HomeMy WebLinkAboutContract 50953-A4 CSC No.50953-A4 AMENDMENT No.0 4 TO CITY SECRETARY CONTRACT No. 50953 WHEREAS, the City of Fort Worth (CITY) and HDR Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 50953, (the CONTRACT) which was authorized by M&C C-28764 on the 26 day of June, 2018 in the amount of $736, 105; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 01 in the amount of $88, 748 which was administratively authorized on the 13th day of December, 2018; and Amendment No. 02 in the amount of $54, 735 which was authorized by M&C C-29172 on the 1st day of July, 2019; and Amendment No. 03 in the amount of $43, 328 which was administratively authorized (CSC No. 50953-A3) on the llth day of May, 2020; and WHEREAS, the CONTRACT involves engineering services for the following project: West 7th Street Design; and WHEREAS, it has become necessary to execute Amendment No. 04 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $51,965. (See Attached Funding Breakdown Sheet, Page -4-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $974, 881 . OFFICIAL RECORD City of Fort Worth CITY SECRETARY Professional Services Agreement Amendment Template Revised:March 9,2020 FT. WORTH, TX Page 1 of 4 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER HDR Engineering, Inc. i wa iguj' 'azfz Dana Burghdoff(D 29,202 AA4 CST) Dana Burghdoff, AXCP Lu A. Bathurst, P.E. Assistant City Manager Vice President DATE: Dec 29,2020 DATE: 10/12/2020 APPROVAL RECOMMENDED: 1 LjQ.L- WilliamJohnso (Dec 29,202015:23 CST) William Johnson Director, Transportation and Public Works Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . Rona,k ReKani Ronak Rekani(Dec 16,202014:27 CST) Ronak Rekani, P.E. Sr. Professional Engineer OFFICIAL RECORD City of Fort Worth CITY SECRETARY Professional Services Agreement Amendment Template Revised:March 9,2020 FT. WORTH, TX Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: M&C: N/A �l Date: N/A DBlack(Dec 29,202016:00 CST) Douglas W. Black Assistant City Attorney ATTEST: r 01°F°Rr*a� for Ronald P. Gonzales pp'�� °�=l�d1 for Ronald P.Gonzales(Dec29,20201T:00 CSY) P-o p�V Cv° o=d Mary J. Kayser 0, �o 0 if o City Secretary da °°° �a4 nEXAsa4p OFFICIAL RECORD City of Fort Worth CITY SECRETARY Professional Services Agreement Amendment Template Revised:March 9,2020 FT. WORTH, TX Page 3 of 4 FUNDING BREAKDOWN SHEET City Secretary No. 50953 Amendment No. 04 Department Fund-Account-Center Amount TPW 34018-0200431-5330500-101555-002330-9999-18010199 $51, 965 Total : $51, 965 City of Fort Worth Professional Services Agreement Amendment Template Revised:March 9,2020 Page 4 of 4 ATTACHMENT A Scope for Engineering Related Professional Services for Street Improvements The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. WORK TO BE PERFORMED Provide landscape design, irrigation design, and construction and related post construction services for the realignment of Stayton Street. Task 1. Project Management Task 9. Landscape Design TASK 1. PROJECT MANAGEMENT ENGINEER will manage the work outlined in this scope to utilize the ENGINEER's and CITY's time and resources efficiently and effectively. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct team activities • Verify quality control is practiced in performance of the work • Attend a project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives. 1.3 Additional Services Allowance (As directed by the CITY) City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 1 of 3 TASK 9. LANDSCAPE DESIGN ENGINEER will provide landscape design, irrigation design, and related construction and post construction services as follows: • Provide sodded turf area in the triangular space created by the construction of the rerouted Stayton Street/West 7th Street Intersection (Attachment A). • Provide natural boulders or concrete bollards in the landscape to alert drivers of the rerouted intersection. • Develop a planting plan with layout of boulders included. • Provide irrigation for turf area limits. • Provide irrigation instructions to restore existing systems affected by construction. • Develop irrigation plan for new landscape with directives to restore the existing system as needed. • Develop construction details and specifications for landscaping and irrigation. • Develop opinion of probable construction cost for landscaping and irrigation. Construction/Post Construction • Assist the City with construction administration services such as needed. • Develop record drawings, as necessary. Meetings • Attend one (1) Predesign Meeting (on-site) • Attend one (1) Preconstruction meeting (on-site) • Attend one (1) Postconstruction meeting (on-site) ASSUMPTIONS • Surveying is not included in this scope of work. • Art installations, monument design or sculptures are not included in this scope of work. • Placemaking and park design is not included in this scope of work. DELIVERABLES A. Landscaping and irrigation plan sheets to be included in the Stayton Street construction plans. B. Attend up to three (3) meetings, as needed. C. Develop record drawings, as needed. City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 2 of 3 ATTACHMENT A �If1•ihrOULiI CITY OF FORT 1A*TN F 1lElI�Ibel FhfO tTl { 1 S CI= C,V. STLHI LHA1N •: SPECTRNY•FOfpltil CITY OF Fdli 110RTNm ELECTRIC. W Ol'V'L•/OL'D' CIT'OF FDRT R7 MORTN�•B• CITY Of FOR}Tmmm IRNI PQ .E EI,TER -� OL 'C'/PL'O' LiiY 6 FLRi IIDRTN�.B ' � ITi a FORT�o6iN n-cn o• ' OF FpFli EARTH TR,IFFIC SIWL5 ' 1 TEST NRE C Tlw ITa [i UTEITY FLEVRTI") CITY OF FMT/ TH B- L"'�'-, M1 TN-1 -556.l1' FxTMo]I 0L'C'rOL'G" I.%T, CITY Of FORT RORTH ib•Lh � {_ STAYTON STREET - TN-I 1p City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 3 of 3 ATTACHMENT Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Engineering Services for West 71h Street AMENDMENT NO.O! Staylon St.Breakout for Landscaping&Irrigation Services City Project No.101555 emcee •.karaptlpn ry e.mw P'Piea er .b.arr Trk N. Orr•laamm aeasule Fraieet TecM1nlol dr.Prel.0 .—I er Enalrer Utlllb „ ye Erglwr taMbrP Err tla cm Aemmure TOTAL Tool tabor aubwrulbM Toblepew TeNaub amb. oiwcbtlac byre. m cemaneb. AmM1ltrl crt Trrl wpmamupn crt Tool ae ae 1 1m +m 2 a 0s ro— rpemn 0 0 0 0 0 0 0 0 0 0 0 0 12 A. 0 Sao 1.1 -ro o 0 o e o 0 0 0 0 0 0 0 o e 1,ras mr9.e e e ar m �e o-e me'n� w emme 0 0 12 D 0 0 0 9 0 0 0 0 0 0 0 0 0 9 entl aeaeeww.We Clw 04— m Cp�aupa vk tlpmnent bimdi V pr*d—M.wbM1 CITY Pro. kbrar. 0 12e .in ematlem rib ARCM1meaSbbb 8lemJetl A9mnaM ee rbMlmmbbbbekmM e0wbtl bras CRY. o 13.5 p1.be®pecAw CITY DgeNna®n in per 126 BDM1etlub uptlebewOM1eedetlJe rnetire npMbb.rebaMb tle SbmeM A—.em—"b tle Cib et Faa Waaxe 8detlub Guitlew 3- 0 Cmrpbb ly WweE ftpm Fmm ek nntl Smrery M ae m Far mbe Dem mac 120 CwMkeb wbM1etler CITY i—e &—d Ao— Dmrkb ee e»rybrtle Dbmie W WNmal kamhmM1r,eM vk mbb iMomrbn retlatl b pepea tlm pr*.tlpmwrb. 19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 wma Sm,a00 2.0 ,m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SO a SO a a a SO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SO 211 Deb caadbn:epriehwiewnenpeire esbab,GlB tleb, mmpie bpe tlMe,Bile rie0 0 0 CDwpbel Drpn PeDkree 0 0 0 0 0 0 0 0 0 0 0 0 0 0 S) —Wpm Wlxmbeyaw:ewer&imr,®eie& 221 eopmetl bpiwlrave.pmm l eberlk pve. emmtlAaemlam Imo itlrP Ci ebrebrcb 1-12P m—p-Trese CeMrtl Dbr:MPrrOrbmlr asM1 anMel bntl 0 2.2S Demob tlm ww ma P.m matl mewl pm. 0 s'M ea Pewm.M ' 9o%x 0 225 Demob tb ea' IemwM w 0 2.2.a 0morSP 0 220 Demob mow mlilumirtipn=1 0 229 —.p P.P— bbmpm w 0 2.10 xrbe aAdbab ilbmlrl:m 0 Cpm abe mebicer bwOM1 —ww W. 0 Ilkrtiepm 90%OC 0 3.19 Dewbpm Wl Uab pbr:Way 0r-0w3e SUE 2214 Pwwe PDF entl pM pbn eeb)zt to n. -F Sm kr e®ex Yta 1.0 on 0 0 0 0 0 0 0 0 0 0 0 0 0 0 S9 S9 SO S9 S9 S9 SO 91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 S' Dewbp pn emery Soetlxer pbne:etltl Wp —ebeb 9.1.1 br eklrmlb entllm tlebib br Peb—mph Wbe b Mil 9.13 UDtleb TIT,CmAal Dbw:uPtlMetlrrOre eM Dleeie 0 9.1.9 Uptlebmwpbtl U9libaw:etltl inert Dmpartl mrwpcn b eelaaim.w�aul ebwr 0 9.tA Demob a Mb ek mea m�ti um 0 9.1.5 Demob uvRtiee fad era—mitt 0 Cib e1 Furl Wara,Tme Wem Naw Pmtl PSE(LOE)-A—Ma PMD Oacbl%Wm Deb:0.-12 1 ae ATTACHMENT Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Engineering Services for West 71h Street AMENDMENT NO.O! Staylon St.Breakout for Landscaping&Irrigation Services City Project No.101555 E— ]rxaraptlpn ra e.mw P'*d er .b.mp Trk N. orr•9aDbM aeasule FMrp Tabnlol dr.Pain .—I er En0�r� Utllib „ yp Erglwr tanbrm Err tla eAD AemapreE.- 3.1.14Tool tabor aubwrulbM Tobl Egww TPNaub arrb. oincbtlac errs. m ccaancb. Arcr�wpert Teri waawcwn cmt ]Pm ae ae +e 1m +m +as 1+e s'p Pp Pm.rM m%x 3127 Da.a a e m bn CapMirlan xMM1pbcNwlewap rppr CapMirlan xMM1 ed�mtl br�ppmrn Dprb wntliil entl wntluclaecMub Dprb rl buMrnebrb Dprb Ouxa% anwrr entl GeaolMr 3.1.13 Iro B'rb00%C.G ­p my—w a i rb 0 91.15 Dprb ixrtim9 mb cbp—tlp pclatlub I 1 0 9.1.18 1 pep' Itlpb pat 0 — 9.1.17 Grbill M.9 0 na.bibem emmad erwb 0 9 Bib Np0.1.18 Cr 1 9.10 Ilbrtim9m 00%C.G 0 9.12 0 9.12131 ROpOM PDF OM DMa0tl pr bOb(1�11zrr,2OOW caprat 8 axoern,DWFbmml b Bu®ex 0 93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 221 r DMO me se GlrmNm Pmpmtl 822 99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m o ,ai ap�axrisp rmeirre im0®b m t p 0 9.9.2 PMDOM mDe9re mmar 0 9.9.9 ryp 0 9A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.4.1 pOMMw ep0 0 9.4.2 PMpOM Uab GriwOD kp 0-M,b DWFbmpbr 0 l0 0n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Dr 0 D r 0 4.1.9 D r 0 W 0 4.1.5 p0 imry 418 renre.o DOrOme me re r ngn,a eu0mObl 418 Upd- 419 41 10 41 19 G%DG 8 UP_GlrmNm Get EpSmmp&8urmW 11arob nnp tlMO=- 1.10 Pmra 00%PDF mp pMaptl ppn ppb)21 IA n, 2 W.W Da oas«nmOrn 118 wnee paP.epcam5m.wrmmum wm r5mpb.Pntl xtl ibm Oumm brnrelCaebucrn 100% 120 Pmra 100%PDFaaabmtl pen epb lal la n, 2mPm DD irpa«nmOrn s.o 0 0 0 0 0 0 0 0 0 0 0 0 0 o to to so to to to s0 )PDF DWw7 amb o 5.1.2 Wabpbrb pen rcpar am Gb'atFDawars,- -Naw—m —(LOE)-A—Ma PMD Oacbl%Wm D010:0-412 2.4 ATTACHMENT Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Engineering Services for West 71h Street AMENDMENT NO.O! Staylon St.Breakout for Landscaping&Irrigation Services City Project No.101555 E— ]rbarnPtlpnrme.mw P'Oi'PT er .e.mr Trk as orre+samm-0P FmiPet Trbnlol dr.Pegrt WnpPN er En0lr� Uaib p 4p Ere�wr la"tlPrA Err ae cm —,o TMAL Tool labor aubwrulbm Tool Eyww TeNaub arrb. oimcbxac Lrme. m cPman.b. rocn cr+ ]r...i R.P—. cr+ ]pm ra.. ae ae +e +m +m +ss ++e 5.1.9 Cammcbmb Ooxsal m nD n epn w 5.1.4 5.1.5 5.1.E pmpme a eppn,mwmm ewa 0 wryp Dremm 5.1.0 CpmpmW br CpmbuNm(CFC)pbm-ep --- (611z1)OOW Dmer pbm,2 OOW epxirttppn Oxb7 0 e.o 0 0 0 0 0 il 0 0 0 0 0 0 0 0 0 0 uDD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.1.1 pm0ae re 0 E.1.2 mm DP b 0 0.1.9 0 0.1A a DeYwrep wane 0 0.1.5 cM1mea Ortlemlwume l)u e 81 Om iw Polr+ eemel wre P m 0 EY imarW 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03.1 M CC rream,e rpa Ma CFC pbm .22 29 7.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TD a s0 a a a s0 71 7. bro m s.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m a so a a a so 91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w Pone(eubmitletlwRmawey Dbml m 0 92B1 am.ae 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2.1 T mbmmme r sod mm w LRrmmbw,mmpm TDLR—Wpl— n 03.2 —TTDLR,—a TDLRbiepeDppn 90tlroe e0er DaehuDtipn eubemmbi mnp.um.mar Dromweb 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m S4]So so a a 00,750 St- 8mc5mtipmkrleMmpinPmxlrreepm wreee +o.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.1.1 (PDFe ntl DW w w na WaYel�eeb mppr wmmm 0 5.1.9 Cammcbmb Ooxsal m nD n can w 518 mmr1 .pmpme a eppn,mwmm ewa 0 mrya DRpem 518 CpmpmW kr CpmbuNm(CFC)pbm entlepcifmOve (dttzt]OOW Daper{bm,2 OOW eDxirttppn Oxb7 0 ++.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 nwPDD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dmmm re 0 mm DP b 0 .1.9 0 e D eu wrep wane 0 1.1.5 cM1mea Ortlemlwume l)u e Weel N aw-.-POE(.E)-A— ma P-ORbbl Rebw D-O-412 9.4 ATTACHMENT Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Engineering Services for West 71h Street AMENDMENT NO.O! Staylon St.Breakout for Landscaping&Irrigation Services City Project No.101555 E- ]rxaraPtlonrme.mw P'*d er .e.mr Trk N. orr•1aao-M acb.sule Prgect Trbnlol dr.Preirt .—I er EnB�reer Utllib ��� erelwr lambrp Err tla eno gemntlre TOTRL Tool labor aubwrulbm ]obi Egww TPNaub arrbr elncmaoc Erl.e. Te Cmdnebr ArcbkeC Crb Trrel ReppbxWn Cwt Tobl ae ae +e +m +m +as ++e r.r.a re Pei em na re P ob lbt 11.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m TD SO CM11.2.1 P.. meore,e rpo 0 imm mnnrp in 0 pm mnM. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 12.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.1.1 leubm�natl wbb RPwbarpwl can w m so 0 0 0 o m s0 12.2.1 kr miw mmPbla TOLRrmn�dePabmb� on b ao 122E TDLR,r 9 oLR'pebm 30 arye ellrmewetienxmb�rtei wirybtion,-t,Cib olrrulb m m a0 meH Tobl HwP 12 Tmm labor ,a10 Tma F­ sa.5 b --E aPb�Pibm ,]$0 P,see acbwPcibm o ros aw bbmP 0 Pareyetlm abal Paawara,Tme wen]aa 8%Rm D Oele:P M1oel-An+mb+ma M0 P0sobl Rebw .0B.412 eae EXHIBIT "BA" ENGINEER INVOICE (Supplement to Attachment B) Design Services for West 7t'Street From University Drive to the Trinity River Bridge AMENDMENT 04 City Project No. 101555 Time and Materials with Rate Schedule Project I. Compensation A. The ENGINEER shall be compensated for personnel time, non-labor expenses, and subcontract expenses in performing services enumerated in Attachment A for an amount not to exceed $51,965 as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Category Rate for the ENGINEER's team member performing the work. Labor Category Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category 2020/2021 Rate $/hour Project Director $246 Technical Director $246 Sr. Project Manager $234 Project Manager/Task Leader $195 Sr. Engineer $170 Utility Coordinator $164 Sr. Landscape Architect $170 Engineer $144 Landscape Architect $144 EIT $125 GIS $119 CAD $104 Administrative/Accounting $79 ii. Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non-labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) IV. Summary of Total Project Fees Firm Primary Responsibility Fee % Amount Prime Consultant HDR Engineering, Inc. Project Management& Engineering $43,215 83% Services: • Stayton St. Landscaping & Irrigation Project Management and Coordination • Additional Services Allowance Proposed MBE/SBE Sub-Consultants SRA/PSC Landscaping & Irrigation Services: $8,750 17% • Stayton St. Landscaping & Irrigation. Non-MBE/SBE Consultants N/A TOTAL $ 51,965 1 100% Project Number& Name Total Fee MBE/SBE Fee 717 SBE West 7' Street Design $ 51,965 $ 8,750 City MBE/SBE Goal = 20% Consultant Committed Goal = 20 % ATTACHMENT C West 7th Street Design Schedule r­� Thin ffirt FInISM1 inh' (idyl' Ocemberas Marsgemmt 965 dap Wetl 1/15/18Wetl)/2s/18:Comeptul Chi I30%) 4IS bp)Mon B/2)/1S Fri 5/22/20 (went)n R.1 merys) Mon B/n/1a Fr111/1q/1B1Rapan R.I 2s days) Mon 12/24/18 Fri I/./. Task):taM SurveylStspon 11, 1dry M s on 4/27/21 In s/22/20 Task 20:TR,isc hit Survey Iffli Sh) 65 drys) Mon 12/29/18 Fri 3/22/19 TMk 11:Norw99tl TMmc counts 0drys Wetl 12/22/20 Well22/12/18 evelop 30%D.Iiin(RdPay.IMa&Ill—) 15)dap Mon 9/24/19 Fri s/31/19 a0 eveiop Pianni:pierel Undi.pi:g C.Ri(2) q5 drys) Mon 12/24/18 Fri 2/22/29 Plennlne-Iael landeceplM Urespts(21 Odeys Frl2/22/19 Fri 1/22/19 30%Deslgn Submhbl Odrys Fri 5/32/29 Fri s/31/19 PubIIC Mee[Ing81 0lay Mon 6/27/19 Mon 6/17/29 30%Chy F.I. 95 drys Mon 6/3/19 Fri)/19/19 Tuk1iIcel Chi 19056)&0rM1 Co TRcdon 315 by Mon 7111119 Fri W/1/10 nts I1ehdj a6 prepare 90%Deslgn 105 days Mon)/22/19 Fri 12/13/19 :MSubm6tal(eg MsIeri 0drys Fri 22/23/29 Fri 22/13/W ea/Le 90%CRY Revew 30 drys Mon 12/26/19 Fri 1/24/W 90%Comment Resolution 20 drys M1bn 1/27/20 Fri 2/21/20 10 90%Comment Resolution Submhtal 0drys Fri 2/22/20 Fri 2/21/W a/aL Public McMing8 Myton R.Community Meenngl Odrys Mon 2/20/20 Mon 2/10/" 21 Prepare 51eial Desgn 45 drys Mon 2/24/m Fri 4/24/M 90 Znal Submlttel Ode, Fri 4/24/20 Fri 4/24/W 90%Slgnal Chy Realew Sdrys Mon 4/27/20 Fri SAM L Prepare]00%/Flnal Deslgn(all sheets) 11)dap Thu3/5/20 Fri 9/14/M ]lha%/FInal chi SubmRMI 0drys Fria/1q/20 Fri 8/14/M 100%/FImi CSy—Iss, 15 drys Mon 8/27/20 Fri 9/4/W is Public hi83(Sre 1-) 0drys Mon 9/7/20 Mon 9/7/M N 19 100%/Final Comment Bemlution Wdrys Mon 9/7/20 Fri 20/21W 30 100%1Final OnlSn Submittal 0drys Fri 1012120 Fri 101111 Task 5:Old Pha rvk W b es Ses by Thu 11/3/1e Fri 9/1/'1 aid Phase Services 8)drys Thu 12/3/20 Fri 4/2/21 Tasty 6:fmO:MMIan PIMM SeMres 317 dep We 4/5111 Tr:e 6/21/12 39 Const—Ion PIM.Servlres all days Mon 4/5/21 Tue 6/21/22 Tax S:Endr9nmental and Permltdrg Idap Mon S/q/10 Tue 7"" Emironmental and Permitting 37 drys Mon 4/s/21 Tue 6/21/22 B.I.(Shinton R.) 15 drys Mon s/q/20 Fri 5/22/M 38 RlMp-bri(Stayton R.) Mdrys Thuq/15/22 Wed 4/29/21 39 RMew(West)th R.) Wdays Mon 9/27/20 Fri 9/11/M TOLE InspettInn(West Ah R.) ]0 drys Wetl W22/22 Tue)/5/22 SMyton R.Reallplm--W. 399 bp)n112/13/19 Wetl 4 /24 /22 90%Sub.h.1(escept sIgnsiii) 0days Fri 11/13/19 Fr111/-In Wt9 93 90%Chy Review 90 drys Mon 12/26/19 Fr!U//20 21 90%Comment Resolution Mdrys Mon 2/2)/20 Fri 2/22/20 Parts Con..I.n(CFWI 135 dap Mon 1/24120 Fri 8/28/W 4. CommunityM ing(We MhR.Publlc Meeting810drys Mon 2/20/20 Mon 1/20/Ll 47 OL A Test Hole IF—Optk) 30 drys Mon 1/17/20 Frl3/61W ses 98 Prepare90%Stayron Signal 15 drys Mon 2/27/20 Frl2/1q/W Submh90%Rryton Signal Odrys FO2/19/20 FO2/1q/20 qa/4 90%Stryton Signal Clty Review 5drys Mon 2/27/20 Fri 2/22/W 9036 Comment Resolution Submittal 0drys Fri 2/22/20 Fri 2/21/M Prepare]00%/Flnal Design 6615 drys Mon 2/1q/20 Fri I/.1 /. ]lha%/FInal chi SubmRMI Odrys Fri 3/23/20 Frl3/13/M 9/Le 100%/FImi City Review 29 drys Mon 3/26120 Thuq/13/10 ]00%/Flnal Comment Reoiution •drys Fri 4/24/20 Wed q/19/Ll 100%/Final Oesign Submittal 0days Wetl 4/29/20 Wed 4/19/M a/19 end-,IsMMs —days Thu 0/./20 Wetl 12/n/28 BMPhax Services UO dap Thuq/30/20 Wed 12/23/20 4ndspape&Irriertbn Design 22 drys ThU B/27/20 Fri 9/1s/W in fanatruralm.-- 1dry) Thu 12/In Thu 12/In fit IaMvpe&Irriertkin Design Sdry) Thu 12/24/20 Th.21/24/m I En FIRM entsl and Pemgtting W dap Thu 11/19/20 Wetl 4/24/22 lwlmnmeMaland Permitting 80 drys Thu 12/24/20 Well 4/24/21 Frl s/18%20 City of Fort Worth ACCEPTANCE OF PREVIOUS SBE COMMITMENT FORM (for use with CHANGE ORDERS or AMENDMENTS greater than$50,000) To be Completed by City Project Manager Amendment(for Professional Services Agreement) Project Name: City Project Number 101555 West 7th Street Design City Project Manager Consultant: JT Auldridge HDR Engineering, Inc. City's SBE Project Goal: 24 % Original Amount of Agreement: $736,105.00 Accepted SBE Commitment: 24 % Total of Previous Amendments: $186,811.00 Date of Last SBE Report: 10/16/2020 Amount for this Amendment: $51,965.00 Amendment#: 4 Revised Amount of Agreement: $974,881.00 Date: 10/12/2020 Language to be inserted in the M&C for this Agreement HDR Engineering, Inc. agrees to maintain its initial SBE commitment of 24% that it made on the original agreement and extend and maintain that same SBE commitment of 24% to all prior amendments up to and inclusive of this Amendment No. 4. Therefore HDR Engineering, Inc. remains in compliance with the City's BIDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous SBE Commitment form executed by an authorized representative of its company. To be Completed by the Representative of the ConsWtant Lucas A. Bathurst Vice President l Printed Signature Title Au zed Signature/Date HDR Engineering, Inc. Jordan Everhart Company Name Contact Name (if different) 600 W. 6th Street jordan.everhart@hdrinc.com Address E-mail address Fort Worth, TX, 76102 972-960-4497 City/State/Zip Phone number Fax Number 13% as of 10/20/2020 SBE % Paid to Date Date City Project Manager has reviewed the work associated with this Amendment, considers it the same or similar to work in the original Agreement, and recommends that the Consultant have the option to retain and confirm its existing SBE commitment. JT Auldridge 1.7, Did'', 10/21/2020 City Project Manager City Project Manager Signature Date . be Completed by the MIWBE Compliance Adrian Zavala 101555 16.8% M/WBE Compliance Staff ID# SBE Current% Level via Last Report Rec'd 11/13/2020 M/W BE Signature Date