HomeMy WebLinkAboutContract 45627 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT §
City Secretary
Contract No. Inc' Z
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Forestar (USA) Real Estate Group, Inc.
Address, State, Zip Code: 14755 Preston Rd., Suite 710 I Dallas, TX 75254
Phone, E-Mail: Darrel Amen: (972) 341-2924 I darrelamen@forestargroup.com
Authorized Signatory/Title: Thomas H. Burleson, Executive Vice President
Project Name and Brief Description: Water, Sewer, Paving, Storm Drain and Street Light
Improvements to serve Bar C Ranch Ph. 4A
Project Location: NE of Intersection of Wagley Robertson Rd. & East Bailey Boswell Rd.
Plat Case No.: FP-13-007 Plat Name: Bar C Ranch
Council District: 7 City Project No: 02130
CFA: 2014-001 DOE: 7076
To be completed by staff
Received by: Date:
OFFICIAL RECORD
rmITY SECRETARY
vr.IWORTH, TX
5J1H j
RECEIVED MAY 22 2016
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water
Sewer (A-1) _X, Paving (B) _X, Storm Drain (B-1) _X , Street Lights &
Signs (C) X .
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any material errors in the preliminary plans, specifications and
cost estimates supplied by the Developer for this Agreement
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees,
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused, in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers. servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold haunless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in confounance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement and such breach remains
uncured following written notice of such breach and a reasonable period of
time to cure such breach, becomes insolvent or fails to pay costs of
construction and the financial guarantee is not a Completion Agreement. If
the financial guarantee is a Completion Agreement and the Developer's
contractors and/or suppliers are not paid for the costs of supplies and/or
construction, the contractors and/or suppliers may put a lien upon the
property which is the subject of the Completion Agreement
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Bar C Ranch Ph. 4A
CFA No.: 2014-001 DOE No.: 7076
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
I Bond = 100°/a
10omp1etion Agreement = 100% / Holds Plat
(Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
$
$
53,084.00
105,192.60
$ 158,276.60
$
$
$
126, 747.30
219, 310.00
13,033.20
$ 359,090.50
$ 517,367.10
$
$
$
$
$
$
$
$
$
3,165.53
3,165.53
6,331.06
13,842.29
6,921.15
521.33
490.00
21,774.77
28,105.83
Amount
517,367.10
517,367.10
197, 845.75
448, 863.13
646, 708.88
Choice
(ck one
1
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this
instrument in quadruplicate, at Fort Worth, Texas this at 3 day of )'Y) a L
, 20
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi-Bfibulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form. & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. 41/4
Date:
ATT
Mry J. Kayser
City Secretary
ATTEST:
Signature
(Print) Name:
•
Transportation & Public Works Department
rTh
Iy;,_ A u,
Douglas
Director
Wiersig, P.E.
Approved by City Manager's Office
Fernando osf
Assistant ity Manager
Forestar (USA) Real Estate Gr
9
up,
Signature \-a))urPrint Name: 'TnpM�,nqS �1 . r 1` S on
£iecutwt
�IS? ES1[l_c_nt
Title:
OFFICIAL RECORD
CITY SECRETARY
Ft WORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
IZI
El
►1
IX
El
El
►/
(Remainder of Page Intentionally Left Blank)
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, & DRAINAGE
IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 4A
•
E. BAILEY BOSWELL RD
WAGLEY ROBERTSON ROAD
r-62
SITE LOCATION
E. HARMON RD
VICINITY MAP
NOT TO SCALE
D.O.E. No. 7076
City Project No. 02130
JBI Partners, Inc.
16301 Quo um Drive, Suite 20013
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
January 20, 2014 — SHEET 1
Case No. FP-013-017
Final Plat
THE BAR C RANCH
BLOCK 6, LOTS 10-18, BLOCK 7, LOTS 20-22,
BLOCK 9, LOTS 8-17 AND PRIVATE OPEN SPACE LOT 30X AND
BLOCK 10, LOTS 1-5
BEING 5.448 ACRES OUT OF THE
JOHN WAGLEY SURVEY, ABSTRACT NO. 1597
CITY OF FORT WORTH, TARRANT COUNTY, TEXAS
FORESTAR (USA) REAL ESTATE GROUP INC. OWNER / DEVELOPER
14755 Preston Road, Suite 710 (972)702-8699
Dallas, TX 75254
JBI PARTNERS, INC.
16301 Quorum Drive, Suite 200 B
Addison, Texas 75001
SURVEYOR/ENGINEER
(972)248-7676
JBI Partners, Inc.
16301 Quo um Drive, Suite 200B
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
January 20, 2014 — SHEET 2
30
31
32
33
i 1?
END & PLUG
8" WATER LINE
5
4
3
2
1
ZJ
EXIST12 WATER
1
2
3 _-I
5
SCALE: 1 "=150'
0
F
1n
9
I
X
W
ce
co
W
JBI Partners, Inc.
1630 Quorum Drive, Suite 200B
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
15'X10' WATER EASEMENT
17
10 11 12
CONNECT TO EXISTING
8 WATER LINE
DOE 4554
WATER PROJ #
P164-060164015178
FORESTAR (USA) REAL
ESTATE GROUP, INC.
DOC. NO. D212079897
16 15 14 13 12 11
HIGH DE$ERT DRIVE
13 14 15 16 17
Z\
0
0=
2a
18w
6 5 4 3 2 1
EXIST. 8" WATER
a 10 11 12 13
to
w
9 8 7
14 15 16 17 18
co
6 5 4 3 2 1
EX. BRANDING IRON TRAIL
LEGEND
EX WATERLINE
-fla- EX VALVE
EX FIRE HYDRANT
PROP. WATERLINE
PROP. VALVE
PROP. FIRE
HYDRANT
PROPOSED WATER
LINES ARE 8' UNLESS
OTHERWISE INDICATED.
4
EXIST. 8" WATER
EX. RED 1\1OON TRAIL
/
7 6 5
4
7-- EXIST. 8" WATER
EX. COLD MOUNTAIN TRAIL
10 9 8
20 21
T 7
CONNECT TO EXISTING
8" WATER LINE
DOE 5336
WATER PROJ #
P164-060164015529
22
30
31
CONNECT TO EXISTING
8" WATER UNE
DOE 5336
WATER PROJ
P164-060164015529
16
32
5
33
4
EXIST. 8" WATER
EX. HIGH DESERT DRIVE
23
24
15
14
25
13
26
12
EXIST. 8" WATER
EX. MYSTIC RIVER TRAIL
20 19 18
21
22 23
17 16 15 14
13
24 25 26 27 28
EXIST. 8" WATER
WATER
EXHIBIT A
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 4A
(D.O.E NO. 7076)
January 20, 2014 — SHEET 3
30
31
32
33
1
5
4
3
2
1
FP—Th
tY
n
cn
9f.
8" SSWR
Do: 4554 SS NO.
P174-070174013177
1 w
0
1.13
0
J_
2
3
5
SCALE: 1 "=150'
X
W
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
END & PLUG. 8" SSWR
FORESTAR (USA) REAL
ESTATE GROUP, INC.
DOC. NO. D212079897
17 16 15 14
1
1
10 11 12
25' SANITARY
SEWER EASEMENT
13 12 11
H GH DE$ERT DRIVE
1 1 1 1 I
CONNECT TO EXIST. 8" 55
DOE 4554
SSWR PROJ #
P174-070174013177
13 14 15
6 5 4
EXIST. 8" SSWR
co
16 17
3
DOE 4554, SS NO. P174-070174013177
10 11 12
13
14 15
(4)
9 8 7 6 5 4
2 1
16 17 18
3
E*.. -BR AP+DING—fROff T-R-Aft
LEGEND
PROP. S.S. LINE
8 PROP. S.S. MH
— EXIST. S.S. MH
— — — EXIST. S.S. LINE
PROPOSED SANITARY
SEWER LINES ARE 8"
SDR- 26 UNLESS
OTHERWISE INDICATED.
2 1
i
0
1
i
7 6 5
END & PLUG. 8" Scum
10 9 8
1
1
1
20
19
1
1
1
4
EX. COLD MOUNTAIN TRAIL
8" SWR
DOE 4554 SS NO.
P174-070174013177
30 31
7
6
32
33
5 4
EX. HIGH DESERT DRIVE
T
8" SSWR J
DOE 4554 SS NO.
P174-070174013177
21 22 23 24 25 26
18 17
16
15
14
FX MXSTL(' RIVER _IRA!'
i
EX. RED MOON TRAIL
20 19 18 17
21
22 23 24
13
12
16 15 14 13
25 26 27 28
EXIST, 8" SSWh
DOE 5336, SS f
SANITARY SEWER
EXHIBIT B-1
PLANS FOR THE CONSTRUCTION OF WATER,
SEVER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 4A
(D.O.E NO. 7076)
January 20, 2014 — SHEET 4
3,
1
SCALE: 1 "=150'
JBI Partners Inc
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
FORESTAR (USA) REAL
ESTATE GROUP, INC.
DOC. NO. D212079897
END & PLUG. 8" SSWR
25' SANITARY
SEWER EASEMENT
END & PLUG. 8" SSWR
LEGEND
PROP. S.S. LINE
8 PROP. S.S. MH
EXIST. S.S. MH
EXIST. S.S. LINE
PROPOSED SANITARY
SEWER LINES ARE 8"
SDR-26 UNLESS
OTHERWISE INDICATED.
8" SSWR
DOE 5367 SS NO.
P174-070174013534
/
8" SSWR
///DOE 5367 SS NO.
/P174-070174013534/
1
\ N
CONNECT TO EXIST. 8" SS
DOE 5367 SSWR PROJ #
P174-070174013534
2 ,
/ I \
11
8" SWR
/
DOE 5367 S 14
P174-07017401 534
8" SSWF
DOE 5367 SS NO
P174-070174013534
EX. RUNNING WATER TRAIL
41 42 43 44
18 17
END & PLUG. 8" SSWR
16
15
EX. MESA VIEW TRAIL
SANITARY SEWER
EXHIBIT B-2
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 4A
(D.O.E NO. 7076)
January 20, 2014 — SHEET 5
30
31
32
33
54
1
1
5
O
4 N
3 9
2
\
1
2
n 4-
0
X
W
17 16
10 11 12
9
8
7
FORESTAR (USA) REAL
ESTATE GROUP, INC.
DOC. NO. D212079897
15 14
IMMO
13 12
H GH DESERT DR VE
13 14 15
6
5 4
16
3
11
\t7
O
O
1
17 18w
W
2
1
10 11 12
9 8 7
I I
10.5' PARKWAY
9.S
TAMPED TOPSOIL PER
rSECPON J2 91 19
){' PER F7 4ON.)
4:1 SMAX)
c_
STANDARD
0: SIDEWALK PER
SECTION 32 13 20
COMPACTED
ACCEPTABLE
NATIVE BACKFLL
PER SECTION
31 24 00
SCALE: 1 "=150'
JBI Partners, Inc.
16301 Quo um Drive, Suite 200E
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
12
13
14 15
16 17
(4)
6 5 4 3
14.5'
STANDARD 6' CURB
PER 32 13 13-0525
5' CROWN
#3 BARS 0 18'
O.C.B.W.
44.
':0' R.O.W.
79' ROADWAY
LON(4TUONAL
CONSTRUCTION JOINT
PER 32 13 13-0511
18
2 1
EX. RED MOON TRAIL
1a1
ONSTRUCT APPROX
8SYOF4'
QliCRF4, SI ESA) K
6' REINFORCED CONCRETE
PAVEMENT PER SECTION 32 13 13
STANDARD 7' CURB
PER 32 13 13-D525
err' ea max
PROPOSED 6' LIUE STABUZED
SUBCRADE 0 30 LBS./SY PER
SECTION 32 11 29
RESIDENTIAL CONCRETE
STREET SECTION (L)
3213 13-D502
LEGEND
SIDEWALK TO BE CONSTRUCTED
BY DEVELOPER
P ROP. 50 ROW
P AVEMENT SECTION
P ROP TYPE R-1 RESIDENTIAL
BARRIER FREE RAMP TO BE
CONSTRUCTED BY DEVELOPER
PAVEMENT TO BE REMOVED
10
20
19
20
9 8
•(a
21 22
18 17
16
23 24
15 14
7 6 5 4
EX. COLD MOUNTAIN TRAIL
30
31
32
33
7 6 5 4
PAVEMENT TO EitE REMO
D
EX. HIGH DESERT DRIVE
25 26
13 12
EX. MYSTIC RIVER TRAIL
19 18
21 22
(
12
23
10.5' PARKWAY
: 5'
TAMPED TOPSOIL PER
SECTION 32 91 19
K' PER ET. (MIN)
4:1 (MAX.)
STANDARD
SOEWALK PER ce
SECTION 32 13 20
17 16
24 25
COMPACTED
ACCEPTABLE
NATIVE DACKFlLL
PER SECTKMN
31 24 DO
NOTE*
SIDEWALK SLOPE SHALL BE )j' PER
FOOT (MAX) UNLESS DIRECTED
OTHERIMSE BY 1HE ENGINEER.
PROMDE 6' TOP SCLL. SEED
HIDROMULCH OR SOD. MD IRRIGATE
UNTIL 80t VEGETATIVE COVER IS
ATTAINED, PER MEDIAN AHD
PARKWAY FINISH GENERAL NOTES
15 14 13
26 27
28
PAVING
EXHIBIT C
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 4A
(D.O.E NO. 7076)
January 20, 2014 — SHEET 6
jt
1
316 Sit OF\ROCK I
RIPRA
1017 SY OF ROCK
RIPRAP
VARIABLE WIDTH
DRAINAGE EASEMENT
43 SOF R CK I
RIP AP
5
4
3
2
SCALE: 1 "=150'
WILDWEST DRIVE
JBI Partners, Inc
16301 Quorum Drive, Suite 200B
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
VARIABLE WIDTH
DRAINAGE EASEMENT
►slide="•
arlibleeliede
%% •�ee
c%gtaiette
AM" infrerlitelri
1164 SY OF ROCK
RIPRAP
VARIABLE WIDTH
DRAINAGE EASEMENT
FORESTAR (USA) REAL
ESTATE GROUP, INC.
DOC. NO. D212079897
42" F:CP
17 16 15 14 13 12 11
10 11 12 13
9 8 7 6
24"
H GH DESERT DRIVE
24" RCP
14 15 16 17
5 4
z
oa
18W
ce
CONNECT TO
EXISTING 30" RCP
DOE 4554
30" RCP
LEGEND
10' CURB INLET
(UNLESS OTHERWISE INDICATED)
STORM SEWER MANHOLE
PROP. STORM SEWER & INLET
EX STORM SEWER & INLET
265 SY OF ROCK
RIPRAP
10
11
IY
i
16
EX. RUNNING WATER TRAIL
41 42 43 44
18
30
17
16
15
EX. MESA VIEW TRAIL
31
32
33
7 6 5 4
EX. COLD MOUNTAIN TRAIL
30
31
32
33
10 9 8 7 6 5 4
36" RCP
24" RCP
EX. HIGH DESERT DRIVE
20 21 22 23
30'RCP
19 18
•
17
16
15
24
14
EX. MYSTIC RIVER TRAIL
25
13
26
12
STORM DRAIN
EXHIBIT D
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 4A
(D.O.E NO. 7076)
January 20, 2014 — SHEET 7
30
31
32
33
5
4
3
2
1
2
3
5
i
SCALE: 1 "=150'
0
X
W
JBI Partners Inc.
16301 Quorum Drive, Suite 200B
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
FORESTAR (USA) REAL
ESTATE GROUP, INC.
DOC. NO, D212079897
17 16 15 14 13 12 11
H GH DESERT DRIVE
7
10 11 12 13 14 15 16 17
9 8
7
6
10 11 12 13
9 8 7 6
5
14
5
4
15
3
16
4 3
EX. BRANDING IRON TRAIL
e.
LEGEND
2
0
0
18w
2 1
17
PROPOSED STREET UGHT
- 100 WATT HPS COBRA 1MTH
TYPE 3 DIST. AND DROP
GLASS LUMINAIRE
- 25' LIGHT STANDARD
CA-€) EXISTING STREET LIGHT
PROPOSED SIGNBLADE
2
i
Q
18
1
7 6 5 4
EX, COLD MOUNT
30
31
10 9 8 7 6
EX, HIGH
20 21 22 23
19
18 17
16
EX, MYSTI
24
15 14
32
TRAIL
33
5 4
SERT DRIVE
25
VER TRAIL
13
26
12
20 19 18 17 16 15 14 13
21
22 23 24 25 26 27 28
STREET LIGHTING & STREET SIGNS
EXHIBIT E
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 4A
(D.O.E N0. 7076)
January 20, 2014 — SHEET 8
ENGINEER'S QUANTITY TAKE -OFF OPINION OF ESTIMATED COST
PREPARED BY JBI PARTNERS, INC. ON 5/9/2014
FORT WORTH, TEXAS
JBI PROJECT NO. LIC006F
ITEM NO.
3311.0261
3312.3003
3312.3002
3312.0103
3312.0001
3311.0001
3312.2003
3331.4115
3331.4116
3339.1001
3339.1002
3339.1003
3331.3101
3301.0001
3301.0002
3301.0101
3305.0112
9999.0001
3349.5002
3137.0102
3349.1005
3339.1101
3341.0402
3341.0309
3341.0302
3341.0205
9999.0002
BID ITEM
8" PVC Water Pipe
8" Gate Valve
6" Gate Valve
Connection to Existing 8" Water Main
Fire Hydrant
Ductile Iron Water Fittings
1" Water Service
8" Sewer Pipe
8" Sewer Pipe, CSS Backfill
4' Manhole
4' Drop Manhole
4' Extra Depth Manhole
4" Sewer Service
Pre -CCTV Inspection
Post -CCTV Inspection
Manhole Vacuum Testing
Concrete Collar
Connect to existing sanit. sewer
20' Curb Inlet
18" Thick RipRap
Type CH-PW-0 Headwall 42" RCP
5'x5' Storm Manhole
42" RCP
36" RCP
30" RCP
24" RCP
Connect to existin_ storm drain
UNIT
LF
EA
EA
EA
EA
TON
EA
LF
LF
EA
EA
VF
EA
LF
LF
EA
EA
EA
EA
SY
EA
EA
LF
LF
LF
LF
EA
7
1050
4
2
3
2
0.73
26
8A
2,506
80
11
1
61.6
26
2,586
2,586
11
9
2
SHEET NO.
26A 34
2
2,953
1
2
196
69
87
48
35
40
BAR C RANCH, PHASE 4A
ITEM UNIT ITEM
TOTAL PRICE TOTAL COST
1,050 $17.00
4 $1,200.00
2 $800.00
3 $400.00
2 $2,600.00
0.7 $5,800.00
26 $700.00
2,506 $21.80
80 $28.00
11 $1,900.00
1 $2,500.00
62 $100.00
26 $450.00
2,586 $0.65
2,586 $0.65
11 $100.00
9 $200.00
$400.00
2 $4,000.00
2,953 $60.00
1 $2,500.00
2 $2,500.00
196 $75.00
69 $65.00
87 $55.00
48 $45.00
1 $500.00
$17,850.00
$4,800.00
$1,600.00
$1,200.00
$5,200.00
$4,234.00
$18,200.00
$53,084.00
$54,630.80
$2,240.00
$20,900.00
$2,500.00
$6,160.00
$11,700.00
$1,680.90
$1,680.90
$1,100.00
$1,800.00
$800.00
$105,192.60
$8,000.00
$177,180.00
$2,500.00
$5,000.00
$14,700.00
$4,485.00
$4,785.00
$2,160.00
$500.00
$219,310.00
F:\Projects\LIC006F\excel\(20131231) LI0006F CFA Quantity Matrix.xls
CITY PROJECT NO. 02130
ENGINEER'S QUANTITY TAKE -OFF OPINION OF ESTIMATED COST
PREPARED BY JBI PARTNERS, INC. ON 5/9/2014
FORT WORTH, TEXAS
JBI PROJECT NO. LIC006F
ITEM NO.
3213.0101
3211.0501
3211.0400
3213.0301
3213.0501
3317.0110
9999.0003
BID ITEM
6" Conc Pvmt
6" Lime Treatment
Lime [27#/SY]
4" Conc Sidewalk
4' Barrier Free Ramp, Type R-1
Special Riprap [3"-5" Grouted rock riprap]
Street barricade
9999.0004 Connect to existing concrete street pavement
3125.0101
3471.0001
SWPPP > 1 acre
Traffic Control
3441.3101 100W HPS PC Lighting Fixture
3441.3301 Rdwy Illum Foundation TY 1,2, and 4
Rdwy Illum Assmbly TY 8,11,D-25, and D-
30
3341.1501 Ground Box
3441.3011 2" CONDT PVC SCH 40 (T)
3441.1410 NO 10 Insulated Elec Condr
3441.3002
JNIT TOTAL
UNIT 7
SY
SY
TN
SF
EA
SY
LF
LF
LS
LS
EA
EA
EA
EA
LF
LF
8A
SHEET NO.
26A
34
918
981
13
4
43.3
28
58
35
2,394
2,560
33
162
40
3
BAR C RANCH, PHASE 4A
ITEM UNIT ITEM
TOTAL PRICE TOTAL COST
3,312 $30.00
3,541 $2.40
46 $150.00
162 $3.50
4 $1,000.00
43.3 $43.00
28 $10.00
58 $10.00
1 $4,000.00
$700.00
$400.00
3 $1,200.00
3 3 $1,700.00
3 3 $400.00
179 179 $9.00
537 537 $0.60
$99,360.00
$8,498.40
$6,900.00
$567.00
$4,000.00
$1,861.90
$280.00
$580.00
$4,000.00
$700.00
$126,747.30
$1,200.00
$3,600.00
$5,100.00
$1,200.00
$1,611.00
$322.20
$13,033.20
F:\Projects\LIC006F\excel\(20131231j LIC006F CFA Quantity Matrix.xls
CITY PROJECT NO. 02130