Loading...
HomeMy WebLinkAboutContract 45627 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § City Secretary Contract No. Inc' Z WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: Forestar (USA) Real Estate Group, Inc. Address, State, Zip Code: 14755 Preston Rd., Suite 710 I Dallas, TX 75254 Phone, E-Mail: Darrel Amen: (972) 341-2924 I darrelamen@forestargroup.com Authorized Signatory/Title: Thomas H. Burleson, Executive Vice President Project Name and Brief Description: Water, Sewer, Paving, Storm Drain and Street Light Improvements to serve Bar C Ranch Ph. 4A Project Location: NE of Intersection of Wagley Robertson Rd. & East Bailey Boswell Rd. Plat Case No.: FP-13-007 Plat Name: Bar C Ranch Council District: 7 City Project No: 02130 CFA: 2014-001 DOE: 7076 To be completed by staff Received by: Date: OFFICIAL RECORD rmITY SECRETARY vr.IWORTH, TX 5J1H j RECEIVED MAY 22 2016 NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water Sewer (A-1) _X, Paving (B) _X, Storm Drain (B-1) _X , Street Lights & Signs (C) X . E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any material errors in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers. servants, or employees. Further, Developer will require its contractors to indemnify, and hold haunless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in confounance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement and such breach remains uncured following written notice of such breach and a reasonable period of time to cure such breach, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Bar C Ranch Ph. 4A CFA No.: 2014-001 DOE No.: 7076 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one I Bond = 100°/a 10omp1etion Agreement = 100% / Holds Plat (Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period $ $ 53,084.00 105,192.60 $ 158,276.60 $ $ $ 126, 747.30 219, 310.00 13,033.20 $ 359,090.50 $ 517,367.10 $ $ $ $ $ $ $ $ $ 3,165.53 3,165.53 6,331.06 13,842.29 6,921.15 521.33 490.00 21,774.77 28,105.83 Amount 517,367.10 517,367.10 197, 845.75 448, 863.13 646, 708.88 Choice (ck one 1 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this at 3 day of )'Y) a L , 20 CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-Bfibulal, EMBA, P.E. Development Engineering Manager Approved as to Form. & Legality: Douglas W. Black Assistant City Attorney M&C No. 41/4 Date: ATT Mry J. Kayser City Secretary ATTEST: Signature (Print) Name: • Transportation & Public Works Department rTh Iy;,_ A u, Douglas Director Wiersig, P.E. Approved by City Manager's Office Fernando osf Assistant ity Manager Forestar (USA) Real Estate Gr 9 up, Signature \-a))urPrint Name: 'TnpM�,nqS �1 . r 1` S on £iecutwt �IS? ES1[l_c_nt Title: OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate IZI El ►1 IX El El ►/ (Remainder of Page Intentionally Left Blank) PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 4A • E. BAILEY BOSWELL RD WAGLEY ROBERTSON ROAD r-62 SITE LOCATION E. HARMON RD VICINITY MAP NOT TO SCALE D.O.E. No. 7076 City Project No. 02130 JBI Partners, Inc. 16301 Quo um Drive, Suite 20013 Addison, Texas 75001 Tel 972-248-7676 Fax 972-248-1414 January 20, 2014 — SHEET 1 Case No. FP-013-017 Final Plat THE BAR C RANCH BLOCK 6, LOTS 10-18, BLOCK 7, LOTS 20-22, BLOCK 9, LOTS 8-17 AND PRIVATE OPEN SPACE LOT 30X AND BLOCK 10, LOTS 1-5 BEING 5.448 ACRES OUT OF THE JOHN WAGLEY SURVEY, ABSTRACT NO. 1597 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS FORESTAR (USA) REAL ESTATE GROUP INC. OWNER / DEVELOPER 14755 Preston Road, Suite 710 (972)702-8699 Dallas, TX 75254 JBI PARTNERS, INC. 16301 Quorum Drive, Suite 200 B Addison, Texas 75001 SURVEYOR/ENGINEER (972)248-7676 JBI Partners, Inc. 16301 Quo um Drive, Suite 200B Addison, Texas 75001 Tel 972-248-7676 Fax 972-248-1414 January 20, 2014 — SHEET 2 30 31 32 33 i 1? END & PLUG 8" WATER LINE 5 4 3 2 1 ZJ EXIST12 WATER 1 2 3 _-I 5 SCALE: 1 "=150' 0 F 1n 9 I X W ce co W JBI Partners, Inc. 1630 Quorum Drive, Suite 200B Addison, Texas 75001 Tel 972-248-7676 Fax 972-248-1414 15'X10' WATER EASEMENT 17 10 11 12 CONNECT TO EXISTING 8 WATER LINE DOE 4554 WATER PROJ # P164-060164015178 FORESTAR (USA) REAL ESTATE GROUP, INC. DOC. NO. D212079897 16 15 14 13 12 11 HIGH DE$ERT DRIVE 13 14 15 16 17 Z\ 0 0= 2a 18w 6 5 4 3 2 1 EXIST. 8" WATER a 10 11 12 13 to w 9 8 7 14 15 16 17 18 co 6 5 4 3 2 1 EX. BRANDING IRON TRAIL LEGEND EX WATERLINE -fla- EX VALVE EX FIRE HYDRANT PROP. WATERLINE PROP. VALVE PROP. FIRE HYDRANT PROPOSED WATER LINES ARE 8' UNLESS OTHERWISE INDICATED. 4 EXIST. 8" WATER EX. RED 1\1OON TRAIL / 7 6 5 4 7-- EXIST. 8" WATER EX. COLD MOUNTAIN TRAIL 10 9 8 20 21 T 7 CONNECT TO EXISTING 8" WATER LINE DOE 5336 WATER PROJ # P164-060164015529 22 30 31 CONNECT TO EXISTING 8" WATER UNE DOE 5336 WATER PROJ P164-060164015529 16 32 5 33 4 EXIST. 8" WATER EX. HIGH DESERT DRIVE 23 24 15 14 25 13 26 12 EXIST. 8" WATER EX. MYSTIC RIVER TRAIL 20 19 18 21 22 23 17 16 15 14 13 24 25 26 27 28 EXIST. 8" WATER WATER EXHIBIT A PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 4A (D.O.E NO. 7076) January 20, 2014 — SHEET 3 30 31 32 33 1 5 4 3 2 1 FP—Th tY n cn 9f. 8" SSWR Do: 4554 SS NO. P174-070174013177 1 w 0 1.13 0 J_ 2 3 5 SCALE: 1 "=150' X W JBI Partners, Inc. 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel 972-248-7676 Fax 972-248-1414 END & PLUG. 8" SSWR FORESTAR (USA) REAL ESTATE GROUP, INC. DOC. NO. D212079897 17 16 15 14 1 1 10 11 12 25' SANITARY SEWER EASEMENT 13 12 11 H GH DE$ERT DRIVE 1 1 1 1 I CONNECT TO EXIST. 8" 55 DOE 4554 SSWR PROJ # P174-070174013177 13 14 15 6 5 4 EXIST. 8" SSWR co 16 17 3 DOE 4554, SS NO. P174-070174013177 10 11 12 13 14 15 (4) 9 8 7 6 5 4 2 1 16 17 18 3 E*.. -BR AP+DING—fROff T-R-Aft LEGEND PROP. S.S. LINE 8 PROP. S.S. MH — EXIST. S.S. MH — — — EXIST. S.S. LINE PROPOSED SANITARY SEWER LINES ARE 8" SDR- 26 UNLESS OTHERWISE INDICATED. 2 1 i 0 1 i 7 6 5 END & PLUG. 8" Scum 10 9 8 1 1 1 20 19 1 1 1 4 EX. COLD MOUNTAIN TRAIL 8" SWR DOE 4554 SS NO. P174-070174013177 30 31 7 6 32 33 5 4 EX. HIGH DESERT DRIVE T 8" SSWR J DOE 4554 SS NO. P174-070174013177 21 22 23 24 25 26 18 17 16 15 14 FX MXSTL(' RIVER _IRA!' i EX. RED MOON TRAIL 20 19 18 17 21 22 23 24 13 12 16 15 14 13 25 26 27 28 EXIST, 8" SSWh DOE 5336, SS f SANITARY SEWER EXHIBIT B-1 PLANS FOR THE CONSTRUCTION OF WATER, SEVER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 4A (D.O.E NO. 7076) January 20, 2014 — SHEET 4 3, 1 SCALE: 1 "=150' JBI Partners Inc 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel 972-248-7676 Fax 972-248-1414 FORESTAR (USA) REAL ESTATE GROUP, INC. DOC. NO. D212079897 END & PLUG. 8" SSWR 25' SANITARY SEWER EASEMENT END & PLUG. 8" SSWR LEGEND PROP. S.S. LINE 8 PROP. S.S. MH EXIST. S.S. MH EXIST. S.S. LINE PROPOSED SANITARY SEWER LINES ARE 8" SDR-26 UNLESS OTHERWISE INDICATED. 8" SSWR DOE 5367 SS NO. P174-070174013534 / 8" SSWR ///DOE 5367 SS NO. /P174-070174013534/ 1 \ N CONNECT TO EXIST. 8" SS DOE 5367 SSWR PROJ # P174-070174013534 2 , / I \ 11 8" SWR / DOE 5367 S 14 P174-07017401 534 8" SSWF DOE 5367 SS NO P174-070174013534 EX. RUNNING WATER TRAIL 41 42 43 44 18 17 END & PLUG. 8" SSWR 16 15 EX. MESA VIEW TRAIL SANITARY SEWER EXHIBIT B-2 PLANS FOR THE CONSTRUCTION OF WATER, SEWER PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 4A (D.O.E NO. 7076) January 20, 2014 — SHEET 5 30 31 32 33 54 1 1 5 O 4 N 3 9 2 \ 1 2 n 4- 0 X W 17 16 10 11 12 9 8 7 FORESTAR (USA) REAL ESTATE GROUP, INC. DOC. NO. D212079897 15 14 IMMO 13 12 H GH DESERT DR VE 13 14 15 6 5 4 16 3 11 \t7 O O 1 17 18w W 2 1 10 11 12 9 8 7 I I 10.5' PARKWAY 9.S TAMPED TOPSOIL PER rSECPON J2 91 19 ){' PER F7 4ON.) 4:1 SMAX) c_ STANDARD 0: SIDEWALK PER SECTION 32 13 20 COMPACTED ACCEPTABLE NATIVE BACKFLL PER SECTION 31 24 00 SCALE: 1 "=150' JBI Partners, Inc. 16301 Quo um Drive, Suite 200E Addison, Texas 75001 Tel 972-248-7676 Fax 972-248-1414 12 13 14 15 16 17 (4) 6 5 4 3 14.5' STANDARD 6' CURB PER 32 13 13-0525 5' CROWN #3 BARS 0 18' O.C.B.W. 44. ':0' R.O.W. 79' ROADWAY LON(4TUONAL CONSTRUCTION JOINT PER 32 13 13-0511 18 2 1 EX. RED MOON TRAIL 1a1 ONSTRUCT APPROX 8SYOF4' QliCRF4, SI ESA) K 6' REINFORCED CONCRETE PAVEMENT PER SECTION 32 13 13 STANDARD 7' CURB PER 32 13 13-D525 err' ea max PROPOSED 6' LIUE STABUZED SUBCRADE 0 30 LBS./SY PER SECTION 32 11 29 RESIDENTIAL CONCRETE STREET SECTION (L) 3213 13-D502 LEGEND SIDEWALK TO BE CONSTRUCTED BY DEVELOPER P ROP. 50 ROW P AVEMENT SECTION P ROP TYPE R-1 RESIDENTIAL BARRIER FREE RAMP TO BE CONSTRUCTED BY DEVELOPER PAVEMENT TO BE REMOVED 10 20 19 20 9 8 •(a 21 22 18 17 16 23 24 15 14 7 6 5 4 EX. COLD MOUNTAIN TRAIL 30 31 32 33 7 6 5 4 PAVEMENT TO EitE REMO D EX. HIGH DESERT DRIVE 25 26 13 12 EX. MYSTIC RIVER TRAIL 19 18 21 22 ( 12 23 10.5' PARKWAY : 5' TAMPED TOPSOIL PER SECTION 32 91 19 K' PER ET. (MIN) 4:1 (MAX.) STANDARD SOEWALK PER ce SECTION 32 13 20 17 16 24 25 COMPACTED ACCEPTABLE NATIVE DACKFlLL PER SECTKMN 31 24 DO NOTE* SIDEWALK SLOPE SHALL BE )j' PER FOOT (MAX) UNLESS DIRECTED OTHERIMSE BY 1HE ENGINEER. PROMDE 6' TOP SCLL. SEED HIDROMULCH OR SOD. MD IRRIGATE UNTIL 80t VEGETATIVE COVER IS ATTAINED, PER MEDIAN AHD PARKWAY FINISH GENERAL NOTES 15 14 13 26 27 28 PAVING EXHIBIT C PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 4A (D.O.E NO. 7076) January 20, 2014 — SHEET 6 jt 1 316 Sit OF\ROCK I RIPRA 1017 SY OF ROCK RIPRAP VARIABLE WIDTH DRAINAGE EASEMENT 43 SOF R CK I RIP AP 5 4 3 2 SCALE: 1 "=150' WILDWEST DRIVE JBI Partners, Inc 16301 Quorum Drive, Suite 200B Addison, Texas 75001 Tel 972-248-7676 Fax 972-248-1414 VARIABLE WIDTH DRAINAGE EASEMENT ►slide="• arlibleeliede %% •�ee c%gtaiette AM" infrerlitelri 1164 SY OF ROCK RIPRAP VARIABLE WIDTH DRAINAGE EASEMENT FORESTAR (USA) REAL ESTATE GROUP, INC. DOC. NO. D212079897 42" F:CP 17 16 15 14 13 12 11 10 11 12 13 9 8 7 6 24" H GH DESERT DRIVE 24" RCP 14 15 16 17 5 4 z oa 18W ce CONNECT TO EXISTING 30" RCP DOE 4554 30" RCP LEGEND 10' CURB INLET (UNLESS OTHERWISE INDICATED) STORM SEWER MANHOLE PROP. STORM SEWER & INLET EX STORM SEWER & INLET 265 SY OF ROCK RIPRAP 10 11 IY i 16 EX. RUNNING WATER TRAIL 41 42 43 44 18 30 17 16 15 EX. MESA VIEW TRAIL 31 32 33 7 6 5 4 EX. COLD MOUNTAIN TRAIL 30 31 32 33 10 9 8 7 6 5 4 36" RCP 24" RCP EX. HIGH DESERT DRIVE 20 21 22 23 30'RCP 19 18 • 17 16 15 24 14 EX. MYSTIC RIVER TRAIL 25 13 26 12 STORM DRAIN EXHIBIT D PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 4A (D.O.E NO. 7076) January 20, 2014 — SHEET 7 30 31 32 33 5 4 3 2 1 2 3 5 i SCALE: 1 "=150' 0 X W JBI Partners Inc. 16301 Quorum Drive, Suite 200B Addison, Texas 75001 Tel 972-248-7676 Fax 972-248-1414 FORESTAR (USA) REAL ESTATE GROUP, INC. DOC. NO, D212079897 17 16 15 14 13 12 11 H GH DESERT DRIVE 7 10 11 12 13 14 15 16 17 9 8 7 6 10 11 12 13 9 8 7 6 5 14 5 4 15 3 16 4 3 EX. BRANDING IRON TRAIL e. LEGEND 2 0 0 18w 2 1 17 PROPOSED STREET UGHT - 100 WATT HPS COBRA 1MTH TYPE 3 DIST. AND DROP GLASS LUMINAIRE - 25' LIGHT STANDARD CA-€) EXISTING STREET LIGHT PROPOSED SIGNBLADE 2 i Q 18 1 7 6 5 4 EX, COLD MOUNT 30 31 10 9 8 7 6 EX, HIGH 20 21 22 23 19 18 17 16 EX, MYSTI 24 15 14 32 TRAIL 33 5 4 SERT DRIVE 25 VER TRAIL 13 26 12 20 19 18 17 16 15 14 13 21 22 23 24 25 26 27 28 STREET LIGHTING & STREET SIGNS EXHIBIT E PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 4A (D.O.E N0. 7076) January 20, 2014 — SHEET 8 ENGINEER'S QUANTITY TAKE -OFF OPINION OF ESTIMATED COST PREPARED BY JBI PARTNERS, INC. ON 5/9/2014 FORT WORTH, TEXAS JBI PROJECT NO. LIC006F ITEM NO. 3311.0261 3312.3003 3312.3002 3312.0103 3312.0001 3311.0001 3312.2003 3331.4115 3331.4116 3339.1001 3339.1002 3339.1003 3331.3101 3301.0001 3301.0002 3301.0101 3305.0112 9999.0001 3349.5002 3137.0102 3349.1005 3339.1101 3341.0402 3341.0309 3341.0302 3341.0205 9999.0002 BID ITEM 8" PVC Water Pipe 8" Gate Valve 6" Gate Valve Connection to Existing 8" Water Main Fire Hydrant Ductile Iron Water Fittings 1" Water Service 8" Sewer Pipe 8" Sewer Pipe, CSS Backfill 4' Manhole 4' Drop Manhole 4' Extra Depth Manhole 4" Sewer Service Pre -CCTV Inspection Post -CCTV Inspection Manhole Vacuum Testing Concrete Collar Connect to existing sanit. sewer 20' Curb Inlet 18" Thick RipRap Type CH-PW-0 Headwall 42" RCP 5'x5' Storm Manhole 42" RCP 36" RCP 30" RCP 24" RCP Connect to existin_ storm drain UNIT LF EA EA EA EA TON EA LF LF EA EA VF EA LF LF EA EA EA EA SY EA EA LF LF LF LF EA 7 1050 4 2 3 2 0.73 26 8A 2,506 80 11 1 61.6 26 2,586 2,586 11 9 2 SHEET NO. 26A 34 2 2,953 1 2 196 69 87 48 35 40 BAR C RANCH, PHASE 4A ITEM UNIT ITEM TOTAL PRICE TOTAL COST 1,050 $17.00 4 $1,200.00 2 $800.00 3 $400.00 2 $2,600.00 0.7 $5,800.00 26 $700.00 2,506 $21.80 80 $28.00 11 $1,900.00 1 $2,500.00 62 $100.00 26 $450.00 2,586 $0.65 2,586 $0.65 11 $100.00 9 $200.00 $400.00 2 $4,000.00 2,953 $60.00 1 $2,500.00 2 $2,500.00 196 $75.00 69 $65.00 87 $55.00 48 $45.00 1 $500.00 $17,850.00 $4,800.00 $1,600.00 $1,200.00 $5,200.00 $4,234.00 $18,200.00 $53,084.00 $54,630.80 $2,240.00 $20,900.00 $2,500.00 $6,160.00 $11,700.00 $1,680.90 $1,680.90 $1,100.00 $1,800.00 $800.00 $105,192.60 $8,000.00 $177,180.00 $2,500.00 $5,000.00 $14,700.00 $4,485.00 $4,785.00 $2,160.00 $500.00 $219,310.00 F:\Projects\LIC006F\excel\(20131231) LI0006F CFA Quantity Matrix.xls CITY PROJECT NO. 02130 ENGINEER'S QUANTITY TAKE -OFF OPINION OF ESTIMATED COST PREPARED BY JBI PARTNERS, INC. ON 5/9/2014 FORT WORTH, TEXAS JBI PROJECT NO. LIC006F ITEM NO. 3213.0101 3211.0501 3211.0400 3213.0301 3213.0501 3317.0110 9999.0003 BID ITEM 6" Conc Pvmt 6" Lime Treatment Lime [27#/SY] 4" Conc Sidewalk 4' Barrier Free Ramp, Type R-1 Special Riprap [3"-5" Grouted rock riprap] Street barricade 9999.0004 Connect to existing concrete street pavement 3125.0101 3471.0001 SWPPP > 1 acre Traffic Control 3441.3101 100W HPS PC Lighting Fixture 3441.3301 Rdwy Illum Foundation TY 1,2, and 4 Rdwy Illum Assmbly TY 8,11,D-25, and D- 30 3341.1501 Ground Box 3441.3011 2" CONDT PVC SCH 40 (T) 3441.1410 NO 10 Insulated Elec Condr 3441.3002 JNIT TOTAL UNIT 7 SY SY TN SF EA SY LF LF LS LS EA EA EA EA LF LF 8A SHEET NO. 26A 34 918 981 13 4 43.3 28 58 35 2,394 2,560 33 162 40 3 BAR C RANCH, PHASE 4A ITEM UNIT ITEM TOTAL PRICE TOTAL COST 3,312 $30.00 3,541 $2.40 46 $150.00 162 $3.50 4 $1,000.00 43.3 $43.00 28 $10.00 58 $10.00 1 $4,000.00 $700.00 $400.00 3 $1,200.00 3 3 $1,700.00 3 3 $400.00 179 179 $9.00 537 537 $0.60 $99,360.00 $8,498.40 $6,900.00 $567.00 $4,000.00 $1,861.90 $280.00 $580.00 $4,000.00 $700.00 $126,747.30 $1,200.00 $3,600.00 $5,100.00 $1,200.00 $1,611.00 $322.20 $13,033.20 F:\Projects\LIC006F\excel\(20131231j LIC006F CFA Quantity Matrix.xls CITY PROJECT NO. 02130