Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 45327 (2)
COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS City Secretary COUNTY OF TARRANT § Contract No. Lie3 3.11 WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: D.R. Horton — Texas, Ltd. Address, State, Zip Code: 6751 North Freeway, Fort Worth Texas 76131 Phone, E-Mail: (817) 230-0800/mpallen@drhorton.coin Authorized Signatoiy/Title: Don E. Allen, Assistant Secretary Project Name & Description: Water, Sewer, Drainage, Paving and Street Light Improvements to serve Emerald Park Phase 5 Project Location: North of Hawks Landing Rd. & Ersebrook Ct. Plat Case No.: FP-013-050 Plat Name: Emerald Park Phase 5 Mapsco: 20N CFA: 2013-092 DOE: 7138 To be completed by staff* Received by: (. RECEIVED jAt4 2 8 11314 Council District: 7 City Project No: 02195 Date: OFR©Uttd! , otoRD CITY 'LILIFIMTARY 1 h FT. VVCL TCi, TX NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A,) _X_, Sewer (A-1) _X_, Paving (B) _X, Storm Drain (B-1) X , Street Lights & Signs (C) X . E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fiilly executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers. servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YhARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Emerald Park Phase 5 CFA No.: 2012-092 DOE No.: 7138 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TRW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period Developer's Cost 226,898.30 249,185.00 $ 476,083.30 $ $ 531,209.09 177,260.60 48,755.50 $ 757,225.19 $ 1,233,308.49 $ $ $ $ $ $ $ 9,521.67 9,521.67 19,043.33 28,338.79 14,169.39 1,950.22 1,225.00 45,683.40 64,726.73 Amount 1,233,308.49 1,233,308.49 595,104.13 946,531.49 1,541,635.61 Choice (ck one). IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has exep ed this instrument in qu druplicate, at Fort Worth, Texas this I day of ._-; `e ,20 CITY OF FORT WORTH - Recommended by: Water Department Wady Chi t- w 7e-1--- abulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. AJ//4 Date: ATTEST: Miiy/J. Icy City Secreta ATTEST: Signature (Print) Name: Mark Allen Transportation & Public Works Department (mere Douglas �� . Wiersig, P.E. Director tJaJ Approved by City Manager's Office t-eanattia‘i Fernando Costa Assistant City Manager DEVELOPER: D.R. Horton — Texas, LTD., a Texas Limited Partnership By: D.R. Horton, Inc., a Delaware Corporation Its authorized agent TIP Print Name: Don Allen Title: Assistant Secretary Signature ()Oil ©Gf'.IJ` 7 ,(7J H) is 1l J t » �c-i ctjll ���, c- �u° iu Uu�'_ 9 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate V' V (Remainder of Page Intentionally Left Blank) PRO CT CATION 4 0 BONDS RANCH i VICINITY map RI 11F MIJJJND HASE 4B HSE PHASE 5 ,i-+f\*. PHASE 4A BNSF RAILWAY NO SCALE LOCATION MAP MAPSCO NO. 20N COUNCIL DISTRICT 7 OWNER/DEVELOPER: DR HORTON-TEXAS LTD. DFW WEST DIVISION 6751 NORTH FREEWAY FORT WORTH, TX 76131 TEL: (817) 230-0800 CONTACT: MARK ALLEN P.E. DATE: PROJECT #: DRAWN BY: CHECKED BY SHEET NO: 12.05.13 1978-05-03 M. SANCHEZ A. CASCO 1 OF 6 FINAL PLAT EMERALD PARK LOTS 2-19, BLOCK 17; LOTS 1-31, BLOCK 18; LOTS 2-56, BLOCK 19; LOTS 31-46, BLOCK 20; AND LOTS 6-25, BLOCK 22 BEING 28.159 ACRES OF LAND LOCATED IN THE HENRY ROBERTSON SURVEY, A-1259 CITY OF FORT WORTH TARRANT COUNTY TEXAS 140 RESIDENTIAL LOTS PRELIMINARY PLAT CASE NUMBER: PP-02-036 CASE NUMBER: FP— 013— 050 CASE NAME: EMERALD PARK PHASE: 5 EMERALD PARK PHASE 5 PLAT INFORMATION & VICINITY MAP S m m a mycoskie : mcinnis+ associates civil engineering surveying landscape architecture planning tbpe registration number. f — 2759 200 east obram arlington, texas 76010 817-469-1671 fax: 817-274-8757 www.mmotexas.com ■ 1-01 EMERALD PARK CC# D212283010 _ OPRTCT \ LEGEND DATE: PROJECT #: DRAWN BY CHECKED BY: SHEET NO: EXISTING 8" /A TER LINE • • • EMERALD PARK!,, CAB. A, SLIDES 10538-10539 PRTCT EXISTING 8" WATER LINE 8" WATER LINE FIRE HYDRANT GATE VALVE EXISTING 10" SERVICES WATER LINE 12.05.13 1978-05-03 M. SANCHEZ A. CASCO 2 OF 6 300 WAST BONDS RANCH ROAD 0 150 300 1 inch = 300 ft. of 20 22 EMERALD PARK —CAB. A, SLIDE 12949— PRTCT 600 ®i k EMERALD PARK PHASE 5 WATER EXHIBIT "A" m —' EXISTING SERVICE 1 EXISTING 8" WATER LINE mycoskie±mcinnisl associates civil engineering surveying landscape architecture planning tbpe registration number. f — 2759 200 east abram arlington, texas 76010 817-469-1671 fax: 817-274-8757 www.mmatexas.com 1 E1111I 1111 111111 IIIIIIIII !II I ■ EMERALD PARK CC/ D212283010 OPRTCT EXISTING 1511 SANITARY SEWER LINE LEGEND • DATE: PROJECT #• DRAWN BY: CHECKED BY SHEET NO: ♦ EXISTING 8" SANITARY SEWER LINE ♦ EMERALD PARK CAB. Al SLIDES 10538-10539 PRTCT EXISTING 8" SANITARY SEWER LINE SANITARY SEWER MANHOLE WITH CONCRETE COLLAR 8" SANITARY SEWER SANITARY SEWER SERVICE 12.05.13 1978-05-03 M. SANCHEZ A. CASCO 3 OF 6 300 9 e WEST BONDS RANCH ROAD 150 300 1 inch = 300 ft. EMERALD PARK PHASE 5 WASTEWATER EXHIBIT "A-1" 4. Cites 1.0 1,1 1s ?a ft aC I — t) At k EXISTING SERVICE ly 2s EMERALD PARK ," CAB. A, SLIDE 12949 PRTCT 600 EXISTING 8J1 SANITARY SEWER LINE mm:a mycoskie "mcinnis associates civil engineering surveying landscape architecture planning tbpe registration number. f — 2759 200 east abram arlington, texas 76010 817-469-1671 fax: 817-274-8757 www.mmatexas.com 10.4 TYPE R-Y RAMP LEGEND DATE: PROJECT #• DRAWN BY CHECKED BY: SHEET NO: TYPE R-1 RAMP ,J // ,O I / �•, „, / )) EMERALD PARK'. CAB. A, SLIDES 10538-10539 PRTCT 29' B-B PAVEMENT, 6" CONC., 50' ROW 12.05.13 1978-05-03 M. SANCHEZ A. CASCO 4 OF 6 TYPE R-1 RAMP 300 • • J 7 J 0 150 I I 300 600 1 1 inch = 300 ft. 96 / ,a TYPE R-1 RAMP EMERALD PARK / —CAB. A, SLIDE 12949 PRTCT WEST BONDS RANCH ROAD EMERALD PARK PHASE 5 PAVING EXHIBIT "B" m m a mycoskie-: mcinnis associates civil engineering surveying landscape architecture planning tbpe registration number. f — 2759 200 east abram arlington, texas 76010 817-469-1671 fax: 817-274-8757 www.mmataxas.com EMERALD PARK !�, CC{ D212283010 OPRTCT se EX. 8'X5' CULVERT EX. 42" RCP LEGEND DATE: PROJECT #: DRAWN BY CHECKED BY SHEET NO: 5.7 • • z 40 4) 4? • INLETS a, .m J0 sew 15" CURB INLET PARK CAB. A, SLID DS10538-10539 30" RCP PRTCT 39" RCP \ EX. 5'X3' RCB STORM SEWER LINE EX. 21 STORM MANHOLE CURB INLET 12.05.13 1978-05-03 M. SANCHEZ A. CASCO 5 OF 6 300 0 150 300 1 inch = 300 ft. 4'X3' „,RCB 4 ,J 14 /J 36" RCP 8 1 15" CURB INLET ® „ /o 5'X3' RCB / 4 EMERALD PARK RCP CAB. A, SLIDE 12949 PRTCT 1 1I 0 UST BONDS RANCH ROAD EMERALD PARK PHASE 5 STORM DRAINAGE EXHIBIT 2J mm a 600 mycoskie mcinnis =-associates civil engineering surveying landscape architecture planning tope registration number. f — 2759 200 east abram arlington, texas 76010 817-469-1671 fax: 817-274-8757 www.mmatexas.com 1. llllll 1 l l EMERALD PARK CC# D212283010 OPRTCT LEGEND DATE: PROJECT #: DRAWN BY: CHECKED BY: SHEET NO: EMERALD PARK'!_, CAB. A, SLIDES 10538-10539 PRTCT STREET NAME SIGNS STREET LIGHTS EX. STREET NAME SIGNS EX. STREET LIGHTS 12.05.13 1978-05-03 M. SANCHEZ A. CASCO 6 OF 6 300 0 150 300 600 1 inch = 300 ft. 2A414 EMERALD PARK CAR. A, SLIDE 12949 PRTCT Id !Q 14 ly Jp rit to 401 WEST BONDS RANCH ROAD EMERALD PARK - PHASE 5 STREET LIGHTS AND SIGNS EXHIBIT "C & C-1" Jp 422 zr mrm3a mycoskie mcinnis- -associates civil engineering surveying landscape architecture planning tbpe registration number f — 2759 200 east abram arlington, texas 76010 817-469-1671 fax: 817-274-8757 www.mmotexos.com 1 1111 I 1111 111 l llll'J 11111111 111 11 III ■ SECTION 00 41 00 BID FORM TO: Q.R. Horton - Texas, LTD c/o Don Allen, P E 6751 North Freeway Fort Worth, TX Tarrat County, TX 76131 FOR: City Project No.: Units/Sections: 1. Enter Into Agreement 02195 U nit III: Water U nit II Samtay Sewer U nit V: Storm Sewer Emerald Park Phase 5 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the developer in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. - 2. BIDDER Acknowledgements and Certification 2.11 In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Developer (b) to establish Bid prices at artificial non- competitive levels, or (c) to deprive Developer of the benefits of free and open competition. G. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of Developer, a purpose of which is to establish Bid prices at artificial, non-competitive levels. d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: Water distribution, development, 12" diameter and smaller Sewer collection system, development, 8" and smaller 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 90 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work (and/or achievement of Milestones} within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Proposal Form, Section 00 42 43 c. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 d. Prequalification Statement, Section 00 45 12 e. Conflict of Interest Affidavit, Section 00 3513 `If necessary, CIQ or CIS forms are to be provided directly to City Secretary f. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below please enter the total bid amount for this project. 6.2 It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Total Bid $65134a:90. 7. Bid Submittal This Bid is submitted on Respectfully,submitttd By I-4\' 1,1 Title: r (Printed Name) ae's i D:�►'l l Company: Burnsco Construction, Inc. Address: 6331 Southwest Blvd. Benbrook, TX 76132 State of Incorporation: erm f7 Email: Phone: END OF SECTION by the entity named below. Receipt is acknowledged of the following Addenda: Addendum No. 1: Addendum No, 2: Addendum No. 3: Addendum No. 4: Corporate Seal: Initial Emerald Park Phase 5 UNIT PRICE BID Bidlist Item No Description SECTION 00 42 43 PROPOSAL FORM Project Item Information Unit l: Water 1-01 3305.0109 Trench Safety 1-02 3311.0001 Ductile Iron Fittings w/Restraint 1-03 3311.0261 8" PVC Water Pipe 1-04 3312.0001 Fire Hydrant 1-05 3312.0017 Connection to Existing 4"-12" Water Main 1-06 3312.2003 1" Water Service 1-07 3312.3002 6" Gate Valve 1-08 3312.3003 8" Gate Valve Unit II: Sanitary Sewer 2-01 3305.0109 Trench Safety 2-02 3331.3101 4" Sewer Service 3331.4115 8" Sewer Pipe 2-03 2-04 3331,4116 8" Sewer Pipe, CSS Backfill 2-05 3339.0001 Epoxy Manhole Liner 2-06 3339.1001 4' Manhole (Up to 6' depth) 2-07 3339.1003 4' Extra Depth Manhole 2.08 9999.0001 Connect to existing 2-09 9999.0002 TV Inspection Unit V: Storm Drain 5-01 0241.4401 Remove Headwall/SET 5-02 3305.0109 Trench Safety 5.03 3305.0112 Concrete Collar 5-04 3341.0302 30" RCP, Class III 5-05 3341.0309 36" RCP, Class III 5-06 3341.0312 39" RCP, Class III 5-07 3341.1001 3'x2' RCB 5-08 3341.1101 4'x2' RCB 5-09 3341.1102 4'x3' RCB 5.10 3349.1201 51x3" RCB 5-11 3349.0002 5' Storm Junction Box 5-12 3349.5002 15' Curb Inlet 5-13 0241.0100 Remove Sidewalk 5-14 3213.0301 4" Concrete Sidewalk 5-15 9999.0007 Connect to existing RCB 5-16 9999.0008 Demo and extend existing headwall 5-17 9999.0009 Grout and abandon pipe in place 5-18 9999.0010 Remove & Replace Conc. Pavement 5-19 9999.0011 Connect to Existing Curb Inlet 5-20 9999.0012 Remove Sediment & Regrade Ex. Eischarge Channel 5-21 9999.0013 Re -stripe New Portion of Parking Lot Bidder's Application Specification Section No. Unit of Measure . Btd,Quantity 33 05 10 33 11 11 33 11 12 33 12 40 33 12 25 331210 33 12 20 33 12 20 33 0510 33 31 50 33 11 10, 31 20 3311 101 31 20 33 39 60 33 39 10, 33 3910, 02 41 14 33 0510 330517 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 49 10 33 4910 33 49 20 02 41 13 32 13 20 33 31 12, 33 33 31 12, 33 33 39 20 33 39 20 SUMMARY END OF SECTION LF TON LF EA EA EA EA EA LF EA IF LF VF, EA VF EA LF EA LF EA LF LF LF IF LF LF EA EA EA SF SF EA EA LS SY EA LS LS 4484 0.93 4484 5 3 139 5 10 4350 139 4052 296 . ...11_. 25 42 2 4350 t1 4912 3 78 60 141 22 184 100 327 1 6 393 393 2 1 Bidder's Proposal Unit Price $0.60 $8,750.00 $18.10 $2,900.00 $500.00 $740,00 5810.00 $1,200.00 UNIT ITOTAL $1.00 5540.00 $23.00 530.50 $185.00 $2,200.00 $100.00 $300,00 $1.30 UNIT II TOTAL $1,000.00 $0.50 $500.00 $62,00 $80,00 $95.40 $119,00 $139.00 159.00 187,60 3,450.00 3,700.00 1.00 5.00 500.00 4,600,00 1,500.00 90,00 250.00 1,700,00 1,000.00 UNIT V TOTAL UNIT t TOTAL J UNIT 11 TOTAL UNCr V TOTAL TOTAL BinJ Bid Value $2.690.40 $8,137,50 $81,160,40 $14,500.00 $1,500.00 $102,860.00 $4,050.00 $12,000.00 $226,898.30 $4,350.00 $75,060.00 $931196.00 $9,089.00 $2,035.04_ $55,000.00 $4,200.00 $5,555.00 $249,185.00 $1,000.00 $456.00 $1,500.00 $4,836.00 $4,800.00 $13,451.40 $2,618.00 $25,576,00 $15,900.00 $61,345.20 $3,450.00 $22, 200.00 $393.00 $1,965.00 31,000.00 $4,600.00 31,500.00 $7,470.00 $500.00 $1,700.09 $1,t)00.00 $177,260.66 $226,898.30 $249,185.00 $177,260.60 $653,343.90 TO: D.R. Horton - Texas, LTD c/o Don Allen, P.E. 6751 North Freeway Fort Worth, TX Tarrat County, TX 76131 FOR, City Project No.: Units/Sections: 1. Enter Into Agreement 02195 Unit III: Paving SECTION 00 41 00 BID FORM Emerald Park Phase 5 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the developer in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Developer (b) to establish Bid pnces at artificial non- competitive levels, or (c) to deprive Developer of the benefits of free and open competition. G. "collusive practice" means a scheme or arrangement between two or more Bidders with or without the knowledge of Developer, a purpose of which is to establish Bid prices at artificial, non-competitive levels. d. 'coercive practice' means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3, Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: Concrete paving construction/reconstruction (10,000 SY and greater) 4. Time of Completion 4.1, The Work will be complete for Final Acceptance within 35 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. -414 t 5 ktmettc tau.aas> re St orva - tertrit tea,( i r 20 IA., 4 2 Bidder accepts the provisions of the Agreement as to liquidated damages in t eli event of failure to complete the Work {and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Proposal Form, Section 00 42 43 AN t Lu- L#q- Co liekeA bJ f', Lra 45.76614. 1204104 na, c. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 d. Prequalification Statement, Section 00 4512 e. Conflict of Interest Affidavit, Section 00 3513 `If necessary, CIO or CIS forms are to be provided directly to City Secretary f, Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below please enter the total bid amount for this project. 6 2 It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject fdo verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Total Bid $531,209.09 7, Bid Submittal This Bid is submitted on Respectf ubmitted, By &im-o 4 . alitA/$/4 (Printed Name) Title: _Piee5/Dvr Company: L.H. Lacy Company, LTD Address: 1880 Crown Road Dallas, TX 75234 atiatif2 4 20/5 by the entity named below. P State of Incorporation: Email. Est G Stacy, co,,K, Phone: t14 ta'7'0144 END OF SECTION Receipt is acknowledged of the following Addenda: Addendum No. 1: Addendum No. 2: Addendum No. 3: Addendum No. 4: Corporate Seal: Initial Emerald Park Phase 5 UNIT PRICE BID Bidlist Item No. Description SECTION 00 42 43 PROPOSAL FORM Project Item Information _ Unit III: Paving 3-01 3211.0400 Hydrated Lime (36 LB/SY) 3-02 3211,0501 6" Lime Treatment 3-03 3213.0103 6" Cone Pvmt 3-04 3-05 3-06 Bidder's Application Specification Section No. Unit of Measure Bid Quantity 32 11 29 32 11 29 32 1313 3213.0501 Barrier Free Ramp, Type R-1 9999.0002 Remove Existing Barricade 9999.0003 Connect to existing pavement header 32 13 20 TN321 SY_ 17853 SY v 16740 EA EA EA 10 4 4 Bidder's Proposal Unit Price $138.81 _ $2.14 $26.10 $974.67 $106.50 $339.74 Total Bid Bid Value $44,558.01 $38,205.42 $436,914.00 $9,746.70 $426.09 $1,358,96 5531,209.09 TO: D.R. Horton - Texas, LTD do Don Allen, P.E. 6751 North Freeway Fort Worth, TX Tarrat County, TX 76131 FOR: City Project No.: Units/Sections: 1. Enter Into Agreement 02195 Unit IV: Street Lights SECTION 00 Al 00 BID FORM Emerald Park Phase 5 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the developer in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this ©id and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond, 2.2. Bidder Is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2,3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and Is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a, "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice' means an Intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Developer (b) to establish Bid prices at artificial non- competitive levels, or (c) to deprive Developer of the benefits of free and open competition, c. "collusive practice" means a scheme or arrangement between two or more Bidders with or without the knowledge of Developer, a purpose of which is to establish Bid prices at artificial, non-competitive levels. d. coercive practice' means harming or threatening to harm directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Roadway and pedestrian lightning 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 21 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a, This Bid Form, Section 00 41 00 b. Proposal Form, Section 00 42 43 c. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 d. Prequalitication Statement, Section 00 45 12 e. Conflict of Interest Affidavit, Section 00 35 13 'If necessary, CIQ or CIS forms are to be provided directly to City Secretary f. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete tho Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. 6.2. It is understood and agreed by the Bidder In signing this proposal that the total bki amount entered below is subject to verification and/or modification by multiplying the unit bid prices For each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Total Bid 7. Did Submittal This Bid is submitted on Respectfully su4fn}itted,; By Title: Company: Independent Utility Construction, Inc, Corporate Seal: Address: 5109 Sun Valley Drive Fort Wroth, TX 76119 r„J/ - I (� (� ( by the entity named below. (Printed Name) !Receipt is acknowledged of the following Addenda: !Addendum No. 1: (Addendum No. 2: (Addendum No. 3: +Addendum No. 4: State of Incorporation: Email: / +r' Phone: e / END OF SECTION Initial Emerald Park Phase 5 UNIT PRICE BID Oidlist Item No SECTION 00 42 43 PROPOSAL FORM Project Item Intonation Bidder's Application Ilidder`s Pivotal Specification Scc*ion No. Unit of Measure Uhl Quantity Unit Price Unit IV; Street Lights 4-01 3441.3101 100W HPS PCS Lighting Fixture 34 41 20 EA 18 4102 3441.3301 Rdwy 'Hum Foundation TY 4 34 41 20 EA ...._. 10 4-03 9999.0004 2' Sch 00 PVC Conduit (T) 26 05 33 LF 850 4.04 9999,0005 NIOXlHW C 12 5, HHW Conductor 34 41 20 Lf• 2550 4-05 9999.0006 Furnish/install D-25 Street Light Polo 34 41 20 EA 18 ENO OF SECTION $222,00 $904.56 $6,01 $0,62 $1,210,44 Total Hid Hid Vibe $3,996.00 $16,282.00 $5,108.50 $1,501.00 $21,787.92 548,755.50