Loading...
HomeMy WebLinkAboutContract 45667 (2)CITY SECRETARY LJ5 cr.f� �--..connRn�cx bo. _...._ Developer and Project Information Cover Sheet: Developer Company Name: D.R. Horton — Texas, Ltd. Address, State, Zip Code: 6751 North Freeway l Fort Worth, TX 76131 Phone, E-Mail: (817) 230-0800, dallen@drhorton.com Authorized Signatory/Title: Don E. Allen, Assistant Secretary Project Name and Brief Description: Water, Sewer, Paving, Street Lighting Improvements to serve Santa Fe Trails Ph. 5 Project Location: West of Robert W. Downing Rd. and South of Basswood Blvd. Plat Case No.: FP-0014-007 Council District: 2 CFA: 2014-022 DOE: 7231 To be complete by staff Received by: Plat Name: Parr Trust City Project No: 02287 Combined CFA Agreement — Revised January 2014 Date: 6) i j OFFICIAL RECORD U rn7 SECVTARY Fut 'SMITH, TX RECEIVEQ JLIN-- 4 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ( `Improvements") related to a project generally described as Santa Fe Trails Ph. 5 ("Project") within the City of Fort Worth, Texas ( City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement (` CFA" or "Agreement") in connection with the Improvements and the Project. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub -contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) _X_, Sewer (A-1) X Paving (B) _X_, Storm Drain (B-1) _, Street Lights & Signs (C) X . E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. 11. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Combined CFA Agreement — Revised January 2014 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state -approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, Combined CFA Agreement — Revised January 2014 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of' streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer s contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Combined CFA Agreement — Revised January 2014 Cost Summary Sheet Project Name: Santa Fe Trails Ph. 5 CFA No.: 2014-022 DOE No.: 7231 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one 'Bond = 100% 'Completion Agreement = 100% / Holds Plat 'Cash Escrow Water/Sanitary Sewer= 125% 'Cash Escrow Paving/Storm Drain = 125% 'Letter of Credit = 125% w/2yr expiration period $ 158,512.00 198, 853.50 $ 357, 365.50 401,255.50 $ $ 67,665.00 $ 468, 920.50 $ 826,286.00 $ $ $ $ 7,147.31 7,147.31 14,294.62 16,050.22 8,025.11 2,706.60 1,250.00 28,031.93 42,326.55 Amount 826, 286.00 826,286.00 446,706.88 586,150.63 1,032,857.50 Choice (ck one) X IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, an a' e eloper has ex ed this instrument in quadruplicate, at Fort Worth, Texas this day o , 2n, fri . CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-?abulal, EMBA, P.E. Development Engineering Manager Approved as to Fo1711 & Legality: Douglas W. Black Assistant City Attorney M&C No. Date: ATTEST: Ma y J. Kayser // City Secretary �� ATTEST: f atist4144M- Signature (Print) Name: o rearrewl Title: Combined CFA Agreement — Revised January 2014 Transportation & Public Works Department „J. Li DouglaWiersig, P.E. Director Approved by City Manager's Office e/apkts4444i--- Fernando Costa Assistant City Manager DEVELOPER: D.R. Horton — Texas, Ltd., a Texas Limited Partnership By: D.R. Horton, Inc., a Delaware Corporation Its authorized agent Signature t Name: Don E. Allen Assistant Secretary OFFICIAL L RECORD Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included NI rs C A Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1 : Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) WATER ITEM # 3311.0241 3312.3003 3312.0001 3311.0001 3312.2003 3305.0109 PELOTON LAND SOLUTIONS, LLC 5751 KROGER DR, SUITE 185, KELLER, TX 76244(817) 562-3350 SANTA FE TRIALS PHASE 5 Unit Prices are Fort Worth CFA Prices 5/29/2014 MPROVEMENTS DESCRIPTION 8" Water Pipe 8" Gate Valve Fire Hydrant Ductile Iron Water Fittings w/ Restraint 1" Water Service Trench Safety TOTAL WATER SANITARY SEWER IMPROVEMENTS ITEM # DESCRIPTION 3331.4115 8" Sewer Pipe 3331.4116 8" Sewer Pipe, CSS Backfill 3339.1001 4' Manhole 3301.0101 Manhole Vacuum Testing 3331.3101 4" Sewer Service 3305,0109 Trench Safety 3301.0002 'Post -CCTV Inspection TOTAL SANITARY SEWER PAVING IMPROVEMENTS ITEM # DESCRIPTION 3213.0101 6" Cone Pvmt 3211.0501 6" Lime Treatment 3211.0400 Hydrated Lime 3213.0501 'Barrier Free Ramp, Type R-1 9999.0005 'Remove Street Barricade 9999,0007 IConst Std Street Header 9999.0008 'End of Road Barricade 9999.0009 'Engineered Channel TOTAL PAVING STREET LIGHTING IMPROVEMENTS ITEM # DESCRIPTION 3441.3002 Rdwy Illum Assmbly TY 8,11,D-25, and D-30 3441.3301 Rdwy Illum Foundation TY 1,2, and 4 9999.0003 2" CONDT PVC SCH 80 (T) 3441.1408 NO 6 Insulated Elec Condr TOTAL STREET LIGHTS STREET SIGNS ITEM # DESCRIPTION 9999,0010 Street Signs (Name Blades) (TOTAL STREET SIGNS UNIT LF EA EA TON EA I LF UNIT LF LF EA EA EA LF LF UNIT SY SY TN EA EA LF LF LF UNIT EA EA LF LF UNIT EA QTY 3,088 4 2 0.8 114 3,088 QTY 3,039 80 11 11 114 3,119 3,119 QTY 11,381 12,148 182 6 4I 29 30 400 QTY 15 15 1,010 3,030 QTY 5 UNIT PRICE 30.00 1,050.00 3,200.00 4,000.00 450.00 0.25 UNIT PRICE 34.00 36.00 3,000.00 50.00 450.00 1.00 1.50 1 UNIT PRICE 28.50 2.75 160.00 1,000.00 300.00 1 30.00 50.00 12.00 UNIT PRICE 2,600.00 800.00 12.00 1.50 UNIT PRICE 245.00 TOTAL 92,640.00 4,200.00 6,400.00 3,200.00 51,300,00 772.00 $158,512.00 TOTAL 103,326.00 2,880.00 33,000.00 550.00 51,300.00 3,119.00 4,678.50 $198,853.50 TOTALI 324,358.50 33,407.00 29,120.00 6,000.00 1,200,00 870.00 1,500.00 4,800.00 $401,255.50 I TOTAL 39,000.00 12,000.00 12,120.00 4,545.00 $67,665.00 TOTAL) 1,225.00 $1,225.00 I 4,;Jh IQ BASSWOOD BLVD I � 156 0 u tu 287 7 m�®m®®om®m® \ NORTH TARRANT PKWY J All 35W �►v .U' 2 tz m 0 ®o®ruc.®aa• • WESTERN CENTER BLVD PROJECT BASr�Woron RI ir 8 287 NORTH NOT TO SCALE SANTA FE TRAILS PHASE 5 DATE: MAY 2014 OWNER / DEVELOPER: DR HORTON—TEXAS, LTD 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 (i!1I P E LOTO N PMLAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 m LEGEND PROPOSED GATE VALVE EXIST GATE VALVE PROPOSED FIRE HYDRANT EXIST FIRE HYDRANT NOTE: ALL PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE NOTED EXHIBIT A - WATER 13 O 70 14 0 1 1 15 i• • .%.a..aa—.-r a1.-_ 11 _ 4ja+F,„.+7 16 • • 40 2 . ' 40 S 1 1 17 ; 39 3 ; 1 I 18 t 38 4 J. 19 37 5 L id vi. 20 36 6 111Q+J�111 r.J. 21 El 35 7 41 f C�• IM- II 34 8 Cl. 23 D. 33 9 1 a , 24 V• ' 1 . . SIN pNP RP11-5 I Id I 2 POTRIL0 LANEP • • • • • • • • • 22 25 i }! I I jer4EgTON$ : TRAIL i 2 t 3 1 i t - -i.•_••_1.•._.._.._ i©• 17 18 19 20 21 22 4 5 ,v 41 71 1 1; 41 32 31 11 +tea+— I—. 1 u+ 34 • 29 28 27 26 25 24 23 22 21 20 : 19 • tie _ J LAC:ITAS fl • 30 / ' . • CC 12 15 16 17 18 ' •> 1 2 3 4 5 6 7 8 9 1 10 (o 1• � 13 14 ' IWJ ; 73 I®Ig • '7 CC- O 1° 1 iaLL 1 i .J ▪ ° J 28 27 26 25 24 23 22 21 20 19 I �520 19 18 17 16 15 14 13 12 11 1 I • • • �° 1 • -- 29 10 23 39 38 36 35 Ig I 2 3 4 5 tp,SEZ LS SNS N 65 6 7 8 9 10 48 47 46 45 44 43 CAF'ULEN RCAD 42 41 40 39 9 10 11 12 13 14 15 16 17 7 8 74 33 74 32 31 30 -- 6 7 8 9 10 11 12 13 MIN IA Ell OBOE' 24 25 WES ERN EADO PHASE 27 s AD 1 • 0 'DOD37 I • 14 15 16 17 18 19 20 21 22 23 24 25 26A ; • •i■ _J I■731 ■•_777 L_•._•■ Mr•Y••i••_EN _•I_•, 28 230 / 32/ 33 f 36 \ J 35 • 50 ,�s NORTH 200' SANTA FE TRAILS PHASE 5 GRAPHIC SCALE DATE: MAY2014 OWNER / DEVELOPER: DR HORTON-TEXAS, LTD 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 li!�I PELOTON muLAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 SIDS LEGEND PROPOSED SEWER LINES EXIST SEWER LINES NOTES: 1. ALL PROPOSED SANITARY SEWER LINES ARE 8" UNLESS OTHERWISE NOTED. 2. ALL SAINTARY SERVICES ARE SDR-26. 1 4 15 I 41 71_--1 ----- -"I I r 41 1 ®; Q e I . 16• • 40 2 40 2 a I I 1 I I t z1 la a' 39 3 ' • 3 —I: I� !:1_it LOTRI GI OLANE) 13 A I SPN 9HF, I — — 70 14 1 17 . 3g 1 1 ! 1 t..GI • , ▪ 18 •; i• 38 4 I 38 } I I 37 . r:C ▪ 19 i i 37 5 1,,,,,L.ur i vt 20 36 6 . 1 21 I0Z 25 22 Hu_. I . i 33 a gala 35 7 C�• 34 8 1 J) • 32 (-).1• 4 1 i : 1 EVON� = TRAIL I i 2 : 1 1 3 • I 4 t t 5 - rAll ■■-10 IMIE EXHIBIT Al - WASTEWATER 17 18 19 4 Q 1 31 30 36 I I 9 10 11 35 34 33 5 7 8 0 32 31 30 29 28 27 26 25 24 23 22 21 20 ' 19 I I v I al- 1 3 4 5 6 P`Nj"PNP `c 2�\�`� 5 48 47 46 65 8 9 10 45 44 43 42 41 40 39 CAFULIN ROAD ___ cs- op I I 1 I I I 15 16 17 18 / 29 13 14 _.. _....._K/. kUNrokLAPCE-BQ . _..) 28 27 26 25 24 23 22 6 7 8 9 10 11 12 13 20 21 22 Ian ■ram.■ OI$$Y 24 25 WES ERN 26 27 EADO S AD PHASE 1 21 26 TION 20 19 9 10 11 12 13 14 15 16 17 13 74 I 0 '>1 2 3 4 5 6 7 8 9 1 10 0 1 �O IW J ; 73 a 1 G_1 •7Q e I ;J IJ1- O I u i G� J 1520 19 18 17 16 15 14 13 12 111 ; 1 I I _....._.._ ._.._. _.__.._..k-�4—(-- I I 14 15 16 17 18 19 20 21 22 23 24 25 26A j I , I \�, I• gPN �NP F•2 ■rr■ err_ a ■ray =IZMI■ err rr irr_r _ _rr_rr 1 29 / 30 / 31 / 32 / 33 / 36 \ 37 1 38 50 Gil = 0 NORTH 200' SANTA FE TRAILS PHASE 5 GRAPHIC SCALE DATE: MAY2014 OWNER / DEVELOPER: DR HORTON-TEXAS, LTD 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 11111 PELOTON 11111 LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 s LEGEND 29' B-B / 50' ROW (TYP) SIDEWALK BY DEVELOPER SIDEWALK BY HOMEBUILDEIk_ t■ H.C. RAMPS BY DEVELOPER EXHIBIT B - PAVING 25 rr =_— ` ��TO = TRAIL 1 2 3 1 1 4 13 70 14 15 41 71 I POTR!L O LANE; ( 41 • • 16 3 R 40 2 a 1 40 i II % p q • 17 11 1•' 39 3 '1 I, 1 II if n II • ▪ 18 1:1 t 38 4 J7 t I P II II ▪ 19 11 i 37 5 HP M • 20 LL.rI 1I 36 6 3 ▪ 1 11 n1 1 21 �1 II N 35 7• I • 1 • 22 �1 1I 34 8 III CY. • 23 09' 1 33 li 1• 0:1 y O 24 (}I r 11 ti 5 4 11 4 .1 B 4 1• 32 31 r 30 r i1 29 :1 39 38 1 0NE V E I 1 2 3 4 5 2 CC' o 'PNj H 5�,22P11-`� 3 Jn D9 4 0 65 48 47 46 45 44 11 12 13 14 15 16 17 18 74 I 15 16 17 18 1I!! -1 2 €% / 13 14 1 .1 11115 J — 6 7 8 9 10 43 42 41 40 39 CAF ULIN RCAD 1 P7 Q 1.1 I!31_ 1 h.1J 28 27 26 25 24 23 22 21 20 19 1.P 1 >20 19 18 17 16 15 14 13 Ilnr-u� n /i N r -�i �I�Ir:.�s.�7LBQ- rribl'.a"v-.s%ff:.'.rn•r:L-v1rsr.:�:.�xtr•jt--� E�R\fig vV/V�// -- - - -- 1 saNjPhPSE2 _ In" _.-=.tea-_s r.-_\ I a 21 22 23 24 25 26A I2� e 11 37 h 36 6 1; 7 8 9 10 1; 35 i 1 II 34 O t 32 31 30 29 28 27 26 25 24 23 22 21 20 : 19 Il 33 1 _ r rras•as __ a acs•- lir��1-kiil:+'-s�he%s-IA*- ae-.:Ism: wt..: rr--- ▪ I- r 11.1 3 4 5 6 7 8 9! 10 a 0 : @ rn ▪ 0 • `0 1 e� 12 i 11 I J 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ammo • ■■i■■VO■■= ©■ 19 20 21 22 E■ ■■EM■■ Oi■■Y ii., 23 24 25 I 26 27 \NES+ERN KPH p� 1J ADO • NMI ■N■f ■ NINE M■1r ,,NI MERINO ■Y■■■■_1 M■■IN230 131 // 32 // 33 ,36 \ 37 J 38 50 28 ON 0 NORTH 200' SANTA FE TRAILS PHASE 5 GRAPHIC SCALE DATE: MAY2014 OWNER / DEVELOPER: DR HORTON-TEXAS, LTD 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 li!�I PE LOTO N 11111 LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 L 13 70 14 16 • • 40 1 1 f � 17 : 39 • I 1 ' 19 u.r ' 20 I 36 21 F-1 i 35 22 34 f 1 23 33 • ! -I 1 :0 24 I 1 25 -i L i:REvON$ : TRAIL 1 1 = 2 3 •I 1 I = 4 II 18 LEGEND PROPOSED STREET LIGHTS EXIST STREET LIGHTS 1 I EXHIBIT C - STREET LIGHTS 38 37 32 31 30 29 28 27 FP\\-5 2 3 a 5 6 7 8 9 10 26 6 7 8 9 _SEISIMI_MM_ ©■ 20 21 22 23 25 24 `POTRIL r41 40 39 38 0 LANE 4 � 0 I 37 5 I 36 6 /j / — 1 35 /7 8 34 3 4 5 SPNT NP E 2 \LS 65 48 47 46 45 44 6 7 8 9 10 43 42 41 40 39 CAE uuN RCAD 9 10 11 12 13 14 15 16 17 1$ 74 0 I 9 33 • 32 31 30 29 28 27 26 25 24 23 22 21 20 : 19 1 1 •_.._.._..,-..�.._..J:1.SCLTMSEZ'9Lt.. _..,-.._.._.._ ,._�_ 15 16 17 18 • ';1 2 3 4 14 I 1=J 11 • •� Q fQF • .J 23 22 21 20 0 19 le 1>20 19 18 17 • • _..J l_.. - 5 6 7 8 9! 10 Hco - 1• 73 , O O I 16 15 14 13 12 1 11 I J NI ._.._. L_.._....J 5PN PNp,SE 2 / I 4 I 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26A ; 9 , 72 I _■ .11 IS SE S■ II•M_�■i SrOiJO MIS 1■� SS_5 _VENOM •iIMI_SN 4,M N•M_•, 24 25 07 28 29 30 VJESt ERN �EADO\�115 AD 12 12 / 31 / 32 / 33 / 36 3750 / 38 \ PHASE ,�s NORTH 200' SANTA FE TRAILS PHASE 5 = GRAPHIC SCALE DATE: MAY 2014 OWNER / DEVELOPER: DR HORTON-TEXAS, LTD 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 PE LOTO N 111111 LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 sp,,s1g4 �^p41 71! . 1 ° 41 u I fQTRILLQ LAYf, j .. • 16 • • 40• 2 • • 40 I I 1 : 17 • : 39 3 : I I I 18 • • 38 4 I I a • 19 1 1 37 5 eg • 1-41 •- V.M 20 I 36 6 • 21 lL-• I ▪ 35 7 I COI 34 8 LLI t C.Y. • • • • 33 9 I I w 32 10 ! i 31 11 30 EVOIN I 29 : TRAIL : 1 1 1 t I : 3 22 23 24 25 I I 1. LEGEND PROP STREET NAME SIGNS A EXIST STREET NAME SIGNS 2 39 35 2 48 47 7 34 O 32 31 30 I 33 ._••/— 46 45 6 7 8 9 10 43 42 41 40 39 CAFULIfd ROAD 9 10 11 12 13 14 15 16 17 18 8 74 29 28 27 26 25 24 23 22 21 20 : 19 a . _ .. _ LSC LIFOlAIL • • w • 15 16 17 18 •'>•1 2 3 4 5 6 7 8 9 110 0 j 1a • • 13 I I=� ; 73 • •7< ▪ O • • 1IC It 0 • •J • J 28 27 26 25 24 23 22 21 20 19 • Ir520 19 18 17 16 15 14 13 12 I 11 =I • ' A... _ • • W .. __KALkU tl°+.I.A0.0 1 EXHIBIT C1 - STREET NAME SIGNS 6 7 8 9 10 11 12 13 14 0 _IMI Ila.._ ■_.S=1■ ■.M.■ _�...J R.i■ 20 21 22 23 I 24 r25 I 26 27 I 28 'ONES+EftN I�EAD1�S ADp1T1�N PHASE 1 L.• _ •,Ez__J ' PNSPHF ,RP LIS • S ' 0 I 15 16 17 18 19 20 21 22 23 24 25 26A 29 30 31 / 32 / 33 % 36 \ 37 / 38 \ 50 7 - 0 NORTH 200' GRAPHIC SCALE SANTA FE TRAILS PHASE 5 DATE: MAY 2014 OWNER / DEVELOPER: DR HORTON—TEXAS, LTD 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 PE LOTO N IfirLAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350