Loading...
HomeMy WebLinkAboutContract 45532 (2)Cffl' aECma% COMMUNITY FACILITIES AGREEMEN ONT��T No, WITH CITY PARTICIPATION Developer and Project Information Cover Sheet: Developer Company Name: Jabez Development, L.P. Address, State, Zip Code: 9001 Airport Freeway, Suite 400 North Richland Hills, TX 76180 Phone, E-Mail: (817) 507-1100, bruce.french@historymaker.com Authorized Signatory/Title: Bruce French, Vice President Project Name and Brief Description: Water, Sewer, Paving, Storm Drain & Street Light Improvements to serve Palmilla Springs Ph. 2 Project Location: West of the Intersection of Chapin Rd. & Chapel Creek Blvd. Plat Case No.: FP-013-071 Plat Name: Paimilla Springs Mapsco: Council District: 3 City Project No: 02221 CFA: 2014-008 DOE: 7180 To be complet Received by: MI Z g NV O3M333I by staff Vh A. Date: OFFICIAL RECORD v. SECRETARY O M; TX • \‘s1/21(-1 COMMUNITY FACILITIES AGREEMENT WITH CITY PARTICIPATION THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. WHEREAS, Jabez Development, L.P. ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Palmilla Strings Ph. 2 ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has reviewed and desires to ; financially participate in the construction of certain Improvements in the Developer's Project in accordance with this Agreement as presented by the Cost Summary Table and Exhibits hereto and the currently adopted Unit Price Ordinance as provided by the Policy for the Installation of Community Facilities, Section II, as amended, and WHEREAS, M&C G-17598, authorizes City participation in an amount less than $50,000 to be administratively approved; and WHEREAS, The City's cost participation shall be in an amount not to exceed $16,575.66 ("Participation"); and WHEREAS, the City has requested the Developer to cause, and the Developer desires to cause, the design, permitting and construction of the Project for which the City will reimburse the Developer for the City's portion of the work after City's final acceptance of the project; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ( CFA" or "Agreement") in connection with the Improvements and the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") 2 Palmilla Spgs. Ph.2 CFA w/City Participation as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors, except as otherwise limited by or provided in this Agreement. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires it to submit an Affidavit of Bills paid signed by its contractor and consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement as described on the Exhibits attached hereto and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X ; Sanitary Sewer (A-1) X ; Paving (B) X ; Storm Drain (B-1) X ; Street Lights and Signs (C) X . E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then -current City -established wage rates. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being 3 Palmilla Spgs. Ph.2 CFA w/City Participation insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer ,storm dram, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water 4 Palmilla Spgs. Ph.2 CFA w/City Participation mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein I. Unless necessitated by the City's participation in this Agreement, City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities. that are or may be in conflict with any of the community facilities to be installed hereunder. However, City will be responsible for the costs of utility relocation necessitated by the City's participation in this Agreement. J. Developer hereby releases and agrees to indemnify', defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, his contractors, sub -contractors, officers, agents or employees. 5 Palmilla Spgs. Ph.2 CFA w/City Participation M. The Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from or in any wiry connected with the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused. in whole or in part. by the alleged negligence of the City of Fort Worth. its officers. servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and N. Upon completion of all work associated . with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows and further apportioned in the Cost Summary Table below i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the Developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the Developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the City is 6 Palmilla Spgs. Ph.2 CFA w/City Participation not installing the streetlights inspection fees equal to four percent (4%) of the Developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs necessary for Developer's portion of the Project. P. COMPLETION WITHIN 1 YEAR i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within one (1) year; provided, however, if construction of the community facilities has started within the one year period, the Developer may request that the CFA be extended for one additional year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in this CFA shall be subject to the annual availability of City funds as evidenced by the M&C cited above. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of one (1) year from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of one (1) year if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. 7 Palmilla Spgs. Ph.2 CFA w/City Participation (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 8 Palmilla Spgs. Ph.2 CFA w/City Participation COST SUMMARY TABLE A. Water and Sewer Construction 1. Water 2. Sewer Water Construction Cost Sub -Total B. TPW Construction 1. Paving 2. Storm Drain 3. Street Lights TPW Construction Cost Sub -Total Total Construction Cost Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Water Construction Fees Sub -Total E. TPW Inspection Fee F. TPW Material Testing Fee G. Street Light Inspection Fee H. Street Signs Installation Cost I. Civil/Geotechnical Engineering & Survey (20%) TPW Construction Fees Subtotal Total Construction Fees TOTAL PROJECT COST Financial Gaurantee Options Bond = 100% Completion Agreement = 100%/Holds Plat Cash Escrow Water/Sewer = 125% Cash Escrow Paving/Drainage/St Lights = 125% Letter of Credit = 125% w/ 2 yr. Expiration Period Developer's Cost 238,392.84 182,743.05 421,135.89 614,512.35 27,510.00 79,415.00 721,437.35 1,142,573.24 $ 8,422.72 $ 8,422.72 $ 16,845.44 $ 25,680.89 $ 12,840.45 $ 3,176.60 $ 1,225.00 $ 42,922.94 $ 59,768.38 $ 1,202,341.62 Amount $ 1,142,573.24 $ 1,142,573.24 $ 526,419.86 $ 901,796.69 $ 1,428,216.55 Water Cost Share (The City pays for 2" air valve and 16"/10" waterline) Item City No. Description Unit Qty Unit Price 1 16" Waterline LF 409 $ 53.00 2 16" Gate Valve EA 1 $8,768.00 3 2" Air Valve EA 1 $3,900.00 4 Fittings for 16" TN 1.04 $6,330.00 Total Contractor Unit Price $ 63.00 $15, 600.00 $10,200.00 $ 2,800.00 $ City's Cost 16, 575.66 16,575.66 16,575.66 331.51 331.51 663.03 663.03 Total Cost 254,968.50 182,743.05 437,711.55 $ 614,512.35 $ 27,510.00 $ 79,415.00 $ 721,437.35 $ 1,159,148.90 $ 8,754 23 $ 8,754.23 $ 17,508.46 $ 25,680.89 $ 12,840.45 $ 3,176.60 $ 1,225.00 $ 42,922.94 $ 60,431.40 $ 17,238.69 $ 1,219,580.30 Choice- Ck One Lower Unit Price $ 53.00 $8,768.00 $3,900.00 I $2,800.00 I 1.074 Price Percentage $ 20.14 $ 3,331.84 $ 3,900.00 $ 1,064.00 Total City Cost $ 8,237.26 $ 3,331.84 I $ 3,900.00 $ 1,106.56 $16,575.66 9 Palmilla Spgs. Ph.2 CFA w/City Participation Note* Since there is no alternate bid for 10" waterline, the percentage was used to calculate city participation (16-10)/16=0.375, then 38% is city cost. The costs stated herein may be based upon construction estimates rather than actual cost. The City s portion of inspection and material testing fees are directly allocated to the City's accounts for charges and does not reimburse the Water Inspection and Material Testing Fees to the developer. The City's participation estimate shall be limited to the unit prices contained in City of Fort Worth Ordinance No. 19192-06-2010, as amended, ( `Unit Price Ordinance") or as determined by public competitive bid. The City's reimbursement of the Participation (excluding inspection and material testing fees) is not a lump sum amount and may be less than stated above depending upon actual quantities from the Notice of Final Completion package (`Green sheet') and unit prices from the construction contract. In no event shall the City pay more per unit than as determined pursuant to the Unit Price Ordinance or public competitive bid. (SIGNATURE PAGE AND EXHIBITS TO FOLLOW) • 10 Palmilla Spgs. Ph.2 CFA w/City Participation IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this day of � w / � 7 6 ,20 /7. Approved by City Manager's office: Fernando Costa Assistant City Manager Date: 4/22/4' Recommended By: Water Department 3 Wendy Chi-1abulal, EMBA, P.E. Development Engineering Manager S. Frank Crumb, P.E. Director Approved as to Forrn & Legality: Douglas W. Black Assistant City Attorney M&C No.: 4l Date: OFFICIAL RECORD CITY UQtETARY Palmilla Spgs. Ph.2 CFA w/City Paticiliat�orWRTH• Jabez Development, L.P. By: BNMJR, Inc. Its: General Partner Bruce French Vice President Date: 3 `•\ Va\ Transportation & Public Works DouglaW. Wiersig, P.E. Director ATTEST: et Check items associated with the project being undertaken; the checked items must be included as Attachments to this Agreement Included N N v N v N N Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate 12 Palmilla Spgs. Ph.2 CFA w/City Participation PROJECT LOCATION! c304 7T11 80 820 a_ co SEMINARY 81 DR 287 LU 0 [)f owIrvi, 0, \P,,,:r:\11,,,;12,\,d\,:TA L.7)-.101 SEDALE; TRINITY \O- ,Lake 'ngt 0 C.F.A. Exhibit for ... Paimilla Springs, Phase 2 Vicinity Map Water Project No. P265-603140222183 Sewer Project No. P275-703130222183 D.O.E. No. 7180 File No. W-2296 Sheet No. 1 of 1 LEGEND t EXIST. WATER PROP. WATER PROP. F.H. ASSEMBLY H PROP. GATE VALVE r PROP. AIR RELEASE Drawing: 0:\PROJECTS\HIS12597\cad\CFA Exhibits\CFA—A Water.dwg at Mar 24, 2014-1:50pm by Chris_E Layout layoutl Xrefs: X—BASE.dwg -...�\__ �, ryo tit ' re",. \ \ '--.. <� / 0 100 200 jimunLiumj 8WAIER LINE 1 O / / L IEXrsr. GAS / waL SITE / C.F.A. Exhibit for ... Palmilla Springs, Phase 2 Water Exhibit 'A' Water Project No. P265-603140222183 Sewer Project No. P275-703130222183 D.O.E. No. 7180 File No. W-2296 Sheet No. 1 of 1 \ LEGEND EXIST. SS PROP. SS EXIST SSMH • PROP. SSMH ',. \ •\,. '‘, \ \, i \ 1- '' • -.‘. . . ‘ '''` • 7 l' % ri; '''''', . ! , 1 -,..„ \ ,. •,:s- .". < , / / t, 'z '''" .2.2, ...,.. ....,,, ...„/ //../ \ ‘, -tExisr. er ss v 1EXIST. 8" SS • \.1 / rr \c5 , 1,0 , 18. SS LINE cp 0 r / 0 )- cP itIG HORN BLUFF CT t• os, \ \'' 1 14,3 .1 4 /-.0 0 1 8' SS UNE N43 / / \ 0 it) 0 i / ---„/ \pRodEI rdo,o,r, Iwg doo 7?, LeKtIt; I..qyQUf 8 S5 LINE 0 100 200 imeni 8" SS LINE 4S Pal S/TE 8" SS UNE L C.F.A. Exhibit for ... Palmilla Springs, Phase 2 Wastewater Exhibit 'Al I Water Project No. P265-603140222183 Sewer Project No. P275-703130222183 D.O.E. No. 7180 File No. W-2296 Sheet No. 1 of 1 LEGEND HMAC PVMT. TRANS. CONCRETE PVMT. CONCRETE SIDEWALK 4 PROP. TRAFFIC SIGN Orowirajt 1) \PF:t).1E1.. \ 1'mfa1\r.1.k ,17'u at dor. 22. 20ie,- 9 Arun F\A (.111r111 i CIYOUt; 1.151;tetIll Xrgis. 2.-LciAriE..ckq 0 100 200 I / 0 i "N \ / 11 1 ...,,, 1' / ' i N ''''', C. \ ---. ..„.. ......_ , \ \ N I LOT 6 SIDEWALK BY DEVELOPER /EATS T. G45 / LL 517 C.F.A. Exhibit for ... Palmilla Springs, Phase 2 Paving Exhibit 1111 Water Project No. P265-603140222183 Sewer Project No. P275-703130222183 D.O.E. No. 7180 File No. W-2296 Sheet No. 1 of 1 \)— //',/ ',..., /1 ,--/: '‘.. ! 144' 0.1 I , / Y / ) 24w RCP 1 A. // z' / EXIST. 24. SDI / i ,„ , " 4., ! • k LEGEND PROP. INLET PROP. SO EXIST SD 00 0 100 200 'ammul t)r,lwirt,j1 \t'f,;().FC.IS \,111`;1',!'?fv.0,1\p'A, ••••••(.rftl Pro,, ,t)i r:t,r;v, ,1 ;.crycttt; Lowutl • • \ , \ •-.s. / / \ r \ \ \ 24RCP C.F.A. Exhibit for ... Palmilla Springs, Phase 2 Storm Drain Exhibit 'Bi Water Project No. P265-603140222183 Sewer Project No. P275-703130222183 D.O.E. No. 7180 File No. W-2296 Sheet No. 1 of 1 xi / / / , ss, / 1 , \ LEGEND EXIST STREET LIGHT •-• PROP. STREET LIGHT Drowirq \l'iM.V.t:P; \111`:1'?n9",Voll \Cr& A is.lystit; 0 100 200 • --, , ----, \ /--- „\ \ \ „,..,\.. ,., ,\ ) , \. -.,--„. , ,c6 ; - f-"N' rl: • \ '`.. N.' . ./ • I1 i I, \ --_, / .--.. C •.,. , / \ , \ / , \ .. \ b \ ‘ , \ ‘ C.F.A. Exhibit for ... Palmilla Springs, Phase 2 Street Lights Exhibit IC Water Project No. P265-603140222183 Sewer Project No. P275-703130222183 D.O.E. No. 7180 File No. W-2296 Sheet No. 1 of 1 \-' • / BIC HORN BLUFF CT. TT 4, coyoTE"" t. LEGEND * PROP. STREET SIGN "t-t ".;f7: .,:(1V • 9' trIKUt; qtrRit ,:f 0 100 200 \ •-.. V / ' n',1 \ \ \ -,... \ , - • \ GAS ',ELL SPE / 1— C.F.A. Exhibit for ... Palmilla Springs, Phase 2 Street Name Signs Exhibit 'Cl" Water Project No. P265-603140222183 Sewer Project No. P275-703130222183 D.O.E. No. 7180 File No. W-2296 Sheet No. 1 of 1 SECTION 00 41 00 BID FORM This proposal must not be removed from this book of Contract Documents. TO: Jabez Development, L P 9001 Airport Freeway, Suite 400 North Richland Hills, TX 76180 004100-1 BID FORM Page 1 of 3 PROPOSAL FOR: Water, Sewer, Paving, Drainage and Street Light Improvements to serve Palmilla Springs, Phase 2 City Project No. 02221, Water Project No. P265-603140222183, Sewer Project No. P275-703130222183, DOE No. 7180, X No. X-22527 Includes the furnishing of all materials, except materials specified to be furnished by the City, equipment and labor for the installation of all facilities and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: WATER, SEWER, PAVING, DRAINAGE AND STREET LIGHT IMPROVEMENTS TO SERVE PALMILLA SPRINGS, PHASE 2 Construction staking for this project shall be performed by the Owner. The Bidder acknowledges that all work types must be performed only by prequalified contractors and subcontractors. Pursuant to the foregoing 'Invitation to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents including plans, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond Maintenance Bond, and such other bonds, if any as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the sum listed in the Proposal Form, Section 00 42 43. PALAIILLA SPRINGS, PHASE 2 CITY PROJECT NO. 02221 004I00-2 BID FORM Page 2of3 After acceptance of this Proposal the undersigned will execute the formal contract and will deliver approved bonds as required by the Contract Documents, for the faithful performance of the Contract. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 120 calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) PALM/LLA SPRINGS, PHASE 2 CITY PROJECT NO. 0 221 ATTEST: RdslJectfully submitted, aa By (Signatur --3 PALE 61WeriA,114 By (Please Print or Type) Title 004100-3 BID FORM Page 3 of 3 _(,sLc. > Cb Te4cr? JG . ISG Contractor (�331 5401- r� r %ot-E•0643 Business Address Telephone Number FAX Number Indicate whether — Individual Partnershi � PALMILLA SPRINGS PHASE 2 CI7YPROJEC7WO. 02221 UNIT PRICE BID Bidlist Item No. 1-01 1-02 1-03 1-04 1-05 1-06 I-07 1-08 1-09 1-10 1-11 1-12 1-13 1-14 1-15 Unit!: Water Improvements 3311.0561 3311.0261 3311.0161 3311.0001 3312.3006 3312.3003 3312.3002 3312.0001 3312.1002 3312.2003 3312.0106 3312.0117 0241.1106 0241.1118 3305.0109 SECTION 00 42 43 PROPOSAL FORM Project Item Information Description 16" PVC C905 Water Pipe 8" PVC Water Pipe 6" PVC Water Pipe Ductile Iron Water Fittings w/ Restraint 16" Gate Valve w/ Vault 8" Gate Valve 6" Gate Valve Fire Hydrant 2" Combination Air Valve Assembly for Water 1" Water Service Connection to Existing 16" Water Main Connection to Existing 4"-12" Water Main 16" Pressure Plug 4"-12" Pressure Plug Trench Safety Unit II: Sanitary Sewer Improvements 11-01 3331.4115 8" Sewer Pipe 11-02 3331.4116 8" Sewer Pipe, CSS Backfill 11-03 3339.1001 4' Manhole 11-04 3339.1003 11-05 11-06 11-07 11-08 3331.3101 3301.0002 3301.0101 3305.0109 4' Extra Depth Manhole 4" Sewer Service Post -CCTV Inspection Manhole Vacuum Testing Trench Safety CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 Specification Section No. 33 11 12 33 11 12 33 11 12 33 11 11 33 12 20 33 12 20 33 12 20 33 12 40 33 12 30 33 12 10 33 12 25 33 12 25 02 41 14 02 41 14 33 05 10 33 11 10, 33 31 12, 33 31 20 33 11 10, 33 31 12, 33 31 20 33 39 10, 33 39 20 33 39 10, 33 39 20 33 31 50 33 01 31 33 01 30 33 05 10 00 42 43 BID PROPOSAL Page I of 3 Bidder's Application Unit of Bid Quantity Measure LF LF LF TON EA EA EA EA EA EA EA EA EA EA LF LF LF EA VF EA LF EA LF Bidders Proposal Unit Price 409 $63.00 3636 $20.00 20 $14.00 4.1 $2,800.00 1 $15,600.00 10 $1,200.00 5 $800.00 5 $2,700.00 1 $10,200.00 107 $770.00 1 $2,200.00 3 $600.00 1 $100.00 2 $50.00 4045 $0.70 3201 80 $26.50 $35.00 12 $2,205.00 23.8 $100.00 106 3281 12 3281 $535.00 $1.40 $100.00 $1.15 Bid Value $25,767.00 $72,720.00 $280.00 $11,480.00 $15,600.00 $12,000.00 $4,000.00 $13,500.00 $10,200.00 $82,390.00 $2,200.00 $1,800.00 $100.00 $100.00 $2,831.50 $84,826.50 $2,800.00 $26,460.00 $2,380.00 $56,710.00 $4,593.40 $1,200.00 $3,773.15 0042 43 Proposal Fonn (by Gilco-Bumscolsls UNIT PRICE BID Bidlist Item No. Unit III: Paving Improvements III-01 3213.0104 III-02 3213.0101 III-03 3211.0502 111-04 3211.0400 III-05 3213.0301 III-06 3213.0501 III-07 3213.0506 III-08 3212.0501 III-09 3212.0302 III-10 3217.4307 III-11 3217.0002 III-12 3217.0003 III-13 3217.2001 III-14 3217.2102 III-15 3217 2103 III-16 3137.0104 III-17 3471.0001 III-18 3305.0107 III-19 3441.4003 III-20 0241.1000 III-21 0241.1100 III-22 9999.9999 III-23 9999.9999 SECTION 00 42 43 PROPOSAL FORM Project Item Information Description 9" Conc Pvmt 6" Conc Pvmt 8" Lime Treatment Hydrated Lime 4" Conc Sidewalk Barrier Free Ramp, Type R-1 Barrier Free Ramp, Type P-1 4" Asphalt Base Type B 2" Asphalt Pvmt Type D Remove Raised Marker 4" SLD Pvmt Marking HAS (Y) 4" BRK Pvmt Marking HAS (W) Raised MarkerTY W REFL Raised MarkerTY I-C REFL Raised MarkerTY II -A -A Medium Stone Riprap, Dry Traffic Control Manhole Adjustment, Minor Fumish/Install Alum Sign Ground Mount City Std. Remove Conc Pvmt Remove Asphalt Pvmt End of Road Barricade Remove Signage/Barricade Unit IV: Drainage Improvements IV-01 3341.0205 IV-02 3341.0201 IV-03 3349.5001 IV-04 3349.6001 IV-05 3349.7001 IV-06 3349.0001 IV-07 3349.1003 IV-08 3137.0104 IV-09 0241.4201 IV-10 0241.3104 IV-11 3305.0109 IV-12 3125.0101 24" RCP, Class III 21" RCP, Class 111 10' Curb Inlet 10' Recessed Inlet 4' Drop Inlet 4 Storm Junction Box 24" Flared Headwall, 1 Pipe Medium Stone Riprap, Dry Remove 4' Drop Inlet 24" Storm Abandonment Plug Trench Safety SWPPP _> 1 Acre CITY OF FORT NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 Specification Section No. 32 13 13 32 13 13 32 11 29 32 11 29 32 13 20 32 13 20 32 13 20 32 12 16 32 12 16 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 31 37 00 34 71 13 33 05 14 34 41 30 02 41 15 02 41 15 34 71 13 02 41 13 33 41 10 33 41 10 33 49 20 33 49 20 33 49 20 33 49 10 33 49 40 31 37 00 02 41 14 02 41 14 33 05 10 31 25 00 Unit of Measure SY SY SY TN SF EA EA SY SY EA LF LF EA EA EA SY MO EA EA SY SY EA EA LF LF EA EA EA EA EA SY EA EA LF LS 00 42 43 BID PROPOSAL. Page 2 of 3 Bidder's Application Bidders Proposal Bid Quantity Unit Price 2508 11815 15255 297 3502 10 2 67 67 536 600 600 64 30 9 128 4 12 4 238 57 6 5 $36.65 $31.75 $2.20 $140.00 $3.95 $1,500.00 $1,000.00 $50.00 $25.00 $1.50 $2.00 $2.00 $5.00 $5.00 $5.00 $75.00 $500.00 $250.00 $500.00 $20.00 $20.00 $1,500.00 $250.00 235 $47.00 18 $44.00 1 $2,800.00 1 $2,900.00 1 $3,000.00 1 $2,800.00 1 $1,700.00 30 $51.00 1 $750.00 1 $50.00 284 $0.50 1 $1.00 Bid Value $91,918.20 $375,126.25 $33,561.00 $41,580.00 $13,832.90 $15,000.00 $2,000.00 $3,350.00 $1,675.00 $804.00 $1,200.00 $1,200.00 $320.00 $150.00 $45.00 $9,600.00 $2,000.00 $3,000.00 $2,000.00 $4,760.00 $1,140.00 $9,000.00 $1,250.00 $11,045.00 $792.00 $2,800.00 $2,900.00 $3,000.00 $2,800.00 $1,700.00 $1,530.00 $750.00 $50.00 $142.00 $1.00 (X142 43 Proposal Fonn (by Gilco-Bumsco).xls UNIT PRICE BID Bidlist Item No. V-01 V-02 V-03 V-04 V-05 V-06 SECTION 00 42 43 PROPOSAL FORM Project hem Information Description Unit V: Street Light Improvements 3441.3002 3441.3301 3441.1502 3441.1410 3441.1415 9999.9999 Rdwy Ilium Assembly TY D-25 Rdwy Ilium Foundation TY 4 Ground Box, Small, w/ Lid Apron NO 10 Insulated Elec Condr NO 10 Bare Elec Condr 2" CONDT PVC SCH 80 (T) Unit VI: Miscellaneous Improvements VI-01 2605.3031 4" CONDT PVC SCH 40 (T) CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Fonn Revised 20120120 Specification Section No. 34 41 20 34 41 20 34 41 10 34 41 10 34 41 10 26 05 33 (NI 42 43 BID PROPOSAL Page 3 of? Bidder's Application Unit of Bid Quantity Measure EA EA EA LF LF LF 26 05 33 LF Bid Summary 16 16 3 5240 2600 2600 75 Bidder's Proposal Unit Price $1,885.00 $1,110.00 $705.00 $0.75 $0.75 $8.75 $10.00 Bid Value $30,160.00 $17,760.00 $2,115.00 $3,930.00 $1,950.00 $22,750.00 $750.00 Total Bid' $1,159,148.90; 00 42 43 Proposal Form (by Gilco-Bunmscol.rls