Loading...
HomeMy WebLinkAboutContract 45611 (2)CITY SECRETAm CONTRACT NO. Developer and Project Information Cover Sheet: Developer Company Name: Catholic Diocese of Fort Worth Address, State, Zip Code: 800 West Loop 820 South f Fort Worth, TX 76108 Phone, E-Mail: (817)560-3300 Authorized Signatory/Title: Michael F. Olson, STD, Bishop of The Catholic Diocese of Fort Worth Project Name and Brief Description: Paving, Storm Drain & Street Light Improvements to serve St. Patrick Cathedral Parish Hall Center, Phase 2 Project Location: 1300 Throckmorton Street, Fort Worth TX - summon' r • me rib Plat Case No.: FS-011-117/118 Plat Name: Daggett's Addition Mapsco: 77A Council District: 9 City Project No: 01962 CFA: 2012-043 DOE:6888 To be complete by staff: . Received by:( (. k ,�&)\_ At - Combined CFA Agreement —Revised January 2014 Date: -I I r 1 OFFICIAL RECORD CITY SECRETARY PtWORTH,TX I SIII1 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § § City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ( `Improvements") related to a project generally described as St. Patrick Cathedral Parish Hall Center, Ph. 2 ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Proj ect. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work perfouned by said contractors. B. Developer shall provide financial security in confounance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub -contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) , Sewer (A-1) Paving (B) X, Stoiin Drain (B-1) X , Traffic Signal (C) X . E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following* i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perfouni water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the tem.' of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. 3 1 iii. To require the contractor(s) it hires to perfouu the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state -approved foiui) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed specified in the Project Name and Description by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with 5 the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 0 Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and stoii i drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 7 1 Cost Summary Sheet Project Name. St. Patrick Cathedral Parish Hall Center, Ph. 2 CFA No.: 2012 043 DOE No.: 6888 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Traffic Signal TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Traffic Signal Inspection Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period 222,332.50 26,377.60 103,936.36 50,295.25 402,941.71 402,941.71 9,948.40 4,974.20 4,157.45 2,011.81 21,091.87 21,091.87 Amount 402,941.71 402,941.71 503,677.14 503,677.14 Choice (ck one) IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this 1 L day of tril , 20 10 . CITY OF FORT WORTH - Recommended by: Water Department k11 Pt - Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. k/44- Date: ATT V//r i - f6ivlh Maly J. Kayser City Secretary ATTEST: it--4-44neCa ignature (Print) Name: 3tUU FeccctosSb o� �. F0t 1/3oP.YvA hfisl.1Djrec4oQ ois # avvCi 14.1 s`titii v e, S ar vi c.eS -cuR Tropestt7 ct-"et-ron ant Transportation & Public Works Department Douglas W. Director iersig, P.E. Approved by City Manager's Office Fernando Costa Assistant City Manager OFFICIAL RECORD CITY SECRETARY ITN WORTH, TX DEVELOPER: Catholic Diocese of Fort Worth Combined CFA Agreement — Revised January 2014 Utettiekt. F thro63 Signature Print Name: Michael F. Olson, STD. Title: Bishop of The Catholic Diocese of Fort Worth Pe - r Mi . I nn, A rney-in�Fact for c ast F. D, Bishop of the Catholic Diocese of Fort Worth • • Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate Exhibit Cl: Traffic Signal Improvements Traffic Signal Estimate (Remainder of Page Intentionally Left Blank) CFA Schedule of Values 2014-02-20.xlsx ITEM DESCRIPTION 1 Paving Improvements 2 Storm Drainage Improvements 3 Street Lighting Improvemetns 4 Traffic Signal Improvements 'Project Totals Baird, Hampton Brown, Inc. 6300 Ridglea Place, Ste 700, Fort Worth, Tx 76116 Tel 338-1277, Fax 338-9245 Texas Firm No, F-000044 SCHEDULE OF VALUES St Patrick s Phase 2 BHB # 2009.152.003 Fort Worth, Texas Summary Construction Cost $222,332 50 $26,377.60 $103,936.36 $50,295 25 $402,941.71 Inspection Fee 1 Testing Fee 2/20/2014 Fee Totals $8,893.30 $4,446.65 $13,339.95 $1,055.10 $527.55 $1,582.66 $4,157.45 0 $4,157.45 $2,011.81 I 0 I $2,011.81 $16,117.67 1 $4,974.20 I $21,091.87 1 of 5 CFA Schedule of Values 2014-02-20.xlsx ITEM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Baird, Hampton Brown, Inc. 6300 Ridglea Place, Ste 700, Fort Worth, Tx 76116 Tel 338-1277, Fax 338-9245 Texas Firm No. F-000044 SCHEDULE OF VALUES St Patrick's Phase 2 BHB # 2009 152.003 Fort Worth Texas UNIT 1 : PAVING IMPROVEMENTS DESCRIPTION SPECIFICATION NO UNIT 0170.0102 Work Order Mobilization (Misc Only) 0241.0100 0241.0401 0241.0401 0241.1100 0241.1300 2605.3031 3110.0101 3123.0101 3125.0101 3201.0123 3212 0302 3212.0501 3213.0301 3213.0401 3213.0501 3214.0100 3216.0102 3217.0009 3217.0012 3217.0305 3217.0503 3217.1002 3217.1003 3217.1004 3217.4301 3217.4304 3291.0100 3305.0107 3305.0108 3471.0001 Tree Grate Structural Soil Backfill Sawcut Remove Sidewalk Remove Concrete Drive Remove Concrete Pvmt Remove Asphalt Pvmt Remove Conc Curb&Gutter 4" CONDT PVC SCH 40 (T) Site Clearing Unclassified Excavation SWPPP >_ 1 acre 6' Wide Asphalt Pvmt Repair, Arterial 2" Asphalt Pvmt Type D 4" Asphalt Base Type B 4" Conc Sidewalk 6" Concrete Driveway 4' Barrier Free Ramp, Type A Brick Pvmt 7" Conc Curb and Gutter 4" SLD Pvmt Marking Paint (W) 4" BRK Pvmt Marking Paint (W) 12" SLD Pvmt Marking Paint (W) 24" SLD Pvmt Marking Paint (W) Lane Legend Arrow Lane Legend DBL Arrow Lane Legend Only Remove 4" Pvmt Marking Remove 12" Pvmt Marking Topsoil Manhole Adjustment, Minor Miscellaneous Structure Adjustment Traffic Control 01 70 00 02 41 13 02 41 13 02 41 15 02 41 15 0241 15 26 05 33 31 10 00 31 23 16 31 25 00 32 01 17 32 12 16 32 12 16 32 13 20 32 13 20 32 13 20 32 14 16 32 16 13 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 91 19 33 05 14 33 05 14 34 71 13 Project Subtotal 14% Inspection Fee I2% Testing Fee (Total EA SF SF SY SY LF LF LS CY LS LF SY SY SF SF EA SY LF LF LF LF LF EA EA EA LF LF CY EA EA MO EA CY LF QUANTITY 1 2422 275 1350 1350 795 190 1 500 1 50 355 355 2920 275 3 221 545 24 855 105 24 3 1 3 15 15 20 2 6 6 5 48 600 UNIT PRICE $9,480.35 $1.15 $1.15 $10.33 $9.63 $2 77 $48.40 $9,024.18 $31.46 $3,932 50 $36.30 $12 10 $32.17 $5.57 $7.26 $1, 269.29 $69.78 $34.57 $3 63 $3.63 $12 10 $18.15 $363.00 $415.03 $363.00 $1.03 $1.03 $60.50 $423.50 $605.00 $5,687.00 $4,055.92 $10.89 $1 21 Separate Check to City Separate Check to City 1 2/20/2014 TOTAL $9,480.35 $2,785.30 $316.25 $13,945.50 $13,000.50 $2,202.15 $9,196.00 $9,024.18 $15, 730.00 $3,932.50 $1,815.00 $4,295 50 $11,420.35 $16,264 40 $1,996.50 $3,807.87 $15,421.38 $18,840.65 $87.12 $3,103.65 $1,270 50 $435.60 $1,089.00 $415.03 $1,089.00 $15.45 $15.45 $1,210 00 $847.00 $3,630.00 $34,122.00 $20,279.60 $522.72 $726.00 $222,332 50 $8,893.30 $4,446.65 $235,672 45 2 of 5 CFA Schedule of Values 2014-02-20.xlsx ITEM DESCRIPTION UNIT 1 : 1 0241.3013 Remove 18" Storm Line 2 0241.4001 Remove 10' Curb Inlet 3 10241.4501 Remove 6" Trench Drain 4 3305.0109 Trench Safety 5 3305.0110 Utility Markers 6 3341.0201 21' RCP, Class III 7 3346.0001 4' Pipe Underdrain, Type 1 8 3349.0001 4 Storm Junction Box 9 3349.5001 10' Curb Inlet Baird, Hampton Brown, Inc. 6300 Ridglea Place, Ste 700, Fort Worth, Tx 76116 Tel 338-1277, Fax 338-9245 Texas Firm No, F-000044 SCHEDULE OF VALUES St Patrick s Phase 2 BHB # 2009.152.003 Fort Worth, Texas STORM DRAINAGE IMPROVEMENTS SPECIFICATION NO UNIT QUANTITY 02 41 14 02 41 14 02 41 14 33 05 10 33 05 26 33 41 10 33 46 00 33 49 10 33 49 20 Project Subtotal 4% Inspection Fee 2% Testing Fee Total 3of5 LF EA LF LF LS LF LF EA EA 75 1 12 75 1 75 115 1 2 UNIT PRICE $7.51 $442.18 $100.00 $1.21 $1,210 00 $104.06 $19 36 $4,310.02 $4,265 25 !S eparate Check to City Separate Check to City 2/20/2014 TOTAL $563.25 $442 18 $1,200.00 $90.75 $1,210.00 $7,804.50 $2,226.40 $4,310.02 $8,530.50 $26,377.60 $1,055.10 $527.55 $27,960.26 CFA Schedule of Values 2014-02-20.xlsx ITEM 1 2 3 4 5 6 7 8 9 10 2605.0101 2605.0131 2605.3011 2605.3011 3441.1408 3441.1410 3441.1502 3441.3021 3441.3303 3441.3501 DESCRIPTION Baird, Hampton Brown, Inc. 6300 Ridglea Place, Ste 700, Fort Worth, Tx 76116 Tel 338-1277, Fax 338-9245 Texas Firm No, F-000044 SCHEDULE OF VALUES St Patrick s Phase 2 BHB # 2009.152.003 Fort Worth Texas UNIT 2 : STREET LIGHTING IMPROVEMENTS Electrical Facilities S alvage Electrical Equipment 2" CONDT PVC SCH 40 (T) 2" CONDT PVC SCH 40 (B) N O 6 Insulated Elec Condr NO 10 Insulated Elec Condr Ground Box, Small, w/ Lid Apron O rnamental Assmbly, Simple Rdwy Illum Foundation TY 7 S alvage Street Light Pole SPECIFICATION NO UNIT QUANTITY 26 05 00 26 05 10 26 05 33 26 05 33 3441 10 34 41 10 3441 10 34 41 20 34 41 20 34 41 20 Project Subtotal 4% Inspection Fee 'Total LS LS LF LF LF LF EA EA EA EA 1 1 920 55 3218 1073 1 11 11 1 UNIT PRICE $3,630.00 $695.06 $9.68 $12 10 $1.82 $1.21 $786.50 $5,841.01 $1,584.00 $423 50 Separate Check to City 2/20/2014 TOTAL $3,630.00 $695.06 $8,905.60 $665.50 $5,856.76 $1,298.33 $786.50 $64,251 11 $17,424.00 $423.50 $103,936.36 $4,157.45 $108,093.81 CFA Schedule of Values 2014-02-20.xlsx ITEM 1 2605.3022 2 3441.1001 3 3441.1002 4 3441.1011 5 3441.1314 6 3441.1315 7 3441.1414 8 Opticom 9 3441.1502 10 3441.1603 11 3441.1611 12 3441.1623 13 3441.1701 14 3441.1703 15 3441.2001 16 3441.3411 17 3441.4005 DESCRIPTION Baird, Hampton Brown, Inc. 6300 Ridglea Place, Ste 700, Fort Worth, Tx 76116 Tel 338-1277, Fax 338-9245 Texas Firm No, F-000044 SCHEDULE OF VALUES St Patrick s Phase 2 BHB # 2009.152.003 Fort Worth, Texas UNIT 2 : TRAFFIC SIGNAL IMPROVEMENTS 3" CONDT PVC SCH 40 (B) 3-Sect Signal Head Assmbly 4 Sect Signal Head Assmbly P ed Signal Head Assmbly 10/C 14 AWG Multi -Conductor Cable 20/C 14 AWG Multi -Conductor Cable N O 8 Bare Elec Condr Ground Box, Large, w/ Lid Apron Furnish/Install 10' - 14 Ped Pole Assmbly Furnish/Install Type 41 Signal Pole Furnish/Install Mast Arm 16' - 36' TY 1 Signal Foundation TY 3 Signal Foundation S alvage Traffic Signal Reconnect Conductor Install Alum Sign Mast Arm Mount SPECIFICATION NO UNIT QUANTITY 26 05 33 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 3441 10 34 41 10 34 41 10 34 41 13 34 41 20 34 41 30 Project Subtotal 4% Inspection Fee Total LF EA EA EA LF LF LF LF EA EA EA EA EA EA EA EA EA 190 1 2 1 130 325 190 240 1 2 1 1 2 1 1 125 3 UNIT PRICE $42 35 $907.50 $1,149.50 $665.50 $4.54 $6.66 $1.51 $2 66 $907.50 $1,815.00 $11, 979.00 $6 534.00 $1 452 00 $3 025.00 $3 025.00 $8.47 $544.50 Separate Check to City 2/20/2014 TOTAL $8,046.50 $907.50 $2,299.00 $665.50 $590.20 $2,164.50 $286.90 $638.40 $907.50 $3 630.00 $11,979.00 $6,534.00 $2, 904.00 $3,025.00 $3,025.00 $1,058.75 $1,633.50 $50,295.25 $2, 011.81 $52,307.06 5of5 SA PA R K Wittn ettle S0 '\G Fielc Baird, Hampton Sc Brown, Inc. e Eng'neering 8c Surveying 6300 F6dglec flcu, S. 700 FL Waih, 1% 6116 T41(617)378- 271 ra{617).119 245 E-WkmnW b &can Tee Rega:63n 1-000044 Ewa TgGE01 j 2003.152FJ5 L. i \w \28t-, St. \F 28tn St. 7 > Q D 0 / o Berry St. (r) 0 a) I 0 a) Seminary NEW PARISH HALL PHASE 2 ST. PATRICK CATHEDRAL PROJECT LOCATION MAP \\,c0 PROJECT LOCATIO Dr. osec DRAWN BY: AB I CHECKED BY: BB I BHB PROJECT: 2009.152.003 IDATE: January, 2014 i II ,1 PROPOSED SIDEWALK CONSTRUCTII'tN J II STREET ABANDO\JLD alimw • 1 n `aa 1ZtthhStreet\• . \\ e1 Baird, Hampton & Brown Inc. — 0 e Eng'neering 8c Surveying 6700 F64ea Rom Ste. 700 7l Worth, 1% 6116 Tet{617)378- 277 kaa17)118 9245 E-thtrdGAS'rccan m TaRN.$oUa, i-000044 0ensFRJ.ECt 1 2009.152.007 4 PROPOSED SIDEWALK RECONSTRUCTION DRIVEWAY RECONSTRUCTION 13 s" • . " r, / --A . ROW ABANDONED PROPOSED INTERSECTION IMPROVEMENTS \ • I 100 50 0 NEW PARISH HALL PHASE 2 ST. PATRICK CATHEDRAL GRAPHIC SCALE DRAWN BY: AB CHECKED BY: BB IBHB PROJECT: 2009.152.003 DATE: January, 2014 EXHIBIT B - PAVING IMPROVEMENTS 9 1 1 1 1 100 (PTeE- �. yet rwPf jI J ins • • \�0 IlO: Street \SQ (0-„m,lk) o r3 Baird, Hampton & Brown Inc. 0 0 Eng'neering & Surveying 6360 E4i Moot, Mt. TOO Ft Worth. TX 6116 T t(617)378- 277 T {6111138 9245 E-WtodAb+::rccom Te.e Regab:Con r-bpM/ Bag PROJECT j 209L15IA93 gip % St{eat 1 4.4 J • PROPOSED 10' CURB INLET PROPOSED 4' SDMH • 1 1 1 O • " I It I 100 50 0 100 NEW PARISH HALL PHASE 2 ST. PATRICK CATHEDRAL EXHIBIT B 1 - STORM DRAIN EXHIBIT GRAPHIC SCALE DRAWN BY: AB CHECKED BY: BB BHB PROJECT: 2009.152.003 DATE: January, 2014 • • ap Te..0- S dank4 4 p` 4 • • 1N • • \I 0 I1l1: Scree! \S '� 01 E-- Baird, Hampton & Brown Inc. Engineering 8c Surveying 5300 gecko Ms . Ste. 700 R Work T( 76116 T t(817)333- D7 Fa (617)338-9245 E-W,b,n:0b`bluem Term Recalm&m F-00001/ PM MELT j 2003.152S03 Oct V _ 1-0 • PROPOSED ANTIQUE TYPE STREET LIGHTING (TYP) • • r / • 100 NEW PARISH HALL PHASE 2 ST. PATRICK CATHEDRAL EXHIBIT C - STREET LIGHT EXHIBIT 50 GRAPHIC SCALE DRAWN BY: AB CHECKED BY: BB BHB PROJECT: 2009.152.003 DATE: January, 2014 • 100 V0 1It1 Street \s `\ (C1••••,.,T llk) 044 C 1 'I J bk f Cf J .. • • 0 _) Baird, Hampton & Brown, Inc. L_e Eng'neering oc Surveying 6300 MO* Par 0 Fl Worth, IX 76116 Td{av)338- Z77 114117}UB- 24 elE Ita r ro4 Uttto s Tent 1 # � �\/ 11iH • MMM PROPOSED TRAFFIC SIGNAL W/ PEDESTRIAN SIGNAL PROPOSED PEDESTRIAN \ SIGNAL ‘ /. • 1�a • 100 50 NEW PARISH HALL PHASE 2 ST. PATRICK CATHEDRAL EXHIBIT C2 - TRAFFIC SIGNAL EXHIBIT GRAPHIC SCALE 'DRAWN BY: AB CHECKED BY: BB 'BNB PROJECT: 2009.152.003 'DATE: January, 2014 • • 100