Loading...
HomeMy WebLinkAboutContract 45669 (2)CITY0EctiLseauf comTpaor 1,11r 15/J&I C Developer and Project Information Cover Sheet: Developer Company Name: North Texas — MCA, LLC d/b/a Medical Center of Alliance Address, State, Zip Code: One Park Plaza I Nashville, TN 37203 Phone, E-Mail: (615) 334-8256, samuel.hazen@hcahealthcare.com Authorized Signatory/Title: Samuel N. Hazen, Manager Project Name and Brief Description: Alliance Professional Office Building Project Location: 3101 North Tarrant Parkway, Fort Worth, TX Plat Case No.: FS-13-201 Plat Name: HCA Health Services Addition Council District: 4 City Project No: 02269 CFA: 2014-018 DOE: 7213 To be completed by staff: Received by: Date: Combined CFA Agreement — Revised January 2014 OFFICIAL CITY SECRETE' GO FT. WORTIE11, LI RECEIVED JUN 16 2014 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § § City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ( `Improvements") related to a project generally described as Alliance Professional Office Building ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub -contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X, Sewer (A-1) ik, Paving (B) X, Storm Drain (B-1) X , Street Lights & Signs (C)__. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair• of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Combined CFA Agreement — Revised January 2014 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state -approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or emplovees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, Combined CFA Agreement — Revised January 2014 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer s contractors and/or suppliers are not paid for the costs of supplies and/or construction the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Combined CFA Agreement — Revised January 2014 Cost Summary Sheet Project Name: Alliance Professional Office Building CFA No.: 2014-018 DOE No.: 7213 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 160, 073.00 $ $ 159, 923.00 150.00 B. TRW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total $ 199, 220.95 $ $ $ 30, 582.95 168,638.00 11. Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees $ 359,293.95 $ $ $ 3,201.46 3,201.46 6,402.92 E TPW Inspection Fee (4%) $ 7,968.84 F. TPW Material Testing (2%) $ 3,984.42 G. Street Light Inspsection Cost $ H. Street Signs Installation Cost $ Sub -Total for TPW Construction Fees $ 11, 953.26 Total Construction Fees: Financial Guarantee Options, choose one I Bond = 100% 'Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% 'Letter of Credit = 125% w/2yr expiration period $ 18,356.18 $ $ $ $ $ Choice Amount (ck one) 359,293.95 359,293.95 200, 091.25 249, 026.19 449,1 17.44 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said D veloper has ex euted this instrument in gadruplicate, at Fort Worth, Texas this / - day o 20 ler1. 1 CITY OF FORT WORTH - Recommended by: Water Department v Cam' 64.41LC. Wendy Chi-Bablal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Doug as W. Black Assistant City Attorney M&C No. NA. Date: ATTEST: Signature (Print)Name: Helen W. Cook Combined CFA Agreement Revised January 2014 Transportation & Public Works Department Douglas Wiersig, P.E. Director Approved by City Manager's Office 3 7-Th 531444444141,1141L-6 Fernando Costa Assistant City Manager DEVELOPER: North Texas- MCA, LLC d/b/a Medical Center of Alliance /171-Mats---- Signature Print Name: Samuel N. Hazen Title: Manager • Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included 0 rI 0 ►1 0 izi ►1 NI Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C. Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) File: K: \ DAL_Civil 67781901—HCA Alliance \ CAD \Exhibits \ CFAVOB \CFA Water Exhibit.dwg [Layoutl] 4/2/2014 9: 48am Xrefs: x-8.5x11—L.dwg x—utility.dwg x—site.dwg x—suryey.dwg x—site—MOB.dwg x—utility—MOB.dwg x-8.5x11.dwa [Or. 1111111110 1-35FRONTAGEROD /, ' " , / • • w. . , ) - a _aamaaa o se ...MM. .11111.1 1111.LWIII 0•11••••• ••••• .••,••• aftommy• ••••1011 .=•••••• 1i r 1 .. : .L4)4iI0i ' -Xc •>*-xm" 1on 34 a ; ---._,P 1- - trj -t L- -, , -i r- - 00 3 - •.•....••,••••• m ill ••• ( ..,, r••= : mm''i'icri ri ,..•f.: / - , 4 ' 1..P„r ,P.4..". z .9 .. . -. . _. . '. { f ...)"1I tMi0i:f . •1 > 73 !/Cn0 M0 .:,m — , c Z :u ETJlhcm j7,„_,4rt,n,2-nr,,.0 1 -I, Jf ..Ii. ... V IIHIHXJ \ JJ ,;;; .... 0 z 1 1 1 1 1 111, WPM, 0 r 0 — 0 (./) " 0 0 > 0 rn z -n rn -is —I 0 co, E — co N PO M,...... ,V st, 4 k • ': 11 1 7 4.tfRE 1 I 4 , , ,,,, Ili 1 1•DriAIEN.AAE , 1 ! 1 ! ! 1 ! t!,- 2,7.,` • , ,,1 , I _ c• , rc.-:,,,,,,-..---&c... I , ' $ 1 II ji±d --11T till 1 1,,:iit i Ii ,I —1.--1"-- \ 1 r, \ -"Hilirouir,f.i ;1 _ .T.:„.........„..._ 6/ ./. / li51a1i;set ':1,, ZRiiiIt:l! I 1Q ••-• PROPOSE D ii.i41. P4;i,x'1c. • 3\.2IL1 .999.i1 ,4,•1I:1 ctiR1- iEelsf/)1] .1cr10,11i' c HOSPIAL EXPANSION tli .OFFICE2 l'Ori4 ?2IBUILDING u1: ' w 11 li-- \ • • ..!!!...-• .!), sgp,,,...72.3 Fr (X ] I/ : IA° 1 kl t . 'ef:‘3X --- MIN I r n i ! fl 4. 0 Mit PROP. ‘‘ \. -• N : I i i '42. rl Et , 1 ii r7rill I.E:r1 ill i ::::u1:111! 11 11,1‘11'74LI1.3- T:ICt//„..71,1 f,,4 :, ,,, 1 , • ;;;., , :, : • .: ,......., . ; . 0 1 , ..,:,. , , , , 17 1 y, clt 11 I 1 Rip-RAp 11 , 1 i :11 1 4_ i...444 H.H.4.4_ Ili -.d il !Li j , Hitl - .i--( :. i i H 1 1 ; ! ; I !;),. i H .,. 4 . , 1:. - „..ra4r---7., —. — ....... — —i. •••••••• .i••• ••••••••mi 1•••••••• .imo1,. „ ‘.; L_. _........., _ , 'LL.7.1nrirtiLillid7M=01.011111-1 I 1 I ' I Trichl rld , )'•1:21 ' CI : I IF I • il I '• ' '• I Wir3 , I I 4 111 \ NPOND s.. PROPOSED DETENTION I 1 ' .10 1 if 'I . i 11 • r . • •‘;; li: ..... ,:1 4111111111111 WINN , 11 1 \ ,',-.1 • TARRANT PKWY. — Cr' --• • STORM SEWER COMMUNITY FACILITIES AGREEMENT FOR STORM SEWER IMPROVEMENTS TO SERVE ALLIANCE PROFESSIONAL OFFICE BUILDING - LOT 1R-1R GRAPHIC SCALE IN FEET 0 190 2009400 1 • 2111RCP-,,,... • 18" RCP \ 1 KimletHom and Associates, Inc. ENGINEERING FIRM REGISTRAllONH F-928 GRAPHIC SCALE IN FEET 0 715 1 r 300 1 E? '4 / PROP. 5' WIDE SIDEWALK „- / W/ 4" THICK CONCRETE PAVEMENT C 0 < 3 817, / a 6, 7, SIDEWALK' .r.).,, COMMUNITY FACILITIES AGREEMENT .-0 urT‘ FOR PAVING IMPROVEMENTS TO SERVE :5 I ALLIANCE PROFESSIONAL OFFICE BUILDING - LOT 1R-1R EXWIDE SIDEWALK LT" PROP. 5' WIDE SIDEWALK I W/ 4" THICK CONCRETE PAVEMENT EXHIBIT B I IC Erni Kimley-Hom NW 1 and Assodates, Inc. 00 42 43 Proposal Form Unit Price pltem No. Spec. Item Name of Pay Item with Unit Price in Words Alliance Professional Office Building, Lot 1 R-1 R UNIT I WATER 1 3312.0105 Connection to Existing 12" Water Main Three -Thousand Eight -Hundred & Twenty -Five 2 3312.2501 6" Water Meter Service and Meter Box 3 3312.3002 4 3312.3003 5 3312.3005 6 3311.0161 7 3311.0261 8 3311.0461 9 3311.0451 10 3305.1103 11 3305.0109 Thirteen -Thousand Two -Hundred & Forty -Nine 6" Gate Valve Nine -Hundred & Seventy -Five 8" Gate Valve One -Thousand Three -Hundred & Fifty 12" Gate Valve Two -Thousand Four -Hundred & Fifty 6" PVC Water Pipe Thirty -Three 8" PVC Water Pipe Thirty -Seven 12" PVC Water Pipe Forty -Two 12" DIP Water Seventy -Six 20" Casing By Other Than Open Cut Three -Hundred & Ten Trench Safety One Approx. Quantity Unit 2 EA 0/100 cents per unit 1 EA 50/100 cents per unit 1 EA 0/100 cents per unit 1 EA 0/100 cents per unit 4 EA 0/100 cents per unit 13 LF 50/100 cents per unit 22 LF 50/100 cents per unit 2,309 LF 0/100 cents per unit 68 LF 0/100 cents per unit 68 LF 0/100 cents per unit 2,412.0 LF 0/100 cents per unit TOTAL WATER $ Unit Bid Price Total Amount $ 3,825.00 7,650.00 $ 13,249.50 13,249.50 $ 975.00 975.00 $ 1,350.00 1,350.00 $ 2,450.00 9,800.00 $ 33.50 435.50 $ 37.50 825.00 $ 42.00 96,978.00 $ 76.00 5,168.00 $ 310.00 21,080.00 $ 1.00 2,412.00 159,923.00 i Bid Proposal Page 1 00 42 43 Proposal Form Unit Price IItem I Spec. I Name of Pay Item with No. Item Unit Price in Words Alliance Professional Office Building, Lot 1 R-1 R UNIT II SANITARY SEWER 12 3301.0101 Manhole Vacuum Testing One -Hundred and Fifty 0/100 cents per unit Approx. I Quantity 1 Unit EA Unit Bid Price $ 150.00 Total Amount 150.00 TOTAL SANITARY SEWER $ 150.00 Bid Proposal 00 42 43 Proposal Form Unit Price Item No. Spec. Item Name of Pay Item with Unit Price in Words Alliance Professional Office Building, Lot 1R-1R UNIT I11 DRAINAGE 13 3341.2001 10x4 Box Culvert Five Hundred & Ten 14 3341.2203 12x6 Box Culvert Eight -Hundred 15 3349.3002 21" Straight Headwall, 1 pipe IOne-Thousand & One -Hundred 16 3341.0202 21" RCP, Class III 17 3137.0104 Fifty -Three Medium Stone Riprap, dry Fifty -Eight 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit Approx. Quantity Unit 96 LF 96 LF 2 EA 31 LF 480 SY Unit Bid Price Total Amount $ 510.00 48,960.00 $ 800.00 76,800.00 $ 1,100.00 2,200.00 $ 58.00 1,798.00 $ 81.00 38,880.00 TOTAL DRAINAGE $ 168,638.00 Bid Proposal 00 42 43 Proposal Form Unit Price Item No. Spec. Item Name of Pay Item with Unit Price in Words Alliance Professional Office Building, Lot 1R-1R UNIT I PAVING 1 3213.0301 4" Conc Sidewalk Five 2 3213.0301 Manhole Adjustment, Minor 3 3213.0301 (One -Thousand Miscellaneous Structure Adjustment One -Thousand Approx. Quantity Unit 5,095 SF Unit Bid Price Total Amount 61/100 cents per unit $ 5.61 28,582.95 1 EA 0/100 cents per unit) $ 1,000.00 1,000.00 1 EA 0/100 cents per unit $ 1,000.00 1,000.00 TOTAL PAVING $ 30,582.95 i Bid Proposal