HomeMy WebLinkAboutContract 45278 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary
Contract No. �I
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project") within the City
of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the Improvements.
Developer and Project Information:
Developer Company Name: Pulte Homes of Texas, L.P.
Address, State, Zip Code: 4800 Regent Blvd., Ste. 100 Irving, TX 75063
Phone, E-Mail: (972)462-3409, clint.vincent@pultegroup.com
Authorized Signatory/Title: Clint Vincent, Vice President
Project Name and Brief Description: Water, Sewer, Paving, Drainage & Street Light Improvements to
serve Trails of Fossil Creek Ph. 2A-2
Project Location: SE of Intersection of Bonds Ranch Rd. and Wagley Robertson Rd.; South of Magma
Drive
Plat Case No.: FP-013-028 Plat Name: Trails of Fossil Creek
Council District: 7
To be completed by Staff:
Received by: d
City Project No: 02167 CFA: 2013-076 DOE: 7111
1
Date: ra-d
i
1 ?�
•
•
OFFICIAL RECORD
CITY %CRUACn7
iFY iiiic�P2TH, TS,
RE
•
8 2014
NOW, THEREFORE, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to
comply with all provisions of said Policy in the performance of its duties and
obligations hereunder and to cause all contractors hired by Developer to comply with
the Policy in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section
II, of the Policy and recognizes that there shall be no reduction in the collateral until
the Project has been completed and the City has officially accepted the
Improvements. Developer further acknowledges that said process requires the
contractor to submit an Affidavit of Bills paid signed by its contractor and Consent
of Surety signed by its surety to ensure the contractor has paid the sub -contractor
and suppliers in full. Additionally, the contractor will provide in writing that the
contractor has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by
this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A) _X_, Sewer (A-1)
_X_, Paving (B) X Storm Drain (B-1) X , Street Lights & Signs (C)_X_.
E The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being insured, licensed and bonded to do
work in public streets and/or prequalified to perform water/waste water
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the Improvements, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the Improvements for
a period of two (2) years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be furnished
before work is commenced and to meet the requirements of Chapter 2253, Texas
Government Code.
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer -awarded
infrastructure construction contracts. The City shall be named as additional
insured on all insurance required by said documents and same will be evidenced on
the ACORD Certificate of Insurance supplied by the contractor's insurance
provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction Services
Division of intent to commence construction so that City inspection personnel will
be available; and to require the contractor to allow the construction to be subject to
inspection at any and all times by City inspection forces and not to install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City
v. To require its contractor to have fully executed contract documents submitted to
the City to schedule a Pre -Construction Meeting. The submittal should occur no
less than 10 working days prior to the desired date of the meeting. No construction
will commence without a City -issued Notice to Proceed to the Developer's
contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and service
lines have been completed to the satisfaction of the Water Department.
G. Developer agrees to provide, at its expense, all engineering drawings and documents
necessary to construct the improvements required by this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in the
relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current
and future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real or
asserted, brought for or on account of any injuries or damages sustained by any
persons (including death) or to any property, resulting from or in connection
with the construction, design, performance or completion of any work to be
performed by said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the work, or
on account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or employees,
whether or not such iniuries, death or damages are caused, in whole or in
part. by the alleged negligence of the City of Fort Worth. its officers. servants,
or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and all
claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
iniuries. death or damages are caused. in whole or in part. by the alleged
negligence of the City of Fort Worth. its officers, servants. or employees. Further,
Developer will require its contractors to indemnify, and hold harmless the City for
any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in
a good and workmanlike manner, free from defects, in conformance with the
Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the infrastructure and
Improvements, Developer will assign to the City a non-exclusive right to enforce the
contracts entered into by the Developer with its contractor along with an assignment of
all warranties given by the contractor, whether express or implied. Further, Developer
agrees that all contracts with any contractor shall include provisions granting to the
City the right to enforce such contracts as an express intended third party beneficiary
of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of the
total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of
the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i If applicable, the City's obligation to participate (exclusive of front foot charges) in
the cost of the Improvements shall terminate if the Improvements are not
completed within two (2) years provided, however, if construction of the
Improvements has started within the two year period, the developer may request
that the CFA be extended for one year. If the Improvements are not completed
within such extension period, there will be no further obligation of the City to
participate. City participation in a CFA shall be subject to the availability of City
funds and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement the Improvements have
not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion of
the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Trails of Fossil Creek Ph. 2A-2
CFA No.: 2013-076
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
I Bond = 100%
'Completion Agreement = 100% / Holds Plat
'Cash Escrow Water/Sanitary Sewer= 125%
'Cash Escrow Paving/Storm Drain = 125%
'Letter of Credit = 125% w/2yr expiration period
DOE No.:7111
Developer's Cost
$
$
148,403.90
99,431.40
$
247,835.30
$
$
$
384,754.70
282,864.00
37,182.50
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
704,801.20
952,636.50
4,956.71
4,956.71
9,913.41
26,704.75
13,352.37
1,487.30
1,470.00
43,014.42
52,927.83
Amount
952,636.50
952,636.50
309,794.13
881,001.50
1,190,795.63
Choice
(ck one)
b
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and sa e D - veloper has ex el.) ed is
instrument in uadru licate, at Fort Worth, Texas this dayo
p
20 'i .
CITY OF FORT WORTH - Recommended by:
Water Department
kei).___e_r d
i
Wendy Chi-B bulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
4
Mr. I"
fif4treAsir"
Douglas W. Black
Assistant City Attorney
M&C No. AA -
Date:
ATTEST:
1Oary J. kaysbi
City Secretar
ATTEST:
(Print) Name:
Signature
e*/ SA7A1
Title: hd �,.�«� th,Drra
Transportation & Public Works Department
Do ersig, P.E.
Dir
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
DEVELOPER:
Pulte Homes of Texas, L.P.
By: Pulte Nevada I, LLC
Its general partner
8
Signature
(Print) Name: Sa;eed
Title: ,,o0fl4,,f OeI
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken; checked items must be included as
Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Dram Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
r
r
rs
►1
►1
►1
►1
(Remainder of Page Intentionally Left Blank)
9
D O.E. NO.
CITY PROJECT NO.
WATER PROJECT NO.
SEWER PROJECT NO.
FILE NO.
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, & DRAINAGE
IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, PHASE 2A-2
W. BONDS RANCH RD.
0
ROBERTSON
w
0
SUBJECT
TRACT
m9
0
7111
02167
P265-607150216783
P275-707130216783
W-2281
LOCATION MAP
NOT TO SCALE
HICKS RD.
JBI Partners, Inc.
16301 Quo um Drive, Suite 200B
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
November 20, 2013 — SHEET 1
Case No. FP-013-028
FINAL PLAT
TRAILS OF FOSSIL CREEK
BLOCK P, LOTS 15 — 28; BLOCK Q, LOTS 1 — 23,
BLOCK R, LOTS 1 — 13; BLOCK T, LOTS 1 — 4 AND
LOTS 36 — 48;
13.151 ACRES OUT OF
THE H. ROBERTSON SURVEY, ABSTRACT NO. 1259
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
PULTE HOMES OF TEXAS, L P.
4800 Regent Boulevard, Suite 100
Irving, Texas 75063
JBI PARTNERS, INC.
16301 Quorum Drive, Suite 200 B
Addison, Texas 75001
OWNER / DEVELOPER
(972)304-2800
SURVEYOR/ENGINEER
(972)248-7676
JBI Partners, Inc.
16301 Quo um Drive, Suite 200B
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
November 20, 2013 — SHEET 2
EX. 8" WATER
CONNECT TO EXISTING
8" WATER LINE
DOE 6928
WATER PROJ /
P265-607150200383
50' "X 20'
WTR, SSWR, & DRNG ESMT
SCALE: 1"=150'
V
AMMO
m
EX.
MAGMA DRI
IE
E <. TRAI _S OF rOSSIL CREEK,
PH. yA-1
N
U1
W
50' "X 20'
WTR & DRNG ESMT
Called: 35.285 Acres
Pulte Homes of Texas, L.P.
Doc. No. D212269394
D.R.T.C.T.
JBI Partners, Inc.
16301 Quo um Drive, Suite 200E
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
N
i
1
i
I
i
Ii
Y
CHERT LANE
50'X2\
WTR & SSWR ESMT
LEGEND
EXIST. WATERLINE & VALVE
N
w
(J7
o)
V
(0
O
N
w
EX. 8" WA J R
EXIST. FH
PROP. WATERLINE
PROP. VALVE
PROP. FIRE
HYDRANT
PROPOSED WATER
LINES ARE 8' UNLESS
OTHERWISE INDICATED.
:
CONNECT TO EXISTING
8" WATER LINE
DOE 6931
WATER PROJ A
P965-607150200783
N
w
0
0)
N
i
i
vt
u,
V
CO
O
O
rA
J
0)
01
t
w
�0
W
w
0)
160' TESCO
ESMT
i
i
7
WATER
EXHIBIT A
PLANS FOR THE CONSTRUCTION OF WATER,
Si wER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, PHASE 2A-2
(D.0 E N0. 7111)
November 20, 2013 — SHEET 3
\a
_
EXIST. 8" SSWR
CONNECT TO
EXIST 8" SS
DOE 6928, SS NO.
P265-607150200383'
v rn
co
50' "X 20'
WTR, SSWR, & DRNG ESMT
50' 'X 20'
WTR & DRNG ESMT
Called: 35.285 Acres
Pulte Homes of Texas, L.P.
Doc. No. D212269394
D.R.T.C.T.
SCALE: 1 "=150'
JBI Partners, Inc
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
. MA9D I MA VE IL
E{. TRAI-S OF rOSSIL CREEK,
PH. 2,A-1
N
CHER r
1 _ 1
1
i
1
1
1
1
N
w
01
to
V
t0
O
W
r
I
1 1.
50'X20'
WTR & SSWR ESMT
0
CONNECT TO
EXIST 8" SS
DOE 4450, SS NO.
P173 070173013250
LAN 5 I 1 I
I- 1 1
1 I I
M-,
WWI
LEGEND
PROP. S.S. LINE
—40— PROP. S.S. MH
EXIST. S.S. MH
EXIST. S.S. LINE
PROPOSED SANITARY
SEWER LINES ARE 8"
UNLESS OTHERWISE
INDICATED.
GEO NM
2
w
N
N
0
o
V
N
co
0
V
Ou
t0
O
EXIST. 8" SSWR
CONNECT TO
EXIST. 8" SS
DOE: 4450, SS NO.
P173-070173013250
N
EXIST. 8" SSWR`
\
co
v
0
4-
CA
N
(00
co
1
i
omu
6 0'00
T3O
Zmtn
0 v
c 2
�A2
A A
moo
Om
0 0 v
to p
O
0
m
Iv{z
N L
AO*
m�
RD
rn
7
7
7
f EXIST. 8" SSWR
1
160' TESCO
ESMT
7
7
7
SANITARY SEWER
EXHIBIT A-1
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, PHASE 2A-2
(D.OE NO. 7111)
November 20, 2013 — SHEET 4
CONSTRUCT'
APPROX. 99 SY 4'
CONCRETE SIDEWALK
mo•o;`>• o•a�;•. 0�v. •
\•ace•w•
•
1 2 3 4 5 6 7
O ♦
•♦
♦•p •
•
•
16 ••♦
•
O
17 .• •
N. 23
••
♦..•
19,O•.i ♦i••O • d• O♦ ♦ •O •• xxxx xx
20
• 1 2 3 4 5 6 7
•
I>
0D
03>
N }.
LA_
0 ± n 23
a
24
W
W
25
18
21
22
26
27
z
5
v
CONSTRUCT
APPROX. 40 SY 4'
CONCRETE SIDEWALK
PsdITE (RIVE
1 2
SCALE: 1 "=150'
3
4
22 21 20 19 18 17 16
-.— 105' PARKWAY --en. -
9.5'
TAMPED TOPSOIL
PER SECR yr
32 91 19
I
STAIEOARO 90EMALX
PER SEDTON 32 13 20
CQPAC1ED ACCEPTADLE NAME BA00EL PER_
SECTKH 31 14 00
JBI Partners, Inc.
16301 Quo um Drive, Suite 200E
Addison, Texas 75001
Tel 972-248-7676
Fax: 972-248-1414
/3 BARS 01B' OCB.
DOL=RITE DRIVT
�°�'�29'1Bve
29 ROADWA.
'4.5'
STANDARD r CUPS PER 32 13
13-D525
REHEORCED CONCRETE
PAVEMENT PER SECBON 32 13
(5.CX MAX ORR IIW)
PROPOSED 6' LAE
STABU2ED 91BCRADE
0 30 LDS./SY
PER 5£Cn3N 32 11 29
LEGEND
15'
OPPIPPIPM0 MUMPS
48 47 46 45 44 43 42
41 40
CALLITE D 2IVE
L
e
00
to
a'
4'
•
•
444
39 38 37 36
9 10
11
15 14 13 12
8 9 10 11 12 13
TUDHAL CON51RUC1108
T PER 32 13 13-0
TYPICAL 50' ROW
PAVEMENT SECTION 54741I
N.T.S.
P ROP. 50' ROW PAVEMENT SECTION
PROP. 4' CONCRETE SIDEWALK TO
BE CONSTRUCTED BY DEVELOPER
P ROP. TYPE R-1 RESIDENTIAL
BARRIER FREE RAMP TO BE
CONSTRUCTED BY DEVELOPER
P ROP. STOP SIGN
10.5' PARKWAY
9.5'
3
t -
AADARO 90E1'AEX
PER SECDCX 32 13 20
TAMPED TCPSOI
PER SEC110N 32 91 19
ACTED ACCEPTABLE
NAME BAtl02L PER SECTOR 31 24 00
CONSTRUCT''
APPROX. 192 SY 4'
CONCRETE SIDEWALK
PAVING
EXHIBIT B
PLANS FOR THE CONSTRUCTION OF HATER,
SEVER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, PHASE 2A-2
(D.O.E NO. 7111)
November 20, 2013 — SHEET 5
w
43 SY
ROCK RIPRAP
50'X 20'
WTR, SSWR, & DRNG ESMT
1051 SY
ROCK RIPRAP
\4
SCALE: 1 "=150'
V
EX. MAGMA DRIVE
E t. TRAI _S OF TOSSIL CREEK,
PH. 2,A-1
A
43 SY
ROCK RIPRAP
50' X 20'
WTR & DRNG ESMT
Called: 35.285 Acres
Pulte Homes of Texas, L.P.
Doc. No. D212269394
D.R.T.C.T.
JBI Partners Inc.
16301 Quo um Drive, Suite 200B
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
100' DRNG
ESMT
524 SY J
ROCK RIPRAP
0
N
'
'
'
'
1
'
N N
O
CHERT LANE
N
r,.
O)
V
(O
O
IINSTALL _
15' C.I
24" RCP-.
6'X4'RCB
jCONST.
CONCRETE
HEADWALL
8 OD V O)
51
INSTALL 10' C.I.
LEGEND
PROP. CURB INLET
PROP. STORM DRIAN
PROP.
EXIST.
EXIST.
HEADWALL
CURB INLET
STORM DRAIN
21" RCP
!INSTALL 10' C.I.(
N
0
0
r
A v
8
N
W
N
w
rn
J
co
O
O
INSTALL r INSTALL
15' C.I 1 10' C I.
N
24" RCP
21" RCP
WX4'RC8
30' DRNG
EMT
=RCP- - n
CONST. -
CONCRETE
56 SY
ROCK RIPRAP
J
0)
A
N
O
0
m
V
0
60' TESCO
ESMT
CO .11�
'I vcv
130
zm
0 0C
�
�c1 c
m
r
o A 0
`O
0 3 oo
zom
000
''- o
co a1
{Z
.AiOi
rn
R•
'
'
'
'
CONST.
CONCRETE /
HEADWALL
4318 SY _
30' DRNG ESMTJ7 ROCK RIPRAP
STORM DRAIN
EXHIBIT B-1
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, PHASE 2A-2
(D.OE NO. 7111)
November 20, 2013 — SHEET 6
SCALE: 1 "=150'
N
CO
V
ig EX. MAGMA DRIVE
E <. TRAI _S OF rOSSIL CREEK,
PH. 2A-1
0) N
Called: 35.285 Acres
Pulte Homes of Texas, L.P.
Doc. No. D212269394
D.R.T.C.T.
JBI Partners, Inc
16301 Quo um Drive, Suite 200B
Addison, Texas 75001
Tel 972-248-7676
Fax: 972-248-1414
e.
A
N
1
1
1
1
f
I
1
LEGEND
O
O 00
CHER,f LAN!
N
W
N
0)
t0
O
PROPOSED STREET LIGHT
-100 WATT HPS COBRA WITH
TYPE 3 DIST. AND DROP
GLASS LUMINAIRE
-25' UGHT STANDARD
CafrE) EXISTING STREET LIGHT
t
45-010
N
N
N
O
(0
0)
U
W
N
O
W
V
160' TESCO
ESMT
STREET LIGHTING
EXHIBIT C
i
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, PHASE 2A-2
(D.0 E N0. 7111)
November 20, 2013 — SHEET 7
o. EX. SIGNBLADE
N
0,
v 0)
E{. TRAI_S OF 'OSSIL CREEK,
PH. 2A-1
01
Called: 35.285 Acres
Pulte Homes of Texas, L.P.
Doc. No. D212269394
D.R.T.C.T.
SCALE: 1 "=150'
JBI Partners, Inc.
16301 Quorum Drive, Suite 200B
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
uti
IJ
1
1
1
1
1
1
O
CHERr LANC
LEGEND
EXISTING SIGNBLADE
N
W
a,
PROPOSED SIGNBLADE
nt
O
C0
J 01
w ru
O CO) C
A O
1
160' TESCO
ESMT
STREET SIGNS
EXHIBIT C-1
1
1
1
1
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, PHASE 2A-2
(D.0 E NO. 7111)
November 20, 2013 — SHEET 8
ENGINEER'S QUANTITY TAKE -OFF OPINION OF ESTIMATED COST
PREPARED BY JBI PARTNERS, INC. ON 11/14/2013
FORT WORTH, TEXAS
JBI PROJECT NO. PUL005
I ITEM NO. BID ITEM UNIT 6 7
3311.0261 8" PVC Water Pipe LF 3309
3312.3003 8" Gate Valve EA 11
3312.3002 6" Gate Valve EA 5
3312.0103 Connection to Existing 8" EA
Water Main 2
3312.0001 Fire Hydrant EA 5
3311.0001 Ductile Iron Water Fittings TON 2.4
3312.2003 1" Water Service EA 67
3305.0109 Trench Safety LF 3309
TRAILS OF FOSSIL CREEK, PHASE 2A-2
ITEM UNIT ITEM
TOTAL PRICE TOTAL COST
10 27 28 29 30 31 33 34 35 36 42
3331.4115 8" Sewer Pipe LF 673 758 623
3331.4116 8" Sewer Pipe, CSS Back: ill LF 40 20 40
3339.1001 4' Manhole EA 2 2 7
3339.1003 4' Extra Depth Manhole VF 7.3 2.3 20.4
3331.3101 4" Sewer Service EA 14 25 7
3301.0001 Pre -CCTV Inspection LF 713 778 663
3301.0002 Post -CCTV Inspection LF 713 778 663
3301.0101 Manhole Vacuum Testing EA 2 2 7
9999.0001 Connect to existing sanitary EA
sewer
3305.0109 Trench Safet LF
1 2
713 778 663
SHEET NO.
3,309 $17.00 $56,253.00
11 $1,200.00 $13,200.00
5 $800.00 $4,000.00
2 $400.00 $800.00
5 $2,600.00 $13,000.00
2.4 $5,800.00 $13,920.00
67 $700.00 $46,900.00
3,309 $0.10 $330.90
$148,403.90
2,054 $21.80 $44,777.20
100 $28.00 $2,800.00
11 $1,900.00 $20,900.00
30 $100.00 $3,000.00
46 $450.00 $20,700.00
2,154 $0.65 $1,400.10
2,154 $0.65 $1,400.10
11 $100.00 $1,100.00
3 $400.00 $1,200.00
2,154 $1.00 $2,154.00
$99,431.40
DOE 6928 II FP-012-031
H:\Projects\PULOOS\excel\(20131114) PUL005 CFA Quantity Matrix.xls CITY PROJECT NO. 02003
ENGINEER'S QUANTITY TAKE -OFF OPINION OF ESTIMATED COST
PREPARED BY JBI PARTNERS, INC. ON 11/14/2013
FORT WORTH, TEXAS
JBI PROJECT NO. PUL005
1 ITEM NO.
3349.5002
3349.5001
3349.0102
3137.0110
3349.1005
3349.1000
3349.1000
3341.1501
3341.1303
3341.0201
3341.0205
3341.0304
3305.0109
3213.0101
3211.0501
3211.0400
3213.0301
3213.0501
3317.0110
9999.0004
9999.0005
3125.0101
3471.0001
BID ITEM UNIT 6
15' Curb Inlet EA
10' Curb Inlet EA
4' Manhole Riser EA
Special Riprap (12" Thick
SY
RipRap)
30" Flared Headwall, 1 pipe EA
Headwall, Box Culvert (8'x4' EA
RCB)
Headwall, Box Culvert (6'x4' EA
RCB)
8' x 4' Box Culvert LF
6' x 4' RCB Curlvert LF
21" RCP, Class III LF
24" RCP, Class III LF
30" RCP, Class III LF
Trench Safety LF
6" Conc Pvmt SY
6" Lime Treatment SY
Lime TN
4" Conc Sidewalk SF
Barrier Free Ramp, Type R-1 EA
Special Riprap [3"-5"
SY
Grouted rock riprap
Street barricade LF
Connect to existing concrete LF
street pavement
SWPPP > 1 acre LS
Traffic Control Ls
SHEET NO.
TRAILS OF FOSSIL CREEK, PHASE 2A-2
ITEM UNIT ITEM
TOTAL PRICE TOTAL COST
10 27 28 29 30 31 33 34 35 36 42
2 2 $3,500.00 $7,000.00
2 2 4 $2,900.00 $11,600.00
1 1 $1,800.00 $1,800.00
318 56 1574 1,948 $44.00 $85,712.00
1 1 $2,400.00 $2,400.00
1 1 $8,100.00 $8,100.00
1 1 $7,800.00 $7,800.00
278 278 $292.00 $81,176.00
260 260 $227.00 $59,020.00
56 56 $39.00 $2,184.00
110 110 $44.00 $4,840.00
188 188 $55.00 $10,340.00
538 166 188 892 $1.00 $892.00
$282,864.00
878 2,526 2,685 2,187 2,187 10,463 $30.00 $313,890.00
959 2,717 2,889 2,341 2,341 11,247 $2.10 $23,618.70
14.4 40.8 43.3 35.1 35.1 169 $135.00 $22,815.00
358 890 336 1727 3,311 $2.10 $6,953.10
6 4 10 $550.00 $5,500.00
86 86 $43.00 $3,698.00
29 29 58 $55.00 $3,190.00
29 29 58 $10.00 $580.00
1 1 $3,809.90 $3,809.90
1 1 $700.00 $700.00
$384,754.70
DOE 6928 1 I FP-012-037
H:\Projects\PUL005\excel\(20131114) PUL005 CFA Quantity Matrix.xls CITY PROJECT NO. 02003
ENGINEER'S QUANTITY TAKE -OFF OPINION OF ESTIMATED COST
PREPARED BY JBI PARTNERS, INC. ON 11/14/2013
FORT WORTH, TEXAS
JBI PROJECT NO. PUL005
'ITEM NO. BID ITEM UNIT
3441.3101 100W HPS PC Lighting EA
Fixture
3441.3301 Rdwy Illum Foundation TY EA
1,2, and 4
Rdwy Illum Assmbly TY EA
8,11,D-25, and D-30
2" CONDT PVC SCH 80 (T) LF
3441.3002
3441.3011
3441.1410
NO 10 Insulated Elec Condr LF
TRAILS OF FOSSIL CREEK, PHASE 2A-2
SHEET NO. ITEM UNIT ITEM
TOTAL PRICE TOTAL COST
10 27 28 29 30 31 33 34 35 36 42
10 10 $230.00 $2,300.00
10 10 $1,120.00 $11,200.00
10 10 $1,605.00 $16,050.00
710 710 $9.01 $6,397.10
2130 2,130 $0.58 $1,235.40
$37,182.50
UNIT TOTAL
$952,636.50
H:\Projects\PUL005\excel\(20131114) PULOOS CFA Quantity Matrix.xls
DOE 6928 I I FP-012-037
CITY PROJECT NO. 02003