HomeMy WebLinkAboutContract 45611 (2)CITY SECRETAm
CONTRACT NO.
Developer and Project Information Cover Sheet:
Developer Company Name: Catholic Diocese of Fort Worth
Address, State, Zip Code: 800 West Loop 820 South f Fort Worth, TX 76108
Phone, E-Mail: (817)560-3300
Authorized Signatory/Title: Michael F. Olson, STD, Bishop of The Catholic Diocese of Fort Worth
Project Name and Brief Description: Paving, Storm Drain & Street Light Improvements to serve St.
Patrick Cathedral Parish Hall Center, Phase 2
Project Location: 1300 Throckmorton Street, Fort Worth TX
- summon' r • me rib
Plat Case No.: FS-011-117/118 Plat Name: Daggett's Addition
Mapsco: 77A Council District: 9 City Project No: 01962
CFA: 2012-043 DOE:6888
To be complete by staff: .
Received by:( (. k ,�&)\_ At -
Combined CFA Agreement —Revised January 2014
Date: -I I
r
1
OFFICIAL RECORD
CITY SECRETARY
PtWORTH,TX
I SIII1
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
§
§
City Secretary
Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
( `Improvements") related to a project generally described as St. Patrick Cathedral Parish
Hall Center, Ph. 2 ("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Proj ect.
NOW, THEREFORE, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work perfouned by said contractors.
B. Developer shall provide financial security in confounance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub -contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) , Sewer
(A-1) Paving (B) X, Stoiin Drain (B-1) X , Traffic Signal (C) X .
E The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following*
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perfouni
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the tem.' of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Chapter 2253, Texas Government Code.
3
1
iii. To require the contractor(s) it hires to perfouu the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state -approved foiui) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre -Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein
City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed specified in the
Project Name and Description by said Developer, his contractors,
subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act,
intentional or otherwise, neglect or misconduct of said DEVELOPER, his
contractors, sub -contractors, officers, agents or employees,
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees. Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
5
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
0 Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and stoii i drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
7
1
Cost Summary Sheet
Project Name. St. Patrick Cathedral Parish Hall Center, Ph. 2
CFA No.: 2012 043 DOE No.: 6888
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Traffic Signal
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Traffic Signal Inspection
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
222,332.50
26,377.60
103,936.36
50,295.25
402,941.71
402,941.71
9,948.40
4,974.20
4,157.45
2,011.81
21,091.87
21,091.87
Amount
402,941.71
402,941.71
503,677.14
503,677.14
Choice
(ck one)
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this
instrument in quadruplicate, at Fort Worth, Texas this 1 L day of tril
, 20 10 .
CITY OF FORT WORTH - Recommended by:
Water Department
k11 Pt -
Wendy Chi-Babulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. k/44-
Date:
ATT
V//r i - f6ivlh
Maly J. Kayser
City Secretary
ATTEST:
it--4-44neCa
ignature
(Print) Name:
3tUU FeccctosSb
o� �. F0t 1/3oP.YvA
hfisl.1Djrec4oQ ois
# avvCi 14.1 s`titii v e, S ar vi c.eS
-cuR Tropestt7
ct-"et-ron ant
Transportation & Public Works Department
Douglas W.
Director
iersig, P.E.
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
OFFICIAL RECORD
CITY SECRETARY
ITN WORTH, TX
DEVELOPER:
Catholic Diocese of Fort Worth
Combined CFA Agreement — Revised January 2014
Utettiekt. F thro63
Signature
Print Name: Michael F. Olson, STD.
Title: Bishop of The Catholic Diocese of Fort Worth
Pe - r Mi . I nn, A rney-in�Fact for
c ast F. D, Bishop of the
Catholic Diocese of Fort Worth
•
•
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
Exhibit Cl: Traffic Signal Improvements
Traffic Signal Estimate
(Remainder of Page Intentionally Left Blank)
CFA Schedule of Values 2014-02-20.xlsx
ITEM DESCRIPTION
1 Paving Improvements
2 Storm Drainage Improvements
3 Street Lighting Improvemetns
4 Traffic Signal Improvements
'Project Totals
Baird, Hampton Brown, Inc.
6300 Ridglea Place, Ste 700,
Fort Worth, Tx 76116
Tel 338-1277, Fax 338-9245
Texas Firm No, F-000044
SCHEDULE OF VALUES
St Patrick s Phase 2
BHB # 2009.152.003
Fort Worth, Texas
Summary
Construction Cost
$222,332 50
$26,377.60
$103,936.36
$50,295 25
$402,941.71
Inspection Fee 1 Testing Fee
2/20/2014
Fee Totals
$8,893.30 $4,446.65 $13,339.95
$1,055.10 $527.55 $1,582.66
$4,157.45 0 $4,157.45
$2,011.81 I 0 I $2,011.81
$16,117.67
1
$4,974.20 I $21,091.87
1 of 5
CFA Schedule of Values 2014-02-20.xlsx
ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Baird, Hampton Brown, Inc.
6300 Ridglea Place, Ste 700,
Fort Worth, Tx 76116
Tel 338-1277, Fax 338-9245
Texas Firm No. F-000044
SCHEDULE OF VALUES
St Patrick's Phase 2
BHB # 2009 152.003
Fort Worth Texas
UNIT 1 : PAVING IMPROVEMENTS
DESCRIPTION SPECIFICATION NO UNIT
0170.0102 Work Order Mobilization (Misc Only)
0241.0100
0241.0401
0241.0401
0241.1100
0241.1300
2605.3031
3110.0101
3123.0101
3125.0101
3201.0123
3212 0302
3212.0501
3213.0301
3213.0401
3213.0501
3214.0100
3216.0102
3217.0009
3217.0012
3217.0305
3217.0503
3217.1002
3217.1003
3217.1004
3217.4301
3217.4304
3291.0100
3305.0107
3305.0108
3471.0001
Tree Grate
Structural Soil Backfill
Sawcut
Remove Sidewalk
Remove Concrete Drive
Remove Concrete Pvmt
Remove Asphalt Pvmt
Remove Conc Curb&Gutter
4" CONDT PVC SCH 40 (T)
Site Clearing
Unclassified Excavation
SWPPP >_ 1 acre
6' Wide Asphalt Pvmt Repair, Arterial
2" Asphalt Pvmt Type D
4" Asphalt Base Type B
4" Conc Sidewalk
6" Concrete Driveway
4' Barrier Free Ramp, Type A
Brick Pvmt
7" Conc Curb and Gutter
4" SLD Pvmt Marking Paint (W)
4" BRK Pvmt Marking Paint (W)
12" SLD Pvmt Marking Paint (W)
24" SLD Pvmt Marking Paint (W)
Lane Legend Arrow
Lane Legend DBL Arrow
Lane Legend Only
Remove 4" Pvmt Marking
Remove 12" Pvmt Marking
Topsoil
Manhole Adjustment, Minor
Miscellaneous Structure Adjustment
Traffic Control
01 70 00
02 41 13
02 41 13
02 41 15
02 41 15
0241 15
26 05 33
31 10 00
31 23 16
31 25 00
32 01 17
32 12 16
32 12 16
32 13 20
32 13 20
32 13 20
32 14 16
32 16 13
32 17 23
32 17 23
32 17 23
32 17 23
32 17 23
32 17 23
32 17 23
32 17 23
32 17 23
32 91 19
33 05 14
33 05 14
34 71 13
Project Subtotal
14% Inspection Fee
I2% Testing Fee
(Total
EA
SF
SF
SY
SY
LF
LF
LS
CY
LS
LF
SY
SY
SF
SF
EA
SY
LF
LF
LF
LF
LF
EA
EA
EA
LF
LF
CY
EA
EA
MO
EA
CY
LF
QUANTITY
1
2422
275
1350
1350
795
190
1
500
1
50
355
355
2920
275
3
221
545
24
855
105
24
3
1
3
15
15
20
2
6
6
5
48
600
UNIT PRICE
$9,480.35
$1.15
$1.15
$10.33
$9.63
$2 77
$48.40
$9,024.18
$31.46
$3,932 50
$36.30
$12 10
$32.17
$5.57
$7.26
$1, 269.29
$69.78
$34.57
$3 63
$3.63
$12 10
$18.15
$363.00
$415.03
$363.00
$1.03
$1.03
$60.50
$423.50
$605.00
$5,687.00
$4,055.92
$10.89
$1 21
Separate Check to City
Separate Check to City
1
2/20/2014
TOTAL
$9,480.35
$2,785.30
$316.25
$13,945.50
$13,000.50
$2,202.15
$9,196.00
$9,024.18
$15, 730.00
$3,932.50
$1,815.00
$4,295 50
$11,420.35
$16,264 40
$1,996.50
$3,807.87
$15,421.38
$18,840.65
$87.12
$3,103.65
$1,270 50
$435.60
$1,089.00
$415.03
$1,089.00
$15.45
$15.45
$1,210 00
$847.00
$3,630.00
$34,122.00
$20,279.60
$522.72
$726.00
$222,332 50
$8,893.30
$4,446.65
$235,672 45
2 of 5
CFA Schedule of Values 2014-02-20.xlsx
ITEM
DESCRIPTION
UNIT 1 :
1 0241.3013 Remove 18" Storm Line
2 0241.4001 Remove 10' Curb Inlet
3 10241.4501 Remove 6" Trench Drain
4 3305.0109 Trench Safety
5 3305.0110 Utility Markers
6 3341.0201 21' RCP, Class III
7 3346.0001 4' Pipe Underdrain, Type 1
8 3349.0001 4 Storm Junction Box
9 3349.5001 10' Curb Inlet
Baird, Hampton Brown, Inc.
6300 Ridglea Place, Ste 700,
Fort Worth, Tx 76116
Tel 338-1277, Fax 338-9245
Texas Firm No, F-000044
SCHEDULE OF VALUES
St Patrick s Phase 2
BHB # 2009.152.003
Fort Worth, Texas
STORM DRAINAGE IMPROVEMENTS
SPECIFICATION NO UNIT QUANTITY
02 41 14
02 41 14
02 41 14
33 05 10
33 05 26
33 41 10
33 46 00
33 49 10
33 49 20
Project Subtotal
4% Inspection Fee
2% Testing Fee
Total
3of5
LF
EA
LF
LF
LS
LF
LF
EA
EA
75
1
12
75
1
75
115
1
2
UNIT PRICE
$7.51
$442.18
$100.00
$1.21
$1,210 00
$104.06
$19 36
$4,310.02
$4,265 25
!S
eparate Check to City
Separate Check to City
2/20/2014
TOTAL
$563.25
$442 18
$1,200.00
$90.75
$1,210.00
$7,804.50
$2,226.40
$4,310.02
$8,530.50
$26,377.60
$1,055.10
$527.55
$27,960.26
CFA Schedule of Values 2014-02-20.xlsx
ITEM
1
2
3
4
5
6
7
8
9
10
2605.0101
2605.0131
2605.3011
2605.3011
3441.1408
3441.1410
3441.1502
3441.3021
3441.3303
3441.3501
DESCRIPTION
Baird, Hampton Brown, Inc.
6300 Ridglea Place, Ste 700,
Fort Worth, Tx 76116
Tel 338-1277, Fax 338-9245
Texas Firm No, F-000044
SCHEDULE OF VALUES
St Patrick s Phase 2
BHB # 2009.152.003
Fort Worth Texas
UNIT 2 : STREET LIGHTING IMPROVEMENTS
Electrical Facilities
S alvage Electrical Equipment
2" CONDT PVC SCH 40 (T)
2" CONDT PVC SCH 40 (B)
N O 6 Insulated Elec Condr
NO 10 Insulated Elec Condr
Ground Box, Small, w/ Lid Apron
O rnamental Assmbly, Simple
Rdwy Illum Foundation TY 7
S alvage Street Light Pole
SPECIFICATION NO UNIT QUANTITY
26 05 00
26 05 10
26 05 33
26 05 33
3441 10
34 41 10
3441 10
34 41 20
34 41 20
34 41 20
Project Subtotal
4% Inspection Fee
'Total
LS
LS
LF
LF
LF
LF
EA
EA
EA
EA
1
1
920
55
3218
1073
1
11
11
1
UNIT PRICE
$3,630.00
$695.06
$9.68
$12 10
$1.82
$1.21
$786.50
$5,841.01
$1,584.00
$423 50
Separate Check to City
2/20/2014
TOTAL
$3,630.00
$695.06
$8,905.60
$665.50
$5,856.76
$1,298.33
$786.50
$64,251 11
$17,424.00
$423.50
$103,936.36
$4,157.45
$108,093.81
CFA Schedule of Values 2014-02-20.xlsx
ITEM
1 2605.3022
2 3441.1001
3 3441.1002
4 3441.1011
5 3441.1314
6 3441.1315
7 3441.1414
8 Opticom
9 3441.1502
10 3441.1603
11 3441.1611
12 3441.1623
13 3441.1701
14 3441.1703
15 3441.2001
16 3441.3411
17 3441.4005
DESCRIPTION
Baird, Hampton Brown, Inc.
6300 Ridglea Place, Ste 700,
Fort Worth, Tx 76116
Tel 338-1277, Fax 338-9245
Texas Firm No, F-000044
SCHEDULE OF VALUES
St Patrick s Phase 2
BHB # 2009.152.003
Fort Worth, Texas
UNIT 2 : TRAFFIC SIGNAL IMPROVEMENTS
3" CONDT PVC SCH 40 (B)
3-Sect Signal Head Assmbly
4 Sect Signal Head Assmbly
P ed Signal Head Assmbly
10/C 14 AWG Multi -Conductor Cable
20/C 14 AWG Multi -Conductor Cable
N O 8 Bare Elec Condr
Ground Box, Large, w/ Lid Apron
Furnish/Install 10' - 14 Ped Pole Assmbly
Furnish/Install Type 41 Signal Pole
Furnish/Install Mast Arm 16' - 36'
TY 1 Signal Foundation
TY 3 Signal Foundation
S alvage Traffic Signal
Reconnect Conductor
Install Alum Sign Mast Arm Mount
SPECIFICATION NO UNIT QUANTITY
26 05 33
34 41 10
34 41 10
34 41 10
34 41 10
34 41 10
34 41 10
34 41 10
34 41 10
34 41 10
34 41 10
3441 10
34 41 10
34 41 10
34 41 13
34 41 20
34 41 30
Project Subtotal
4% Inspection Fee
Total
LF
EA
EA
EA
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
EA
EA
EA
190
1
2
1
130
325
190
240
1
2
1
1
2
1
1
125
3
UNIT PRICE
$42 35
$907.50
$1,149.50
$665.50
$4.54
$6.66
$1.51
$2 66
$907.50
$1,815.00
$11, 979.00
$6 534.00
$1 452 00
$3 025.00
$3 025.00
$8.47
$544.50
Separate Check to City
2/20/2014
TOTAL
$8,046.50
$907.50
$2,299.00
$665.50
$590.20
$2,164.50
$286.90
$638.40
$907.50
$3 630.00
$11,979.00
$6,534.00
$2, 904.00
$3,025.00
$3,025.00
$1,058.75
$1,633.50
$50,295.25
$2, 011.81
$52,307.06
5of5
SA
PA
R
K
Wittn ettle
S0
'\G
Fielc
Baird, Hampton Sc Brown, Inc.
e Eng'neering 8c Surveying
6300 F6dglec flcu, S. 700 FL Waih, 1% 6116 T41(617)378- 271 ra{617).119 245 E-WkmnW b &can
Tee Rega:63n 1-000044 Ewa TgGE01 j 2003.152FJ5
L.
i
\w \28t-, St. \F 28tn St.
7
>
Q D
0
/ o Berry St.
(r)
0
a)
I
0
a)
Seminary
NEW PARISH HALL PHASE 2
ST. PATRICK CATHEDRAL
PROJECT LOCATION MAP
\\,c0
PROJECT
LOCATIO
Dr.
osec
DRAWN BY: AB
I CHECKED BY: BB
I BHB PROJECT: 2009.152.003
IDATE: January, 2014
i
II
,1
PROPOSED SIDEWALK
CONSTRUCTII'tN
J
II
STREET ABANDO\JLD
alimw
•
1
n
`aa
1ZtthhStreet\•
. \\
e1
Baird, Hampton & Brown Inc.
— 0 e Eng'neering 8c Surveying
6700 F64ea Rom Ste. 700 7l Worth, 1% 6116 Tet{617)378- 277 kaa17)118 9245 E-thtrdGAS'rccan
m TaRN.$oUa, i-000044 0ensFRJ.ECt 1 2009.152.007
4
PROPOSED SIDEWALK
RECONSTRUCTION
DRIVEWAY
RECONSTRUCTION
13
s"
• .
" r, /
--A .
ROW ABANDONED
PROPOSED INTERSECTION
IMPROVEMENTS
\
•
I
100 50 0
NEW PARISH HALL PHASE 2
ST. PATRICK CATHEDRAL
GRAPHIC SCALE
DRAWN BY: AB
CHECKED BY: BB
IBHB PROJECT: 2009.152.003
DATE: January, 2014
EXHIBIT B - PAVING IMPROVEMENTS
9
1
1
1
1
100
(PTeE-
�. yet rwPf
jI
J
ins
•
•
\�0
IlO: Street \SQ
(0-„m,lk)
o r3 Baird, Hampton & Brown Inc.
0 0 Eng'neering & Surveying
6360 E4i Moot, Mt. TOO Ft Worth. TX 6116 T t(617)378- 277 T {6111138 9245 E-WtodAb+::rccom
Te.e Regab:Con r-bpM/ Bag PROJECT j 209L15IA93
gip
% St{eat
1
4.4
J
•
PROPOSED 10' CURB INLET
PROPOSED 4' SDMH
•
1
1
1
O •
" I
It
I
100 50 0 100
NEW PARISH HALL PHASE 2
ST. PATRICK CATHEDRAL
EXHIBIT B 1 - STORM DRAIN EXHIBIT
GRAPHIC SCALE
DRAWN BY: AB
CHECKED BY: BB
BHB PROJECT: 2009.152.003
DATE: January, 2014
•
•
ap Te..0-
S dank4 4 p`
4
•
•
1N
•
•
\I 0
I1l1: Scree! \S '�
01
E--
Baird, Hampton & Brown Inc.
Engineering 8c Surveying
5300 gecko Ms . Ste. 700 R Work T( 76116 T t(817)333- D7 Fa (617)338-9245 E-W,b,n:0b`bluem
Term Recalm&m F-00001/ PM MELT j 2003.152S03
Oct
V
_ 1-0
•
PROPOSED ANTIQUE TYPE
STREET LIGHTING (TYP)
• •
r
/
•
100
NEW PARISH HALL PHASE 2
ST. PATRICK CATHEDRAL
EXHIBIT C - STREET LIGHT EXHIBIT
50
GRAPHIC SCALE
DRAWN BY: AB
CHECKED BY: BB
BHB PROJECT: 2009.152.003
DATE: January, 2014
•
100
V0
1It1 Street \s `\
(C1••••,.,T llk) 044
C 1 'I
J
bk f
Cf
J ..
•
•
0 _) Baird, Hampton & Brown, Inc.
L_e Eng'neering oc Surveying
6300 MO*
Par 0 Fl Worth, IX 76116 Td{av)338- Z77 114117}UB- 24 elE Ita r ro4 Uttto s Tent 1
# � �\/ 11iH
•
MMM
PROPOSED TRAFFIC SIGNAL
W/ PEDESTRIAN SIGNAL
PROPOSED PEDESTRIAN
\ SIGNAL
‘
/. • 1�a
•
100 50
NEW PARISH HALL PHASE 2
ST. PATRICK CATHEDRAL
EXHIBIT C2 - TRAFFIC SIGNAL EXHIBIT
GRAPHIC SCALE
'DRAWN BY: AB
CHECKED BY: BB
'BNB PROJECT: 2009.152.003
'DATE: January, 2014
•
•
100