Loading...
HomeMy WebLinkAboutContract 45309COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary • Contract No. t4s3Oj WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: Developer Company Name: Wazir Corporation, Inc. Address, State, Zip Code: 11204 Harry Hines Blvd. I Dallas, TX 75229 Phone, E-Mail: (214)682-1426, faroogwazirali@gmail.com Authorized Signatory/Title: Mohammed F. Wazirali, President Project Name and Brief Description: Water, Sewer & Drainage Improvements to serve Trinity Liquor Store Project Location: South of Trinity Blvd., West of Euless Main St. Plat Case No.: FS-013-093 Plat Name: Trinity Addition Council District: 5 To be completed by Receivedby: jtaff \ii_ytev_A RFCEWER jAN Mis City Project No: 02175 CFA: 2013-088 DOE: 7121 1 Date: OFFICIAL RECORD CITY SECRETARY G �C, WORTHS TX NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1) X 2 Paving (B) , Storm Drain (B-1) X Street Lights & Signs (C)_ E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the depai linent having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Wortlt, its officers. servants, or ~levees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. If applicable, the City's obligation to participate (exclusive of front foot charges) in the cost of the Improvements shall terminate if the Improvements are not completed within two (2) years provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Trinity Liquor Store CFA No.: 2013-088 DOE No.:7121 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 12,300.00 2. Sewer Construction $ 4,675.00 Water and Sewer Construction Total $ 16,975.00 B. TPW Construction 1. Street $ 2 Storm Drain $ 11,800.00 3. Street Lights Installed by Developer $ TPW Construction Cost Total $ 11,800.00 Total Construction Cost (excluding the fees): $ 28,775.00 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 339.50 D. Water/Sewer Material Testing Fee (2%) $ 339.50 Sub -Total for Water Construction Fees $ 679.00 E. TPW Inspection Fee (4%) $ 472.00 F. TPW Material Testing (2%) $ 236.00 G. Street Light Inspsection Cost $ H. Street Signs Installation Cost $ - Sub -Total for TPW Construction Fees $ 708.00 Total Construction Fees: $ 1,387.00 Choice Financial Guarantee Options, choose one Amount (ck one) I Bond = 100% $ 28,775.00 'Completion Agreement= 100% / Holds Plat $ 28,775.00 (Cash Escrow Water/Sanitary Sewer= 125% $ 21,218.75 (Cash Escrow Paving/Storm Drain = 125% $ 14,750.00 'Letter of Credit = 125% w/2yr expiration period $ 35,968.75 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City d tt is aitiCal)/ Secretary, with the corporate seal of the City affixed, and said Deve instrument in quadruplicate, at Fort Worth, Texas this 20 r7 CITY OF FORT WORTH - Recommended by: Water Department • Wendy Chj/Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. 403e Date: ATTEST: Mary 4. .r ser City Secretary ATTEST: • a 1;111enk os Y t r , .e '4k .:): al ny r"I 4I N.1%%% 1I11111 III I • ¢I.. • . a.. I. 1 •. J SUN I. MULLENIX MY COMMISSION EXPIRES January 31, 2016 e. Signature (Print) Name: C,-*rfh) .Aelca I l &j 1- Title: J a -i per has exec day of ,/ u Transportation & Public Works Department tAJ Douglas Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager DEVELOPER: Wazir Corporation, Inc. (Print Title: Signature me: /tMkMM7F to A % tF rest e lFFNr N I RECO k 0f i ?oCRET1I►-, Y 8 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate rs ■ ►1 (Remainder of Page Intentionally Left Blank) 9 CHITTAMWOOD TRAIL PROJECT SITE PEACH TREE WAY d„ ,he „ „ • CONIFER LN TRINITY BLVD W= 0CC a 1.4 N SWEE 7 BAY DRIVE SCALE . NONE VICINITY MAP MP►PSC❑M 55-V Rd CRANE WO M WEL - flea' 1. oa - a.,W, asAene 2. limb elY e�f boa Mee(*YOleo TawMfine Meetth bee , war (WO 'It 3. Tole Ye be MNt et ,,epeM�,ee eeMeetay ay en) �saneseeit wajVio Sten ewe,a Webb r Nere, 490 t 1� -LF A a Weal �mmberr LOT 20 MOCK A sip, ox_I RR CAuCWAY/ A. ALUi N0. 337 // WW TRINITY BOULEVARD fit WORT-p_Ym) - SBiE SICi obit EI01' IM1r( P)ntRE) ormeor FAMICId 8 m'.saw atop 58704 _4r Jot 4 twL rev, fa re _ aAna,. _ _�2r au1wa tat _ Pat MI fun UMW aerie aw 040 1WWKIIN WOOD SURVEY A881PA.'T NO. /690 -y �g_ "1 LOT 23 BLOCK A G0'2I0' T. WIC O WIMO Ca rM6R LOT 24 BLOCK A LOT 1 BLOCK 1 109,972 S0. Fr. • MINIMUM FINISH FLOOR ELMATON-019.0' In COW If Oalwnen WSW Let Ira THE mei M0IWNLM F. WADMLI MO MR ASI4 S. WA2IP.0 b1 tici], Pa Ion a.R./LCT. 165.771 St Et, 3.874 ACRES 25 BLOCK A -8 5.7511201E 447.93' . SOflw as 1 s726.72' s4 Nyge Pleb54 b 1a 4p l InIO ) n eta be no) il NOLO olt11 ' termer Iltil Ina \ Ion O WA'Ir Ire wed mew Aa�A IR Aar 24aMy Nq i'Y01 rnaoar Pldt-d P`�` Iot1t N ,AA CAW SAC "mat ea a 1E B{ IC 100dM0' CHAMPION OPERATING PARINFRSNP, LTD. wL I2tw, P6 aw MOAT. $mrg CRCOd ADOmON CM A Wu 404E PA,/ILT. U1D� r- LOT 2r rain BLOCK 1 80,936 SO. FT. 1.109 ACRE Nast NI aawsal SITESmeal FORY11wb2Mr Ibex 1. MO at a MM/.Ta tsar orwr worm WE(9 1 nsD100a170 ft. TIN IDT wr CaA IMMO iI LOT 25 CLOCK A p3 I (ttset b ZZZ W.018141f1 .-ygg g i 14,IL MwIP ao-10714 vet p-24 Pala AMOS WIDAINT M 1 -.11mn__nb_71 BO? A Pat oOPP fib Ma Pun IR WC 130 Sat rs tt ,RA it r, sin' TS 4n. dw-'I w Natw LOT 30 DWC( A BLOCK A BLOCK A 14-1 Agar. t1PntPaTAL a6T. [WMT. Saber./ _ SWEET BAY DRNE iMca'0Y o1ael .w Ott NCM-V--Y) 7t' IOW a. 4 wart be tux 104e NOT@ *star / W0Mwvlr beat W. TM City of fort Worth Me an ordinance MnplomeMing the coeeesmul and collection of rotor ant oaten* Impost We the total owed aseeeeed Is w W onnd MN dote of this plat apNiadm, based upon ShMduk, 1 of Po Impact fee ordinance In effect as m the dole of be plat The amount to M collected N d.larmiod under Schedule II of said ordham% and Womb 01 on the dote a building awe Is Issued, o on be oomnelbn dole. 1* to the municipal wily and/or wasbPMer system. 6111041 MY PM ulriy. Ineludtn* V1. City al Fort Wort, shall tan Ind ngall1t to move and bap rimed all or part m any Building, fence. We. Mwb. other 7,. h Or Improwm t vhlah In any r% adaMen or Intadoro with Ind be awtn.11 .M 111011'tn obt anw %.y & Iicvve mo stems at QQ Dews to Ingress ad egress upon mot eamments for the purpow al MntNdlan, reconstruction, Inspection, patrolling, mololdning, dad addbp to or mnolm all or port of lb resprays sestina .11hoUt the n.abalty at my time of curb tot 9wlrmmiipn(bn of anyan. The y at Fort WMh hay an ordinance Implamendng the mwwmnt and collodion of tmuponalbn Impost lees. The bed amount ennead I• wlabl.h.d on the opprovol dale of this plot application, bind upon SahadM. 1 of the topCol:I fee orb pones In dtsnt as of the dab o1 to plot The ampuM to M m en tl N ate a bud under Sahsdule 2 m aald ---anal h Drams ydo. a Ua dale a building p.nn0 b Innd. A sib drainage rudy, showing allomane. with Ow approved !widow drainage Ma, may be requgd Wort ay building pwmll wN M Issued an a Pie ON (a boding plan In ar batman nay M adequate) If the site dew not aMrm. than a drtPop. stud/ may bs round along rot a CFA far any robbed draMaa, pro.w7an nd use aired owner shag submit a totter to the Orakmen nt afn'Traneponelbbn and Public Wake slating war n.sv that a Ma Drabaa. Study .N M rsalind before any pamlt Is Wood. The amend armor .WInform each buyer of tot some. Gnbtm9at PrptlW.Onr ra.,WIb No permanent budln�pps or elalur.• Moll M conducted won at oils*, or pidl.d rate. eoru[a y weer, drainage ao. dams, cone or other ugliy .a.6 t of any type Sb4wdb on required ad)ownt to bob sides of ad public and prate duets. In cadamence with the P Sidewalk Pc&y per *City Umlaa md DsaM gn Standa'. P ark.w Improvement such as curb E gutter, pavement tr-la drive approochw, sidewalks end Wimps blob may M nquk.d at lime of bulldog amlt I __ a parkway nnlL Mehitm The City of Fort WaM shag not M rwpomIMe to mebinlmce of private Webs. drl+ee, .m.nacy °WM easements, recmoUo, areas, OW .porn and dialaa facilities. ant ant tamers agree ta Ir4emnify one save h armless On City of Fat Worth Taw, from clam. canapes an Imes addng out of or from pnfomann el 1st obligoUas of sold owners end tool In Ps pictograph. Ing pmmits shag M Iund for any tot In this .ubdNtalan until an CFA or ether eewptsblt protdane an mod. from to When al cry oPpleebte outer, sash storm dub, allot Tights, adewalM, or palm kmrc,emanb; and approval le RM obtained from V10 cw of fort Werth. P V, Prlwb PAV. s HI M raqubd R wds prawn aae.ad. 00 P.S.I. PMocb pawwreducer who to M Undated altar each water mdo. No conuhrtNa Nell be bland wbldn the Dadpldn easement without the wrtltsn opprvel of th. director of banpartoll n and public works. In order to secure appwal. dMded .wterb9 plans and/or Mucks for P. Imgwramnt....SIOC oy to tot dlrwlor, wed be on/pared and submitted by th. arty (ins) wishing 10 construct MUM the fbedpldn Mery an.Uucuon Is pomtlted all fWMed Dar .bglbns shall M a minimum of two (2) MI above the Peed: Mn Bare flood devotion nulUne from Whyte d.Wapmml fallpaMdse whetted. Team mak. stream dour, aarr drdaeha g• aal baaenLYgq Citing or acute Minimal of Pis addhbn, wN realer unebetral.d of al( times and rill be maintained by the IndMduol lot wan whose tab an trceernd by, or ad)a.nt b, the drainage way. TM City of Fort Worth will not M responsible for the maintmonce, .melon oontuh and/or aperolbn of wed drainage woy.. Property ornen soil Mop Ps ed)aat dnlww ways IunSny their Innn&I@ clean oondlnoou, rso andebris, MIItt. clb thaor n have ills substances.lttf entry would result purpose of Inspecting the maintenance wartthe o .or the by property owners. Tho .' champ says an bi l Wined. sTh. C b f Frt Rater ondb. and/o teak ores don old ram 1 M The rt of Fad Nbrlh wn:m not n Rabb for ail eager swan; from the ceoun•mo of Ow phmmnn. war Or falser m arty . t N contained witned w W 01 goo we iM drntflns oway ar on • rho each tot h contained within the Doodpbkr easement Me o. Dhow on lot pill. CNmAM11000 IRAL \ TRINITY .Lou PtACN TREE WAY SWEET BAY NNE A(irrnO{ at NOW ThERE1ORE KNOW ALL MEN BY MERE PRESENTS' 1MT Mohamed F. %Mal and We, Mnf D. Wasfrod, Wing by nd went does hroby � w. pet designating the WW1 above :Marked real popery as tot 1 alp 2. Meek 1, TIM& WOMon, an addition b the City of Fat Worth, Tarrant County, Tan, and do hobby deScate la Ind public's as the struts. moments (and Pants) perm thereon. f. WVT9Wl Mbar 3. worm (Ownw (Owmr) 'Pursuant to Section 12.002 of the Teas Property Cods, as amended. I how obtained o,iglnol be e.NBcabs from mall tatting WI with lurNdk0bn aver each pawl of property preIn ark •ebdl4slon IndbpMg that no d.lkatant ad Worm tapes aw owed an the not poverty oNan is 1M oubjaat of the pot Cr rapid I how * Mnlltbd to the CI& of Fort Werth, Tomcod Carry, Teas for filing and recording with *Pt Taint Gay Diodes dflc.7 Blab mar. Two County Term WortMMRby wdsnW S aAhndb, tab en paay mOberst IMemrnd F. to me le M be when Can new 1 e M.aYv ll mawladBM to me Pal he mecrewel e .*masame ler the purer N mnWwdla Perin awe.i f end P tee mob Per in Wei Nem M,mew rap lab end NO al ebb. en the - Day ben tae I t iiiInon ipawr an SWI. al Tun county a/ empt wary me the 1Md*r.Mned Minn *limo, Npe, M P4 Penal* wand SSW 8. W.ir.d boa to me b tea w boors dose name l abroad to Ind Inwlnq belmnent and Wrewlodgod to m. that she awned The I0 m M 1st pwp..w and mareberetton Pain nprewd end M Pe aweny theme whew. ghat woke w hoot and seal of Wee on Ind Day m 2013. Mtory i C.nw tar rgbm 1''ORTWORTH _e�,,,_ CgtYLT t wrWelt LION This plot Is w414 only U naeed.a within Meaty (a) days after lets of pomnL I Plat lann2 Data 1 97 DEI OWNER MONWMN F. MEDIAL! MO MIL WPM? S. WAOMU 0621 MWM[EO CIRCLE PLWO, TX 75023-6300 214-602-1428 PREMED BY: KEETON NO. KEET M.S. P SURVEYIKAOSIW 2037 OALWOMIt GRAM PRNW. TENS 75050 REGISTERED PROFESSIONAL IMO SURVEYORS PRONG (072) 041 3 FM: (972) 047-0154 E-MAL 14440191249beelatalnilt OWNER'S OFFMFIMw• STATE OF TEXAS COUNTY OF TMMIT WHEREAS, Mggnngd r. BMW aid writ Ahem 6 taball, an P. Ws omen al a tract of land battled b the Franklin Woad Surrey, Abduct No IOW, located In un CIy of fort Worth. Tarrant County, tan. according to ins dad wonted In Volum 014032. Pon 0186, of the dad records of Tarrant County. Teas. and Ming mow particular& dumbed as follow. RIM61q et a •d X cut In concrete M be Unionisation of myth hest of Trinity Boulevard (120 foul ride dell -el -ray) rot the west Tea of Eden South Main Slant (vmbble teed right-of-way); TNDKIE 0. 071014' L. rib tot wet be of said Euless South Mole Street end tar up Ilm of ant Nadu' tract for a dtsbnce al 374.05 feet b a laurel 1/2 Inch Lon rod wits sop marked 'USA Inc. RPLS 2025' M be southeast earner m sold WSnIt tram and ths nenlnast comer of a coiled 1330 acre tract cogca rNMIn conveyed 146,, a13. Dud Records .4 Tarrant County, Town 1NDCE S. 51151'20' W- din the .wed Inc of said Matra and the nob line of said 1330 owe tract for a distance of 447.93 fop to a 5/6 bah Iron rod found el tot southwest comer of said Walrali tram and al rot .oMwat awe of Lot 19, Mon A, Slone Croak *ddua, an addgo to the City of Fat built wording b the Mat then*? worded In Gbto A, Side 5193, of the plot Hoards at Tarrant Canty, Tun; WOKE N. 01'1l'OD' W., with the rap line of mot MOW tram and Be cap llm of said Block A Stone Cask Adam. for a distance *4 47.22 Not to a 1/2 Inch Inn rod toad for coma; 1)OCE N. 0504'34' L. with the west gne of said Waging boot and the mot Me of *old Mark A Slone CrW. MOW. for a dMance of term bet to a 1/2 bah Mon rod M with rap marked 'XSC 4019' fa cem.r, 111DCCE N. 11'42'10- W.. with the wnt One of sold WniwO tract and the wet her al aM Block A Stone Crook Mdwon. for o distance of 107.08 bet to 0 1//22 Inch Iran red found for comer In the south be of *ant TI M& Boulevard; 11OCE S. 5704'22' C. well the north gm of said WSW! Pam and Ow south gm of veld Trinity Boulevard for a dlton . of 45460 fed to be POINT OF BEGINNING and containing 155,771 square NM or 3.874 cores of Imd Mae or Mn. Nob bo ahem msuura bearing an bawd on Taos Mate Ptob Zan 4202, to town fan State Plane to deed beadier a. Mown In Volume 14033. Pogo 166, Dead Ravens. Tarrant County, Tun, Rolot. 028'25' In o Gaunter dooMpe. dlrnua, SURVEYORS CFRIIFIGTF' That I, MS Om) Mean. a Registered Pnhwbnol tand Surmyor In the State of inc., do hereby corty gat I prepared this Plot from an Cabal on Ps ground Murry of the land, and the monuments Mown human win fund ad/or DIM'S under my personal npwlson In accordance dth the rd plat rap os and ngubtbn of the Cite Pia CwnNuMn al Ind City of Fait Worth. PRELIMINARY NOT TO 8E RECORDED ILA Rat (MwPnl awl Iasi Surveyor No. 4019 FINAL PLAT LOT 1 AND LOT 2, BLOCK 1 TRINITY ADDMON BEING A PLAT OF 3.874 ACRES OF LAND IN THE FRANKUN WOOD SURVEY, ABSTRACT NO. 1698 CITY OF FORT WORTH, TARRANT COUNTY, TOGAS DATE: MAY 30. 2012 REVISED: JULY 15, 2013 REVISED: JULY 26, 2013 REVISED: SEPTEMBER 18, 2013 REVISED: SEPTEMBER 25. 2013 CASE NO: ESS-013-093 MS PUT FILM IN: CAB. SUDS N0. INST NO DATE ATTIC CNAL DLE I 0 1 r. TRINITY' B03ULEVARD EXHIBIT "A" SCALE: 1" = 50' SED CURB INLET 5 EI G 13 G LJGTSB i ,00' y n 9 Z H D 0 P.P. J w 0 J w 0 Z Q o STA. 0+00 LINE W-1 INSTALLS 1- 12' X 10' WATER TAP WITH RESILIANT GATE VALVE N `APPROX. 24" WATER LINE • EX. SAN. SEWER M,H TOP =518.32 F L = 513.13 0+13 AND 0+54 LINE SS-1 = R.❑.W LINE. 0+00 LINE SS-1 CONSTRUCT 4' DIA. M.H TOP = 517.50 (EXISTING GRADE) F L IN =512.27 (6' PVC) F.L IN = 511.94 (10' VCP) F.L OUT =511.94 (10' VCP) STA. 0+32 LINE W-1 = R,❑ W LINE. • AFF1C GNAL GLE o EXHIBIT "A-1" SANITARY SEWER LINES SCALE• 1" = 50' `APPROX. 24' WATER UNE r. TRINITYBO,yLEVARD SED CURB INLET 5 A• ANC. N EX SAN. SEWER M.H TOP = 518.32 F L = 513.13 0+13 AND 0+54 LINE SS-1 R.O.W LINE. 0+00 LINE SS-1 CONSTRUCT 4' DIA. M.H TOP = 517.50 (EXISTING GRADE) F L IN =512.27 (6' PVC) F.L IN = 511.94 (10' VCP) F.L ❑UT =511.94 (10' VCP) EX. 0.50Y SLOPE OH EXHIBIT "B- t REMOVE EXISTING 10' STORM SEWER INLET AND CONSTRUCT 10' RECESS INLET SCALE: 1" = 50' :X. 10' RECESSED CURB INLET TO BE REMOVED w XTEND 24' RCP TO NEW INLET. MEDIAN PROP. 24' RCP AT 1.0X SLOPE all _INE STM-2 CONSTRUCT 10' RECESSED CURB INLET TOP = 518.75 FL =515.32 cI npc �!IIIII iIII1111idJl6hllldlldl'4hlliVdllllli hIIVdIIiIIVIYI G a' LASS ui1r PROP. 5' R.O.W DEDICATION • bt FUTURE DEVELOPMENT AREA K� I N t1 rn N 1 TRAFFIC SIGNAL o POLE WATER M.M. J W O J W O `APPROX. 24' WATER LINE UTILTY COST ESTIMATE JAHVANI CONSULTING ENGINEERS, INC. 2121 N. Josey Lane, Suite #100 Carrollton, TX 75006 Tel. 214-718-9469 E-Mail: jahvani@hotmail.com January 15, 2014 RE: Trinity Liquor Store Lot 1, Block 1, Trinity Addition Ft. Woi th, TX WATER LINE: Item No 1 2 3 4 5 6 PROJECT QUANTITY MATRIX Bid Item 10" water line 1" Meter & Service 10' Gate Valve 12' x10' Tapping Sleeve Traffic Control Testing SANITARY SEWER: Item No Bid Item 1 4' Dia manhole 2 8"SDR35 STORM SEWER: Item No I Bid Item Demo Exis ting sting Inlet 2 24" RCP 3 10' Recessed Inlet TOTAL PROJECT COST: $28,775.00 Unit LF EA EA EA LS LS Item Total 33 2 1 2 1 Unit Price $50.00 $1200.00 $2000.00 $1500.00 TOTAL WATER COST Item Total Cost $1 650.00 $2 400.00 $2 000.00 $3 000.00 $2 500.00 $750.00 $12,300.00 Unit Item Total Unit Price Item Total Cost EA 1 $3,955.00 $3 955 00 LF 15' $48.00 $720.00 TOTAL SANITARY SEWER COST I $4,675.00 Unit Item Total Unit Price LS LF 32 __:$9'0.:00 EA 1 $4000.00 TOTAL STORM SEWER COST Item Total Cost $4 920 00 $2 880.00 $4 000 00 $11,800.00