Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 45341 (2)
COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. 531I WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: Developer Company Name: Beazer Homes of Texas, L.P. Address, State, Zip Code: 1750 Valley View Ln. Suite 200, Dallas Texas 75234 Phone, E-Mail: 972-250-5558, troy.radelat@beazer.com Authorized Signatory/Title: Troy Radelat, Division President Project Name and Brief Description: Water, Sewer, Drainage & Street Light Improvements to serve Willow Ridge Ph. 2A Project Location: East of Mesa Crest Dr. and Breeze Dr., Southwest of US 287 Plat Case No.: FP-013-049 Plat Name: Willow Ridge Estates Council District: 7 To be completed by staff: Received by: ` ) V in_ RFCE rrsn 0 4 Am City Project No: 02186 CFA: 2013-094 DOE: 7129 ‘yLa2---k— Date: k. [ r)H ifICLIIQED ORD BrI I OW 5 F�! r�,p Th [Jf-r7 f{_rj c1 11 ° 1_ �_J L �1 i1 / ti 9 %l` � NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. The following checked exhibits are made a part hereof: Water (A) X_, Sewer (A-1) D. X_, Paving (B) X Storm Drain (B-1) X_, Street Lights & Signs (C)_X_. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide at its expense all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused. in whole or in part. by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants. or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. If applicable, the City's obligation to participate (exclusive of front foot charges) in the cost of the Improvements shall terminate if the Improvements are not completed within two (2) years; provided, however, if construction of the Imps ovements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Project Name: Willow Ridge Ph. 2A CFA No.: 2013-094 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat !Cash Escrow Water/Sanitary Sewer= 125% 'Cash Escrow Paving/Storm Drain = 125% 'Letter of Credit = 125% w/2yr expiration period Cost Summary Sheet DOE No.:7129 Developer's Cost $ 250, 815.00 195,447.90 $ 446,262.90 $ $ 617,265.33 572,162.50 69,416.15 $ $ $ $ $ $ $ $ $ $ 1,258,843.98 1,705,106.88 8,925.26 8,925.26 17, 850.52 47,577.11 23,788.56 2,776.65 1,470.00 75,612.32 93,462.83 Amount 1,705,106.88 1,705,106.88 557,828.63 1 1,573,554.98 1 2,131,383.60 I Choice (ck one) IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said instrument in qua 1 ruplicate, at Fort Worth, Texas this 20 CITY OF FORT WORTH - Recommended by: Water Depaiment &if 4,4 Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. XJA, Date: ATTEST: Mary J. City Secre ary ATTEST: Sigature (Print) Name: eakctA. ?sem Title: V e 0 Title: veloper has executed this day of +4ialm" rneiv1/12447 Transportation & Public Works Department Douglas W Director iersig, P.E. Approved by City Manager's Office Fernando Costa Assistant City Manager DEVELOPER: Beazer Homes Texas, L.P. By: Beazer Homes Texas Holdings, Inc. Its general partner (Print Name: Na Tr Titi Presi I ©FFUWAL iEC CITY SECRETARY adeLt t Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included v rs v ix Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Dram hstimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 9 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE WILLOW RIDGE, PHASE 2A VS Q MESA o CROSSING ' /4i DRIVEcn l MESA o CREST z RIVE SITE TWISTING STAR DRIVE WAGLEY ROBERTSON ROAD - WEST HICKS ROAD VICINITY MAP (N.T.S.) D.O.E. NO. 7129 CITY PROJECT NO. 02186 WATER PROJECT NO. P265-6071502186-83 SEWER PROJECT NO. P275-7021302186-83 FILE NO. W-2285 HAWKS LANDING ROAD TEv.AS REGISIEREDE'3A'EERUN3 FIR\ 1F438 16301 Quorum Drive, Suite 2008 Addison, Texas 75001 Tel: 972,248.7676 Fax: 972-248-1414 October 16, 2013— SHEET 1 FINAL PLAT WILLOW RIDGE ESTATES FP # 013-049 BLOCK 4, LOTS 28-36; BLOCK 10, LOTS 49-58; BLOCK 12, LOTS 62-90; BLOCK 13, LOTS 1-15, BLOCK 14, LOTS 1-6 AND LOTS 39-42; BLOCK 15, LOTS 1-5 AND LOTS 45-47, BLOCK 16, LOTS 19-48 25.683 ACRES OUT OF THE JAMES RICHLY SURVEY, ABSTRACT NO. 1268 CITY OF FORT WORTH, TARRANT COUNTY; TEXAS BEAZER HOMES TEXAS, L.P. 1750 Valley View Lane, Suite 200 Dallas, Texas 75234 JBI PARTNERS, INC. 16301 Quorum Drive, Suite 200 B Addison, Texas 75001 D.O.E. NO. CITY PROJECT NO. WATER PROJECT NO. SEWER PROJECT NO. FILE NO. 7129 02186 P265-6071502186-83 P275-7021302186-83 W-2285 MAY 24, 2013 OWNERS/DEVELOPERS (972)250 5544 SURVEYOR/ENGINEER (972) 248-7676 Sheet 2 of 2 1ER.4SREGISIII2IDE"X INEE IM tiiC fF438 16301 Quorum Drive, Suite 2008 Addison, Texas 75(01 Tel: 972.248.7676 Fax: 972-248-1414 October 15, 2013— SHEET 2 EMMM SCALE: 1 "=300' • EDGE ESTATES v 5 5 w'A* c«c =OEH T O A.a� 120.18 run. R D1wvir nn.sD2w�3 39TNERS 2. cm CALLER (It AA W a: .; I ▪ A O TON Or INS £Axwrt TO Tx .s xcoaco x ✓ m USIMIT un omeaeisn. »o swx HATCHED cn IS Mwwa,TD H DOPMENT NO ` (SY SZ �.v.a enwiurj T • TEXAS REGISIERIDE DTERE tllQ1F-43S 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel: 972-248-7676 Fax; 972-248-1414 / / CONNECT TOF RIE OREE2E Imi,h EXISTING 12" WATER LINE DOE - 5308 ' y . Xu186 I I Y v • • • Ito•seARYou Kam ai1aoz twoouT w in? 4 LEGEND ImMEEME 1- k_ I_y I e i v a CONNECT TO 1 EXISTING 8" WATER LINE DOE - 5308 X- 18665 PROP. WATERLINE PROP. VALVE PROP. FIRE HYDRANT EXIST. WATER LINE PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE INDICATED. UPI ACC • LOT Id moan OWE SPACE Osia REAM se NG BR CH C CIS • 4R 13 • PART T omsassni ocyea DM0.Di'SS, Lit c M97741 NOW v+ow s DOcia D2icaiisseo NOR• OVECT OOKST 11.I0EPPOsta MC Ha o21e2024SE NCRIDOGNreWI o itu 0 o ^ `"%CCE.301 PGROS "ialva 40• SAPS uaw,.x rcnxc CG.ca.W, LP. Rcwr-�-*AT ra�.vwr oaimn ASZVOIT O . a) O isomer DOG NO.201109,"I mw O WC LP 7.¢oawas.w WATER EXHIBIT A PLANSHFOR THE, CONSTRUCTION- OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE WILLOW RIDGE, FHASE 2A (D.O.E NO.7129) October 15, 2013— SHEET 3 fl0CE MAWMAY ONE. SECTdv TAO CAR A SuED 13OM •Rt°• R ooiDnT NO. 02112 32»Hw. z LID CALLED 77.554 AONS IKE EAWJENT 10 IDE OTT OF M AS REC N OO DITT k& O?OSS51571. Al0 SHOW OOO�TtnO4 K MMDD.ED N / / / / I HI 33 • 2 2 • PRAIRIE BREEZE PANE 1 ( 1 nY f' I Y T" I L w 1 " I Le 14- I L- I e I I- II I a I- 1 - �A.= x . I - ail aCkaTME CAD A, 1223a CONNECT 8" SS LINE TO EXISTING SS MH. "ft II r e -1 �' -1 / CONNECT '4' SS MH II OVER EXISTING 8" SS % LINE. x DOE - 5308 7 P174-070174013507 - fr ' 141;" TIT SEPMalu FNMA/ ' o� ‘6.444•41 n 1 44. ts aIM RENoflfNi LW DOCUMENT NO 1l SCALE: 1 "=300' TEXAS REGISIEREDE \GMEERLNG BM IF-139 16301 Quorum Drive, Suite 2008 Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248.1414 DOE - 5308 P174-070174013507 OR 113 (r TE 1 MATA LEGEND PROP. S.S. LINE PROP. S.S. MH EXIST. S.S. MH EXIST. S.S. LINE PROPOSED SANITARY SEWER LINES ARE 8" UNLESS OTHERWISE INDICATED. as • • • TN. Taman WA NWT 10 at OW a NG BR..Na O 4 • CIE 23150 T DM20553393, T Of m o..sPC1/20.40 NC Doc NO 0205159741 /WI MOM w AS TWR$C BRANCNORCI£ 313d10 HONV Q o T. J NTAa 1 'SCT OW D2„ .M . DST SINCOL DOC. ND 05O8051,S1 IONT JAMAS PORTER ESTATE b EAU£ ucaNTAN fE1a.E CENMRO t-- AY ACA DAD,T EASEmINT DOC. RU D205330730 0-1590 WW1- DOC ND DIOS]S tU SANITARY - EXHIBIT A-1 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE WILLOW RIDGE, PHASE 2A D.O.E NO.7129) October 15, 2013— SHEET 4 I I' SEff�Y S�E croTOO CA& A. SLOE 12066 r.LG. s Ax12 32311W 2. L CALM 77.554 w warm Cr ,re 6A6osENr To Tht NOTE: Y FORT WiM AS RECOiW W 11 Rm %R „en OZO6.]81671. ND SHOW EA 16 MANDO.LRa aflurrwl r o _—_— ..6.,.A1taAarar:a3 I SCALE: 1 "=300' psi " Itt, TE'•AS REGSIIPmE` r4 D' : O FERN W-1 s 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel:972,248,7676 Fax: 972-248-1414 (6r Y➢lw6R usrnm Cr 6VAM¢e6 DOCOSENT 10 021122 PARTNERS. LID431 IS la Pa n ASSEPTAILE Litt works MI fret -PI 14 CO L 4 l- ootu'1 Y /r-!' `.. t_a.n1 lel aseassa a;a'S p nnnO2 • Manila SISSCEIS MOOR COI IFfiee CONCRETE STREET SECTIONOK1 1-01 PRAIRIE BREEZE OHN\E 1 I s—J L �� +_u 1 L" T LI • - s rl I-1 g1=1=HH1 TM. 1.01 0ABEEE Oat* r - Nc BRWCIC � nnil OE mar Er 4tr tP A r' • • • CtE PART Cf THE 25150 AM TRACT 0203354731 KC NO. 0205359741 DEVON �o�.tp NO.n10 R0aa.r6T „1E SCHOOL QOC. .012 66 52 Tt1 DOC Na 0305092658 VARY VO- 430P0PGia ESTATE 40. EAGLv AN MINE R ASNENT PoC tNO P2O 3i669730 SCrOOL 0 C. N o0naonn6r DEWS ENERGY *m CO, LP PAVING EXHIBIT B PLANS • FOR THE CONSTRUCTION OF WATER, SEwER PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS s:== TO SERVE WILLOW RIDGE, FHASE 2A (D.O.E NO. 7129) October 15, 2013— SHEET 5i- YELLOW SE�t F$ CM. A see 12uw _ • STWUCI E1E MINT • NSME B f1t°" RDCE 000Noit 1* 0211241319 u z Ero CALLED- 77.554 Aa(s SSY gam 1 Cr M t[T EA&&NiE10 THE DTY Of FORT M DOCUV011 NO.0205551571, AAD SHOW I4AT 4EO7 RCN, IS ABANDONED H / SCALE: 1 "=300' (or SWUM hillE.A100) TEXAS REGIS'IEREDEZNEEI FIR\IF-43S 16301 Quorum Drive, Suite 2008 Addison, Texas 75001 Tel: 972-248.7676 Fax: 972-248-1414 / / / la )_ / NENt R ;010. ,RAC Walla° 9.1.1.09 D'OCCWUI1i O 0211224 7 £ LT MRS 4- • INIEMEIEM ImMEME • PHIb UT LIVEwt C2d A� - ti229 I CJ X E..,mTTOEISEND &S COLLAR %T I (—1 CAN x l a 1 _l e a, L L1_1—_I_ I 20 ISO A TRACT PAR0205159731 NOR/NICEST 1100000E10 SCHOOL DIDECT 000 aM2,1�R59 E.CAIDSTICT 000 MI 05M2995 WIT Si Xi NE *WM ale IICAZOt in - v - - , LEGEND P ROP. INLET EXIST. INLET P ROP. STORM DRAIN EXIST. STORM DRAIN OCE RGs.LLG DOC 0535974/ NOR 02*N AS DEVON 0 mu€O lit ENDS PPEIINE . �P. RENT-Cr-WAY AGREEMENT DDOOC. NO. 07O1359/30 INDEPENDENTNO5DOG N'O, OEVOT 9x COy o213 STORM DRAIN LXHIbtI H-1 PLANS FOR Hit CONSTRUCTION OF WATER, - SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS - - TO SERVE WILLOW RIDGE, FHASE 2A - - - (o.o.ENo.7129) October 15, 2013— SHEET 6 SCALE: 1 "=300' 16301 Quorum Dore, Suite 200B Addison, Texas 75001 Tel:972-248.7676 Fax: 972-246.1414 I —I 1 a I I— I —I I SECN�pPHAE ME SECTION GU A SLUE 120a4 ruo. Ro¢ %esowl$L R2lD.a3 No 2. )ro DOOM O NiO D2113231 tALIFD- oaTIC EASENr TO THE WY Orr0N a lN EUat 2I31/1. AS RECOtE0 w DOCUUENORDD HER (S]eN3ANim a0 SHOWNVOCIVENT MO / I-• • PRAIRE BREE2"c,ORVE %T I L ` JL e I t4 —=-1 - _ I— I L x l JAI—- 1 1 1— JAI—x I2I— :Id _nil- " 1$I ,4 0L 7rt (T ^V,PAPJ N intVO4 ) vuo9 DOCOliENr NO. !: 122RODE FeSDENTIAL 20.469r hERS7 Em LEGEND LUMINAIRE EXISTING LUMINAIRE .V OW[STALES 12233 - -1 r -u a i r J PROPOSED SIGN BLADE PROPOSED STOP SIGN T I I�I=11a\ _L J L LOT 98 0,101 SPACE TOPE OANIO PART Cr 'DE 23.19)02o6a2Dt 59) 0413 D LLC DDCC. NO 020S3.59741 POI ION7aPt AS DOC. NO.qua TXNNG BRANCH CRCIE 0 IW !WEST O r nzei DOC. NO _0i58 . IISTRCT Da- NO, D2050229641 W [YOUNTAN PPELsvE R r NO. SEIENT WD DD2OS5923O CHSO� r DOS. O 25aa swami -or a mow No STREET SIGNS & LIGHTING EXHIBIT C PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE WILLOW RIDGE, FI-I ASE 2A (D.O.E NO.7129) October 15, 2013— SHEET 7 ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST REVISED BYJBI PARTNERS, INC. ON DECEMBER 13, 2013 FORT WORTH, TEXAS 1131 PROJECT NO. BZH007 WILLOW RIDGE, PHASE 2 A DOE 7129 X-22477 ITEM NO. 3311.0001 3311.0261 3311.0262 3311.0461 3312.0001 3312.2003 3312.2103 3312.3002 3312.3003 3312.3005 3312.0117 9999.0000 9999.0001 BID ITEM WATER Ductile Iron Water Fittings w/ Restraint 8" PVC Water Pipe 8" PVC Water Pipe, CSS Backfill 12" PVC Water Pipe Fire Hydrant 1" Water Service 1 1/2" Water Service 6" Gate Valve 8" Gate Valve 12" Gate Valve Remove Plug & Connect to Existing 4" to 12" Main 4" Irrigation Casing 6" Irrigation Casing SEWER 3301.0002 I Post -CCTV Inspection 3301.0101 'Manhole Vacuum Testing 3305.3004 112" Sewer Carrier Pipe 3331.4115 18" Sewer Pipe 3331.4117 1 8" Sewer Pipe, CSS Backfill 3339.1001 14' Manhole (all depths) 3305.0106 'Adjust rim elevations on existing 4' Manhole (all depths) 3331.3102 '4" Standard sanitary lateral with 2-Way Cleanout 3331.3314 'Locate and adjust existing sanitary service 0241.2013 'Remove and Dispose 370 LF of 8" sanitary pipe 0241.2001 RRemove and Dispose 13 existing services 9999.0002 (Connect to Existing Manhole 3317.0110 3341.0201 3341.0205 3341.0205 3341.0302 3341.0309 3341.0309 3341.0309 3341.1201 3341.1302 9999.0003 9999.0004 3349.0001 3349.0002 3349.0102 3349.5001 3349.5002 3349.7001 9999.0005 9999.0006 9999.0007 9999.0008 3211.0400 3211.0502 3211.0501 9999.0009 3213.0101 3213.0301 3213.0501 9999.0010 9999.0011 9999.0012 3441.3101 3441.3301 3441.3000 3441.1502 3441.3011 3441.1410 GRAND TOTAL STORM DRAIN (Special Riprap [8" - 12" rock riprap on grouted 6" bottom; 18" Deep) 1 21" RCP, Class III 124" RCP, Class III �24" RCP, Class IV 30" RCP, Class III 36" RCP, Class III 36" RCP, Class IV 42" RCP, Class III 5x4 Box Culvert 6x4 Box Culvert 7x3 Box Culvert 8x3 Box Culvert 4' Storm Junction Box 5' Storm Junction Box 4' Manhole Riser w/ Manhole Steps 10' Curb Inlet 15' Curb Inlet 4' Drop Inlet FW-O Headwall, 6x4 FW-O Headwall, 8x3 2 Stage inlet erosion protection Remove and dispose of existing headwall, rip rap, and mitered pipe to a clean joint on existing 36" RCP as per plans and City specs PAVING Hydrated Lime 8" Lime Treatment (35N/SY) 6" Lime Treatment (27It/SY) 7 1/2" Concrete Pavement 6" Concrete Pavement 4" Concrete Sidewalk Barrier Free Ramp, Type R-1 Concrete Header Type III Traffic Barricade Connect to Existing Pavemen STREET LIGHTS Install 150W Metal Halide Cobra lighting Fixture Foundation TY 4 Rdwy Ilium Assmby TY 8, 11, D-25, and D-30 Ground Box, Small, w/ Lid Apron 2" CONDT PVC SCH 40 (T) N0 10 Insulated Elec Condr SPEC NO. -UNIT 33 11 11 33 11 12 33 11 12 33 11 12 33 12 40 33 12 10 33 12 10 33 12 20 33 12 20 33 12 20 33 12 25 33 01 31 33 0130 33 05 24 33 11 10 33 11 10 33 39 10 33 05 14 33 3150 33 3150 02 41 14 02 41 14 3137 00 33 41 10 33 41 10 33 4110 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 39 10 33 39 10 33 39 10 39 49 40 39 49 40 02 41 14 32 1129 32 11 29 32 11 29 32 13 13 32 13 13 32 13 20 32 13 20 34 4120 34 41 20 34 41 20 34 41 10 26 05 33 34 41 10 TON LF LF LF EA EA EA EA EA EA EA LF LF LF EA LF LF IF EA EA EA EA SY- LF LF LF LF LF 'LF LF LF LF IF EA EA EA EA EA EA EA •.LS, TN •SY SY SY- SY SF EA IF LF LF EA EA EA EA LF IF ITEM TOTAL 3.75 $ 3,261 $ 98 $ 1,476 $ 7 $ 109 $ 1 7 11 4 2 40 40 UNIT PRICE 4,900.00 20.00 37.00 31.50 2,550.00 650.00 1,350.00 750.00 1,020.00 1,900.00 880.00 13.00 $ 17.50 UNIT TOTAL 2,949 $ 1.10 18 $ 140.00 20 $ 62.00 2,949 $ 31.00 140 $ 47.00 13 $ 2,670.00 5 $ 1,210.00 75 $ 437.00 34 $ 325.00 1 $ 740.00 i $ 4,450.00 1 $ 670.00 UNIT TOTAL 383 $100.00 16S $ 33.00 113 $ 36.00 53 $ 40.50 464 $ 47.50 272 $ 60.00 33 $ 67.00 635 $ 81.00 400 I $ 179.00 408 I $ 211.00 97 1 $ 229.00 702 I $ 248.00 2 I $ 2,750.00 1 ( $ 3,150.00 3 I $ 2,200.00 10 I $ 2,750.00 4 I $ 3,715.00 1 j $ 2,640.00 ' 1I $ 5,610.00 1 I $ 6,150.00 19 I $" 90.00 2 $ - 1,240.00 UNIT TOTAL 268.1 $ 132.00 - 6,936 $ 2.20 10,864 $ 2.20 6,580 $ 33.60 10,163 $ 29.00 1,893 $ 4.25 14 $ 850.00 161 $ 9.00 161 $ 29.00 70 $ 12.00 UNIT TOTAL 17 17 17 17 3203 9609 300.00 700.00 1,325.00 430.00 5.25 0.60 UNIT TOTAL ITEM TOTAL COST $18,375.00 $65,220.00 $3,626.00 $46,494.00 $17,850.00 $70,850.00 $1,350.00 $5,250.00 $11,220.00 $7,600.00 $1,760.00 $520.00 $700.00 $250,815.00 $3,243.90 $2,520.00 $1,240.00 $91,419.00 $6,580.00 $34,710.00 $6,050.00 $32,775.00 $11,050.00 $740.00 $4,450.00 $670.00 $195,447.90 $38,300.00 $5,445.00 $4,068.00 $2,146.50 $22,040.00 $16,320.00 $2,211.00 $51,435.00 $71,600.00 $86,088.00 $22,213.00 $174,096.00 $5,500.00 $3,150.00 $6,600.00 $27,500.00 $14,860.00 $2,640.00 $5,610.00". $6,150.00 $1,710.00i $2,480.00 $572,162.50 $35,389.20 $15,259.20 $23,900.80 $221,088.00 $294,727.00 $8,043.13 $11,900.00 $1,449.00 $4,669.00 $840.00 $617,265.33 $5,100.00 $11,900.00 $22,525.00 $7,310.00 $16,815.75 $5,765.40 $69,416.15. $1,705,106.88: C.tw-n."" ard 4":wV.. w.:i.=P\Copt ofo2aauI2nam»1CAQirinn noose DOE 32311 FP-013ue9 Off PROIECI NO. 02IES