Loading...
HomeMy WebLinkAboutContract 45662-A2 (2)201 =.,. y a q tea' SEP 2 3 70,. }-fir • C\ti A' WHEREAS, the City of Fort Worth (CITY) and Jacobs Engineering Group, (ENGINEER) made and entered into City Secretary Contract No. 45662, (the CONTRACT) which was authorized by M&C C-26822 on the 3 day of June, 2014 in the amount of $ 2,485,403.75; and CITY r # RETA COOritt A Oa AMENDMENT No.2 TO CITY SECRETARY CONTRACT No. 45662 WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $ 4 3, 8 7 5. 9 5 which was administratively authorized on May 5, 2015; and WHEREAS, the CONTRACT involves engineering services for the following project: Final Design for Extensions for Runway 16R, Runway 16L and Taxiway A; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated 08/18/15, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $7, 125. 00. 2. Article II of the CONTRACT is amended to provide for an increase in gi; :*the fee to be paid to Engineer for all work and services performed under the Contract, as amended so that the total fee by aid the Cityfor all p work and services shall be an amount of $ 2, 53 6, 4 04 . 70 . VI. Tii: :21: swirl i:Mended All other herein, 3. provisions of the Contract, which are not expressly shall remain in full force and effect. City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 2 OFFICIAL RECORD CITY SECRETARY 13, WORTH, TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: 9/ZZ//se APPROVAL RECOMMENDED: /7 gra n William Welstead, AAJ' Director, Aviation Department APPROVED AS TO FORM AND LEGALITY: Grant JorcI Assistant City Attorney City of Fort Worth Professional Services Agreement Amendment Template PM0 Official Release 8/1/2012 Page 2 of 2 f4V ENGINEER cotes .Engineering Group Inc. Scoff Sanders, P.E. Operations Manager DATE: C /0 /64 l M&C: Co2ipg)a 1p 3 xi+ Date: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX lAlliance Airport Runway Extension Project - Phase X Contract Amendment #2 Task List and Summary of Fees Task Embankment Subgrade Analysis - Laboratory Services • Engineering Services Slope Stability Analysis • Engineering Services Total Fee 1 1 Consultant Task Amount Terracon Terracon $ 3,325.00 $ 1,050.00 $ 2,750.00 $ 7,125.00 18-Aug-15 1 SUPPLEMENT TO AGREEMENT FOR SERVICES CHANGE TO SCOPE OF SERVICES AND FEES Reference Number: 94145170 I This SUPPLEMENT to AGREEMENT FOR SERVICES to the original Agreement for Services (original Agreement dated 06/23/2014, Agreement reference number JEMLP059) is between Jacobs Engineering Group, Inc. ("Client") and Terracon Consultants, Inc. ("Consultant") for additional or changed Services to be provided by Consultant for client on the Project, as described in the Agreement for Services. This Supplement is incorporated into and part of the Agreement for Services. 1. Scope of Services. The scope of the additional or changed Services are described in the Scope of Services section of the Consultant's Supplemental Proposal, unless Services are otherwise described below or in Exhibit B to this Supplement (which section or exhibit are incorporated into the Supplement). Testing and analysis of subgrade preparation for proposed runway and taxiway pavement design on existing embankment on the north side of the project site. + Three additional borings + Laboratory testing, including Sulfate determination, Lime pH, two Proctors, two lime stabilized CBR tests, and Atterberg Limits. + Engineering analysis Slope stability analysis of the proposed embankments of the proposed project site. + One additional boring + Laboratory testing, including Atterberg Limits and Unconfined Compression on soil. + Global stability analysis for 4H:1V new embankment slopes 2. Compensation. Client shall pay compensation for the additional or changed Services performed at the fees stated in the Supplemental Proposal unless fees are otherwise stated below or in Exhibit C to this Supplement (which section or exhibit are incorporated into the Supplement). Existing embankment subgrade analysis (note additional boring cost is within initial contract) + Laboratory: $3,325.00 + Engineering: $1,050.00 Slope Stability Analysis (note addional boring cost and laboratory cost are covered within initial contract) + Engineering: $2,750.00 Total Additional Compensation: $7,125.00 All terms and conditions of the Agreement for Services shall continue in full force and effect. This Supplement is accepted and Consultant is authorized to proceed. Consultant: By: Name/Title: Address: Phone: Email: Page 1 of 1 Terracon - nts, Inc. / Date: 9(23/2014 Tim G. Abrams / Senior Principal 8901 Carpenter Frwy., Suite 100 Dallas, TX 75247 (214) 630-1010 Fax: (214) 630-7070 tgabrams@terracon.com Client: By: Name/Title: Address: Phone: Email: Jacobs Engineering Group, Inc. Date: Jarrod Parker / P.E. 777 Main Street Floor 29 Fort Worth, TX 76102 (817) 735-7166 Fax Jarrod. parker@jacobs.com Rev. 8-12