Loading...
HomeMy WebLinkAboutContract 45668 (2)Developer and Project Information Cover Sheet: Developer Company Name: Reserve at McAlister Senior Living, LLC Address, State, Zip Code: 9349 Waterstone Blvd. I Cincinnati, OH 45249 Phone, E-Mail: Josh Pettijohn (214) 729-75 5 8, i osh.pettii ohn(a,mvg.com Authorized Signatory/Title: Dave Liette, Authorized Signer Project Name and Brief Description: Water, Sewer, Paving, Drainage and Street Light Improvements to serve Reserve at McAlister Project Location: North of McAlister, West of South Freeway Plat Case No.: FP-014-006 Plat Name: Highpoint Hill (Reserve at McAlister) Council District: 6 City Project No: 02308 CFA: 2014-033 DOE: 7259 To be completed y staff Received by: I Date: VIS i LI RECEIVED AIN 6 2,614 ofrocia rit:{ r » Grin! r cstzliftur vitt RIA Combined CFA Agreement — Revised January 2014 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § § City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ( `Improvements") related to a project generally described as Reserve at McAlister ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Proj ect. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 s affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub -contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X, Sewer (A-1) _X_, Paving (B) _X, Storm Drain (B-1) X ,Street Lights & Signs (C)_X_. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Combined CFA Agreement — Revised January 2014 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state -approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, Combined CFA Agreement — Revised January 2014 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Combined CFA Agreement — Revised January 2014 Cost Summary Sheet Project Name: Reserve at McAlister CFA No.: DOE No.: 7259 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Developer's Cost 49,916.00 99,499.00 Water and Sewer Construction Total $ 149,415.00 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period 236,081.50 224,434.00 23,459.90 $ 483, 975.40 $ 633,390.40 $ $ $ 2,988.30 2,988.30 5,976.60 18,420.62 9,210.31 938.40 28,569.33 34,545.93 Amount 633,390.40 633,390.40 186,768.75 604,969.25 791,738.00 Choice (ck one) X IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer haile e `- cute this instrument in uad ruplicate, at Fort Worth, Texas this i day o ,20 ('1. CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi- bulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. NA - Date: ATTEST: \i‘Sike LliAeolatiP\ Signature (Print) Name: J i e;(QQ 1,4 M Eft) 6,50\i ktic Combined CFA Agreement — Revised January 2014 Transportation & Public Works Department Douglas vv,s( Col Li cry Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager DEVELOPER: RESERVE AT MCAL'ISTER SENIOR LIVING, LLC a Texas limited liability company By: MV Reserve at McAlister LLC an Ohio limited liability company Its: Managing Member By: MV Affordable Housing LLC an Ohio limited liability company Its: Sole Member, By: r Print Name: I !�, -%� Title_ r Auther 4 Signer By: -Pont Nam IZ {< tiaO,S#J I!v Title Authorized Signer • OFFICIAL RECORD CITY SECRETARY Fet WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Stoiin Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate El // rs AS r r AL (Remainder of Page Intentionally Left Blank) UNIT PRICE BID Bidlist Item No. 3311.0161 3311.0241 3312 0117 3312.2802 3311.0001 3312.0001 3312 3002 3312 3003 3305.0109 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description 00 42 43 DAP - BID PROPOSAL Page 1 of 7 Engineer's Opinion of Cost Specification Section No. Unit of Measure UNIT I: WATER IMPROVEMENTS 6" PVC Water Pipe 8" PVC Water Pipe Connection to Existing 8" Water Main 4" Water Meter and Vault Ductile Iron Water Fittings Fire Hydrant 6" Gate Valve 8" Gate Valve Trench Safety 33 11 12 33 11 12 33 12 25 33 12 11 33 11 11 33 12 40 33 12 20 33 12 20 33 05 10 LF LF EA EA TON EA EA EA LF Bid Quantity Unit Price Estimate 3 $30.00 683 $30.00 1 $500.00 1 $15,000.00 1.1 $4,500.00 1 $3,200.00 1 $1,100.00 3 $1,300.00 686 $1.00 TOTAL UNIT I: WATER IMPROVEMENTS Bid Value $90.00 $20,490.00 $500.00 $15,000.00 $4,950.00 $3,200.00 $1,100.00 $3,900.00 $686.00 $49,916.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 00 42 43 Estimate DAP - REV.xls UNIT PRICE BID Bidlist Item No. 3331.4115 3331.4108 3331.4108 3339.1001 3339.0001 3305.1002 3305.0113 3305.0109 3301.0002 3301.0101 3305.011 3339.1003 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description 8" Sewer Pipe (PVC) 8" Sewer Carrier Pipe (DI) 6" Sewer Pipe 4' Manhole Epoxy Manhole Liner 16" Steel Casing Water Stops Trench Safety Post -CCTV Inspection Manhole Vacuum Testing Utility Markers 4' Extra Depth Manhole 00 42 43 DAP - BID PROPOSAL Page 2 of 7 Engineer's Opinion of Cost Specification Unit of Bid Section No. Measure Quantity UNIT II: SANITARY SEWER IMPROVEMENTS 33 31 20 LF 1115 33 31 20 LF 103 33 31 20 LF 24 33 39 10 EA 7 33 39 60 VF 10 33 05 22 LF 108 33 05 15 EA 4 33 05 10 LF 1258 33 01 31 LF 1258 33 01 30 EA 7 33 05 26 LF 1258 33 39 10 VF 19 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS Estimate Unit Price $38.00 $60.00 $36.00 $3,000.00 $100.00 $225.00 $10.00 $1.00 $1.50 $50.00 $2.00 $150.00 Bid Value $42, 370.00 $6,180.00 $864.00 $21,000.00 $1,000.00 $24,300.00 $40.00 $1,258 00 $1,887.00 $350.00 $2,516.00 $2,850.00 $104,615.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 004243 Estimate DAP- REV.xis UNIT PRICE BID Bidlist Item No. SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description 3110.0101 Site Clearing 3123.010 Unclassified Excavation 3125.0101 SWPPP >_ 1 acre 3341.0208 27" RCP, Class III 3341.0309 36" RCP, Class III 3341.0402 42" RCP, Class III 3341.0409 48" RCP, Class III 3341.0502 54" RCP, Class III 3349.0001 4' Storm Junction Box 3349.0002 5' Storm Junction Box 3349.0006 5' Storm Junction Box w/ wings_ 3349.0003 6' Storm Junction Box 3349.1012 54" Flared Headwall, 1 pipe 3349.5001 10' Curb Inlet 3349.5003 20' Curb Inlet 3305.0109 Trench Safety 00 42 43 DAP- BID PROPOSAL Page 3 of 7 Engineer's Opinion of Cost Specification Unit of Bid Section No. Measure Quantity UNIT III: DRAINAGE IMPROVEMENTS 31 10 00 LS 31 23 16 CY 31 25 00 LS 33 41 10 _ LF 33 41 10 LF 3341 10 33 41 10 3341 10 33 49 10 33 49 10 33 49 10 33 49 10 33 49 40 33 49 20 33 49 20 33 05 10 LF LF LF EA EA EA EA EA EA EA LF Estimate Unit Price 1 $1,500.00 3300 $3.00 1 $2,800.00 55 $65.00 273 $96.00 121 $108.00 422 $125.00 482 $140.00 1 $3,300.00 2 $4,200.00 1 $6,000.00 2 $5,000.00 1 $5,500.00 1 $3,000.00 2 $4,800.00 1353 $1.00 TOTAL UNIT III: DRAINAGE IMPROVEMENTS Bid Value $1,500.00 $9,900.00 $2,800.00 $3,575.00 $26,208.00 $13,068.00 $52,750.00 $67,480.00 $3,300.00 $8,400.00 $6,000.00 $10,000.00 $5,500.00 $3,000.00 $9,600.00 $1,353.00 $224,434.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 00 42 43 Estimate DAP - REV.xls UNIT PRICE BID Bidlist Item No. 3213.0103 3211.0502 3211.0400 3213,0301 3213,0402 3291,0100 3292 0450 3292 0500 3213,0501 3471,0001 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description UNIT 7 5" Conc Pvmt (with monolithic curb) 8' Lime Treatment Lime 4' Conc Sidewalk 7' Concrete Driveway Topsoil Seeding, Hydromulch with binding agent Seeding, Soil Retention Blanket ADA Ramp-1 Traffic Control 00 42 43 DAP - BID PROPOSAL Page4 of7 Engineer's Opinion of Cost Specification Unit of Section No. Measure IV: PAVING IMPROVEMENTS 332 13 13 3 SY 32 11 29 32 11 29 32 13 20 32 13 20 32 91 19 32 92 13 32 92 13 32 13 20 34 71 13 SY TON SF SF CY SY SY EA Month Bid Quantity 3449 3625 54 5 2580 790 109 995 995 2 6 TOTAL UNIT IV: PAVING IMPROVEMENTS Unit Price Estimate • $44.00 $4.00 $170.00 $4.50 $42 00 $1200 $1.50 $6.00 $2,000,00 $500,00 Bid Value $151,756,00 $14,500,00 $9,265,00 $11,610,00 $33,180,00 $1,308,00 $1,492 50 $5,970.00 $4,000,00 $3,000,00 $236,081,50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 00 42 43Estimate DAP- REV.xls UNIT PRICE BID Bidlist Item No. 3441,3002 3441,3201 2605,3015 3441,1408 3441,3312 3441,1503 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description 00 42 43 DAP- BID PROPOSAL Page 5 of 7 Engineer's Opinion of Cost Specification Section No. Unit of Measure UNIT V: STREET LIGHTING IMPROVEMENTS • Rdwy Illum Assmbly TY 8,11,D-25, and D-30 LED Lighting Fixture 2" Sch 80 PVC (includes Trenching & Backfill) NO 6 Insulated Elec Conductor Contact Enclosure, Pad Mount Ground Box, Large, w/ Lid Apron 34 41 20 34 41 20 26 05 33 34 41 10 34 41 20 34 41 10 EA EA LF LF EA EA Bid Quantity Unit Price Estimate 5 $1,545.00 5 $8.00,00 715 $6 26 2860 $0.65 1 $4,000.00 2 $700.00 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS Bid Value $7,725.00 $4,000.00 $4,475.90 $1,859.00 $4,000.00 $1,400.00 $23,459.90 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 00 42 43 Estimate DAP- REV.xls 00 42 43 DAP - BID PROPOSAL Page 6 of 7 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Engineer's Opinion of Cost Bidlist Item No. Project Item Information Estimate Description Specification Unit of Section No. Measure UNIT VI TRAFFIC S GNAL IMPROVEMENTS Bid Quantity TOTAL UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS Unit Price Bid Value CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 00 42 43Estimate DAP- REV.xls • UNIT PRICE BID Bidlist Item No. SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description 00 42 43 DAP - BID PROPOSAL Page7of7 Engineer's Opinion of Cost Specification Unit of Bid Section No. Measure Quantity Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS Total Construction Bid Contractor agrees to complete WORK for FINAL ACCEPTANCE within # days CONTRACT commences to run as provided in the General Conditions. END OF SECTION Estimate Unit Price Bid Value $49,916.00 $104,615.00 $224,434.00 $236,081.50 $23,459.90 $638,506.40 calendar days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 00 42 43 Estimate DAP - REV xls AZLE v v RESERVE AT MCALISTER EAGLE MOUNTAIN LAKE LAKESIDE LAKE WORTH Atk LAKE WORTH CARSWEll MR FORCE BASE ---SETT EMENT "- 6Fi BENBROOK BENBROOK RESERVOIR WR\ONS SANSOM PARK SAGINAW 0 IVER OAKS WESTWORTH VILLAGE WESTOVER l BLUE MOUND WR! MEACHAM AIRFIELD - ' ALTA VISTA AIRPORT HALTOM . CITY NORTHEAST WATAUGA OOP 820, AIRPORT KELLER EDGECLIFI VILLAGE Fri CH N EAST FRWY. v EAST LOOP Dry NORTH RICHLAND HILLS 5 N__ COLLE ' LLE 0 = HURST - FORT WORTH a o� LAKE ARLINGTON FOREST HILL EVERMAN PROJECT a, LOCATION WLEY - -- --- BU ONRT WORTH SPINKS AIRPORT o Baird, Hampton & Brown, Inc. 0 e Engineering & Surveying 6300 Ridglea Place, `wife 700 Ft. Worth, TX 76116 Tei:(817)338-1277 Fax:1817)338-9245 E-Mail:maibs'bhbinc.corn Certificate of .Authorization n F-000344 KENNIDALE BEDFORD I AIR 0 ARLINGTON PANTEGO DALWORTHINGTON, GARDENS MANSFIELD craz EXHIBIT 1 A - LOCATION MAP BHB PROJECT NO. DATE 2013.183.000 06-03-2014 D EASE. RESERVE AT M CALI STER PR EXISTING 8" WL OSED CENTERWLEASEED \ . \\sue \Nt PROPOSED - 8" WL Baird, Hampton & Brown, Inc. e' 0= Engineering & Surveying 6300 Ridglea Place, Suite 700 Ft, Worth, TF 76116 Tel:(817)336-1277 Fax:(517)335'-9245 E—Mail:rnai10bh6inc.com Certificate of Authorization # F-000044 \s; PROPOSED FH PROPOSED " WL FH PLUG BHB PROJECT NO. 2013.183.000 / / /��� 150' 75' 0 150' 300/ / GRAPHIC SCALE IN FEET o7'5 A, AP \ \ EXHIBIT A - WATER DATE 06-03-2014 RESERVE AT MCALISTER APO CTI L Lt J MH ED IRON 3aIrd, Hampton & Brown,Inc. e Engineering 8c Surveying 6300 Ridglea Place, Suite 700 Ft. Worth, TX 76116 Tel:(817)338-1277 Fax:(817)338-9245 E—Mail:mail©bhbinc.com Certificate of Authorization # F-000044 PROPOSED MH MH STU B & PLUG PROPOSED MH BHB PROJECT NO. 2013.183.000 PRO MH ED 150' 75' 0 150' 300/ GRAPHIC SCALE IN FEET 4 EXHIBIT Al - SEWER DATE 06-10-2014 RESERVE AT MCALISTER TRIPE —EXISTING NEW 4" CONCRETE ASPHALT SIDEWALK PAVING NEW CENTER STRIPE —NEW 7.5" CONCRETE PAVING Baird, Hampton & Brown, Inc. a 0 e Engineering & Surveying 6300 Ridgl o Place, Suite 700 Ft. Worth, TX 76116 Tcl:(817)3.38-1277 Fcx:(817)338--9245 E-Tdoihrnal@bhbinc.com Certiiicaie ci Aufhorizotion ) F-000044 NEW R-1 RAMPS EXISTING ASPHALT AVING 4" CONCRETE ��, SIDEWALK BY o' OTHERS ���<5°� o J ,6 O i G� NEW 7.5'; CONCRETE PAVING BY OTHERS BHB PROJECT NO. N tee G• ^` CSCALELN zoo' EXHIBIT B - PAVING DATE 2013.183.000 06-03-2014 RESERVE AT MCALISTER PROPOSED 36" STORM DRAIN W/ PLUG PROPOSED 42" STORM DRAIN — PROPOSED 36" STORM DRAIN 20'CI brIr 'AlNAGE EASE. 'II SDMH sS PROPOSED 48" STORM DRAIN \S.�DMH o PROPOSED 54" STORM DRAIN ss s 20' DRAINAGE EASE. PROPOSED 48" STORM DRAIN Baird, Hampton & Brown, Inc. L71. 0 a Engineering 8c Surveying 6300 R14g1 o Plea, Suite 700 Ft. Worth, TX 76116 Tel:(817)338-1277 Fax:0817)338-9245 E-1,1ail:mail@bhbinc.cnm Certificate of Authorization ri F-000044 ass DETENTION BASIN SDMH SDHW 150' 75' RA 0 150' 300' moomommi GRAPHIC SCALE IN FEET EXHIBIT B1 - STORM DRAINS BHB PROJECT NO. DATE 2013.183.000 06-03-2014 RESERVE AT M CALI STER 100' S0, 0 1000' 200' MAN-11C SCALE IN FEET Baird, Hampton & Brown, Inc. 0 =Engineering 84 Surveying 6300 Eidgl a Place, °vile 700 Ft, Worth, TX 76116 Tel:(817)338-1277 Fax:(817)338-9245 E—Mail:rnoi60bhbinc.cnm Certificate of Authorization 11 F-000044 STREET LIGHT (TYP.) UTILITY BOX (TYP.) Nx `N \ NNN \ // \N\ // // // EXHIBIT C - STREET LIGHTS BHB PROJECT NO. DATE 2013.183.000 06-03-2014