Loading...
HomeMy WebLinkAboutContract 45613 (2)rn cm, r-n r • I CD ara nia swat COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: Developer Company Name: PR III/CROW 35 EAGLE, LP Address, State, Zip Code: 2100 McKinney Ave., Suite 800 I Fort Worth, TX 75201 Phone, E-Mail: 214-863-4410, sdyche@trammellcrow.com Authorized Signatory/Title: Scott A. Dyche, Director Project Name and Brief Description: Water, Sewer, Paving, Storm Drain and Street Light Improvements to serve Heritage Parkway between Eagle Parkway & I-3 5 W Project Location: Heritage Parkway between Eagle Parkway and I-3 5 W Plat Case No.: FP-013-068 Plat Name: Trammel Crow Eagle 35 Council District: 7 To be completed y staff Received by:( \(— seer City Project No: 02210 CFA: 2013-087 DOE: 7159 1 Date: Ot I \3 • 1 OFFMAL RECORD:. FAIN SECRETARY �} �� WORTH, TX • NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide fmancial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X_, Sewer (A-1) _X Paving (B) X, Storm Drain (B-1) _X , Street Lights & Signs (C) X_. E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included m this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer,, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries. death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth. its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs P. COMPLETION WITHIN 2 YEARS i If applicable, the City's obligation to participate (exclusive of front foot charges) in the cost of the Improvements shall terminate if the Improvements are not completed within two (2) years provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Heritage Parkway between Eagle Pkwy. & 1-35W CFA No.: 2013-087 DOE No.:7159 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 734,106.00 $ $ 311,414.00 422,692.00 B. TPW Construction 1. Street & Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total $ 2,268,968.00 $ $ 2,117,061.00 151,907.00 Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees $ 3,003,074.00 $ $ $ 14,682.12 14,682.12 29,364.24 E TPW Inspection Fee (4%) $ 84,682.44 F. TPW Material Testing (2%) $ 42,341.22 G. Street Light Inspsection Cost $ 6,076.28 H. Street Signs Installation Cost $ Sub -Total for TPW Construction Fees $ 133,099.94 Total Construction Fees: Financial Guarantee Options, choose one IBond = 100% ICompJetion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period iii $ 162,464.18 $ $ $ $ $ Choice Amount (ck one) 3,003,074.00 X 3,003,074.00 917,632.50 2,836,210.00 3,753,842.50 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in at Fort Worth, Texas this 1 day of Ma quadruplicate, 20 1 CITY OF FORT WORTH - Recommended by: Water Department Wendy ChBabulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. 4/4 Date: ATT laic • Mary J. Kayser City Secretary Transportation & Public Works Department o Douglas NO. Wiersig, P.E. Director Approved by City Manager's Office -7-6/4-psst444, Fernando Costa Assistant City Manager (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) ©6L1©ULML UU © 1 DEVELOPER: PR III/CROW 35 EAGLE, LP, a Delaware limited partnership By: PR III/ Crow 35 Eagle GP, LLC, a Delaware limited liability company, its general partner By: PR III/Crow Building B & D Holdings, LLC, a Delaware limited liability company, its sole member and manager By: TC Eagle Land, LLC, a Delaware limited liability company, a member By: TCDFW Industrial Development, Inc., a Delaware corporation, its managing member By: Name: Title: Scott A. Dyche Executive Vice President Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement included r/ ►1 Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 5/1/2014 2:30:15 PM ah2142 HALFF 1328000s \ 28961 \ CADDNExhibits \ Communities Facility Agreement \CFA-EXHIBIT-LOCATION MAP.dan f44' 0 jr1 F5111r.::: Z > .r71 ! m i7"4* 171,0Z/L/9 DGN: CFA-EXHIBIT-LOCATION MAP.dgn 1. dO :'ON 30Vd OD C) 31VO! DAY OLD DENT01\11 RD 411, r- 0 > Iz Sheet PDF 2D MON MW 150.olt CEMETERY 2 -‹ / 1I oz EX. 24" < i411 WATER LINE 0 2:27:36 PM ah2142 HALFF I: \28000M2896MADMExhibits \Communities Facility Agreement\ CFA-EXHIBIT-WATER.dan ------i- EX. 16" WATER LINE As S. THON''' RN\ REY8 R VEY \ SU- RA A GT c-T-F ABN-6.1130 if ALEX 0 ,mcDONA\-- sURVEY P 'ABSTRA CT EXISTING 24" WATER LINE HOiVARD L. PETERS°1 V VOL. 320. PC. 455 UNDERGROUND PUBL/C UT/L/TI EASEMENT VOL. 2950, PC. 802 LEGEND PROPOSED WATER LINE PROPOSED WATER VALVE PROPOSED AIR RELEASE VALVE PROPOSED FIRE HYDRANT PROPOSED BLOW OFF VALVE EXISTING WATER LINE IL ,-1-11111 ; r\ ‘.‘ ,,,„----FUTURE DEVELOPMENT - • (BY SEPARATE CONTRACT) 11111 I \ 1;1, JI 111— IIrI SPECIAL WRRANTY DEED INTEL CORPORATION DOC. NO. 97\ 0058793 D.R.D. 0 150 300 450 SCALE: 1=300' PROPOSED 16" WATER LINE DRILL SITE OOC. NO. 2010-98249 0.R.0.C. T. 'EXISTING 24" 'WATER LINE ADS mES suRvEY T BsTRAC 410 =PERMANENT EASEMENT -1H_35w--DOC. NO. 96-R003715J- ---70,R.D.C. WATER EXHIBIT "A" HERITAGE PARKWAY BETWEEN EAGLE PARKWAY AND I-35W • HALFFsm DGN: CFA-EXHIBIT-WATER.dgn NEE TBPE FIRM #F-312 4000 FOSSIL CREEK BLVD. FORT WORTH, TEXAS 76137 (817) 847-1422 DATE: 5/1/2014 AVO: 28961 PAGE NO.:1 OF 1 3 7 0 ALE L: SURV /rAgSTR FUTUREDEVELOPMENT,� RO>< (BY SEPARATE CONTRACT) ARP' ' \ SURVEY EARS 0° 410 JAA L' ACT N P IR®, PECIAL WARRANTY DEED NT CORPOP TION D O.97-R00`.8793 D°R°D°C° T° \\ 25' S4N/TARP SEWER, ESMT LEGEND PROPOSED SANITARY SEWER PROPOSED SANITARY SEWER MANHOLE - EXISTING SANITARY SEWER 0 300 PROPOSED 12" Y SANITARY SEWER S SURVE TER K MATTNNv s PE qgS 600 T 900 SCALE: 1 "=600' DANIELS J°TRAL, AB O 349 (EXISTING 30" SANITARY SEWER 'PROPOSED 12" SANITARY SEWER 7° 5' SAN/TARY— SEWER ESMT EXTENS/ON IH-35W EXISTING 24" SS'_ FORCE MAIN HALFFSM NE]. TBPE FIRM#F-312 4000 FOSSIL CREEK BLVD. FORT WORTH, TEXAS 76137 (817) 847-1422 BATES T°SU VEY T g AR RAC NO° 206 SEWER EXHIBIT "A-1" HERITAGE PARKWAY BETWEEN EAGLE PARKWAY AND I-35W DGN: CFA-EXHIBIT-SEWER.dgn DATE: 5/1/2014 25' SAN/TAR,' SEWER ESMT AVO: 28961 PAGE NO.:1 OF 1 PDF 2D MON MW 150.r t ent\CFA-EXHIBIT-PAVING.dgn OOOst28961\CADDIE 0 a Ex A D A ONAL MoS�Rri. Ag 0 786 It r OMAS N REYVEY\ SU. AC N�RN 1113 FORT WORTH ALLIANCE AIRPORT 1 9O'PAV/NC SETBACK c:=VOL. 3095, PC. 199 D.R.D.C.T\ PROPOSED BRICK, PAVEMENT /� j�/NOWARD L. PETER5 N /_� VOL..R. P0. 455 �� D.R.D.C.Tj i _ALL_ LOCATION MAP N.T.S. FUTURE 5' SIDEWALK (BY DEVELOPER) 0 150 SCALE:1"=300' 300 IL 1llI ;r.- \\ FUTURE DEVELOPMENT (BY SEPA II I I ATE CONTRACT) \\,, !II_ Q PROPOSED 5' �1SIDEWALK PROPOSED 9" PAVEMENT SPECIAL RRANT Y DEED INTEL C PORA TION DOC. NO. 9 R0038793 D.R.D. T. 450 ■ '::1111 ■ ■■ III ■ TBPEFIRM#F312 4000 FOSSIL CREEK BLVD. FORT WORTH, TEXAS 76137 (817) 847.1422 DATE:5/1/2014 I LEGEND PROPOSED 9" PAVEMENT PROPOSED BRICK PAVEMENT PROPOSED 5 ' SIDEWALK FUTURE 5' SIDEWALK (BY DEVELOPER) DR/L. 51 'E B DOC. I/O. 201 J-98249 O.P..D.0 T. FADS JA SES \TR �i Ag 0. q10 PROPOSED 100' ROW 25'P,AV/NC SETBACK L/NE VOL. 3095, PC /99 O.R.O. C. T, PAVING EXHIBIT "B" HERITAGE PARKWAY BETWEEN EAGLE PARKWAY AND I-35W HALFF SM DGN: CFA-EXHIBIT-PAVING.dgn IH-35W AVO: 28961 PAGE NO.:1 OF 1 MON MW 150.0t 0 42 FEALFF I:\28000o\.2896I\CADD\Ex 0 11 Al- DONAL MVEY, SU- GT ABSTRA .NO. EXISTING STORM DRAIN ;""*".. HOWARD L. PETERSON ".•••••" VOL .03206 p.C. 455 S HMA N T eyBuR POcuRVEY,-r -)BsTRAu A 1130 NO° FORT WORTH ALUANCE AIRPORT LOCATION MAP N.T.S. EXISTING STORM DRAIN IL FUTURE DEVELOPMENT 7 (BY SEPARATE CONTRACT) I I \ __ 41, SPECIAL W RRANTY DEED INTEL CO PORATION DOC. NO. 97 0038 793 D.R.D. 0 150 300 450 MINN mu. SCALE: 1"=300' WAY 'PROPOSED 'STORM DRAIN LEGEND PROPOSED STORM DRAIN o PROPOSED STORM DRAIN MANHOLE PROPOSED RECESSED CURB INLET EXISTING STORM DRAIN DRILL SITE 8 DOC. N. 20,0-98249 O.P.D.C. T. PROPOSED (2) 6'X5' BOX CULVERT STA TE OF TEXAS CHANNEL OR ORA/NACEESIWT VOL. 517, RO. 202 O.R.O.C. DRAINAGE EXHIBIT "B-1" HERITAGE PARKWAY BETWEEN EAGLE PARKWAY AND I-35W LI H LFr DGN: CFA-EXHIBIT-STORM.dgn 1117 I. TBPE FIRM #F-312 DATE: 5/1/2014 4000 FOSSIL CREEK BLVD. FORT WORTH, TEXAS 76137 (817) 847-1422 IH-35W r•ADS mES - " SURVEA- YGT asTR A Nio. 410 AVO: 28961 PAGE NO.:1 OF 1 If DONALD Mc VEYI C A SNRg6 N 1 OMAS Sa REURVEY S ACT E ABpTR130 0 _ f 8 FORT WORTH ALLIANCE AIRPORT TARRT'N ANi LOCATION MAP N.T.S. /O'EL EC ESMT IVOL..3196, PG: 798 150 300 SCALE: 1 "=300' / IL rl-- I111I : r 6' V\ FUTURE DEVELOPMENT (BY SEPARATE CONTRACT) I hit/ /20\ o 0� 111 I�— QoQo 1 HERITAGE PARKWAY SPECIAL WARRANTY DEED INTEL C( PORA TION DOC. NO. 97\R0038793 D.R.D., T. 450 HALFF SM ■7.7■ TBPE FIRM #F-312 4000 FOSSIL CREEK BLVD. FORT WORTH, TEXAS 76137 (817) 847-1422 LEGEND 01* PROPOSED LIGHT DRILL SITE 5 DOC. NO. 2010-96249 O.R.D.C.T. LIGHTING EXHIBIT "C" HERITAGE PARKWAY BETWEEN EAGLE PARKWAY AND I-35W DGN: CFA-EXHIBIT-LIGHT.dgn DATE: 5/1/2014 DS mES JA SuRv ACT A BN N Rq 0 'IH-35W AVO: 28961 PAGE NO.:1 OF 1 UNIT PRICE BID Bidlist Item No, Description 00 42 43 BID PROPOSAL Page 1 of 2 SECTION 00 42 43 PROPOSAL FORM Project [tem information Bidder's Application Specification Section No. Measure Quantity Unit I; Water Improvements 1 3305,0109 Trench Safety 33 05 10 2 3305.0111 Valve Box Adjustment 33 05 14 3 3311.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 4 3311.0261 8" PVC Water Pipe 331112 5 3311.0461 12" PVC Water Pipe 331112 6 3311.0462 12" PVC Water Pipe, CSS Backfill 331112 7 3311.0561 16" PVC C905 Water Pipe 33 11 12 8 3311,0562 16" PVC C905 Water Pipe, CSS Backfill 33 11 12 9 3312 0001 Fire Hydrant 33 12 40 10 3312.0108 Connection to Existing 24" Water Main 33 12 25 11 3312.1005 6" Combination Air Valve Assembly for 33 12 30 12 3312.3003 8" Gate Valve 33 12 20 13 3312.3005 12" Gate Valve 33 12 20 14_ 3312.3006 16" Gate Valve w/ Vault 33 12 20 15 3312.4212 24" x 16" Tapping Sleeve & Valve 33 12 25 16 3312,6002 6" Blow Off Valve 33 12 60 17 99990001 Relocate Existing Fire Hydrant 99 99 01 18 9999.0002 Remove 2 - 10" Combination Turbo Meters 99 99 02 • Unit I 1 0241 2 0241 3 3110 4 3201 5 3231 6 3301 7 3301 8 3305 9 3305. 10 3305. 11 3305, 12 3331, 13 3331. 14 3331. 15 3331. 16 3331. 17 3331, 18 3331. 19 3339. 20 3339. 21 3339. 22 3339. I; Sewer Improvements .0500 Remove Fence . 1000 Remove Conc Pvmt . 0102 6"-12" Tree Removal .0616 Conc Pvmt Repair, Arterial/Industrial . 0211 Barbed Wire Fence, Metal Posts .0002 Post -CCTV Inspection ,0101 Manhole Vacuum Testing .0109 Trench Safety 0113 Trench Water Stops 1003 20" Casing By Open Cut 3004 12" Sewer Carrier Pipe 3102 4" 2-Way Cleanout 4108 6" Sewer Pipe 4109 6" Sewer Pipe, CSS Backfill 4115 8" Sewer Pipe 4116 8" Sewer Pipe, CSS Backfill 4208 12" Sewer Pipe 4209 12" Sewer Pipe, CSS Backfill 0001 Epoxy Manhole Liner 1001 4' Manhole 1002 4' Drop Manhole 1003 4' Extra Depth Manhole CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Fenn Rcvncd 20120120 Unit of Bid LF EA TON LF LF LF LF IF EA EA EA EA EA EA EA EA EA EA TOTAL BID FOR WATER 02 41 13 02 41 15 31 10 00 32 01 29 32 31 26 33 01 31 33 01 30 33 05 10 33 05 15 33 05 22 33 05 24 33 31 50 33 11 10, 33 31 12, 33 31 33 11 10, 33 31 12, 33 31 33 11 10, 33 31 12, 33 31 33 11 10, 33 31 12,33 31 33 11 10, 33 31 12, 33 31 33 11 10, 33 31 12, 33 31 33 39 60 33 39 10, 33 39 20 33 39 10, 33 39 20 33 39 10, 33 39 20 LF SY EA SY LF LF EA LF EA LF LF EA LF LF LF LF LF LF VF EA EA VF TOTAL BID FOR SEWER 3,785 3 2.22 5 220 75 3,450 35 3 1 1 1 5 4 1 1 1 1 30 35 1 35 30 6,879 23 6,879 19 70 70 5 236 70 732 80 5,521 240 75 19 4 2218 Bidder's Proposal Unit Price $2,00 $250.00 $5,000,00 $46.00 $33.00 $70.00 $44.00 $100.00 $4,214,00 $14,955.00 $4,040,00 $1,205.00 $2,102, 00 $12,062.00 $20,367.00 $7,508.00 $1,979.00 $2,500.00 $311,414, 00 $33.00 $22.00 $1,229.00 $120 00 $500 $1.00 $100.00 $2.00 $542.00 $128.00 $38,00 $1,038.00 $27.00 $65.00 $30.00 $75.00 $35.00 $90. 00 $200,00 $2,482,00 $3,209.00 $165.00 $422,692.00 Bid Value $7,570.00 $750.00 $11,100.00 $230.00 $7,260,00 $5,250.00 $151,800.00 $3,500.00 $12,642.00 $14,955.00 $4,040.00 $1,205.00 $10,510.00 $48,248.00 $20,367.00 $7,508.00 $1,979,00 $2.500.00 $990,00 $770.00 $1,229.00 $4,200,00 $150.00 $6,879,00 $2,300.00 $13,758.00 $10,298.00 $8,960.00 $2,660.00 $5,190.00 $6,372.00 $4,550.00 $21,960.00 $6,000.00 $193,235.00 $21,600.00 $15,000.00 $47,158.00 $12,836,00 $36.597.00 00 41 00_00 43 13 00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workb UNIT PRICE BID Bidlist Item No Description SECTION 00 42 43 PROPOSAL FORM Project Item Information Unit III; Paving and Drainage Improvements 1 0241.1300 Remove Conc Curb&Gutter 2 0330,0001 Concrete Encase Sewer Pipe 3 3123,0101 Unclassified Excavation by Plan 4 3123.0103 Borrow by Plan 5 3125.0101 SWPPP > 1 acre 6 3137,0101 Concrete Riprap 7 3137,0103 Large Stone Riprap, grouted 8 3211.0400 Hydrated Lime 9 3211,0502 8" Lime Treatment 10 3213,0104 9" Conc Pvmt 11 3213,0301 4" Conc Sidewalk 12 3213.0403 8" Concrete Driveway 13 3213.0504 Barrier Free Ramp, Type M-2 14 3213.0510 Barrier Free Ramp, Type C-3 15 3214.0100 Brick Pvmt 16 3216,0101 6" Conc Curb and Gutter 17 3217.0001 4" SLD Pvmt Marking HAS (W) 18 3217.0002 4" SLD Pvmt Marking HAS (Y) 19 3217.0003 4" BRK Pvmt Marking HAS (W) 20 3217.0004 4" BRK Pvmt Marking HAS (Y) 21 3217,0005 4" DOT Pvmt Marking HAS (W) 22 3217.0006 4" DOT Pvmt Marking HAS (Y) 23 3217.0201 8" SLD Pvmt Marking HAS (W) 24 3217,0501 24" SLD Pvmt Marking HAE (W) 25 3217.1002 Lane Legend Arrow 26 3232.0201 TxDOT Std Ret Wall - RW 1 (L) A 27 3292.0400 Seeding, Hydromulch 28 3292 0500 Seeding, Soil Retention Blanket 29 3305.0109 Trench Safety 30 3305 0112 Concrete Collar 31 3341.0201 21" RCP, Class III 32 3341,0205 24" RCP, Class ill 33 3341.0309 36" RCP, Class III 34 3341,0409 48" RCP, Class III 35 3341 0502 54" RCP, Class III 36 3341 1304 6x5 Box Culvert 37 3349.0001 4' Storm Junction Box 38 3349,0002 5' Storm Junction Box 39 3349,0003 6' Storm Junction Box 40 3349,6001 10' Recessed Inlet 41 3349,6002 15' Recessed Inlet 42 3441.4003 Furnish/Install Alum Sign Ground Mount 43 3471,0001 Traffic Control 00 42 43 BID PROPOSAL Paget oft Bidder's Application Specification Section No.Unit of Bid Measure Quantity 02 41 15 03 30 00 31 23 16 31 23 23 31 25 00 31 37 00 31 37 00 32 11 29 32 11 29 32 13 13 32 13 20 32 13 20 32 13 20 32 13 20 32 14 16 32 16 13 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 32 13 32 92 13 32 92 13 33 05 10 33 05 17 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 49 10 33 49 10 33 49 10 33 49 20 33 49 20 34 41 30 34 71 13 LF CY CY CY LS SY SY TN SY SY SF SF EA EA SY LF LF LF LF LF LF LF LF LF EA SF SY SY LF EA IF LF LF LF LF LF EA EA EA EA EA EA MO TOTAL BID FOR PAVING AND DRAINAGE Unit IV; Lighting Improvements 1 2605.3011 2" CONDT PVC SCH 40 (T) 2 3441.1502 Ground Box Type B, w/Apron 3 3441.3003 Rdwy lllum Assmbly TY 18,18A,19, and 1)- 4 3441.3102 200W HPS PC Lighting Fixture 5 3441.3302 Rdwy Ilium Foundation TY 3,5,6, and 8 6 3441,3502 Relocate Street Light Pole 26 05 33 34 41 10 34 41 20 34 41 20 34 41 20 34 41 20 LF EA EA EA EA EA TOTAL BID FOR LIGHTING 538 6 51,064 29,645 1 399 641 451.44 27,360 26,222 15,000 5,991 1 2 440 6,336 1,230 5,356 1,540 1,350 78 68 195 40 16 1,135 23,610 17,350 4,214 1 836 1,250 1,112 221 363 432 9 1 1 18 2 10 5 Bidder's Proposal Unit Price $2.00 $200.00 $2.00 $2.00 $2,250.00 $89.00 $90.00 $155.00 $1.80 $33.90 $4.75 $4.00 $304.00 $250.00 $50.00 $6.01 $2.25 $2,25 $2,25 $2,25 $2.25 $2.25 $5 00 $16,00 $295.00 $22.90 $0.36 $1.25 $2.00 $1,039.00 $45.00 $49,00 $61.00 $111.00 $154.00 $450.00 $4,373,00 $6,050.00 $6,930,00 $3,520,00 $5,280,00 $225,00 $6,000.00 $2,117,061.00 4,225 $12,12 9 $300.00 20 $3,970.00 21 $300,00 20 $525.00 1 1,800.00 $151,907.00 Bid Value $1,076.00 $1,200,00 $102,128.00 $59,290.00 $2,250.00 $35,511.00 $57,690,00 $69,973.20 $49,248,00 $888,925.80 $71,250.00 $23,964.00 $304.00 $500,00 $22,000.00 $38,079.36 $2, 767.50 $12,051.00 $3,465.00 $3,037,50 $175.50 $153,00 $975,00 $640,00 $4,720.00 $25,991.50 $8,499.60 $21,687.50 $8,428.00 $1,039,00 $37,620.00 $61,250,00 $67,832.00 $24, 531.00 $55,902,00 $194,400,00 $39,357,00 $6,050,00 $6,930.00 $63,360,00 $10,560,00 $2,250.00 $30,000,00 $51,207.00 $2,700.00 $79,400,00 $6,300.00 $10,500,00 $1,800.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECWICATION DOCUMENTS Form Revised 20120120 004100_004313_004243 004337_004512_003513_Bid Proposal Workb BID SUMMARY TOTAL AMOUNT BID WATER TOTAL AMOUNT BID SEWER TOTAL AMOUNT BID PAVING & STORM DRAIN TOTAL AMOUNT BID LIGHTING GRAND TOTAL AMOUNT BID This Bid is submitted on Respec u1 y submitted, By: se ti (Signature) Roaer Pavlovich (Printed Name) Title: Executive Vice President Company: Jordan Foster Construction Address: 9639 Greenville Avenue Dallas, TX 75243 State of Incorporation: Texas Email: rpavlovich@jordanfosterconstruction.com Phone: (214) 349-7900 $311,414.00 $422,692.00 $2,117, 061.00 $151, 907.00 $3,003,074.00 by the entity named below. !Receipt is acknowledged of the following Addenda: Addendum No. 1: Addendum No. 2: Addendum No. 3: Addendum No. 4: Corporate Seal: Initial