HomeMy WebLinkAboutContract 45532 (2)Cffl' aECma%
COMMUNITY FACILITIES AGREEMEN ONT��T No,
WITH CITY PARTICIPATION
Developer and Project Information Cover Sheet:
Developer Company Name: Jabez Development, L.P.
Address, State, Zip Code: 9001 Airport Freeway, Suite 400 North Richland Hills, TX 76180
Phone, E-Mail: (817) 507-1100, bruce.french@historymaker.com
Authorized Signatory/Title: Bruce French, Vice President
Project Name and Brief Description: Water, Sewer, Paving, Storm Drain & Street Light
Improvements to serve Palmilla Springs Ph. 2
Project Location: West of the Intersection of Chapin Rd. & Chapel Creek Blvd.
Plat Case No.: FP-013-071 Plat Name: Paimilla Springs
Mapsco:
Council District: 3 City Project No: 02221
CFA: 2014-008 DOE: 7180
To be complet
Received by:
MI Z g NV O3M333I
by staff
Vh
A.
Date:
OFFICIAL RECORD
v. SECRETARY
O M; TX
•
\‘s1/21(-1
COMMUNITY FACILITIES AGREEMENT
WITH CITY PARTICIPATION
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary
Contract No.
WHEREAS, Jabez Development, L.P. ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Palmilla Strings Ph. 2 ("Project") within the City
of Fort Worth, Texas ("City"); and
WHEREAS, the City has reviewed and desires to ; financially participate in the
construction of certain Improvements in the Developer's Project in accordance with this
Agreement as presented by the Cost Summary Table and Exhibits hereto and the currently
adopted Unit Price Ordinance as provided by the Policy for the Installation of Community
Facilities, Section II, as amended, and
WHEREAS, M&C G-17598, authorizes City participation in an amount less than
$50,000 to be administratively approved; and
WHEREAS, The City's cost participation shall be in an amount not to exceed
$16,575.66 ("Participation"); and
WHEREAS, the City has requested the Developer to cause, and the Developer
desires to cause, the design, permitting and construction of the Project for which the City
will reimburse the Developer for the City's portion of the work after City's final acceptance
of the project; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ( CFA" or "Agreement") in connection with the Improvements and the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA")
2
Palmilla Spgs. Ph.2 CFA w/City Participation
as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations
hereunder and to cause all contractors hired by Developer to comply with
the Policy in connection with the work performed by said contractors,
except as otherwise limited by or provided in this Agreement.
B. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy and recognizes that there shall be no reduction
in the collateral until the Project has been completed and the City has
officially accepted the infrastructure. Developer further acknowledges
that said process requires it to submit an Affidavit of Bills paid signed
by its contractor and consent of Surety signed by its surety to ensure
the contractor has paid the sub -contractor and suppliers in full.
Additionally, the contractor will provide in writing that the contractor
has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement as described on the Exhibits attached
hereto and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the
City -approved construction plans, specifications and cost estimates
provided for the Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X ;
Sanitary Sewer (A-1) X ; Paving (B) X ; Storm Drain (B-1)
X ; Street Lights and Signs (C) X .
E The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy and the contracts for the construction of the public infrastructure
shall be administered in conformance with paragraph 8, Section II, of the
Policy. Developer shall ensure its contractor(s) pays the then -current
City -established wage rates.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of
the department having jurisdiction over the infrastructure to be
constructed, said contractor to meet City's requirements for being
3
Palmilla Spgs. Ph.2 CFA w/City Participation
insured, licensed and bonded to do work in public streets and/or
prequalified to perform water/waste water construction as the case
may be.
ii. To require its contractor to furnish to the City a payment and
performance bond in the names of the City and the Developer for one
hundred percent (100%) of the contract price of the infrastructure, and
a maintenance bond in the name of the City for one hundred percent
(100%) of the contract price of the infrastructure for a period of two
(2) years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to
be furnished before work is commenced and to meet the requirements
of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required
by said documents and same will be evidenced on the ACORD
Certificate of Insurance supplied by the contractor's insurance provider
and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's
Construction Services Division of intent to commence construction so
that City inspection personnel will be available; and to require the
contractor to allow the construction to be subject to inspection at any
and all times by City inspection forces, and not to install or relocate
any sanitary sewer ,storm dram, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such
laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The
submittal should occur no less than 10 working days prior to the
desired date of the meeting. No construction will commence without a
City -issued Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
4
Palmilla Spgs. Ph.2 CFA w/City Participation
mains constructed under this Agreement until said sewer and water
mains and service lines have been completed to the satisfaction of the
Water Department.
G. Developer agrees to provide, at its expense, unless otherwise agreed to by
City, all engineering drawings and documents necessary to construct the
improvements required by this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities
to serve the development or to construct the improvements required herein
I. Unless necessitated by the City's participation in this Agreement, City
shall not be responsible for payment of any costs that may be incurred by
Developer in the relocation of any utilities. that are or may be in conflict
with any of the community facilities to be installed hereunder. However,
City will be responsible for the costs of utility relocation necessitated by
the City's participation in this Agreement.
J. Developer hereby releases and agrees to indemnify', defend and hold the
City harmless for any inadequacies in the preliminary plans,
specifications and cost estimates supplied by the Developer for this
Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said Developer, his contractors, sub -contractors,
officers, agents or employees.
5
Palmilla Spgs. Ph.2 CFA w/City Participation
M. The Developer will further require its contractors to indemnify, defend
and hold harmless the City, its officers, agents and employees from and
against any and all claims, suits or causes of action of any nature
whatsoever, whether real or asserted, brought for or on account of any
injuries or damages to persons or property, including death, resulting
from or in any wiry connected with the construction of the
infrastructure contemplated herein, whether or not such injuries,
death or damages are caused. in whole or in part. by the alleged
negligence of the City of Fort Worth. its officers. servants, or
employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses
suffered by the City or caused as a result of said contractor's failure to
complete the work and construct the improvements in a good and
workmanlike manner, free from defects, in conformance with the
Policy, and in accordance with all plans and
N. Upon completion of all work associated . with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with
its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party
beneficiary of such contracts.
O. Inspection and material testing fees are required as follows and further
apportioned in the Cost Summary Table below
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
Developer's share of the total construction cost as stated in the
construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees
equal to four percent (4%) and material testing fees equal to two percent
(2%) for a total of 6% of the Developer's share of the total construction
cost as stated in the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the City is
6
Palmilla Spgs. Ph.2 CFA w/City Participation
not installing the streetlights inspection fees equal to four percent (4%)
of the Developer's share of the streetlight construction cost as stated in
the construction contract.
iv. Developer shall pay in cash the total cost of street signs necessary for
Developer's portion of the Project.
P. COMPLETION WITHIN 1 YEAR
i. The City's obligation to participate (exclusive of front foot charges) in
the cost of the community facilities shall terminate if the facilities are
not completed within one (1) year; provided, however, if construction
of the community facilities has started within the one year period, the
Developer may request that the CFA be extended for one additional
year. If the community facilities are not completed within such
extension period, there will be no further obligation of the City to
participate. City participation in this CFA shall be subject to the annual
availability of City funds as evidenced by the M&C cited above.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial
guarantee, its agreement with its contractor or other related
agreements.
iii. The City may utilize the Developer's financial guarantee submitted for
this Agreement to cause the completion of the construction of the
community facilities if at the end of one (1) year from the date of this
Agreement the community facilities have not been completed and
accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause
the payment of costs for construction of same before the expiration of
one (1) year if the Developer breaches this Agreement, becomes
insolvent or fails to pay costs of construction and the financial
guarantee is not a Completion Agreement. If the financial guarantee is
a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the
contractors and/or suppliers may put a lien upon the property which is
the subject of the Completion Agreement.
7
Palmilla Spgs. Ph.2 CFA w/City Participation
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
8
Palmilla Spgs. Ph.2 CFA w/City Participation
COST SUMMARY TABLE
A. Water and Sewer Construction
1. Water
2. Sewer
Water Construction Cost Sub -Total
B. TPW Construction
1. Paving
2. Storm Drain
3. Street Lights
TPW Construction Cost Sub -Total
Total Construction Cost
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Water Construction Fees Sub -Total
E. TPW Inspection Fee
F. TPW Material Testing Fee
G. Street Light Inspection Fee
H. Street Signs Installation Cost
I. Civil/Geotechnical Engineering & Survey (20%)
TPW Construction Fees Subtotal
Total Construction Fees
TOTAL PROJECT COST
Financial Gaurantee Options
Bond = 100%
Completion Agreement = 100%/Holds Plat
Cash Escrow Water/Sewer = 125%
Cash Escrow Paving/Drainage/St Lights = 125%
Letter of Credit = 125% w/ 2 yr. Expiration Period
Developer's Cost
238,392.84
182,743.05
421,135.89
614,512.35
27,510.00
79,415.00
721,437.35
1,142,573.24 $
8,422.72 $
8,422.72 $
16,845.44 $
25,680.89 $
12,840.45 $
3,176.60 $
1,225.00 $
42,922.94 $
59,768.38
$ 1,202,341.62
Amount
$ 1,142,573.24
$ 1,142,573.24
$ 526,419.86
$ 901,796.69
$ 1,428,216.55
Water Cost Share (The City pays for 2" air valve and 16"/10" waterline)
Item City
No. Description Unit Qty Unit Price
1 16" Waterline LF 409 $ 53.00
2 16" Gate Valve EA 1 $8,768.00
3 2" Air Valve EA 1 $3,900.00
4 Fittings for 16" TN 1.04 $6,330.00
Total
Contractor
Unit Price
$ 63.00
$15, 600.00
$10,200.00
$ 2,800.00
$
City's Cost
16, 575.66
16,575.66
16,575.66
331.51
331.51
663.03
663.03
Total Cost
254,968.50
182,743.05
437,711.55
$ 614,512.35
$ 27,510.00
$ 79,415.00
$ 721,437.35
$ 1,159,148.90
$ 8,754 23
$ 8,754.23
$ 17,508.46
$ 25,680.89
$ 12,840.45
$ 3,176.60
$ 1,225.00
$ 42,922.94
$ 60,431.40
$ 17,238.69 $ 1,219,580.30
Choice- Ck One
Lower
Unit Price
$ 53.00
$8,768.00
$3,900.00 I
$2,800.00 I
1.074
Price
Percentage
$ 20.14
$ 3,331.84
$ 3,900.00
$ 1,064.00
Total City
Cost
$ 8,237.26
$ 3,331.84
I $ 3,900.00
$ 1,106.56
$16,575.66
9
Palmilla Spgs. Ph.2 CFA w/City Participation
Note* Since there is no alternate bid for 10" waterline, the percentage was used to calculate
city participation (16-10)/16=0.375, then 38% is city cost.
The costs stated herein may be based upon construction estimates rather than actual cost.
The City s portion of inspection and material testing fees are directly allocated to the City's
accounts for charges and does not reimburse the Water Inspection and Material Testing Fees
to the developer. The City's participation estimate shall be limited to the unit prices contained
in City of Fort Worth Ordinance No. 19192-06-2010, as amended, ( `Unit Price Ordinance")
or as determined by public competitive bid. The City's reimbursement of the Participation
(excluding inspection and material testing fees) is not a lump sum amount and may be less
than stated above depending upon actual quantities from the Notice of Final Completion
package (`Green sheet') and unit prices from the construction contract. In no event shall the
City pay more per unit than as determined pursuant to the Unit Price Ordinance or public
competitive bid.
(SIGNATURE PAGE AND EXHIBITS TO FOLLOW)
•
10
Palmilla Spgs. Ph.2 CFA w/City Participation
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to
be executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in quadruplicate, at Fort Worth, Texas this day of
� w / � 7
6
,20 /7.
Approved by City Manager's office:
Fernando Costa
Assistant City Manager
Date: 4/22/4'
Recommended By:
Water Department
3
Wendy Chi-1abulal, EMBA, P.E.
Development Engineering Manager
S. Frank Crumb, P.E.
Director
Approved as to Forrn & Legality:
Douglas W. Black
Assistant City Attorney
M&C No.: 4l
Date:
OFFICIAL RECORD
CITY UQtETARY
Palmilla Spgs. Ph.2 CFA w/City Paticiliat�orWRTH•
Jabez Development, L.P.
By: BNMJR, Inc.
Its: General Partner
Bruce French
Vice President
Date: 3 `•\ Va\
Transportation & Public Works
DouglaW. Wiersig, P.E.
Director
ATTEST:
et
Check items associated with the project being undertaken; the checked items must
be included as Attachments to this Agreement
Included
N
N
v
N
v
N
N
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
12
Palmilla Spgs. Ph.2 CFA w/City Participation
PROJECT LOCATION!
c304 7T11
80
820
a_
co
SEMINARY
81
DR
287
LU
0
[)f owIrvi, 0, \P,,,:r:\11,,,;12,\,d\,:TA
L.7)-.101
SEDALE;
TRINITY
\O-
,Lake
'ngt
0
C.F.A. Exhibit for ...
Paimilla Springs, Phase 2
Vicinity Map
Water Project No. P265-603140222183
Sewer Project No. P275-703130222183
D.O.E. No. 7180
File No. W-2296
Sheet No. 1 of 1
LEGEND
t
EXIST. WATER
PROP. WATER
PROP. F.H. ASSEMBLY
H PROP. GATE VALVE
r PROP. AIR RELEASE
Drawing: 0:\PROJECTS\HIS12597\cad\CFA Exhibits\CFA—A Water.dwg at Mar 24, 2014-1:50pm by Chris_E
Layout layoutl Xrefs: X—BASE.dwg
-...�\__ �, ryo tit ' re",.
\ \
'--.. <� /
0 100 200
jimunLiumj
8WAIER LINE
1 O
/
/
L
IEXrsr. GAS
/ waL SITE
/
C.F.A. Exhibit for ...
Palmilla Springs, Phase 2
Water
Exhibit 'A'
Water Project No. P265-603140222183
Sewer Project No. P275-703130222183
D.O.E. No. 7180
File No. W-2296
Sheet No. 1 of 1
\
LEGEND
EXIST. SS
PROP. SS
EXIST SSMH
• PROP. SSMH
',.
\
•\,. '‘,
\
\,
i \ 1- '' •
-.‘. .
. ‘
'''` • 7 l' % ri; '''''',
.
! , 1
-,..„
\
,. •,:s-
.". < , /
/ t, 'z '''" .2.2,
...,.. ....,,, ...„/
//../ \
‘,
-tExisr. er ss
v
1EXIST. 8" SS
• \.1 / rr \c5 , 1,0 ,
18. SS LINE
cp
0 r
/ 0
)-
cP itIG HORN BLUFF CT
t• os,
\ \'' 1 14,3
.1
4
/-.0
0
1 8' SS UNE N43 /
/
\ 0 it) 0 i /
---„/
\pRodEI rdo,o,r, Iwg doo 7?,
LeKtIt; I..qyQUf
8 S5 LINE
0 100 200
imeni
8" SS LINE
4S
Pal S/TE
8" SS UNE
L
C.F.A. Exhibit for ...
Palmilla Springs, Phase 2
Wastewater
Exhibit 'Al I
Water Project No. P265-603140222183
Sewer Project No. P275-703130222183
D.O.E. No. 7180
File No. W-2296
Sheet No. 1 of 1
LEGEND
HMAC PVMT. TRANS.
CONCRETE PVMT.
CONCRETE SIDEWALK
4 PROP. TRAFFIC SIGN
Orowirajt 1) \PF:t).1E1.. \ 1'mfa1\r.1.k ,17'u at dor. 22. 20ie,- 9 Arun F\A (.111r111
i CIYOUt; 1.151;tetIll Xrgis. 2.-LciAriE..ckq
0 100 200
I
/ 0 i
"N \ / 11 1
...,,,
1' / '
i N ''''', C.
\ ---.
..„.. ......_
, \
\ N I LOT 6 SIDEWALK
BY DEVELOPER
/EATS T. G45
/ LL 517
C.F.A. Exhibit for ...
Palmilla Springs, Phase 2
Paving
Exhibit 1111
Water Project No. P265-603140222183
Sewer Project No. P275-703130222183
D.O.E. No. 7180
File No. W-2296
Sheet No. 1 of 1
\)— //',/ ',...,
/1 ,--/: '‘..
! 144' 0.1
I ,
/ Y / )
24w RCP 1 A. // z' /
EXIST. 24. SDI
/ i ,„ ,
" 4., ! •
k
LEGEND
PROP. INLET
PROP. SO
EXIST SD
00
0 100 200
'ammul
t)r,lwirt,j1 \t'f,;().FC.IS \,111`;1',!'?fv.0,1\p'A, ••••••(.rftl Pro,, ,t)i r:t,r;v, ,1
;.crycttt; Lowutl
•
•
\
,
\ •-.s.
/ / \ r \
\ \
24RCP
C.F.A. Exhibit for ...
Palmilla Springs, Phase 2
Storm Drain
Exhibit 'Bi
Water Project No. P265-603140222183
Sewer Project No. P275-703130222183
D.O.E. No. 7180
File No. W-2296
Sheet No. 1 of 1
xi
/
/
/ ,
ss, / 1 ,
\
LEGEND
EXIST STREET LIGHT
•-• PROP. STREET LIGHT
Drowirq \l'iM.V.t:P; \111`:1'?n9",Voll \Cr& A
is.lystit;
0 100 200
•
--, , ----, \ /---
„\ \ \
„,..,\.. ,., ,\ )
,
\.
-.,--„. , ,c6 ; - f-"N' rl: •
\
'`.. N.' . ./ •
I1
i I,
\
--_,
/
.--.. C
•.,. , / \ , \
/ , \
.. \
b \
‘
, \
‘
C.F.A. Exhibit for ...
Palmilla Springs, Phase 2
Street Lights
Exhibit IC
Water Project No. P265-603140222183
Sewer Project No. P275-703130222183
D.O.E. No. 7180
File No. W-2296
Sheet No. 1 of 1
\-'
• /
BIC HORN BLUFF CT.
TT
4,
coyoTE""
t.
LEGEND
* PROP. STREET SIGN
"t-t ".;f7: .,:(1V • 9'
trIKUt; qtrRit ,:f
0 100 200
\ •-.. V /
' n',1
\ \ \
-,... \
,
- •
\
GAS
',ELL SPE
/
1—
C.F.A. Exhibit for ...
Palmilla Springs, Phase 2
Street Name Signs
Exhibit 'Cl"
Water Project No. P265-603140222183
Sewer Project No. P275-703130222183
D.O.E. No. 7180
File No. W-2296
Sheet No. 1 of 1
SECTION 00 41 00
BID FORM
This proposal must not be removed from this book of Contract Documents.
TO:
Jabez Development, L P
9001 Airport Freeway, Suite 400
North Richland Hills, TX 76180
004100-1
BID FORM
Page 1 of 3
PROPOSAL FOR: Water, Sewer, Paving, Drainage and Street Light Improvements to serve
Palmilla Springs, Phase 2
City Project No. 02221,
Water Project No. P265-603140222183,
Sewer Project No. P275-703130222183,
DOE No. 7180,
X No. X-22527
Includes the furnishing of all materials, except materials specified to be furnished by the City,
equipment and labor for the installation of all facilities and all necessary appurtenances and
incidental work to provide a complete and serviceable project designated as:
WATER, SEWER, PAVING, DRAINAGE AND STREET LIGHT IMPROVEMENTS TO
SERVE
PALMILLA SPRINGS, PHASE 2
Construction staking for this project shall be performed by the Owner.
The Bidder acknowledges that all work types must be performed only by prequalified contractors
and subcontractors.
Pursuant to the foregoing 'Invitation to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents including plans, the site of the project and understanding the
amount of work to be done, and the prevailing conditions, hereby proposes to do all the work,
furnish all labor, equipment and material except as specified to be furnished by the City which is
necessary to fully complete the work as provided in the Plans and Contract Documents and
subject to the inspection and approval of the City of Fort Worth, Texas; and binds himself upon
acceptance of this Proposal to execute a contract and furnish an approved Performance Bond,
Payment Bond Maintenance Bond, and such other bonds, if any as may be required by the
Contract Documents for the performing and completing of the said work. Contractor proposes to
do the work within the time stated and for the sum listed in the Proposal Form, Section 00 42 43.
PALAIILLA SPRINGS, PHASE 2
CITY PROJECT NO. 02221
004I00-2
BID FORM
Page 2of3
After acceptance of this Proposal the undersigned will execute the formal contract and will
deliver approved bonds as required by the Contract Documents, for the faithful performance of
the Contract.
The Bidder agrees to begin construction within 10 calendar days after issue of the work order,
and to complete the contract within 120 calendar days after beginning construction as set forth in
the written work order to be furnished by the Owner.
I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the
provisions and requirements of which have been taken into consideration on preparation of the
foregoing bid:
Addendum No. 1 (Initials) Addendum No. 3 (Initials)
Addendum No. 2 (Initials) Addendum No. 4 (Initials)
PALM/LLA SPRINGS, PHASE 2
CITY PROJECT NO. 0 221
ATTEST:
RdslJectfully submitted,
aa
By (Signatur
--3
PALE 61WeriA,114
By (Please Print or Type)
Title
004100-3
BID FORM
Page 3 of 3
_(,sLc. > Cb Te4cr? JG . ISG
Contractor
(�331 5401- r� r %ot-E•0643
Business Address
Telephone Number FAX Number
Indicate whether — Individual
Partnershi
�
PALMILLA SPRINGS PHASE 2
CI7YPROJEC7WO. 02221
UNIT PRICE BID
Bidlist
Item No.
1-01
1-02
1-03
1-04
1-05
1-06
I-07
1-08
1-09
1-10
1-11
1-12
1-13
1-14
1-15
Unit!: Water Improvements
3311.0561
3311.0261
3311.0161
3311.0001
3312.3006
3312.3003
3312.3002
3312.0001
3312.1002
3312.2003
3312.0106
3312.0117
0241.1106
0241.1118
3305.0109
SECTION 00 42 43
PROPOSAL FORM
Project Item Information
Description
16" PVC C905 Water Pipe
8" PVC Water Pipe
6" PVC Water Pipe
Ductile Iron Water Fittings w/ Restraint
16" Gate Valve w/ Vault
8" Gate Valve
6" Gate Valve
Fire Hydrant
2" Combination Air Valve Assembly for Water
1" Water Service
Connection to Existing 16" Water Main
Connection to Existing 4"-12" Water Main
16" Pressure Plug
4"-12" Pressure Plug
Trench Safety
Unit II: Sanitary Sewer Improvements
11-01 3331.4115 8" Sewer Pipe
11-02 3331.4116 8" Sewer Pipe, CSS Backfill
11-03 3339.1001 4' Manhole
11-04 3339.1003
11-05
11-06
11-07
11-08
3331.3101
3301.0002
3301.0101
3305.0109
4' Extra Depth Manhole
4" Sewer Service
Post -CCTV Inspection
Manhole Vacuum Testing
Trench Safety
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120
Specification
Section No.
33 11 12
33 11 12
33 11 12
33 11 11
33 12 20
33 12 20
33 12 20
33 12 40
33 12 30
33 12 10
33 12 25
33 12 25
02 41 14
02 41 14
33 05 10
33 11 10,
33 31 12,
33 31 20
33 11 10,
33 31 12,
33 31 20
33 39 10,
33 39 20
33 39 10,
33 39 20
33 31 50
33 01 31
33 01 30
33 05 10
00 42 43
BID PROPOSAL
Page I of 3
Bidder's Application
Unit of Bid Quantity
Measure
LF
LF
LF
TON
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
LF
LF
LF
EA
VF
EA
LF
EA
LF
Bidders Proposal
Unit Price
409 $63.00
3636 $20.00
20 $14.00
4.1 $2,800.00
1 $15,600.00
10 $1,200.00
5 $800.00
5 $2,700.00
1 $10,200.00
107 $770.00
1 $2,200.00
3 $600.00
1 $100.00
2 $50.00
4045 $0.70
3201
80
$26.50
$35.00
12 $2,205.00
23.8 $100.00
106
3281
12
3281
$535.00
$1.40
$100.00
$1.15
Bid Value
$25,767.00
$72,720.00
$280.00
$11,480.00
$15,600.00
$12,000.00
$4,000.00
$13,500.00
$10,200.00
$82,390.00
$2,200.00
$1,800.00
$100.00
$100.00
$2,831.50
$84,826.50
$2,800.00
$26,460.00
$2,380.00
$56,710.00
$4,593.40
$1,200.00
$3,773.15
0042 43 Proposal Fonn (by Gilco-Bumscolsls
UNIT PRICE BID
Bidlist
Item No.
Unit III: Paving Improvements
III-01 3213.0104
III-02 3213.0101
III-03 3211.0502
111-04 3211.0400
III-05 3213.0301
III-06 3213.0501
III-07 3213.0506
III-08 3212.0501
III-09 3212.0302
III-10 3217.4307
III-11 3217.0002
III-12 3217.0003
III-13 3217.2001
III-14 3217.2102
III-15 3217 2103
III-16 3137.0104
III-17 3471.0001
III-18 3305.0107
III-19 3441.4003
III-20 0241.1000
III-21 0241.1100
III-22 9999.9999
III-23 9999.9999
SECTION 00 42 43
PROPOSAL FORM
Project Item Information
Description
9" Conc Pvmt
6" Conc Pvmt
8" Lime Treatment
Hydrated Lime
4" Conc Sidewalk
Barrier Free Ramp, Type R-1
Barrier Free Ramp, Type P-1
4" Asphalt Base Type B
2" Asphalt Pvmt Type D
Remove Raised Marker
4" SLD Pvmt Marking HAS (Y)
4" BRK Pvmt Marking HAS (W)
Raised MarkerTY W
REFL Raised MarkerTY I-C
REFL Raised MarkerTY II -A -A
Medium Stone Riprap, Dry
Traffic Control
Manhole Adjustment, Minor
Fumish/Install Alum Sign Ground Mount City Std.
Remove Conc Pvmt
Remove Asphalt Pvmt
End of Road Barricade
Remove Signage/Barricade
Unit IV: Drainage Improvements
IV-01 3341.0205
IV-02 3341.0201
IV-03 3349.5001
IV-04 3349.6001
IV-05 3349.7001
IV-06 3349.0001
IV-07 3349.1003
IV-08 3137.0104
IV-09 0241.4201
IV-10 0241.3104
IV-11 3305.0109
IV-12 3125.0101
24" RCP, Class III
21" RCP, Class 111
10' Curb Inlet
10' Recessed Inlet
4' Drop Inlet
4 Storm Junction Box
24" Flared Headwall, 1 Pipe
Medium Stone Riprap, Dry
Remove 4' Drop Inlet
24" Storm Abandonment Plug
Trench Safety
SWPPP _> 1 Acre
CITY OF FORT NORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120
Specification
Section No.
32 13 13
32 13 13
32 11 29
32 11 29
32 13 20
32 13 20
32 13 20
32 12 16
32 12 16
32 17 23
32 17 23
32 17 23
32 17 23
32 17 23
32 17 23
31 37 00
34 71 13
33 05 14
34 41 30
02 41 15
02 41 15
34 71 13
02 41 13
33 41 10
33 41 10
33 49 20
33 49 20
33 49 20
33 49 10
33 49 40
31 37 00
02 41 14
02 41 14
33 05 10
31 25 00
Unit of
Measure
SY
SY
SY
TN
SF
EA
EA
SY
SY
EA
LF
LF
EA
EA
EA
SY
MO
EA
EA
SY
SY
EA
EA
LF
LF
EA
EA
EA
EA
EA
SY
EA
EA
LF
LS
00 42 43
BID PROPOSAL.
Page 2 of 3
Bidder's Application
Bidders Proposal
Bid Quantity Unit Price
2508
11815
15255
297
3502
10
2
67
67
536
600
600
64
30
9
128
4
12
4
238
57
6
5
$36.65
$31.75
$2.20
$140.00
$3.95
$1,500.00
$1,000.00
$50.00
$25.00
$1.50
$2.00
$2.00
$5.00
$5.00
$5.00
$75.00
$500.00
$250.00
$500.00
$20.00
$20.00
$1,500.00
$250.00
235 $47.00
18 $44.00
1 $2,800.00
1 $2,900.00
1 $3,000.00
1 $2,800.00
1 $1,700.00
30 $51.00
1 $750.00
1 $50.00
284 $0.50
1 $1.00
Bid Value
$91,918.20
$375,126.25
$33,561.00
$41,580.00
$13,832.90
$15,000.00
$2,000.00
$3,350.00
$1,675.00
$804.00
$1,200.00
$1,200.00
$320.00
$150.00
$45.00
$9,600.00
$2,000.00
$3,000.00
$2,000.00
$4,760.00
$1,140.00
$9,000.00
$1,250.00
$11,045.00
$792.00
$2,800.00
$2,900.00
$3,000.00
$2,800.00
$1,700.00
$1,530.00
$750.00
$50.00
$142.00
$1.00
(X142 43 Proposal Fonn (by Gilco-Bumsco).xls
UNIT PRICE BID
Bidlist
Item No.
V-01
V-02
V-03
V-04
V-05
V-06
SECTION 00 42 43
PROPOSAL FORM
Project hem Information
Description
Unit V: Street Light Improvements
3441.3002
3441.3301
3441.1502
3441.1410
3441.1415
9999.9999
Rdwy Ilium Assembly TY D-25
Rdwy Ilium Foundation TY 4
Ground Box, Small, w/ Lid Apron
NO 10 Insulated Elec Condr
NO 10 Bare Elec Condr
2" CONDT PVC SCH 80 (T)
Unit VI: Miscellaneous Improvements
VI-01 2605.3031 4" CONDT PVC SCH 40 (T)
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Fonn Revised 20120120
Specification
Section No.
34 41 20
34 41 20
34 41 10
34 41 10
34 41 10
26 05 33
(NI 42 43
BID PROPOSAL
Page 3 of?
Bidder's Application
Unit of Bid Quantity
Measure
EA
EA
EA
LF
LF
LF
26 05 33 LF
Bid Summary
16
16
3
5240
2600
2600
75
Bidder's Proposal
Unit Price
$1,885.00
$1,110.00
$705.00
$0.75
$0.75
$8.75
$10.00
Bid Value
$30,160.00
$17,760.00
$2,115.00
$3,930.00
$1,950.00
$22,750.00
$750.00
Total Bid' $1,159,148.90;
00 42 43 Proposal Form (by Gilco-Bunmscol.rls