HomeMy WebLinkAboutContract 45895-A6 (2)RECEIVED NOV -42015 CITY OF FORT WORM CITY SFCRFTARY WHEREAS, the City of Fort Worth (CITY) and CP&Y, Inc, (ENGINEER) made and entered into City Secretary Contract No. 45895, (the CONTRACT) which was authorized by M&C C-2 6925 on the 19th day of August, 2014 in the amount of $ 4 6 8, 9 6 6. 0 0; and AMENDMENT No. 6 CTY aECf3EiARV /54N511.4e CUNT i‘CINO0 Lf TO CITY SECRETARY CONTRACT No. 45895 WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $8,250 which was administratively authorized on December 8, 2014, Amendment Number 2 in the amount of $73,790.00 which was authorized by M&C C-27157 on January 27, 2015, Amendment 3 in the amount of $26,511.00 which was administratively authorized on March 3, 2015, Amendment 4 in the amount of $3,300.00 which was administratively authorized on April 27, 2015, Amendment 5 in the amount of $19,952.90 which was administratively authorized on May 5, 2015; and WHEREAS, the CONTRACT involves engineering services for the following project: Airport Development Projects at Alliance Airport; and WHEREAS, it has become necessary to execute Amendment No. 6 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 9, 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $74,350.17. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under e Contract, as amended, so that the total fee paid by work and services shall be an en nity of Fort Worth rofessional Services Agreement Amendment Template MO Official Release 8/1/2012 =age 1 of 2 rin 0 amount of $ 675,120. 07. the City for OFFICIAL RECORD CITY SECRETARY . EtWORTHM all 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth -,senses•siz Fernando Costa Assistant City Manager DATE: /0/.50/.54 APPROVAL RECOMMENDED: William Welstead Director, Aviation Department APPROVED AS TO FORM AND LEGALITY: Grant Jordr Assistant City Attorney ATTE t(-7 fJMav'y J. Kayser City Secretary City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2of2 ENGINEER CP&Y, Inc chael S. Hartzle Senior Vice President DATE: !�Jth5 M&C: Cartri6 I 10e- pase�15 Date: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Partners for a Better Quality of Life James A. McKenzie, PE CP&Y 1820 Regal Row Dallas, TX 75235 September 9, 2015 Ruseena Johnson City of Fort Worth Aviation Department 3951 Lincoln Ave Fort Worth, TX 76106 RE: Airport Development Projects at Alliance Airport Amendment No. 6 Dear Ms. Johnson: I am requesting an amendment to the Airport Development Projects at Alliance Airport for construction management services on the RTR Duct Bank & Taxiway H Improvements project. The additional expenses were incurred due to construction contract time extensions granted to the contractor. The total contract amendment request is for $74,350.17. A summary of the change to the contract is shown below. Original Contract Amount $468,966.00 Previous Amendments $131,803.90 RPR Services by Jacobs & PMA $46,231.06 CP&Y 10% Subconsultant Markup $4,623.11 CM Services by CP&Y $23,496.00 Amendment #6 Total $74,350.17 New Contract Total $675,120.07 DBE Participation DBE Participation Amount for Original Contract $72,262.00 DBE Participation for Previous Amendments $39,610.00 Additional DBE Participation for This Amendment $22,520.00 DBE Participation for New Contract Total $134,392.00 DBE Participation % for New Contract Total 19.9% Thank you for your consideration of this request. Should you have any questions or comments regarding this matter, please feel free to contact me at 214-589-6914 or by email at imckenzie@cpvi.com Sincerely, 1820 Regal Row. Suite 200 James A. McKenzie, PE Dallas. Texas 75235 (p) 214.638.0500 (f) 214.638.3723 www cpyi.com Proposal for Construction Phase Services RTR Ductbank Fort Worth Alliance Airport Phase construction Management CP&Y CM Services PMA RPR Services Jacobs RPR Services Total - Cost Plus Fixed Fee Total Proposal Amount 1 Labor Cost Reimbursables $21, 360.00 $21, 360.00 I $0.00 $22, 520.00 $23,711.06 CP&Y Fee $2,136.00 $2,252.00 $2,371.11 $46,231.06 I $6,759.11 CRYJ Total $23,496.00 $24,772.00 $26, 082.17 $74,350.1 11 $74,350.17 8/24/2015 Proposal for Construction Phase Services RTR Ductbank Fort Worth Alliance Airport 1 2 Construction Management Task Description Pre -construction Coordination Pre -construction meeting Construction Coordination Bi-Weekly Project meetings QA (12 weeks) Pre -acceptance Inspection Acceptance inspection Maintain project records Change Orders Pay Request (2) 3 I Punch List Coordination Final payment (1) 4 I Closeout Coordination Closeout documents CP&Y) Labor (Hours) Project Civil Elec Hours by Admin. Inspector Inspector Task 120 Fours by classification 120 Direct Hourly Rate by classification $178 Direct Labor Cost by classification 1 $21,360 0 $94 $0 $99 $0 0 $0 0 $br 120 OI 0 120 $01 $a� $21,36611 Construction Phase Services Jacobs Fee Proposal RTR Duct Bank - Additional Services Alliance Airport, Fort Worth, Texas Fee Proposal Resident Project Represetative (RPR) Salary Cost Overhead Rate @ Sub - Total Profit @ Labor Cost Expenses Mileage ($0.56 * 280 miles per trip) Lodging ($550 per month) Electric Taxi Hotel (Per Diem) Meals (Per Diem $56) Airfare (Per trip) Parking (Per Day) Rental Car Total Expenses Jacobs Additional Total Cost Total Additional Contract Cost Hourly Rate $ 66.44 91.85% 10% $156.80 $550.00 $100.00 $0.00 $0.00 $56.00 $0.00 $0.00 $0.00 Hours 160 4 1 1 0 0 0 0 0 0 Labor Cost $ 10,630.40 $ 10,630.40 $ 9,764.02 $ 20,394.42 $ 2,039.44 $ 22,433.86 627 20 550.00 100.00 1,277.20 $ 23,711.06 $ 23,711.06 8/7/2015 VV PROJECT MANAGEMENT ASSOCIATES James A. McKenzie., P.E Aviation Project Manager CP&Y Engineers 1820 Regal Row Dallas TX 75235 Dear Sir, Amendment Request to Fort .rrf AHaim Akp Improvements !roject P roject Management Associates PLLC (PMA) would like to request an amendment to its subs consultancy agreement with CP&Y Engineers to provide Resident Project Representative (RPR) Services for the above mentioned project. CIVIL ENGINEERS AND CONSTRUCTION MANAGERS August 24,, 2015 r t R R Duce Barr* and Taxiway A Due to time extension requests granted to the Contractor, the original contract execution time of 300 hours will be exceeded. It is envisaged that the project will now be completed within 581.5 hours. Therefore, PMA is requesting that an additional $22,520.00 (twenty-two thousand, five hundred and twenty dollars) representing an additional 281.5 hours at the hitherto agreed contract RPR rate of $80.00/hr be added to the original not to exceed contract cost of $24,000.00. The new Not To Exceed contract sum shall be $46, 520.00 (forty - six thousand, five hundred and twenty dollars). The scope of our services does not change. S hould you have any questions, please do not hesitate to contact me at telephone number (972)302J635. S incerely, P roject Management Associates PLLC. Edward M. Andrews, P.E. President 1013 Siena Drive Southlake Texas 76092 City of Fort Worth ACCEPTANCE OF PREVIOUS DBE COMMITMENT FORM (for use with CHANGE ORDERS or AMENDMENTS greater than $50,000) To be Completed by City Project Manager Amendment (for Professional Services Agreement) Project Name: City Project Number na City Project Manager Consultant: Ruseena Johnson CP&Y, Inc City's DBE Project Goal: 17 Airport Development Projects at Alliance Airport Original Amount of Agreement: Total of Previous Amendments: Amount for this Amendment: Revised Amount of Agreement: $468,966,00 $131,803,90 $74,350.17 $675,120.07 Accepted DBE Commitment: 17 Date of Last DBE Report, Amendment #: 6 Date: 9/4/2015 Language to be inserted in the M&C for this Agreement CP&Y, Inc agrees to maintain its initial DBE commitment of 17% that it made on the original agreement and extend and maintain that same DBE commitment of 17% to all prior amendments up to and inclusive of this Amendment No. 6, Therefore CP&Y, Inc remains in compliance with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous DBE Commitment form executed by an authorized representative of its company. To be Completed by the Representative of the Consultant James McKenzie Project Manager Printed Signature Title CP&Y, Inc Company Name 1820 Regal Row Address Dallas, TX 75235 City/State/Zip Authorize Signature/Date Contact Name (if different) jmckenzie@cpyi.com E-mail address 214-589-6914 214-638-3723 Phone number Fax Number 14% as of 9/9/2015 DBE % Paid to Date RIM Date City Project Manager has reviewed the work associated with this Amendment, considers it the same or similar to work in the original Agreement, and recommends that the Consultant have the option to Ruseena Johnson City Project Manager ifta&fetenPlegfA rtd M/WB Q'om.Ilance Staff BE Signature n and con rm i s existing SBE commitmen lit)PO ��, /\/`� O i C> Ci Project'Manager Signature I8a3' ID # g. act DBE Current % Level via Last Report Reed y ' Date EXHIBIT "B-3" (Supplement to Attachment B) On Call Agreement for Certain Development Projects at Alliance Airport SUMMARY OF TOTAL PROJECT FEES Consulting Firm Prime Responsibility Amount P rime Consultant: CP&Y Program management, airfield civil design, construction management • 04 411,873.65 61.0 P roposed M/WBE S ub -Consultants Amount ANA Consultants, LLC Gorrondona & Associates, Inc. P roject Management Associates, LLC Ferguson Consulting, Inc. N on-M/WBE Consultants: Jacobs Engineering Group, Inc. Proiect Description Development Projects At Alliance Airport City M/WBE Goal = 17% S urvey services Geotechnical investigation & construction materials testing Resident project representative services Airfield electrical design Resident project representative services S cope of Services Engineering Design & Construction Management 30, 000.00 4.4 30, 302.00 4.5 46,520.00 6.9 27, 570.00 4.1 128,854.42 19.1 Total Fee MWBE Fee Percent $600,769.90 $134, 392.00 19.9%