CHANGE ORDER NO. 3 DATE: 813/12 D.0.E Nt} PROJECT NO. WTR-2010-200051
FROIECr DESCRIPTION: Riverside Wastewater Tretttment Plan Digester Sludge TreaGnen t,Removal a nd Disposal Project CITY SECRETARY CONTRACT NO.
42205 f
OIUGINAL CONTRACT AMOUNT
EXTRAS TO D ATE........................1..........,........I,.......1.,,....,$ :Luo
f
CREDITSTO DATE............................................,..................1
k
CONTRACT'COST TO DATE.................................................................................................1.....,.I...../..1............••.,.11.............,..................,..,,..1.1,...,1.,.......11.....
AMOUNTOF PROPOSED CHANCE ORDER/.................................................1.....I.,,,,...,...,.,/1.1.................II................,..r..................>...1.,..,,.,,.....,....1.............1$ D
REVISEDCONTRACT AMOt NT..................................................1.........1...,...1../.........,.....,..............1.........1....1........1...........1.,1.........1.....................1,...,.,......,...
ORIGINAL FUNDS AVAILADIX FOR CHANGE ORDERS....................................I.....................I.../...................1....I..1...........................I...f.a.......................1.$ 4
ADDrflONALFUNDING(IF NECESSARY).........l►..f..1,ifl.I..i■..I.il.....1..,..1►/..1.........•.... ....f./f or,......f...I................\....Ia...i..l..11......►f..f..\,1.1../lf...1a 1.....•� -0~
REMAIMNG FUNDS AVAll..Ak3LE HUR CHANGE ORDER..........,,.,.,.....I..................I...,.f>.....11.........,......,............f..........,».,............,...................................5 4�iS 50
IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL:
Complete all portions of tho contract wtwk as approved in the original contract documents and Change Orders No.I and No,2.
Schedule of cornplofon is revised per this change order as described in supporting docunmfing submitted to City by AU1 on August 3,2012(see Allachtnent 1},
Contract glwntities and unit costs remain unchanged.
MMBE participation goal for the project remains unchanged at 13.00°/6.
U. 'HIROM .0
A
Ay oo0DOQ6
AVY13H33S All!)
o°
04
n QQ 10033H Id1
��
❑ D � �
° °
0
AUeSW bey ..o .4- OF rj�161LIPAXI
coo❑ ❑❑ '' �` ''• it
0 00 0 0000
S e-retay �'P* RA
Ti*
K4#69 e
1 . . ■ t • . . . • to ■ f .�
JQT
TOTAL COST FOR CHANGE ORDER NUMBER 3 ��C�i r�,j•'�..... L: $ 0.00
It is nrtdentood aad agreed fhal the acceptance of this Changa Order by rho contractor canstitUtts an accord and xatisfactiaat
and represent*payment in full(both in brut and money)for all costa arNikg out of,or Inalderdal to,the Change Order.
0P.101NAL CONTRACT TtMS ADDITIONAL APPROV130 TOME 10 DATE A.PPROYI:+•D CONTRACT TIME&TO DATE AWITIUKAL TIME FOR TNiS CHANCE O"Ek
180 days 154 days 334 days 125 days �
COI`ITRAt±'t i R, DATE FMLD ENGINEER ��Fr! DATe 1
AUI Contractors,Inc,
$�� !4��. Tony Bosecker,P. ., d Ni chols,xn►c. � � ��
MMAGIDtACOMT.SUL r D DIMTOR MANAGING DRPT. ❑AI
Richard S.Tallm Pr ra —/;z
=RCI'ORICON )A' TFORt�lIiY VAJE
S.Frank a I a o s,;wor Asststan City Attom
CITY ;71
COUNCIL ACTION(IF REQUIRED: DATE
Fernand
�� o APPRGVF.Y) t3 DISAPPROVED a�7lIEA 11V a
FM 112311TADigester RcinovalWonstruction Contract Managotned\0angc Orda ACO#31Digmwr Sludge Removal Chatigo Ordcr No.3.doc i
t
0�3-2'J-1 2 A`1 1 :5 1 IN
FE E Practical results
MEMORANDUM R • - approaches
ir -1c C
■
■ _ - -
4055 International Plaza,Suite 200 • Fort Worth,Texas 76109 • 817-735-7300 0 fax 817-735-7491 www.freese.com
TO: Richard Talley, City of Fort Worth
FROM: Barbara Nickerson, Robert Chambers, P.G., Kimberly Buckley, P.G., Freese and Nichols
SUBJECT: Documentation for Change Order No. 3 Schedule Extension
DATE: August 6, 2012
PROJECT: Former Riverside Wastewater Treatment Plant Digester Project
The following portions of the project have resulted in additional time to date for the specified project:
Digester#8—Sludee Disposal at CSC Landfill
4/5/12—Republic Services approved waste characterization profile for Digester#8 sludge.
4/10/12—AUl delivered one truckload of Digester#8 sludge to CSC Landfill. Landfill indicated too much
free-liquid in truck. Hauling was halted.
5/29/12-Republic Services onsite to perform paint filter test.Samples passed test.
6/4/12 - ALII resumed hauling of Digester #8 sludge to CSC Landfill. Landfill restricted AUl to two
truckloads per day.
6/5/12--CSC Landfill called meeting to discuss moisture content of Digester#8 sludge arriving at landfill.
AUl halted hauling of Digester #8 sludge. Even though sludge passed the paint filter test, the landfill
could not accept it due to its consistency, which prevented them from being able to cover it with heavy
equipment.
6/21/12 — AUl resumed hauling of Digester #8 sludge to CSC Landfill and continued hauling through
7/19/12.Sawdust and cement slag was used to further solidify the materials.
Total additional time to date=55 days during first halt+ 16 days during second halt= 71 days
Digester#7-Dewatering and Treatment of Liquids
4/25/12 to 4/30/12 — Pumped, treated, and discharged 41,160 gallons (2 treated tanks) from Control
Room between Digesters#8 and#9.
4/30/12 --5/30/12 — Pumped, treated, and discharged 409,576 gallons (20 treated tanks) from Control
Room between Digesters#6 and#7 and the Pump House.
Note: Current contract includes 2,800,000 gallons (approximately 140 treated tanks of liquids). The
process requires on average 5 days to process each tank(treat,fill,sample, analysis, and discharge).
Total additional time to date for treatment of liquids from other structures= 29 days
w
dc
W
W
W
a
o�
W
Y
us
>
W
W
0 �G
W Y Ls
W ❑ W
W ❑ :.
W ;a
ce
w
W m
W b;s
LU
Ld
11 % 7 . 1
z-
�3e'
ka
C"
� W
L7 W .
Polk LA
0 0 a 0 4) ❑W W N W J Q) W W 4+ Q]
W, v -o ry
W +� L W +-+ 1 W �' •� L W �+ ` •-- L W � .� L
cc L7 (U � .N 0 a k a) — L Ln N vii N a m > OL > m > CL CL
0 ES 4a
❑ N 0 ❑ &A ❑ ❑ cn o ❑ %n ❑ Q N ❑ •—
+�+ C 42 C ate-+ C C E C "�
•
W
ifl �G
W
_u W
3
W
W
W
ui W
0
Z
71 11
LU
W �
m
W
MIA
� 3
0
e�
W
W r
LU
H
a
W
e
W
yj
!y L m M
3 :3 D M
�? H V W
off t!w 0
7 a o 0
> t
0
0 CA
(U E N .� W L W
WE s ❑ iz w 0
i
'.,fir e h:`.�� �'L >.•'•`.':;; <,.��. ;, �.,�' °4';r
r
-,w•
....... ONICH LS--
4055 international Plaza,Suite 200 Fort Worth,Texas 76109 817-735-7300 fax 817-735.7491 ■ www,ir►,,ese.com
August 3,2012
Mr.Richard Talley
Regulatory/Environmental Coordinator
City of Fort Worth Water Department
P.0. Box 870
Fort worth,Texas 76101-0870
Re: City of Fort Worth
Riverside Wastewater Treatment Plan Digester Sludge Treatment, Removal,and Disposal Project
City Secretary Project No.42705
F N I Project No. FTW11231
Change order Request No.3 (CO-03)
Dear Mr.Talley:
Enclosed please find a copy of Change Order No.3 for work to be performed by AUI Contractors,Inc.on the
above referenced project.
This change order does not change the overall contract value of$5,754,571.50. The purpose of this change
order is to extend the contract time for the project by 125 calendar days due to additional liquid treatment
and solid sludge processing time.
Sincerely, .
r
�le x r
J
gobert W. Chambers, P.G.
Principal
Enclosure
cc: File
FTW 112311CAUser+s1 02171V App0ata lLoca[\Microsomwindows\Temporary lntemet FIIes1 C.ontent.Dutlook\TVQIV5RB\Change Order No 3 Submittal
Letter.doc