTH, �� � : Basswood Boulevard DPA Page 1 B. Developer will retain Peloton Land Solutions, LLLP. as the "Engineer" for the Project pursuant to a written agreement approved by the City (the "Engineering Contract") attached as Attachment "C". C. City agrees to reimburse Developer for the City's share of the actual cost to design the Project, an estimated amount not to exceed $458,639.00 upon presentation of plans for the Project, including, as appropriate, engineering drawings, studies, renderings, contract specifications, estimates, and other documents, (collectively the "Work Product") necessary to construct the improvements contemplated by this Agreement. D. The Developer covenants and agrees to, and by these presents does hereby, indemnify and hold the city, its officers, agents and employees harmless against any and all suits, actions, or claims of any character, including, but not limited to, those for property damage or loss and/or personal injury including death, that may relate to, arise out of or be occasioned by (i) Developer's breach of any of the terms of this Agreement or (ii)any act or omission of Developer or any of its affiliates, their officers, agents, associates, employees, contractors or subcontractors, related to the Project, except that the indemnity provided for in this paragraph shall not apply to any liability resulting from the sole negligence of the City its officers, agents, employees, or separate contractors, and in the event of joint and concurrent negligence of both Developer and the City, responsibility, if any, shall be apportioned comparatively in accordance with the laws of the state of Texas. E. Developer agrees to require Engineer to, pursuant to Texas Local Government Code Section 271.904, indemnify, hold harmless, and defend the City against liability for any damage caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier committed by the Engineer or Engineer's agent, consultant under contract, or another entity over which the Engineer exercises control. F. Developer agrees that the Engineering Contract shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of Basswood Boulevard DPA Page 2 such contract. ACCORDINGLY, the City, through its Assistant City Manager, and Developer, through its authorized signatory, have each caused this instrument to be executed in multiple counterparts to be effective as of the date subscribed by the Assistant City Manager. DR Horton — Texas, Ltd. A Texas Limited Partnership By: D.R. Horton, Inc. A Delaware Corporation Its Authorized Agent r on Allen Assistant Secretary Date: 3/12/lY Recommended by: Trans `_ tation & Public Works Department L) • L) Douglas W Wiersig, P.E. Director Approved as to Form & Legality: afr Douglas W. Black Assistant City Attorney Basswood Boulevard DPA CITY OF FORT WORTH 5-sernamo&Ls. Fernando Costa Assistant City Manager Date: 4/ZZ//4' ATT _ T: ary J. Kay City Secreta y M&C No. C ' 2- 6 5-5- Date:l t- l Z a l 3 OFFICIAL RECORIO CITY SEE?) (MY FT. RTH, TX List of Attachments to this Agreement Attachment A — Concept Plan/Work Area Attachment B - Construction Cost Estimate Attachment C — Engineering Contract [Follows] Basswood Boulevard DPA Page 4 • K }G0.t 4IChLI .. 1 rt;L Ire�.��/�d l ce 111 Y .a u Iµ OPDOV T - HQOGE TYPICAL SEC !ION RASED SP3E SILle NDHSIRRER .um1‘11.5 p.,.a to 4 _v 4 . erler I e ICI ftr I erttr Lii(.1fpr:Y:1 F*4_ 1 art OPTIOV z• EIZL E TYPICAL SEC Mat 1R On 111 s RASED SSDEWALK 11 11 w„R. 7 3 4 3 4 1 33 5 72 3 21 7 7T 13 91`` 13 1hx 49 RES 1i- — 31 r • ._.la•• 1.15 LOX. 1 _2 I 9RM n IIC• ,Q 4.1105-1-1 BASSHOMBDLREVARO llflAL RDILINIIYSECTOI (Fin nxxat La,e b Rwrtlllatt 1C1 A 14.1 1.5140.e. Lea LIQ Ia of I t I Arefl 1 taE �.l,L lfl Va I Lail II JJ I_ J _ IIIII r__ r r — 115 113 J 1! I I 1 I I I I I I 1L_ I3 — =---� ��— 2 yr r—r T nr T IT r 1 I I 1 1 1 1 1 I F�j 13 1 2 S 1 �� 1' - I I I I I.I I I I I I I ' 1)O r�o T9 —r_rT w:1_1— — I I _ 4r mere S I T I N 19 1 IS I11 171 u 1 I I I I I I I I 14 3 14 I S I e l T I e 1 9 1 w 1 11 1 121 13 20 1 1 1 1 I 1 1 1 1 11____ i 1 I 1 I I I 1 1 I 24 1 v l ja l 21 1 n 1 11 113 117 I 11 I u l 14 I J 1 1 1 1 t 1 1 1 Is T" (—r T T—r - 1 -241: 3 1 0 I se .`r an•<1cr tom_ t BASSWOOD BOULEVARD —I- J to F4. MMM > 111 r1 3,II t _I .1.7 - 4— f Il '..se Y 1 1 ' Ubs.-. Da... 1\1 It tie ,\ ( 7i ( !s 1 ra tu + I 1 1N. • • • --- -- - -._.. io�iise-sip sin ann.; sancreassassawacaaaa- r.a Nan x.n era or 114* na i}x Y-a -F—.F f-_.•[— it 71 • S-• n-x t w s-s I 3 (it-4-1 .1 i 1 5 )1 3 I I. I O \ 7II j Z O I Ii 1 1 \ , n. I t 7 LI I \ - aj IS rsor-Nc sew - . 411trim. ra 0 • M N £ ,3SSWOUP LJLV4L M Attachment A Iair I O 0 0 LAMS lO%LCCU aJ d CURIE TILE moan Ia evun any ig anrt 1 0 snn I B a I m l nrn s.ra 1 ,,n Ian I E aw ran aaa vin earn 1 I 1 run* 1 IQ — *nK a,rit I ® .1<n 1.'erT a:ltrt L� xaan a yen l aC-4a x Vfl V tearaa a eRa-'�Nc a ;KAM naa 5.111.11 04E11 0 n —y' ., wiry' plan • war en aar n r VIA FT SFT mzlr an n rt I Ian 1 © tan ILIT 1-trw 1.9IT PRELT :'DIARY - FOR REVIEW ONLY These •lueaet n L DrCJ1 R_.11a Bed r-1---. - . br Carat. Barg a Pad P+rAst 11e, nand t1. aaversr a TRAYS D. CLEGG Tel 0 — { um at 13 xnrt a sn ay.n I © Haan 0 at=vi� :il1F cur . gal noun 1 rnr Illa s aF SINS I>R ` al1R ,Sv Isnrt n rare- sun 1 An PT 1 v<a wan 1 tvn ,ra ran Han nar nun US IT 1nr to rr as rr Mar — "7 Styr Err m9n 1 131111T 1 THE CITY OF FORT WORTH, TEXAS TRANSPORTATION & PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION EXHIBIT 1 PRELIMINARY DESIGN SCHEMATIC BASSWOOD BOULEVARD 45 MPH DESIGN SPEED LEGENT CI Y OF FORT WORTH VEMENT BY D.R.PRHORTON PAVEMENT BY TEMPORARY PAVEU9rt PROPOSED SIDEWALK PROPOSED ROW EXISTING ROiY DIRECTION OF TRAFFIC ROW IPI PELOTON II LAND S O L U T O H S 1n t kYltrEf M. STE 111I t81EP-T<Tr24111 r-r-i2JF, PREPARED BY: PELOTON DATE: OCTOBER 8, 2013 N,1 Attachment B • • s• • 11111 LAND SOLUTIONS 5751 KROGER DR. STE. 185 Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment KELLER, TX 76244 ( 817,562.3350 1: Basswood Blvd (2 Southern Lanes - 1,016 LF) 2: Basswood Blvd (2 Southern Lanes - 2,524 LF) 3: Basswood Blvd (2 Northern Lanes - 1107 LF) 4: Robert W Downing Drive (2 Western Lanes - 197 LF) 5: Robert W Downing Drive (2 Western Lanes - 422 LF) 6: Basswood Bridge (320 LF) 7: Basswood Blvd (4 Lanes 275 LF) 8: Basswood Blvd (2 Southern Lanes - 1 728 LF) 9. Basswood Blvd (2 Northern Lanes 1,046 LF) 10 Robert W Downing Drive (2 Western Lanes - 985 LF) 11. Basswood Blvd (2 Southern Lanes - 260 LF) 12: Robert W Downing Drive (2 Eastern Lanes - 1745 LF) 13: Basswood Blvd (2 Northern Lanes - 1768 LF) Total Development Costs PRELIMINARY COST ESTIMATE SANTA FE WEST BASSWOOD, BASSWOOD BRIDGE & ROBERT W DOWNING DRIVE City of Fort Worth, Tarrant County, Texas P roject Number: 10-DRH001.1 P repared For: D.R. Horton Homes Date: March 19, 2014 Development Costs By Others By Others $ 967,425 By Others $ 146,692 $ 2,500,000 $ 623,143 By Others By Others By Others $ 429,101 $ 799,963 $ 686,147 $ 6,152,471 Basswood City Cost Estimate.xlsx, Summary 1 of 19 3/19/2014 • 11111 LAND SOLUTIONS 5751 KROGER DR. STE. 185 1 KELLER, TX 76244 f 817.562.3350 BASSWOOD BLVD - SEGMENT 3 North Half of Basswood 2 - Lanes of 130' ROW from Robert Downing to proposed bridge 1107.0 LF * Proposed City Founded Project - DR Horton CFA CONSTRUCTION COSTS Earthwork Water Sanitary Sewer Storm Drain Paving _Street Lights & Signs P P & M Bonds (3% of Pvg & Util Contracts) TOTAL CONSTRUCTION COSTS City Fees PRELIMINARY COST ESTIMATE SANTA FE TRAILS INFRASTRUCTURE City of Fort Worth, Tarrant County, Texas Project Number: Prepared For: Date: File Name. Sub -Total Utilities MISCELLANEOUS COSTS __City Inspection Fee (Wtr Dept - 2%) City Inspection Fee (TPW - 4%) Construction Materials Testing (City Fee - 2% of Pvg & Utils) Erosion Control TOTAL MISC. COSTS Construction Costs Miscellaneous Costs 12% Engineering 10% Contingency ROW Dedication Credit NET PROJECT COSTS SUMMARY 10-DRH001.1 D.R. Horton Custom Homes March 19, 2014 RoadwayFeeAnalysis20120816.xlsx $0 $472,457 $472,457 I LF $5,70 $207,600 $0 $0 $190,116 $247,486 $34,855 $14,180 $694,237 $0 $18,900 $9,450 $6,310 $34,660 $694,237 $34,660 $87,468 $81,636 $69,424 $967,420 Basswood City Cost Estimate.xlsx, BW-S3 2 of 19 3/19/2014 GENERAL NOTES: 1) This estimate is based on the approved preliminary plat of Parr Trust (Nov. 2010), prepared by Peloton Land Solutions, except for Santa Fe Phase 7 (The Enclave Phase 3) qtys which reflect a slightly different lot layout. 2) Quantities are based on a preliminary engineering design not yet approved by the City of Fort Worth. 3) CFA prices were utilized for all proposed / future construction costs. Where CFA prices were not available, engineer used recent contractor bid unit prices. 4) Earthwork quantities do not include any costs for moisture conditioning or rock excavation. 5) 404 Impacts and Mitigation costs are not included in this estimate. 6) Storm drain outfalis into Big Fossil Creek are subject to city approval & acceptance of a floodplain development permit. 7) Pavement thickness was estimated for the various street sections, however final paving thicknesses could increase based on geotechnical data obtained at a later date. Costs for additional pavement thickness are not included. 8) Fees exclude Final Plat fees for the roadways, costs assume that roadways will be platted with adjacent residential developments. 9) Costs shown herein exclude interest, legal fees, other services provided by others, off -site sanitary sewer pro-rata, telephone service, off -site easement preparation & procurement, impact fees, or other costs not specifically addressed, such as rock excavation, moisture conditioning of pads, jurisdictional determination and permit processing, and brick pavers. Engineering costs do not include cost for staking retaining walls. 10) Since the design professional has no control over the cost of labor, materials, or equipment, or over the contractor's method of determining prices, or over competitive bidding or market conditions, his opinions of probable development cost provided for herein are to be made on the basis of his experience and qualifications. These opinions represent his best judgment as a design professional familiar with the construction industry However, the design professional cannot and does not guarantee that proposals, bids, or the development cost will not vary from opinions of probable cost prepared by him. If the owner wishes greater assurance as to the development cost, he shall employ an independent cost estimator. Basswood City Cost Estimate.xisx, BW-S3 3 of 19 3/19/2014 1 1 1 1 EARTHWORK DESCRIPTION Clear, Strip & Grub * Excavation Fill Material - Borrow (Bridge) Disposal of Unsuitable Matenais Compaction Testing TOTAL EARTHWORK * Estimated 2' of cut across site STORM DRAIN DESCRIPTION 21" RCP 15' Recessed Curb Inlets Remove 5 - 10'x8' Headwall 5 - 10'x8' RBC 5-10'x8' PW Hdwl Trench Safety TOTAL STORM DRAIN PAVING * ** DESCRIPTION 9.5" Reinf. Conc. Pvmt. w/ 7" curbs (28' B-B) ** j 6" Lime Stabilized Subgrade Hydrated Lime (34#/SY) 5 , 4" Conc. Sidewalk Pavement Striping Topsoil (6") for all Parkways and Medians Seeding/Hydromulch of all Parkways and Medians (Includes Watering/Irrigation until 70% Vegatative Cover is Attained) 1 QTY I UNIT 2.9 1 AC 9,400I CY 10,000 1 CY 1 , LS 2.5 f QTY I 89 2 1 80 1 89 QTY 4,854 5,210 89 1,092 2,768 LF 700 CY 4,000 TOTAL PAVING * Requires City Approval of Pavement Design by Geotechnical Engineer ** Estimated total stripping including turn lanes STREET LIGHTS & SIGNS DESCRIPTION Street Lights (approx 200' spacing) Electric Conduit in Median Street Signs TOTAL STREET LIGHTS & SIGNS SY QTY I UNIT 6 ( EA 1,107 I_ LF 1 EA UNIT PRICE 1 12,000.00 7.00 ! 10.00 1,900.00 i 202,500.00 UNIT UNIT PRICE LF 45.00 EA 3,500.00 LS 4,000.00 LF 1,853.00 EA LF 26,782.00 1 1.00 UNIT UNIT PRICE SY 38.00 SY 3.00 TON 120.00 LF 20.00 0.50 15.00 0.75 UNIT PRICE 3,000.00 15.00 250.00 AMOUNT 34,800.00 65,800.00 100,000_00 1,900.00 5,100.00 $207,600.00 AMOUNT 4,005.00 7,000.00 4,000.00 148,240.00 _ 26,782.00 89.00 $190,116.00 AMOUNT 184,452.00 15,630.00 10,680.00 21,840.00 1,384.00 10,500.00_ 3,000.00 $247,486.00 AMOUNT 18,000.00_ 16, 605.00 250.00 $34,855.00 Basswood City Cost Estimate.xlsx, BW-S3 4 of 19 3/19/2014 1"III LAND SOLUTIONS 5751 KROGER DR. STE. 185 KELLER, TX 76244 1 817.562,3350 ROBERT W. DOWNING DRIVE - SEGMENT 5 West Half of Rober W. Downing Drive 2 - Lanes from entrance to Phase 6 to Basswood Blvd. 422.0 LF * Proposed City Founded Project - DR Horton CFA CONSTRUCTION COSTS Earthwork Water Sanitary Sewer Storm Drain Paving Street Lights & Signs P, P & M Bonds (3% of Pvg & Util Contracts) TOTAL CONSTRUCTION COSTS PRELIMINARY COST ESTIMATE SANTA FE TRAILS INFRASTRUCTURE City of Fort Worth, Tarrant County, Texas Project Number: 10-DRH001.1 Prepared For: D.R. Horton Custom Homes Date: March 19, 2014 File Name: RoadwayFeeAnalysis20120816.xisx Sub -Total Utilities MISCELLANEOUS COSTS City Fees City Inspection Fee (Wtr Dept - 2%) City inspection Fee (TPW - 4%) Construction Materials Testing (City Fee - 2% of Pvg & Utils) Erosion Control TOTAL MISC. COSTS Construction Costs Miscellaneous Costs 12% Engineering 10% Contingency ROW Dedication Credit NET PROJECT COSTS SUMMARY 2%! 4%$ 2%1 422 I LF $4,328 1 $0 $80 592 $80,592 $6.00 $20,300 $0 $_0 $4,328 $71,284 $4,980 $2,420 $103,312 $0 $3,220 $1,610 $2,540 $7,370 $103,312 $7,370 $13,282 $12,396 $10,331 $146,690 Basswood City Cost Estimate.xisx, RD-S5 5 of 19 3/19/2014 GENERAL NOTES: 1) This estimate is based on the approved preliminary plat of Parr Trust (Nov. 2010), prepared by Peloton Land Solutions. 2) Quantities are based on a preliminary engineering design not yet approved by the City of Fort Worth. 3) CFA prices were utilized for all proposed / future construction costs. Where CFA prices were not available, engineer used recent contractor bid unit prices. 4) Earthwork quantities do not include any costs for moisture conditioning or rock excavation. 5) 404 Impacts and Mitigation costs are not included in this estimate. 6) Storm drain outfalls into Big Fossil Creek are subject to city approval & acceptance of a floodplain development permit. 7) Pavement thickness was estimated for the various street sections, however final paving thicknesses could increase based on geotechnical data obtained at a later date. Costs for additional pavement thickness are not included. 8) Fees exclude Final Plat fees for the roadways, costs assume that roadways will be platted with adjacent residential developments. 9) Costs shown herein exclude interest, legal fees, other services provided by others, off -site sanitary sewer pro-rata, telephone service, off -site easement preparation & procurement, impact fees, or other costs not specifically addressed, such as rock excavation, moisture conditioning of pads, jurisdictional determination and permit processing, and brick pavers Engineering costs do not include cost for staking retaining walls. 10) Since the design professional has no control over the cost of labor, materials, or equipment, or over the contractor's method of determining prices, or over competitive bidding or market conditions, his opinions of probable development cost provided for herein are to be made on the basis of his experience and qualifications, These opinions represent his best judgment as a design professional familiar with the construction industry However, the design professional cannot and does not guarantee that proposals, bids, or the development cost will not vary from opinions of probable cost prepared by him. If the owner wishes greater assurance as to the development cost, he shall employ an independent cost estimator. Basswood City Cost Estimate.xlsx, RD-S5 6 of 19 3/19/2014 EARTHWORK DESCRIPTION Clear, Strip & Grub Excavation Disposal of Unsuitable Materials Compaction Testing TOTAL EARTHWORK * Estimated 2' of cut across site STORM DRAIN DESCRIPTION 21" RCP 15' Recessed Curb Inlet_ Trench Safety QTY 0.5 1,700 1' 2.5 , QTY 18 1 18 UNIT AC CY LS UNIT LF EA LF TOTAL STORM DRAIN Majority of storm drain will be constructed with DR Horton Santa Fe Trails Ph 3 PAVING DESCRIPTION 9.5" Reinf. Conc. Pvmt. w/ 7" curbs (28' B-B) 6" Lime Stabilized Subgrade Hydrated Lime (34#/SY) 5', 4" Conc. Sidewalk Pavement Stripping I Topsoil (6") for all Parkways and Medians Seeding/Hydromulch of all Parkways and Medians (Includes Watering/Irrigation until 70% Vegatative Cover `is Attained) I TOTAL PAVING * Estimated total stripping STREET LIGHTS & SIGNS DESCRIPTION Conduit - 2 Inch - Open Cut: Schad. 40 — Install Light - Concrete Foundation - Type 4 — Install Light - Type 8 w/ 33A Arm (includes 200w HPW Luminaii #8 THHW Aluminum — Install TOTAL STREET LIGHTS & SIGNS QTY UNIT 1,318 SY 1,420 SY 25.0 TON 423 LF 1,055 LF 254 CY 1,524 , SY UNIT PRICE 12,000.00 7.00 1,900.00 19,800.00 UNIT PRICE 45.00 3,500.00 1.00 UNIT PRICE 38.00 3.00 120.00 20,0Q I 0.50 15.00 0.75 QTY I UNIT ( UNIT PRICE I 110 LF 1I EA 1 I EA 330 LF 15.00 , 1,000.00 2,000.00 1.00 i AMOUNT 6,000.00 11,900.00 1,900.00 500.00 $20,300.00 AMOUNT 810.00 3,500.00 18,00 $4,328.00 AMOUNT 50,084.00 4,260.00 3,000.00 8,460,00 527.50 3,809.72 1,142.92 $71,284,14 AMOUNT 1,650.00 1,000.00 2,000.00 330.00 $4,980.00 Basswood City Cost Estimate.xisx, RD-S5 7 of 19 3/19/2014 • • ILAND SOLUTIONS 5751 KROGER DR. STE. 185 1 KELLER, TX 76244 1 817.562.3350 BASSWOOD BLVD - SEGMENT 7 East of Basswood Bridge 4 - Lanes of 130' ROW from the proposed bridge to ex. Basswood Blvd 275.0 LF * Proposed City Founded Project - DR Horton CFA CONSTRUCTION COSTS Earthwork Water Sanitary Sewer Storm Drain Paving Street Lights & Signs P P & M Bonds (3% of Pvg & Util Contracts) TOTAL CONSTRUCTION COSTS City Fees City Inspection Fee (Wtr Dept 2%) City Inspection Fee (TPW - 4%) PRELIMINARY COST ESTIMATE SANTA FE TRAILS INFRASTRUCTURE City of Fort Worth, Tarrant County, Texas Project Number: Prepared For: Date: File Name: Sub -Total Utilities MISCELLANEOUS COSTS Construction Materials Testing (City Fee - 2% of Pvg & Utils) Erosion Control TOTAL MISC. COSTS SUMMARY Construction Costs Miscellaneous Costs 12% Engineering 10% Contingency ROW Dedication Credit NET PROJECT COSTS 2%1 4%' 2% 275 °lo LF 10-DRH001.1 D.R. Horton Custom Homes March 19, 2014 RoadwayFeeAnalysis20120816.xtsx $15,200 $0_. $137,076 $137,076 $6.00 $317,500 $0 $0 $15,200 $114,751 $7,125 $4,120 $458,696 $0 $5,480 $2,740_ $1,650 $9,870 $458,696 $9,870 $56,228 $52,479 $45,870 $623,140 Basswood City Cost Estimate.xlsx, BW-R7 8 of 19 3/19/2014 GENERAL NOTES: 1) This estimate is based on the approved preliminary plat of Parr Trust (Nov. 2010), prepared by Peloton Land Solutions. 2) Quantities are based on a preliminary engineering design not yet approved by the City of Fort Worth. 3) CFA prices were utilized for all proposed / future construction costs. Where CFA prices were not available, engineer used recent contractor bid unit prices. 4) Earthwork quantities do not include any costs for moisture conditioning or rock excavation. 5) 404 Impacts and Mitigation costs are not included in this estimate 6) Storm drain outfalls into Big Fossil Creek are subject to city approval & acceptance of a floodplain development permit. 7) Pavement thickness was estimated for the various street sections, however final paving thicknesses could increase based on geotechnical data obtained at a later date. Costs for additional pavement thickness are not included. 8) Fees exclude Final Plat fees for the roadways, costs assume that roadways will be platted with adjacent residential developments. 9) Costs shown herein exclude interest, legal fees, other services provided by others, off -site sanitary sewer pro-rata, telephone service, off -site easement preparation & procurement, impact fees, or other costs not specifically addressed, such as rock excavation, moisture conditioning of pads, jurisdictional determination and permit processing, and brick pavers Engineering costs do not include cost for staking retaining walls 10) Since the design professional has no control over the cost of labor, materials, or equipment, or over the contractor's method of determining prices, or over competitive bidding or market conditions, his opinions of probable development cost provided for herein are to be made on the basis of his experience and qualifications These opinions represent his best judgment as a design professional familiar with the construction industry However, the design professional cannot and does not guarantee that proposals, bids, or the development cost will not vary from opinions of probable cost prepared by him. If the owner wishes greater assurance as to the development cost, he shall employ an independent cost estimator. Basswood City Cost Estimate.xlsx, BW-R7 9 of 19 3/19/2014 EARTHWORK DESCRIPTION Clear, Strip & Grub * Excavation Fill Material - Borrow (Bridge) Disposal of Unsuitable Materials Compaction Testing TOTAL EARTHWORK * Estimated 2' of cut across site STORM DRAIN DESCRIPTION 27" RCP 10' Recessed Curb Inlet_ 27" Headwall Trench Safety TOTAL STORM DRAIN PAVING 1 *4 ** DESCRIPTION 9.5" Reinf Conc. Pvmt. w/ 7" curbs (28' B-B) * 6" Lime Stabilized Subgrade Hydrated Lime (34#/SY) 52 4" Conc. Sidewalk Pavement Striping Topsoil (6") for all Parkways and Medians -roeuuirlyrnytiturifuleTT UT dl1 (-'drKWayS ariu MeurarnS /Innhlrw 5Alatorinn/trrinotinn nntil 7flOJ j/o[1.7iatitin Prates* io QTY I UNIT 1 UNIT PRICE 0.8 I AC 12,000.00 2,600 CY 28,000 CY 1 ' LS 2.5 QTY UNIT 100 __ LF 2 EA 2 EA 100 " LF 7.00 10.00 1,900.00 309, 700.00 UNIT PRICE 45.00 3,500.00 1,800.00 1.00 QTY ( UNIT I UNIT PRICE 2,298 SY 38.00 2,470 SY 3.00 42 TON__ 120.00 550 LF 20.00 1,500 LF 0.50 166 CY 993 SY TOTAL PAVING * Requires City Approval of Pavement Design by Geotechnical Engineer ** Estimated total stripping including turn lanes STREET LIGHTS & SIGNS DESCRIPTION Street Lights (approx 200' spacing) Electric Conduit in Median TOTAL STREET LIGHTS & SIGNS 15.00 0.75 QTY 1 UNIT UNIT PRICE I 1 EA 3,000.00 2751 LF 15.00 AMOUNT 9,600.00 18,200.00 280,000.00 1,900.00 7,800.00 $317,500.00 AMOUNT 4,500.00 7,000.00 3,600.00 100.00 $15,200.00 AMOUNT 87,324.00 7,410.00 5,040.00 11,000.00 750.00 2,482 64 744.79 $114,751.43 AMOUNT 3,000.00 4,125.00 $7,125.00 Basswood City Cost Estimate,xisx, BW-R7 10 of 19 3/19/2014 1• 1111 LAND SOLUTIONS 5751 KROGER DR. STE. 185 ; KELLER, TX 76244 i 817.562,3350 BASSWOOD BLVD - SEGMENT 11 South Half of Basswood 2 - Lanes of 130' ROW from Phase 6 to proposed bridge 260.0 LF * Proposed City Founded Project - DR Horton CFA CONSTRUCTION COSTS Earthwork Water Sanitary Sewer Storm Drain Paving Street Lights & Signs P P & M Bonds (3% of Pvg & Util Contracts) TOTAL CONSTRUCTION COSTS PRELIMINARY COST ESTIMATE SANTA FE TRAILS INFRASTRUCTURE City of Fort Worth, Tarrant County, Texas Project Number: 10-DRH001.1 Prepared For: D.R. Horton Custom Homes Date: March 19, 2014 File Name: RoadwayFeeAnalysis20120816.xlsx Sub -Total Utilities MISCELLANEOUS COSTS City Fees City Inspection Fee (Wtr Dept - 2%) City Inspection Fee (TPW - 4%) _ Construction Materials Testing (City Fee - 2% of Pv9 & Utils) Erosion Control TOTAL MISC. COSTS Construction Costs Miscellaneous Costs 12% Engineering 10% Contingency ROW Dedication Credit NET PROJECT COSTS SUMMARY 2% 4% 1 2% 260 0/0 LF $O I $186,148 1 $186,148 $570 $118,700 $0 $0 $135,192 $44,056 $6,900 $5,590 $310,438 $0 $7,450 $3,720 $1,490 $12,660 $310,438 $12,660 $38,772 $36,187 $31,044 $429,100 Basswood City Cost Estimate.xisx, BW-S11 11 of 19 3/19/2014 GENERAL NOTES: 1) This estimate is based on the approved preliminary plat of Parr Trust (Nov. 2010), prepared by Peloton Land Solutions. 2) Quantities are based on a preliminary engineering design not yet approved by the City of Fort Worth. 3) CFA prices were utilized for all proposed / future construction costs. Where CFA prices were not available, engineer used recent contractor bid unit prices. 4) Earthwork quantities do not include any costs for moisture conditioning or rock excavation. 5) 404 Impacts and Mitigation costs are not included in this estimate. 6) Storm drain outfalls into Big Fossil Creek are subject to city approval & acceptance of a floodplain development permit. 7) Pavement thickness was estimated for the various street sections, however final paving thicknesses could increase based on geotechnical data obtained at a later date. Costs for additional pavement thickness are not included. 8) Fees exclude Final Plat fees for the roadways, costs assume that roadways will be platted with adjacent residential developments 9) Costs shown herein exclude interest, legal fees, other services provided by others, off -site sanitary sewer pro-rata, telephone service, off -site easement preparation & procurement, impact fees, or other costs not specifically addressed, such as rock excavation, moisture conditioning of pads, jurisdictional determination and permit processing, and brick pavers. Engineering costs do not include cost for staking retaining walls. 10) Since the design professional has no control over the cost of labor, materials, or equipment, or over the contractor's method of determining prices, or over competitive bidding or market conditions, his opinions of probable development cost provided for herein are to be made on the basis of his experience and qualifications. These opinions represent his best judgment as a design professional familiar with the construction industry However, the design professional cannot and does not guarantee that proposals, bids, or the development cost will not vary from opinions of probable cost prepared by him. If the owner wishes greater assurance as to the development cost, he shall employ an independent cost estimator. Basswood City Cost Estimate.xisx, BW-S11 12 of 19 3/19/2014 EARTHWORK I DESCRIPTION Clear, Strip & Grub * Excavation Fill Material - Borrow (Bridge) Disposal of Unsuitable Materials Compaction Testing 1 I TOTAL EARTHWORK * Estimated 2' of cut across site STORM DRAIN DESCRIPTION 24" RCP 21" RCP 2-105x8'RCB _2 - 10'x8' Headwall 15' Recessed Curb Inlet 18" Thick Rock Rip Rap Trench Safety TOTAL STORM DRAIN PAVING f DESCRIPTION 9.5" Reiff. Conc. Pvmt. w/ 7" curbs (28' B-B) * 6" Lime Stabilized Subgrade _Hydrated Lime (34#/SY) 5, 4" Conc. Sidewalk Pavement Striping Topsoil (6') for all Parkways and Medians Seeding/Hydromulch of all Parkways and Medians (Includes Watering/Irrigation until 70% Vegatative Cover is Attained) QTY I UNIT UNIT PRICE 0.4 AC 1,300 1 CY 10,000 CY 1 LS 2.5 % QTY 133 73 90 1 1 451 206 UNIT I LF LF LF EA EA SY LF 12,000.00 7.00 10.00 1,900.00 115,800.00 I UNIT PRICE 55,00 45.00 930.00 13,400.00 3,500.00 50.00 7.00 QTY ! UNIT I UNIT PRICE 802 SY 38.00 860 SY 15 TON 260 LF 650 ' _LF 200 CY 900 SY TOTAL PAVING * Requires City Approval of Pavement Design by Geotechnicai Engineer ** Estimated total stripping STREET LIGHTS & SIGNS DESCRIPTION Street Lights (approx 200' spacing) Electric Conduit in Median TOTAL STREET LIGHTS & SIGNS 3.00 120.00 20.00 0.50 15.00 0.75 QTY I UNIT UNIT PRICE 1 EA 3,000.00 t 260 I LF 15.00 AMOUNT 4,800.00 9,100.00 100,000.00 1,900.00 2,900.00 $118,700.00 AMOUNT 7,315.00 3,285 00 83,700.00 13,400.00 3,500.00 22, 550.00 1,442.00 $135,192.00 AMOUNT 30,476.00 2,580.00 1,800.00 5,200.00 325.00 _ 3,000.00 675.00 $44,056.00 AMOUNT 3,000.00 3,900.00 $6,900.00 Basswood City Cost Estimate.xlsx, BW-S11 13of19 3/19/2014 ILAND SOLUTIONS 575t KROGER DR. STE. 185 1 KELLER, TX 76244 1 817.562.3350 ROBERT W. DOWNING DRIVE - SEGMENT 12 East Half of 130' ROW from ex. Robert Downing Dr to Basswood Blvd 1745.0 LF * Proposed City Founded Project - DR Horton CFA Earthwork Water Sanitary Sewer Storm Drain Paving Street Lights & Signs P, P & M Bonds (3% of Pvg & Util Contracts) TOTAL CONSTRUCTION COSTS CONSTRUCTION COSTS PRELIMINARY COST ESTIMATE SANTA FE TRAILS INFRASTRUCTURE City of Fort Worth, Tarrant County, Texas Project Number: 10-DRH001.1 Prepared. For: D.R. Horton Custom Homes Date: March 19, 2014 File Name: RoadwayFeeAnalysis20120816.xtsx Sub -Total Utilities MISCELLANEOUS COSTS City Fees City Inspection Fee (Wtr Dept - 2%) City Inspection Fee (TPW - 4%) Construction Materials Testing (City Fee - 2% of Pv_ g & U tits) Erosion Control TOTAL MISC. COSTS Construction Costs Miscellaneous Costs 12% Engineering 10% Contingency ROW Dedication Credit NET PROJECT COSTS SUMMARY 2% % 4%3 % 2% % 1,745 ;— LF $66,807 $0 $464,181 $464,181 $5.70 $87,500 $0 $0 $66,807 $344,199 $53,175 $13,930 $565,611 $0 $18,570 $9,280 $9,950 $37,800 $565,611 $37,800 $72,409 $67,582 $56,561 $799,960 Basswood City Cost Estimate.xlsx, RD-S12 14of19 3/19/2014 GENERAL NOTES: 1) This estimate is based on the approved preliminary plat of Parr Trust (Nov. 2010), prepared by Peloton Land Solutions. 2) Quantities are based on a preliminary engineering design not yet approved by the City of Fort Worth. 3) CFA prices were utilized for all proposed / future construction costs. Where CFA prices were not available, engineer used recent contractor bid unit prices. 4) Earthwork quantities do not include any costs for moisture conditioning or rock excavation. 5) 404 Impacts and Mitigation costs are not included in this estimate. 6) Storm drain outfalls into Big Fossil Creek are subject to city approval & acceptance of a floodplain development permit. 7) Pavement thickness was estimated for the various street sections, however final paving thicknesses could increase based on geotechnical data obtained at a later date. Costs for additional pavement thickness are not included. 8) Fees exclude Final Plat fees for the roadways, costs assume that roadways will be platted with adjacent residential developments. 9) Costs shown herein exclude interest, legal fees, other services provided by others, off -site sanitary sewer pro-rata, telephone service, off -site easement preparation & procurement, impact fees, or other costs not specifically addressed, such as rock excavation, moisture conditioning of pads, jurisdictional determination and permit processing, and brick pavers Engineering costs do not include cost for staking retaining walls. 10) Since the design professional has no control over the cost of labor, materials, or equipment, or over the contractor's method of determining prices, or over competitive bidding or market conditions, his opinions of probable development cost provided for herein are to be made on the basis of his experience and qualifications. These opinions represent his best judgment as a design professional familiar with the construction industry However, the design professional cannot and does not guarantee that proposals, bids, or the development cost will not vary from opinions of probable cost prepared by him. If the owner wishes greater assurance as to the development cost, he shall employ an independent cost estimator. Basswood City Cost Estimate.xlsx, RD-S12 15 of 19 3/19/2014 EARTHWORK DESCRIPTION Clear, Strip & Grub * Excavation Disposal of Unsuitable Materials Compaction Testing TOTAL EARTHWORK * Estimated 2' of cut across site STORM DRAIN DESCRIPTION 21" RCP 33" RCP 42" RCP 42" Headwall 15' Recessed Curb Inlet 18" Thick Rock Rip Rap Remove 33" Headwall Trench Safety TOTAL STORM DRAIN PAVING 1 DESCRIPTION 9.5" Reinf. Conc. Pvmt. w/ 7" curbs (28' B-B) 6' Lime Stabilized Subgrade Hydrated Lime (34#/SY) 5', 4" Conc. Sidewalk B/F Ramps ** Pavement Stripping Topsoil (6') for all Parkways and Medians ' Seeding/Hydromulch of all Parkways and Medians (Includes Watering/Irrigation until 70% Vegetative Cover is Attained) QTY I UNIT 2.4 7,800 1. 2.5 QTY 107 633 75 1 1 50 1 107 AC CY LS UNIT PRICE 12,000,00 7.00 I 1,900.00 85,300.001 UNIT LF LF LF EA EA SY EA UNIT PRICE 45.00 70.00 105.00 2,700.00 3,500.00 50.00 1,000.00 LF QTY UNIT 6,646 SY 7,084 SY 121.0 1 TON 1,660 LF 3 EA 4,363 LF 1,050 6,301 TOTAL PAVING * Requires City Approval of Pavement Design by Geotechnical Engineer ** Estimated total stripping STREET LIGHTS & SIGNS DESCRIPTION Street Lights (approx 200' spacing) Electric Conduit in Median TOTAL STREET LIGHTS & SIGNS 1 CY SY 1.00 i UNIT PRICE 38.00 3.00 120,00 20.00 6.00 0.50 15.00 0.75 QTY I UNIT UNIT PRICE I 9_ EA 3,000.00 C 1,745 LF 15.00 AMOUNT 28,800.00 54,600.00 1,900.00 2,200.00 $87,500.00 AMOUNT 4,815.00 44,310.00 7,875,00 2,700.00 3,500.00 2,500.00 1,000.00 107.00 $66,807.00 AMOUNT 252, 548.00 21,252 00 14,520,00 33,200 00 18.00 2,181.50 15,753.47 4,726.04 $344,199.01 AMOUNT 27,000.00 26,175.00 $53,175.00 Basswood City Cost Estimate.xlsx, RD-S12 16of19 3/19/2014 • on- • Pit • • • • • • pill LAND SOLUTIONS 5751 KROGER OR, STE. 185 ( KELLER, TX 76244 i 817,562.3350 BASSWOOD BLVD - SEGMENT 13 North Half of Basswood 2 - Lanes of 130' ROW from existing Highland Station to end of Ph 4 1768.0 LF * Proposed City Founded Project - DR Horton CFA CONSTRUCTION COSTS Earthwork Water Sanitary Sewer Storm Drain Paving _ Street Lights & Signs P P & M Bonds (3% of Pvg & Utii Contracts) TOTAL CONSTRUCTION COSTS PRELIMINARY COST ESTIMATE SANTA FE TRAILS INFRASTRUCTURE City of Fort Worth, Tarrant County, Texas Project Number: Prepared For: Date: File Name: 10-DRH001.1 D.R. Horton Custom Homes March 19, 2014 RoadwayFeeAnalysis20120816,xisx IEE Sub -Total Utilities $17,704 MISCELLANEOUS COSTS City Fees City Inspection Fee (Wtr Dept - 2%) City Inspection Fee (TPW - 4%) Construction Materials Testing (City Fee - 2% of Pvg & Utils) Erosion Control TOTAL MISC. COSTS SUMMARY Construction Costs Miscellaneous Costs 12% Engineering 10% Contingency ROW Dedication Credit NET PROJECT COSTS 4% % 2%' 1,768 I LF 0 i $0 $417,874 $417,874 $5.70 I $52,200 $0 $0 _ $17,704 $346,400 $53,770 $12,540 $482,614 $0 $16,710 $8,360 $10,080 $35,150 $482,614 $35,150 $62,132 $57,990 $48,261 $686,150 Basswood City Cost Estimate.xlsx, BW-S13 17 of 19 3/19/2014 GENERAL NOTES: 1) This estimate is based on the approved preliminary plat of Parr Trust (Nov. 2010), prepared by Peloton Land Solutions, except for Santa Fe Phase 7 (The Enclave Phase 3) qtys which reflect a slightly different lot layout. 2) Quantities are based on a preliminary engineering design not yet approved by the City of Fort Worth. 3) CFA prices were utilized for all proposed / future construction costs. Where CFA prices were not available, engineer used recent contractor bid unit prices. 4) Earthwork quantities do not include any costs for moisture conditioning or rock excavation. 5) 404 Impacts and Mitigation costs are not included in this estimate. 6) Storm drain outfails into Big Fossil Creek are subject to city approval & acceptance of a floodplain development permit. 7) Pavement thickness was estimated for the various street sections, however final paving thicknesses could increase based on geotechnical data obtained at a later date. Costs for additional pavement thickness are not included. 8) Fees exclude Final Plat fees for the roadways, costs assume that roadways will be platted with adjacent residential developments. 9) Costs shown herein exclude interest, legal fees, other services provided by others, off -site sanitary sewer pro-rata, telephone service, off -site easement preparation & procurement, impact fees, or other costs not specifically addressed, such as rock excavation, moisture conditioning of pads, jurisdictional determination and permit processing, and brick pavers Engineering costs do not include cost for staking retaining walls. 10) Since the design professional has no control over the cost of labor, materials, or equipment, or over the contractor's method of determining prices, or over competitive bidding or market conditions, his opinions of probable development cost provided for herein are to be made on the basis of his experience and qualifications. These opinions represent his best judgment as a design professional familiar with the construction industry However, the design professional cannot and does not guarantee that proposals, bids, or the development cost will not vary from opinions of probable cost prepared by him. If the owner wishes greater assurance as to the development cost, he shall employ an independent cost estimator, Basswood City Cost Estimate.xisx, BW-S13 18 of 19 3/19/2014 EARTHWORK I DESCRIPTION Clear, Strip & Grub Excavation _ iDisposal of Unsuitable Materials Compaction Testing TOTAL EARTHWORK * Estimated 2' of cut across site STORM DRAIN DESCRIPTION 21" RCP 10' Recessed Curb Inlets 15' Recessed Curb Inlets Trench Safety I TOTAL STORM DRAIN PAVING DESCRIPTION * 9.5" Reinf. Conc. Pvmt. w/ 7" curbs, (28' B-B) ** 6" Lime Stabilized Subgrade Hydrated Lime (34#/SY)_ 7' Conc. Curb 5 , 4" Conc. Sidewalk ** Pavement Striping Topsoil (6") for all Parkways and Medians Seeding/Hydromulch of all Parkways and Medians (Includes Watering/Irrigation until 70% Vegatative Cover is Attained) 1 QTY ( UNIT UNIT PRICE I 1.4 AC 4,600 , CY 1 LS 2.5 % 12,000.00 7.00 1 1,900.00 50,900.00 QTY I UNIT 1 UNIT PRICE 124 LF 2 ( EA 2 EA 124 LF QTY 6,530 7,000 119 UNIT SY SY TON 155 j LF 1,958 LF 4,420 LF 45.00 2,500.00 3,500.00 1.00 UNIT PRICE I 38.00 3.00 120.00 1,100 CY 6,400 SY TOTAL PAVING * Requires City Approval of Pavement Design by Geotechnical Engineer ** Estimated total stripping including turn lanes STREET LIGHTS & SIGNS DESCRIPTION Street Lights (approx 200' spppilig) Electric Conduit in Median Street Signs TOTAL STREET LIGHTS & SIGNS 2.00 20.00 0.50 15.00 0.75 QTY UNIT UNIT PRICE 9 EA 3,000.00 1,768 LF 15.00 1 EA 250.00 AMOUNT 16,800.00 32,200 00 1,900.00 1,300.00 $52,200.00 AMOUNT 5,580.00 5,000.00 7,000.00 124.00 $17,704.00 AMOUNT 248,140.00 21,000.00 14,280.00 310.00 39,160.00 2,210.00 16,500.00 4,800.00 $346,400.00 AMOUNT 27,000.00 26,520.00 250.00 $53,770.00 Basswood City Cost Estimate.xlsx, BW-S13 19 of 19 3/19/2014 Attachment C Owner Project #: Engineer Project#: DRH13001.1 THIS IS A WORK ORDER effective as of December 11.2013 Between: D.R. Horton -Texas. Ltd. ("Owner") and Peloton Land Solutions, LLLP ("Engineer"), Vendor Number 1436207 Referenced Original MSA: September 2010 Basswood Boulevard & Bridae ("Project"), Work under this Agreement shall be as set forth in Attachment "A" Compensation shall be as set forth in Attachment "A" Invoice will be sent to the attention of: Don E. Allen Director of Land Acquisition and Development D.R. Horton, Inc. DFW West 6751 North Freeway Fort Worth, TX 76131 IN WITNESS WHEREOF, the parties hereto have executed this Work Order, the Effective Date of which is mdicated above. Owner: Signature dilliZ t Title Engineer: By: Peloton Land Solutions (GP), LLC, general partner ARite A. l4-ha BY V /I/%nil r74_•4..._-f n( / / Date Signature Address 6751 North Freeway Fort Worth. Texas 76131 • M At JAA#2 Title Date Engineer's Firm License Number TX 12207 PELOTON LAND SOLUTIONS, LLLP 5751 Kroger Drive, Suite 185, Keller, TX 76244 Phone 817-562-3350 Page 1 • PELOTON 11111 LAND SOLUTIONS ATTACHMENT "A" WORK ORDER Basswood Boulevard 10/24/13 Peloton Land Solutions, LLLP. (PLS) understands the project to be the survey and civil design of the proposed improvements of Basswood Boulevard, the Basswood Bridge and Robert Downing Drive. The project will be designed as one (1) phase and one (I) set of construction/design plans. The limits of the Basswood Blvd. design are expected to be: • Basswood Blvd. - From the existing 4-lane divided arterial constructed with Santa Fe West Phase 2 (DOE 6795) approximately 1 000 LF east of the inter section of Basswood Blvd and FM 156 to the existing 4-lane divided arterial constructed with Basswood Blvd. (DOE 4241) approximately 2,900 LF west of the intersection of I-35W service road and Basswood Blvd This design shall incorporate expected improvements by PLS for Basswood Blvd. up to Horseman drive under a separate contract. • Robert Downing Drive - From the existing 4-lane arterial south of the Santa Fe Trails project north to Basswood Blvd. The roadways shall be designed as a 4-lane divided arterial roadway within the proposed and existing 130 Right -of -Way consisting of 28' pavement sections on each side of the median. • Basswood Bridge - Design of a 330' TxDOT standard bridge and necessary infrastructure as outlined in this scope. The project will be designed utilizing the COFW design criteria unless otherwise specified or detailed below. BASIC SCOPE OF SERVICES A. PRELIMINARY DESIGN: Attend one (1) kick-off meeting with the Owner and the City to discuss and formalize the project scope, schedule and design parameters. Scope shall include coordination of the Memorandum of Understanding (MOU) and the Design Procurement Agreement (DPA) Conduct field topographic surveys of the Basswood Boulevard right-of-way and the Robert Downing Road right-of-way areas. Surveys shall consist of a 50' grid of the project area, surface structures fences tops and toes of any slopes and floodplain areas determined for necessary permitting of the Basswood Bridge. 3. Prepare a preliminary alignment layout, centerline profiles and proposed storm drainage infrastructure plans for the proposed improvements These documents will be submitted to the Owner, City and/or contractor for review and comment prior to preparation of the final construction documents. Scope includes addressing one (1) set of comments from the Client and/or City. Peloton Land Solutions, LLLP. Basswood Boulevard PELOTON mLAND SOLUTIONS 10/24/13 4. PLS will subcontract for Geotechnical design and report for construction of Basswood Boulevard and the Basswood Bridge. The Geotech report shall include pavement design recommendations for Basswood Boulevard, recommendations for bridge foundations, slope stability, and up/down stream protection. Scope includes up to the (5) borings for the bridge design and standard boring spacing for pavement design as per the City of Fort Worth requirements. 5. Prepare U.S. Army Corps of Engineers (USACE) permitting necessary for the Basswood Bridge. It is assumed that a Nationwide 14 or 25 permits will be applicable without notification of the USACE for the construction of the Basswood Bridge. Scope includes the review of previous delineations for this area, preliminary jurisdictional determination report, Section 404 permitting assistance, modifications to the delineation maps (if required) and coordination with the Owner, City and USACE. This scope does not include an Individual Permit or Preconstruction Notification coordination. It is assumed based on preliminary observations that the mitigation impacts to the Waters of the U.S. are estimated between $15 000 and $50 000, depending on market price and credit availability at the time of the transaction. 6. PLS will subcontract for Hydrologic and Hydraulic studies necessary for the Basswood Bridge design to meet City of Fort Worth standards. Based on the preliminary layout and design of the Basswood Bridge area and the previous flood studies that have been prepared and approved PLS shall provide a revised. flood study and a flood development permit necessary for construction Prepare preliminary cost estimates for construction based on the preliminary layout. Cost shall utilize City of Fort Worth standard unit prices for construction of public infrastructure. B. CONSTRUCTION DOCUMENTS: Prepare roadway construction plans including engineering, design and drafting for the proposed infrastructure improvements. The construction plans shall be submitted to the City for review at four (4) different submittals; 30% 60% 90% and Final set of plans. These plans will be prepared in accordance with the City of Fort Worth criteria and include the folloss ing: o Paving plan and profile, and typical section consisting of additional turning movement lanes and driveways per the City of Fort Worth standards. Associated pedestrian access, ramps, street crossings and intersection improvements will be included in this design if warranted. o PLS shall subcontract with an outside engineering firm for the design of the Basswood Boulevard Bridge. PLS will include the design plans and details within the overall set of plans for construction of Basswood Boulevard The bridge design shall include approach slabs, foundations substructure, superstructure and grading and slope protection under the structure. The bridge is assumed to be a typical span bridge with a concrete deck on girder superstructure. Aesthetic treatments will be limited to basic concrete form liners and custom fencing along sidewalks, if required. Peloton Land Solutions, LLLP. Basswood Boulevard PELOTON 11111 LAND SOLUTIONS o Temporary and Permanent Traffic control measures and staging. o Demolition plans to be included within the construction plans. 10/24/13 o Grading plans for the proposed rough grading with grades showing connection back into the existing ROW grades. o Drainage area map and the associated hydraulic calculations in accordance with City of Fort Worth iSWM. o Drainage infrastructure plans and profiles for storm drain improvements / extensions across the roadway alignment. o PLS will subcontract for electrical design of street lights as required by the City of Fort Worth and based on client selection of light standards. Design shall include street light placement conduit sizing, conductor sizing, hand-hole/pedestal location, transformer locations and details. The electrical engineering design for the referenced project will be provided with sufficient detail to receive construction bids from contractors and in sufficient detail to install the system in accordance with applicable codes. Deliverable will be included and processed with the civil construction plans. o Miscellaneous City of Fort Worth pavement, utility and storm drain details. o Pavement signage / striping plans and associated details. o Erosion/sediment control plan and details. 2. Prepare a ROW Final Plat in accordance to the COFW criteria for conveyance of the Basswood ROW. This scope includes plat preparation, coordination and clearance of the Final Plat comments Prepare the TPDES Permit/Storm Water Pollution Prevention Plan (SWPPP) and the Construction Site Notice to be submitted to the City of Fort Worth for approval. 4. Prepare construction contracts, specifications and construction quantities required for bidding purposes Construction specifications and contracts shall follow and utilize the format for Developer awarded projects Separate Instrument Easements or legal descriptions for dedication of ROW, utility extensions, slope easements or access shall be prepared by PLS. Ten (10) Legal descriptions or easements are anticipated. Additional easements shall be invoiced as an additional hourly service or $1,000/easement. PLS shall use standard City of Fort Worth language on all easements. Coordination or modification of easement Language shall be invoiced as an hourly expense. Peloton Land Solutions, LLLP. Basswood Boulevard • PELOTON 11111 LAND SOLUTIONS 10/24/13 6. Prepare and submit a standard CFA, construction costs and exhibits in accordance with the City of Fort Worth requirements. Scope includes one revision of estimates based on contractor prices one (1) time and one (1) resubmittal through the City. Inspection Fees, Materials Testing Fees and appropriate Developer financial guarantee to be provide by the Developer *All contractors must be pre -approved by the City of Fort Worth and must be able to provide Payment, Performance and Maintenance Bonds. 7. Prepare a Letter of Map Revision (LOMR) to be submitted to the City and ultimately to FEMA for the Basswood Bridge design. The LOMR shall be based on the previously approved Flood Study (FPO1111 FS) and field -verification of the proposed grading plans and flood plain cross -sections. C. CONSTRUCTION PHASE SERVICES: 1. Provide the following service: o Prepare and conduct one (1) public bid for the construction of Basswood Boulevard Scope shall include creation of the bid documents, advertising the bid, preparing necessary addendums/changes to the bids and coordination of questions and comments regarding the bids. o Assist the Owner with opening and tabulation of bids for construction and recommended course of action. o Attend pre -construction conference at the City of Fort Worth. (Assumes 2 meetings) o Establish a minimum of 2 horizontal and 1 vertical control networks for survey construction staking by others. o Prepare and process change orders and review shop drawings with respect to industry standard relevance and other submittals by the contractor (anticipates 8 submittals). o Attend a "Final Inspection or Acceptance" meeting for the project conducted by the City of Fort Worth. Provide franchise utility coordination for the construction of the project. Upon substantial completion of the construction plans, PLS shall conduct one (1) coordination meeting each franchise utility company to coordinate plans for relocation of necessary utilities. 3. PLS will subcontract with a Hydrologist to prepare a Letter of Map Revision (LOMR) for the modification and remapping of the FEMA floodplain based on the existing Conditional Letter of Map Revision (CLOMR) as necessary for the construction of the Basswood Bridge. This scope includes surveyed as -built topo verification. Peloton Land Solutions, LLLP. Basswood Boulevard P E LOTO N 11111 LAND SOLUTION S 10/24/13 Construction Staking - PLS will provide construction staking services as outlined below: o Rough Grading: Once clearing is complete one (1) time grading stakes will be provided for streets to indicate alignment and grade Streets will be staked on both sides of the right of way at 100 foot intervals and at 50 feet along curves. o Rough Grade Verification: Upon the Contractor's written statement of completion of rough grading, verify one (1) time the contractors compliance to grades within the tolerance set forth by the Client. Re -verification will be considered additional service. o Storm Drain Staking: Provide one (1) time storm drain centerline alignment and grade stakes on 100 foot intervals on tangents and 50 foot intervals on curves. All stone drain structui es will be staked indicating alignment, flow line and rim/surface grade for inlets and manholes. o Electric and Conduit Stakes: Provide one (1) complete set of stakes for crossings. o Street Paving Stakes: Provide one (1) time alignment and grade stakes at 100 foot centers. All vertical and horizontal curves shall be staked at 50 foot intervals. o Bridge Stakes: Provide one (1) time alignment and grade stakes for bridge abutments, piers, foundations, and necessary appurtenances. o Street Light Stakes* Provide one (1) time alignment stakes with offsets, as directed by the contractor, for the location of street lights within the median of Basswood Boulevard. o LOMR Cross -Sections: Provide topographic surveys at cross -sections specified by the Flood Study necessary to submit the LOMR to the City of Fort Worth. o ROW Monumentation. Set one (1) time, iron rods at corners as required at the completion of construction activities or after recordation of the Final Plat as required by State law. Peloton Land Solutions, LIP. Basswood Boulevard PE LOTON Mil` LAND SOLUTIONS BASIS OF COMPENSATION: A. Preliminary Design Phase Preliminary Coordination Design Surveys Preliminary Layout, Grading and Utility Design Geotechnical Investigation & Report USACE Delineation and Report Flood Study Preliminary Cost Estimates Total Preliminary Design Phase B. Construction Documents Phase Final Roadway Construction Plans 30% Submittal 60% Submittal 90% Submittal Final Submittal Basswood Bridge Design ROW Final Plat TPDES (SWPPP) Technical Specifications Legal Descriptions / Easements (10) CFA — City of Fort Worth Total Construction Documents Phase C. Construction Phase Services Construction Phase Services Franchise Utility Coordination LOMR Construction Surveying Construction Meetings (20) Total Construction Phase Services Total Fee Estimate of Reimbursable Expenses Peloton Land Solutions, LLLP. 10/24/13 $ 9,500.00 $ 10,500.00 $ 36,500.00 $ 13,500.00 $ 15,500.00 $ 9,500.00 $ 7.500.00 $ 102,500.00 $ 77,000.00 $ 38,000.00 $ 33,000.00 $ 29,000.00 $ 152,500.00 $ 15,500.00 $ 4,500.00 $ 8,500.00 $ 10,000.00 $ 6.500.00 $ 374,500.00 $ 12,500.00 $ 4,500.00 $ 11,500.00 $ 78,500.00 $ 10..000.00 $ 116,500.00 $593,500.00 $ 9,500.00 Basswood Boulevard IS PELOTON IIIII LAND SOLUTIONS REIMBURSABLE EXPENSES: 10/24/13 Reimbursable Services - The following items shall be considered as reimbursable expenses to this contract: c Printing/reproduction services o Application and/or Review fees o Sales tax on survey work o Public Bid Advertising Fees EXCLUSIONS: 1. Landscape Architectural service 2. Water modeling or system analy sis / design 3. Design of pump houses, pump stations or other water delivery features 4. Design of retaining walls, screening walls 5. Geotechnical investigations or soil gradation analysis or recommendations 6. Irrigation design or design of special structures not identified as standard 7. Design for the relocation of gas, water or sewer mains 8. Legal descriptions or closing documents not identified in original scope 9 Planning, entitlement or zoning review preparation or representation 10. TXDOT driveway permitting 11. TXDOT standard roadway cross -sections at 50' or 100' intervals 12. Traffic Signal Design or recommendations 13. Traffic Impact Analysis 14. ADA accessibility design, review or compliance 15. Structural Paving sections to be provided by others 16. Urban Forestry Permitting and submittals 17. Early Grading Design and Permitting 18. Non-standard photometric streetlight designs. Peloton Land Solutions, LLLP. Basswood Boulevard Owner Retasal, LP Puite/City DR Horton BASSWOOD BOULEVARD FEE BREAKDOWN BY OWNER Section per Map linear Foot Description/Scope Est. Construction Costs 30% 19% 0% Qty of Fort Worth North Two Lanes of Basswood from Phase 2 to 13 1780 Robert Downing Drive $ 2 4 Preliminary Design Construction Documents Construction Phase Services Subtotal $ North Two lanes of Basswood from Robert 1100 Downing Drive to Bridge $ Preliminary Design Construction Documents Construction Phase Services Subtotal $ South Two lanes of Basswood from Phase 2 to 2500 the east side of Phase 6 2 West lanes of Robert Downing Drive from 200 existing to Phase 6 Preliminary Design Construction Documents Construction Phase Services Subtotal $ 2 East Lanes of Robert Downing Drive from 12 1750 Existing to Basswood 2 West Lanes of Robert Downing Drive from 5 420 Existing to Basswood 2 South Lanes of Basswood from Phase 6 to 51% 11 260 Bridge 6 330 Basswood Bridge 4 Lanes of Basswood Blvd. from Bridge to 7 275 existing Preliminary Design Construction Documents Construction Phase Services 100% Subtotal $ Total $ Grand Total $ 686,147,00 Est Engineering Fee Comments S 686,14700 $ 967,425.00 967,425.00 S 1,445,796.00 $ 82,671.00 $ 1,445,79600 $ 799,963.00 146,692.00 233,625.00 2,500,000.00 $ 623,143.00 0,303, 423 00 $ 7,402,800,00 $ 150,000.00 $ 7,552,800.00 Ssi� 27,986.48 66,806.42 31,597.63 126,390 53 This section to be covered by City of Fort Worth and Reimbursed by Impact Fees 17,295.01 41,284.87 19,526.63 78,105 51 Already under contract to be designed and 145,000.00 constructed by Horton Already under contract to be designed and 8,500.00 constructed by Horton 153,500.00 173,500.00 includes Flood Study and LOMR 47,718.51 113,908.71 53,875.74 389,002 9F 747,000.00 Engineering fee In percentage of Const. 10.09% 90,000.00 Roundabout Change Orders Engineering Contracts . . . . 1 st1. a .. 1 1.7 .•1.1 l. .j I. • .....i 1. _ ..�. i �..-. 1 ..I I .r .'>. .71 ..I �.., _,f.i I. '...�, -- _• -7 I •.I l_ - Try .. . l_.__.._.._.._.._i L.._............. y 1...t_i.... i L A t r, --.�, • • r ` • -'JI.i•i- �;. _i. Ljj i .% c;• • / . _, amr&000ttW ►Y LLJE10224 NOWA SPEA7TON ENGINEER) PROPOSEDsteoe SAX N. • MOTORAEDVAZIThleatj N. AYCNNpRCN CPA \ -• L .• '`Ns k i • �.4 • w�Enrw.00APnN�E Y`ie s'��tA�71a C�AP.W. P.tli � \ 4.\ PyNP1EErnooe . eroRNonran CFA �-i RRUIEPAVCMQR•wAlER •rV ral" re -al - a-C-�-... u�iMar. rt.-Mares sat ye. 1 EXISTINC3 BY PREVIOUS DEVELOIIER EXISTING BASSWOOD BLVD D.O.E. NO.6795 BY DR HORTON RTON (PELOTON ENGINEER) • - .. i, W flan - a •.-• a IN •aa. } a a -a a M SS -a • • • • • • • • • •• • • • • • • • iT r • • • 1 1 a aas• A • Saw a at a- at • Y .•tea/�I a1 �••••.a/ •a•••••ati - • 1 1 far • • / 1 •1 1 • 1 • t • • - • • J 1 • • • 1 T 1 1 . • • . • • 1 • • . • • . • • . 1 . 1 I 1 •- • a PROPOSED 1/2 BASSWOOD BLVD D.O.E. NO. 6795 CITY FUNDED BY D.R. HORTON (PELOTON ENGINEER) (PAT BUCKLEY C.O.F.W. P.M.) BASSWOOD BLVD • ,► .a- w a -a- a •. asa - a J•••._a s ate• s a WM a • !ra a- a a••.• -a a=11 _ a VMS S • a-. { Salem* SEWN a• Me -ate •u/a-a4uwr••a.- re_n ______ --, - ----- IS al Erma Si r -ap-- .•.--^- a n a a -- - a Maw - - a-. - r aw a _ as 1 pPSes Sti5 4"1p4tptNE 1 •Sn -_a-.-- 1 1 s 1 1 1 1 •a a •V•r a - SIMa _ r•.aw 11 ! 1 1 -J 1 II art S IN a "Mall .• a ar- ♦•r+. a a .a- a • ar.- a.aaa.... /aa nroe a -•- NO ••.•.r. - a ..._ - arm_ ----- . 1 • , • • • • 1 • • • I • • 1 • • • • • IP - a r. a - - a a.a I - - - • • a • • �.• - i .. - - - - ...r \ . • 1 • a a as--_a.aaalr ae are ._a'T•aTam*arA•a-••aa^ms 'a•a•• 1 r • • • • 1 i • • • 1 ` 1• • • 1 1 1 I • 1 r I 1 1 1 1 1 1 - _ a-. a - 0 a _ M•- .•_• i _ -a ---- —♦.•-a a.. - -m-../ - a a-- --.-a .••nw -a -- a -a- - a ws.= ■ -T. a._ ammo•- •'•a.•.•.•-ramY-a^ 11 1 1 I. n 1 _ _ Mai L 7 .ram srP e �'•'.. ..• { 1 I • n w " aN • • "11•a a••• - ••• -- v ar --• - - --.e a - •-_ etm • ••• • • . • • • • • • . • •. • + • • • • • • • • •• 1 • , • 1 1 •••.•II .. • ' • • • • 4 1 • • 1 1 • • . • • • 1 •• --•_ • a .. •a-. - - +- ./ - . a 1 • 1 OeaeUMelII 1 • • • . •1 . •.• . r • 1 • •► 1 1 1 ♦ - •e...T • 1 y .. • 1 ., . •. • - \ ., . 1 - - .�- •- - _ - =- - - •--• - - --• a .--. wa- - •1a. ••• a. aa1- - 1• a-1 - ti - .- - , -- r • -• r Mar - ..•— 1 • 1 1 a - erne,de+- -ball - a ...oaf a — 1 r 1 • • • • •, ,.• i J • 1 •1 1 :1 1 1 • .1 • • • •a• - • I .... i 1 1 • I I•.. A I' 1 1 1 It .... *, La'••--- --- -- --- -- L Il • • . ii •• 1 l • i 1 i ‘ i .• • r — r .� a //ram- IV - /� ` 1 _ 4.w-. -• -r.a - -a- a - - r ammo! ♦ , -�� ... rr. ► • . • • i ~ , ; j ^_l • .�.. r T t ',• l • • • 1 • . . 1/ I t\ II • . • + •• • • • • • •• 1 2 • / 1 1 • 1 1 I r a m a a r * a ▪ •Iii O•r aa, - sta1 >�- el *an a a �• a an a a a •► ..s a • ■ L.•...t.• �►_ a-r •• a..r a.a f• ww 4 •. 7 1 1 1 i ` , • s j i i r y/ t ter. 4.,,.-f/Le1 -.7 ...-' sot% \ \ ` 1 i r t I_ _L i _.: . - - _ .i __ • t 1 1 melt 1 a • L • a PELOT•N LAND SOLUTIONS • • • • ae . - a. •. - a ar. - a Mar a •• •••..-- 7 . *4 CITY FUNI BY DRHO (PELOTOII 1 • 1 1 1 --- _ •a- -a as PRI ROI D.0 BYi (PE EX I5. ROE D.O • =PROJECT ST:: M&C Review Page 1 of 2 CITY COUNCIL AGENDA Official site of the City of Fort Worth, Texas liFoRI WORTII t. COUNCIL ACTION: Approved on 11/12/2013 = Ordinance No. 21029-11-2013 DATE: 11/12/2013 REFERENCE NO.: 06BASSWOOD DESIGN **C-26554 LOG NAME: PROCUREMENT AGREEMENT CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of a Design Procurement Agreement with D R. Horton - Texas, Ltd., in the Amount of $458,639.00 for the Engineering Design of Basswood Boulevard from Cloudcroft Lane to Horseman Road and Robert W. Downing Road South of Basswood Boulevard, Provide for Amendments for a Total Project in the Amount of $504,502.90 and Adopt Appropriation Ordinance (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the execution of a Design Procurement Agreement with D.R. Horton - Texas, Ltd., in the amount of $458,639.00 for engineering services related to the design of Basswood Boulevard from Cloudcroft Lane to Horseman Road and Robert W Downing Road south of Basswood Boulevard; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Transportation Impact Fund in the amount of $504,502.90 from available funds. DISCUSSION: D.R. Horton - Texas, Ltd. (D R. Horton), has been designing and constructing portions of Basswood Boulevard east of FM 156 and portions of Robert W. Downing Road south of Basswood Boulevard to meet their subdivision access and public infrastructure requirements for their portion of the Parr Trust subdivision. The Transportation and Public Works Department desires to accelerate the engineering design for the remainder of Basswood Boulevard, including a bridge, to complete full design and eventual construction of Basswood Boulevard from FM 156 to I-35W. In addition, Transportation and Public Works desires to complete the design of Robert W. Downing Road south of Basswood Boulevard to connect to existing pavement approximately 300 feet north of Lou Menk Drive. The execution of this Design Procurement Agreement will allow D.R. Horton to advance the engineering design for all of Basswood Boulevard from Cloudcroft Lane to Horseman Road and Robert W. Downing Road from Basswood Boulevard south to Lou Menk Drive. D.R. Horton will be responsible for its proportional share of the design costs, with additional contributions being made to the design effort by Retasal I, L.P , which owns a large portion of the property on the north side of the future Basswood Boulevard. The City will participate in the design costs with funding of $458,639.00 from Transportation Impact Fee revenues from Service Areas C and F under a pass -through reimbursement basis. D R. Horton will not earn a fee for this service. http://apps.cfwnet.org/council packet/mc_review. asp?ID=18974&councildate=11 /12/2013 11 / 15/2013 M&C Review Page 2 of 2 Owner Estimated Engineering Fee Retasal I, L.P. $ 686,147.00 $110,857.00 D R. Horton - $1,445,796.00 $153,504.00 Texas, Ltd. City of Fort Worth Jk$'270.848.O0 ' $458.639.00 Total ( II $7,402,791.00 $723,000.00 In addition, a 10 percent con 'ngency $45,863.909e g appropriated for the City's share of any amendments to the design e n . It is anticipated that the City and D.R. Horton - Texas, Ltd., will enter into a subsequent infrastructure construction Agreement for construction of this project. This project is located in COUNCIL DISTRICT 2, Mapsco 34V, 35N, 35P and 35S. Estimated Construction FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that, upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Transportation Impact Fund. TO Fund/Account/Centers 2) C206 488139 061249991300 2) C206 541200 061249991300 2) C206 488139 061249991600 2)C206 541200 061249991600 $216.013.48 $216.013.48 $288.489.42 $288.489.42 Submitted for City Manaaer's Office bv: Oriainatinci Department Head: Additional Information Contact: FROM Fund/Account/Centers 1) C206 531200 062230212030 $458.639.00 Fernando Costa (6122) Randle Harwood (6101) David Schroeder (2239) Jim Walker (8009) ATTACHMENTS 06BASSWOOD DESIGN PROCUREMENT AGREEMENT A014(Rev10.31.13).doc basswood blvd Overview. odf Basswood Proiect Design Cost estimate. odf http://apps.cfwnet.org/council_packet/mc review.asp?ID-18974&councildate-11/12/2013 11/15/2013