The Proceeding people have been Con cted Concerning the request for final
payment & have released this project for such payment.
Clearance Conducted By Shameka Kennedy
c ITWORTH
ATION AND PUBLIC WORKS
F PROJECT COMPLETION
(MY SECRAR",
CONTRACT tom. Qytt"
‘_
D.O.E. Ni.): 7259
C5Mil_cag
Regarding contract 117259 for RESERVE AT MCALISTER- DRAINAGE, PASTING & ST LIGHT as required by
the TRANSPORTATION Pc PUBLIC WORKS as approved by City Council on N/A through M&C N/A the
director of the TRANSPORTATION & PUBLIC WORKS upon the recommendation of the Assistant Director of
the Transportation & Public Works Department has accepted the project as complete.
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
Recommended for Acceptance
Asst. Director, TPW - Infrastructure Design and Construction
Accepted
SIP Director, TRANSPORTATION &
Asst. City Manager
BLIC WORKS /abbiz,//se
Comments: C205-541200-206760230883, C205-541200-206320230883
EMS ILED
DEC V 2015
Welele ftA ('JS17
SCANNED
$606,340.80
N2
$606,340.80
Days @ $210.00/ Day
$606,340.80
$0.00
$606,340.80
_Y--/r
Date
Date
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
moi
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name SEWER IMPROV. RESERVE AT MCALISTER
Contract Limits
Project Type DRAINAGE, PAVING & ST LIGHT
City Project Numbers 02308
DOE Number 7259
Estimate Number 1 Payment Number 1 For Period Ending 9/24/2015
CD
City Secretary Contract Number 117259 Contract Time 36ED
Contract Date Days Charged to Date 331
Contract is 100.00 Complete
Project Manager Long
Contractor KWA
16800 WESTGROVE DRIVE SUITE 300
ADDISON , TX 75001
Inspectors LAYER / ODEN
Thursday, September 24, 2015 Page 1 of 5
City Project Numbers 02308
Contract Name
Contract Limits
Project Type
Project Funding
DRAINAGE
Item
No.
SEWER IN/TROY. RESERVE AT MCALIS 1 ER
DRAINAGE, PAVING & ST LIGHT
Description of Items
1 SITE CLEARING
2 UNCLASSIFIED EXCAVATION
3 SWPPP
4 27" RCP CLASS III
5 36" RCP CLASS Ill
6 42" RCP CLASS III
7 48" RCP CLASS III
8 54" RCP CLASS III
9 4' STORM JUNCTION BOX
10 5' STORM JUNCTION BOX
11 5' STORM JUNCTION BOX W/WINGS
12 6' STORM JUNCTION BOX
13 54" FLARED HEADWALL
14 10' CURB INLET
15 20' CURB INLET
16 TRENCH SAFETY
PAVING
Item
No.
Estimated
Quanity
1353 LF
Sub -Total of Previous Unit
Description of Items
1 7.5" CONC PVMT
2 8" LIME TREATMENT
3 LIME
4 4" CONC SIDEWALK
5 7" CONCRETE DRIVEWAY
6 TOPSOIL
7 SEEDING, HYDROMULCH WITH BINDING
AGENT
8 SEEDING, SOIL RETENTION BLANKET
9 ADA RAMP-1
Thursday, September 24, 2015
Estimated
Quanity
3449 SY
3625 SY
54.5 TN
2580 SF
790 SF
109 CY
995 SY
Unit Unit Cost
1 LS
3300 CY
1 LS
55 LF
273 LF
121 LF
422 LF
482 LF
DOE Number 7259
Estimate Number 1
Payment Number 1
For Period Ending 9/24/2015
Estimated
Total
$18,000.00
$4.00
$7,500.00
$69.00
$91.00
$119.00
$139.00
$179.00
1 EA $2,900.00
2 EA $4,200.00
1 EA $7,600.00
2 EA $5,400.00
1 EA $5,800.00
1 EA $3,900.00
2 EA $6,900.00
$1.00
Unit Unit Cost
995 SY
$57.00
$2.75
$180.00
$5.00
$20 00
$14.00
$1.10
$2.80
2 EA $424.00
$18,000.00
$13,200.00
$7,500.00
$3,795.00
$24,843.00
$14,399.00
$58,658.00
$86,278.00
$2,900.00
$8,400.00
$7,600.00
$10,800.00
$5,800.00
$3,900.00
$13,800.00
$1,353.00
$281,226.00
Estimated
Total
£ 196,593.00
$9,968.75
$9,810.00
$12,900.00
$15,800.00
$1,526.00
$1,094.50
$2,786.00
$848.00
Completed Completed
Quanity Total
1 $18,000.00
3300 $13,200.00
1 $7,500.00
55 $3,795.00
273 $24,843.00
121 $14,399.00
422 $58,658.00
482 $86,278.00
1 $2,900.00
2 $8,400.00
1 $7,600.00
2 $10,800.00
1 $5,800.00
1 $3,900.00
2 $13,800.00
1353 $1,353.00
$281,226.00
Completed Completed
Quanity Total
3449 $196,593.00
3625 $9,968.75
54.5 $9,810.00
2580 $12,900.00
790 $15,800.00
109 $1,526.00
995 $1,094.50
995 $2,786.00
2 $848.00
Page 2 of 5
City Project Numbers 02308
Contract Name SEWER IMPROV. RESERVE AT MCALISTER
Contract Limits
Project Type DRAINAGE, PAVING, ST LIGHT
Project Funding
10 TRAFFIC CONTROL
STREET LIGHT
Item
No.
DOE Number
Estimate Number
Payment Number
For Period Ending
7259
1
1
9/24/2015
6 MO $4,000.00 $24,000.00 6 $24,000.00
Sub -Total of Previous Unit
Description of Items
1 RDWY ILLUM ASSMBLY
2 LED LIGHTING FIXTURE
3 2" SCH 80 PVC
4 NO 6 INSULA I ED ELEC CONDUCTOR
5 CONTACT ENCLOSURE, PAD MOUNT
6 GROUND BOX, LARGE W/LID APRON
7 RDWY ILLUM FOUNDATION
Thursday, September 24, 2015
Estimated Unit Unit Cost
Quanity
5 EA $2,000.00
5 EA $1,500.00
715 LF $9.70
2860 LF $1.20
1 EA $9,421.05
2 EA $1,000.00
5 EA $2,100.00
Sub -Total of Previous Unit
$275,326.25
Estimated Completed
Total Quanity
$10,000.00
$7,500.00
$6,935.50
$3,432.00
$9,421.05
$2,000.00
$10,500.00
$49,788.55
$275,326.25
Completed
Total
5 $10,000.00
5 $7,500.00
715 $6,935.50
2860 $3,432.00
1 $9,421.05
2 $2,000.00
5 $10,500.00
$49,788.55
Page 3 of 5
City Project Numbers 02308
Contract Name SEWER IMPROV. RESERVE AT MCALISTER
Contract Limits
Project Type PAVING, DRAINAGE, ST LIGHT
Project Funding
U
Contra
Inspection Su+ery of
Project Manage-V
Contract Information Summary
Original Contract Amount
Chance Orders
Date
Date its/2/-
Date re-r-t-7%
r �
61s/V r
4-ter---rate--- Date /2,
orfl'PW - Infrastructure Design and Construction
Date 7213N<
Direct() Jf Contracting Departni4n
DOE Number 7259
Estimate Number 1
Payment Number 1
For Period Ending 9/24/2015
$606,340.80
Total Contract Price $606,340.80
Total Cost of Work Completed
Less % Retained
Net Earned
Earned This Period
Retainage This Period
$606,340.80
$0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$606,340.80
$0.00
$606,340.80
$0.00
$0.00
$0.00
$0.00
$0.00
$606,340.80
Thursday, September 24, 2015 Page 4 of 5
City Project Numbers 02308
Contract Name SEWER IMPROV. RESERVE AT MCALISTER
Contract Limits
Project Type PAVING, DRAINAGE, ST LIGHT
Project Funding
Project Manager Long
Inspectors LAYER / ODEN
Contractor KWA
16800 WESTGROVE DRIVE SUITE 300
ADDISON , TX 75001
Line Fund Account Center
Thursday, September 24, 2015
DOE Number
Estimate Number
Payment Number
For Period Ending
City Secretary Contract Number
Contract Date
Contract Time
Days Charged to Date
Contract is .000000
CITY OF FORT WORTH
SUMMARY OF CHARGES
Amount
Funded
Gross
Retainage
Total Cost of Work Completed
Less % Retained
Net Earned
Earned This Period $606,340.80
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
117259
7259
1
1
9/24/2015
365 CD
331 CD
Complete
Net
$606,340.80
$0.00
$606,340.80
$0.00
$0.00
$0.00
$0.00
$0.00
$606,340.80
Page 5 of 5
FORT WORTH
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Reserve@ McAlister
PROJECT NO.: C205-2067602308
PERIOD FROM:10/27/14 TO: 09/22/15
WORK ORDER EFFECTIVE:10/27/2014
DAY OF
MONTH
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
THIS
PERIOD
PREVIOUS 0 0 0
PERIOD
TOTALS 0 0 0
TO DATE
*REMARKS:
DAYS
CHARGED
DURING
rev 03/05/07
CONTRACTOR: KWA Construction
DOE NO.: 7259
FINAL INSPECTION DATE: 22-Sep-15
CONTRACT TIME: 365 0 W
REASON FOR DAYS
CREDITED
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
DAY OF
MONTH
RAIN, TOO WET, UTILITIES
& TOO COLD RELOCATIONS
SAT, SUN,
& HOLIDAYS
0
0 0
DAYS
CHARGED
DURING
OTHERS *
0
0
0
REASON FOR DAYS
CREDITED
DAYS
CHARGED
331
0
0
l/ r i w• „vv.)
DATE INSPECTOR
ENGINEERING DEPARTMENT
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
1�
TOTAL
DAYS
331
10
1331
CI la I
DATE
=
CD
•
OFFICIAL RECORD
CITY SECRETA
F7 WORTH,
FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR & PROJECT DATA
Nance of Contractor
KWA Construction
DOE Inspector
Weyman Oden
DOE Inspector
❑ Water ❑ Waste Water Ni Storm Drainage
Initial Contract Amount
$606,340.80
Fatal Contract Amount
$606,340.80
Projecl Nance
Reserve a, Mcalister
DOE Number
7259
Projecl Manager
Pavement Aaron Long
Project Difficulty
0 Simple
Date
9/30/2015
II) PERFORMANCE EVALUATION
10 - Inadequate 1 - Deficient 2 - Standard 3 - Good 4 - Excellent
ELEMENT
1 Submission of Documents
Public Notifications
Plans on Site
Field Supervision
Work Performed
Finished Product
17 Job Site Safety
8 Traffic Control Maintenance
9 Daily Clean Up
10 Citizen's Complaint Resolution
11 Property Restoration
112 After Hours Response
113 Project Completion
2
3
4
5
16
WEIGHT (x )
2
5
5
15
15
15
15
15
5
5
5
5
5
Routine
APPLICABLE (Y / N) RATING (0 - 4)
Y 4
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
4
4
4
4
3
3
3
4
4
4
4
4
REV: 02/20/07
0 Complex
MAX SCORE
8
20
20
60
60
60
60
60
20
20
20
20
20
SCORE
8
20
20
60
60
45
45
45
20
20
20
20
20
TOTAL ELEMENT SCORE (A) 403
BONUS POINT'S (25 Maximum) (B)
TOTAL SCORE (TS) 403
III) CONTRACTOR'S RATING
Maximum Score (MS) = 448 or sum of applicable element score maximums which = 448
Rating ( [TS / MS] * 100%) 403 / 448 = 90%
Performance Category Excellent
<20% = Inadequate 20% to <40% = Deficient 40% to <60% = Standard 60% to <80% = Good >_80% = Excellent
Inspector's Comments (INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
Signature Contractor
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth s 1000 Throckrnorton Street • Fort Worth, "IX 76012-6311
(817) 392 - 7941 Fax: (817) 392 - 7845
FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I) PROJECT INFORMATION
Name of Contractor
KWA Construction
DOE Inspector
Weyman Oden
DOE Number Project Dcul01
7259 0 Simple O Routine
Initial Contract Amount
$606,340.80
II) PERFORMANCE EVALUATION
0 - Inadequate 1 - Deficient 2 - Standard
ELEMENT
INSPECTION EVALUATION
1 Availability of Inspector
2 Knowledge of Inspector
3 Accuracy of Measured Quantities
4 Display Of Professionalism
5 Citizen Complaint Resolution
6 Performance - Setting up Valve Crews, Labs
ADMINISTRATION
1 Change Order Processing Time
12 Timliness of Contractor Payments
13 Bid Opening to Pre -Con Meeting Tirneframe
III) COMMENTS & SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
0
Complex
Date: 19/30/2015
Project Name
Reserve @ McAlister
Project Manager
Aaron long
Type of Contract
❑ Water ❑ Waste Water si Storm Drainag
Final Contract Amount
$606,340.80
3 - Good 4 - Excellent
RATING ELEMENT
(0 - 4)
PLANS & SPECIFICATIONS
1 Accuracy of Plans to Existing Conditions
�2 Clarity & Sufficiency of Details
3 Applicability of Specifications
4 Accuracy of Plan Quantities
PROJECT MANAGER EVALUATION
I Knowledge And/Or Problem Resolution
12 Availability of Project Manager
13 Communication
14 Resolution of Utility Conflicts
(..s3 CwSearli
A/14,14 fr) A 7$
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
REV: 02/22/07
Pavement
RATING I
(0 - 4)
Mrer-
Vidialtine
Group
Development
till►�-ti/:,1�r�rir�,; r,-.,,:n
9349 WaterStone Blvd
Suite 200
Cincinnati, Ohio 45249
513 774-8400
513 683.6165 Fax
City of Fort Worth
1000 Throckmorton St
Fort Worth, TX 76102
Re: Liquidated Damages
To Whom It May Concern,
Reserve at McAlister, LLC hereby states that no liquidated damages will be assessed against the general
contractor for the work performed under the CFA agreement.
Please do not hesitate to contact me with any questions that you may have regarding this matter at
(513) 588-2694.
Sincerely,
Brian M. McGeady
Partner, President MV Affordable Housing Development
MV Residential Development
EXPERI CE THE DIFFERENCE
ww w.mvg,com
Consent of Surety
to Final Payment
AIA DOCUMENT G707
Bond No. 46BCSOS8988
TO OWNER:
(Name and address)
Reserve at McAlister Senior Living, LLC
9349 WaterStone Blvd.
Cincinnati, OH 45249
PROJECT: CFA for Reserve at McAlister
(Name end address)
OWNER
ARCHITECT
CONTRACTOR
SURETY
OTHER
ARCHITECT'S PROJECT NO:
CONTRACT FOR: Paving, Drainage, Street Lights, Water
& Sanitary Sewer Improvements
CONTRACT DATED: September 24, 2014
In accordance with the provisions of the Contract between the Owner and the Contractor as included above, the
Hartford Fire Insurance Company
One Hartford Plaza, Hartford, CT 06155-0001
(Insert nave and address of Surety)
SURETY, on bond of KWA Construction, L.P.
(Insert name and address of Contractor)
16800 Westgrove Drive, Suite 300, Addison, TX 75001
CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the
Surety of any of its obligations to Reserve at McAlister Senior Living, LLC
(Insert name and address of Owner)
9349 WaterStone Blvd., Cincinnati, OH 45249
as set forth in the said Surety's bond.
OWNER,
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date• October 5, 2015
(insert In wrkIng the month folkmed by the numeric date and year.)
Hartford Fire Insurance Company
tkre 1>)
L,
(fgnafure of authorized repre
to tfv e)
Amber Jones, Attorney -in -Fact
(Printed name and title
Printed in cooperation with the American Institute of Architects (AIA)
The language in this document conforms exactly to the language used in AIA Document G707 - Consent of Surety Company to Final Payment -
1994 Edition.
IMPORTANT NOTICE
To obtain information or make a complaint:
You may contact your agent.
You may call Hartford Insurance Group at the
toll free telephone number for information or to
make a complaint at:
1-800-392-7805
You may also write to The Hartford:
The Hartford
Hartford Financial Products
2 Park Avenue, 5th Floor
New York, New York 10016
1-212-277-0400
You may contact the Texas Department of
Insurance to obtain information on companies,
coverages, rights or complaints at
1-800-252-3439
You may write the Texas Department of
Insurance
P.O. Box 149104
Austin, TX 78714-9104
Fax Number (512) 475-1771
Web: http://www.tdi state.tx.us
E-mail: ConsumerProtection@tdi.state.tx.us
PREMIUM OR CLAIMS DISPUTES: Should
you have a dispute concerning your
premium or about a claim you should
contact the agent first. If the dispute is not
resolved, you may contact the Texas
Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY:
This notice is for your information only and
does not become a part or condition of the
attached document.
F-4275-1, ./TX4275-1
HR 42 H006 00 0807
AVISO IMPORTANTE
Para obtener informacion o para someter una
queja.
P uede comunicarse con su agente.
U sted puede Ilamar al numero de telefono
gratis de The Hartford Insurance Group para
indormacion o para someter una queja al
1-800-392-7805
Usted tambien puede escribir a The Hartford.
The Hartford
Hartford Financial Products
2 Park Avenue, 5th Floor
New York, New York 10016
1-212-277-0400
P uede comunicarse con el Departamento de
S eguros de Texas para obtener informacion
acerca de companias, coberturas, derechos o
quejas al:
1-800-252-3439
P uede escribir al Departamento de Seguros de
Texas
P .O Box 149104
Austin, TX 78714-9104
Fax Number (512) 475-1771
Web: httrx//www.tdi state.tx.us
E-mail: ConsumerProtection@tdi.state.tx.us
DISPUTAS SOBRE PRIMAS 0 RECLAMOS:
Si tiene una disputa concerniente a su
prima o a un reclamo, debe comunicarse
con su agente primero. Si no se resuelve la
d isputa, puede entonces comumcarse con
el departamento (TDI).
U NA ESTE AVISO A SU POLIZA: Este aviso
es solo para proposito de mformacion y no
se convierte en parte o condicion del
documento adjunto.
Producer Compensation Notice
THE
IRTFORD
You can review and obtain information on The Hartford's
producer compensation practices at www.thehartford.com
or at 1-800-592-5717
HR 00 H093 00 0207
2007, The Hartford Page 1 of 1
Direct Inquiries/Claims to:
THE HARTFORD
T • Bond T-4
One Hartford Plaza
Hartford, Connecticut 06155
call: 888-266-3488 or fax: 860-757-5835)
KNOW ALL PERSONS BY THESE PRESENTS THAT: Ac)ency Code: 46-508894
�..
Ix I
Ix
1
1
1
1
1
1
1
1
1
Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut
Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana
Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State ofConnecticut
Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut
Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana
Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois
Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana
Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida
having
in famount of Unlimitedtheir home office in Hartford, e onnecticut (here nafter collectively referred to as the Companies") do hereby make, constitute and appoint
,
Julie Baumberger, Amber Jones, April Penny, Darrin J. Weber of DALLAS,
Texas
their true and lawful Altorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated
above by .2 and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf
of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds
and undertakings required or permitted in any actions or proceedings allowed by law.
In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on August 1, 2009, the Companies have
caused these presents to be signed by its Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further,
pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any
mechanically applied signatures applied to this Power of Attorney.
John Gray, Assistant Secretary
STATE OF CONNECTICUT 1
COUNTY OF HARTFORD
On this 12th day of July, 2012, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that
he resides in the County of Hartford, State of Connecticut; that he is the Vice President of the Companies, the corporations described in and which executed
the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were
so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority.
ss. Hartford
M. Ross Fisher, Vice President
CERTIFICATE
etztCrL02,.n•..1
Kathleen T. Maynard
Notary Public
My Commission Expires July 31, 2016
I, the undersigned, Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power
of Attorney executed by said Companies, which is still in full force effective as of October 5 , 2015
Signed and sealed at the City of Hartford.
Kevin Heckman, Assistant Vice President
POA 2012
AFFIDAVIT
STATE OF Texas
COUNTY OF Dallas
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Keller Webster,
Presiden Of KWA Construction, LP, known to me to be a credible person,
who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Paving, Drainage, Street Lights, Water & Sanitary Sewer Improvements to
serve Reserve at McAlister Lots 1 & 2, Block 6, Highpoint Hill; City
Project No. 02308
BY
Keller Webster - President
Subscribed and sworn before me on this date 22nd of September, 2015.
Notary Public
Dallas, Texas
TASHA KEENE
My Commission Expires
February 18, 2019
e
gr