Developer and Project Information Cover Sheet:
Developer Company Name: Crimson Building Company, LLC
Address, State, Zip Code: 1903 Central Drive, Suite 404 1 Bedford, TX 76021
Phone, E-Mail: (817) 684-3444, eric@crimsonbuilders.com
Authorized Signatory/Title: Eric Little, Managing Member/President
Project Name and Brief Description: Water and Sanitary Sewer Improvements to serve Vickery
Apartment Building
Project Location: 801 W. Vickery Boulevard, Fort Worth TX
Plat Case No.: FS-13-183 Plat Name: Jennings South Addition
Council District: 9 City Project No: 02271
CFA: 2014-013 DOE: 7217
To be completer by staff: .
is
Received by:
Combined CFA Agreement — Revised January 2014
Date: 312-Cn
OFFICIAL RECORD
CITY SECRETARY
Ft WORTH, TX
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
§
§
City Secretary
Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
( `Improvements") related to a project generally described as Vickery Apartments Building
("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Proj ect.
NOW, THEREFORE, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub -contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X 1
Sewer (A-1) X , Paving (B) N/A Storm Drain (B-1) _N/A , Street
Lights & Signs (C) N/A
E The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Combined CFA Agreement — Revised January 2014
Chapter 2253, Texas Government Code.
iii To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state -approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre -Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Depth fluent.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement
L The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
Combined CFA Agreement — Revised January 2014
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Combined CFA Agreement — Revised January 2014
Cost Summary Sheet
Project Name. Vickery Apartment Building
CFA No.: 2014-013 DOE No.: 7217
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 17,438.00
2. Sewer Construction $ 18,777.00
Water and Sewer Construction Total $ 36,215.00
B. TPW Construction
1. Street $
2. Storm Drain $
3. Street Lights Installed by Developer $
TPW Construction Cost Total $
Total Construction Cost (excluding the fees): $ 36,215.00
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 724.30
D. Water/Sewer Material Testing Fee (2%) $ 724.30
Sub -Total for Water Construction Fees $ 1,448.60
E TPW Inspection Fee (4%) $
F. TPW Material Testing (2%) $ G. Street Light lnspsection Cost $
H. Street Signs Installation Cost $ -
Sub -Total for TPW Construction Fees $ -
Total Construction Fees: $ 1,448.60
Choice
Financial Guarantee Options, choose one Amount (ck one)
'Bond = 100% $ 36,215.00 X
'Completion Agreement = 100% / Holds Plat $ 36,215.00
Cash Escrow Water/Sanitary Sewer= 125% $ 45,268.75
Cash Escrow Paving/Storm Drain = 125% $
Letter of Credit = 125% w/2yr expiration period $ 45,268.75
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said peveloper has execut d this
instrument in quadruplicate, at Fort Worth, Texas this O day of(
20)l�
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi-
Developmen't Engineering Manager
abulal, EMBA, P.E.
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. WA
Date:
ATTEST:
Mary Jr Ka
City Secretary
ATTEST:
1
Signature
(Print) Name: get 441 elµ�rDSes.
Combined CFA Agreement - Revised January 2014
Transportation & Public Works Department
Douglas W. Wiersig, P.E.
Director
Approved by City Manager 's Office
Fernando Costa
Assistant City Manager
DEVELOPER:
Crimson : uilding Company, LLC
Signature
Print Name: 'c--,-"rla
Title: ` r/097"ft
i
OFFICIAL RECORDI
CITY SECRETARY
FT. WORTh, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
n Street Lights and Signs Estimate
ra
►1
►1
►s
►1
n
(Remainder of Page Intentionally Left Blank)
00 41 00
BID FORM
Page 1 of 14
SECTION 00 41 00
BID FORM
TO: The City Manager
c/o The Purchasing Department
1000 Throckmorton Street
City of Fort Worth, Texas 76102
FOR: Vickery Apartment Building
SEC Vickery Blvd. and Lipsomb St.
City Project No: DOE #7217 City # 02271
Units/Sections: Utility
Paving
Drainage
Electrical
1. Enter Into Agreement
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form
included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions
of the Contract Documents.
2. BIDDER Acknowledgements and Certification
2.1. In submitting this Bid Bidder accepts all of the terms and conditions{, of, the INVITATION TO BIDDERS and
INSTRUCTIONS TO BIDDERS, including without limitation those deal;n9 with the disposition of Bid Bond.
2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will
provide a valid insurance certificate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed
individual or entity and is not submitted in conformity with any collusive agreement or rules of any group
association, organization, or corporation
2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract.
For the purposes of this Paragraph:
a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to
influence the action of a public official in the bidding process
b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the
bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive
levels, or (c) to deprive City of the benefits of free and open competition
c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or
without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-
competitive levels.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327
Bid Document.xls
00 41 00
BID FORM
Page 2 of 14
d. 'coercive practice" means harming or threatening to harm,;directly or indirectly, persons or their
property to influence their participation in the bidding process or affect the execution of the
Contract.
3. Prequalification
The Bidder acknowledges that the following work types must be performed only by prequallfied contractors and
subcontractors:
a. Utiliy
b. Paving
c. Drainage
d Electrical
4. Time of Completion
4.1. The Work will be complete for Final Acceptance within 'ddjrs ° days after the date when the
the Contract Time commences to run as provided in Paragraph 2.03 oVthe General Conditions.
4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete
the Work {and/or achievement of Milestones} within the times specified in the Agreement
5. Attached to this Bid
The following documents are attached to and made a part of this Bid:
a. This Bid Form, Section 00 41 00
b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph
5.01 of the General Conditions.
c. Proposal Form, Section 00 42 43
d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37
e. MWBE Forms (optional at time of bid)
f. Prequalification Statement, Section 00 45 12
g. Conflict of Interest Affidavit, Section 00 35 13
*If necessary, CIQ or CIS forms are to be provided directly to City Secretary
h. Any additional documents that may be required by Section 12 of the Instructions to Bidders
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In
the space provided below, please enter the total bid amount for this project. Only this figure will be read
publicly by the City at the bid opening.
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327
Bid Docurhent.xls
00 41 00
BID FORM
Page 3 of 3
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is
subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective
estimated quantities shown in this proposal and then totaling all of the extended amounts.
6.3.
Total Bid
7. Bid Submittal
This Bid is submitted on
Respectfully su
By:
Title:
Company: n clirtYk
(Printed Name)
V'
11.:3 r 2--t
by the entity named below.
Receipt is acknowledged of the
following Addenda:
Addendum No. 1:
Addendum No. 2:
Addendum No. 3:
Addendum No. 4:
Lv'arw G C v,+i N 111\1 t✓ L L Corporate Seal:
Address: i eid y C 7��L p (p✓' tGr) 6 vvTf- `� d
4,---4)rei 0-1-� / (� 71 0 Lam'
State of Incorporation:
Email:
Phone:
j 14 Li
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327
�C,
Initial
CFA Copy of Bid Document
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID WATER IMPROVEMENTS
Bidlist Item
No.
1
2
3
4
5
6
7
VICKERY APARTMENTS
Description
Trench Safety
Utility Markers
6" Water Pipe
Connection to Existing 4"-12" Water Main
2" Private Water Service
8" Cut -in Gate Valve
8" x 6" Tapping Sleeve & Valve
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Font Revised 20120120
Specification Section
No.
3305.0109
3305.0110
3311.0141
3312.0117
3312.2204
3312.3103
3312.4004
Alternate Bid
Deductive Alternate Bid
Additive Alternate Bid
1
Unit of
Measure
LF
LS
LA
EA
LF
EA
EA
00 42 43
BID PROPOSAL
Page 1 of 6
Bidder's Application
Bid
Quantity
10
1
46
2
4
1
1
Bidder's Proposal
Unit Price
$8.00
$500.00
$24.00
$1,200.00
$950.00
$1,600.00
$3,200.00
Total Base Bid
I 1 I
Total Alternate Bid
I I
---
-TotalDeduc ive Alternate Bid
I '
- - Total Addi ive Alternate Bid
Total Bid Water Line Section'
Bid Value
$80.00
$500.00
$1,104.00
$2,400.00
$3,800.00
$1,600.00
$3,200.00
Lari
$12,684.001
$12,684.001
CFA Copy of Bid Docwaeatxls
PROPOSAL FORM
UNIT PRICE BID SEWER IMPROVEMENTS
Bidlist Item
No.
1
3
4
5
6
7
8
9
10
11
VICKERY APARTMENTS
Description
Remove 4" Sewer Line
Asphalt Pvmt Repair, Sewer Service
Utility Markers
6" 2-way Cleanout
6" Private Sewer Service
6" Sewer Service, Reconnection
Concrete Encase Sewer Pipe
Post -CCTV Inspection
Manhole Vacuum Testing
Bypass Pumping
Trench Safety
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Fomr Revised 20120120
Specification Section
No.
0241.2011
3201.0150
3305.0110
3331.3202
3331.3205
13331.3312
10330.0001
3301.0002
3301.0101
3303.0001
3305.0109
Alternate Bid
Deductive Alternate Bid
Additive Alternate Bid
1
A0 42 43
BID PROPOSAL
Page 2 of 6
Bidder's Application
Unit of Bid
Measure Quantity
LF 55
LF. 45
LS 1
EA 4
LF 84
EA
CY 1.3
LF. 84
EA 1
LS 1
LF. 84
1
Bidder's Proposal
Unit Price
$20.00
$49.00
$500.00
$750.00
$24.00
$1,000.00
$500.00
$10.00
$1,500.00
$1,000.00
$8.00
Total Base Bid
Total Alternate Bidl
Total Deductive Alternate Bid
1
Total Additive Alternate Bid
Total Bid Sewer Line Section)
Bid Value
$1,100.001
$2,205.001
$500:0D
$3,000.001
$2,016.001
$1,000.00
$650.00
$840.00
$1,500.00
$1,000.00
$672.00
$14,483.00
$14,483.001
CFA Copy of Bid Doctunent.sls
co
1--
cn I TEXAS
m cpv) ' 3 TH
--m— CC
D W
o cn
n
1 BR
I I
SITE
JARVIS
DAGGETT
ADWAY
PENN SYLV NIA
0
W ST VICKERY
DAiGGE
BROADVvAY
0
Li J
VICINITY MAP
MAPSCO #76H
GRAPHIC SCALE
500 0 250 500 1000
1105 CHEEK SPARGER RD. SUITE #1 .
COLLEYVILLE, TX 76034
PHONE: 817281.0572
WWVV.CLAYMOOREENG.COM
VICKERY APARTMENTS IMPROVEMENTS CFA EXIIIBITS
NO MIN
1 inch. 1005.
ENGINEERING'
0
5
§
EXISTING 8" GATE VALVE TO
BE ADJUSTED TO MATCH
FINISHED GRADE
PROPOSED:
(1)DOMESTIC METER
!!!
N8911137't 100.07'
LEGEND
ss
PRIVATE 2"
WATER LINE
- -
PROP. PRIVATE DOUBLE
DETECTOR CHECK WILL BE
INSTALLED IN FIRE RISER ROOM
PROPOSED WATER LINE
EXISTING SANITARY SEWER
EXISTING WATER LINE
EXISTING WATER LINE VALVE
PROPOSED 8" GATE VALVE
EX. 8" WATER LINE
EX. 21" SEWER LINE
PRIVATE 6" FIRE
1,0
EXHIBIT A
WATER
GRAPHIC SCALE
0 5 10
1 Inch • 20 0.
20
(I)
m
ENGINEERING
1105 CHEEK SPARGER RD. SUITE #1
COLLEWILLE, TX 76034 7E'
PHONE: 817.281.0572 8
VVWW.CLAYMOOREENG.COM
1 1 1, 1,1 " 1' .1.11 11 1'111,1, " 11, 1,1 11, 1 1 1 '1' 11y 1,1, 1, 11" '1, 1, 1, " " .11y y 1, " • 1, 1' I• I,' 11, " ,.11. 111. " " V,. 11, " • 11y 1, 111y y 1
VICKERY APARTMENTS IMPROVEMENTS CFA EXHIBITS
PROPOSED 84 LF 6" SS
REMOVE 48 LF OF EX. 4" SS
LEGEND
SS
PROPOSED SEWER LINE
EXISTING SANITARY SEWER
------- EXISTING WATER LINE
EXISTING WATER LINE VALVE
2
0
o_
rr
t -
EX. 48" STORM LINE
EX. 21" SEWER LINE
CONNECT PROPOSED 6"
SERVICE LINE TO EXISTING
MANHOLE
PROPOSED 8" WATER LINE
(BY OTHERS)
1.0
EXHIBIT Al
WASTEWATER
GRAPHIC SCALE
0 s 10
hod: 6meav
1 Inch 20 ft.
2P
CLAY
RE
ri
ENGINEERING
1105 CHEEK SPARGER RD. SUITE #1 ;
COLLEYVILLE,1X 76034
PHONE: 817.281.0572
VVWVV.CLAYMOOREENG.COM
VICKERY APARTMENTS IMPROVEMENTS CFA EXHIBITS